Surname
|
Construction year
|
Total power (MW)
|
number
|
Type (WKA)
|
place
|
agriculture circle
|
Coordinates
|
Project planner / operator
|
Remarks
|
Breitungen wind turbine
|
1995
|
0.6
|
1
|
Tacke TW 600 (1 ×)
|
Winne
|
SM
|
50 ° 45 ′ 22 ″ N, 10 ° 21 ′ 19 ″ E
|
|
|
Cretzschwitz wind turbine
|
2015
|
2.35
|
1
|
Enercon E-92 (1 ×)
|
Cretzschwitz
|
G
|
50 ° 56 ′ 12 ″ N, 12 ° 6 ′ 24 ″ E
|
GoEn planning company
|
|
Diedorf wind turbine
|
1995
|
0.6
|
1
|
Micon M1500-600 (1 ×)
|
Diedorf
|
UH
|
51 ° 11 ′ 22 "N, 10 ° 17 ′ 32" E
|
|
|
Dippach wind turbine
|
1997
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Dippach
|
WAK
|
50 ° 55 '18 "N, 10 ° 5' 17" E
|
|
|
Dünwald wind turbine
|
2000
|
0.6
|
1
|
Enercon E-40 / 6.44 (1 ×)
|
Dünwald
|
UH
|
51 ° 19 ′ 25 ″ N, 10 ° 25 ′ 18 ″ E
|
|
|
Eliasbrunn wind turbine
|
1993
|
0.6
|
1
|
Micon M1500-600 (1 ×)
|
Eliasbrunn
|
SOK
|
50 ° 29 ′ 21 ″ N, 11 ° 35 ′ 28 ″ E
|
Martin Nürnberger
|
|
Frauenprießnitz wind turbine
|
1995
|
0.25
|
1
|
NEG Micon M750 / 250 (1 ×)
|
Frauenprießnitz
|
SHK
|
51 ° 1 ′ 21 ″ N, 11 ° 43 ′ 13 ″ E
|
|
another plant has already been dismantled
|
Hermsdorf wind turbine
|
1995
|
0.1
|
1
|
Fuhrländer FL 100 (1 ×)
|
Hermsdorf
|
SHK
|
50 ° 53 ′ 7 "N, 11 ° 50 ′ 28" E
|
GLOBUS market in Hermsdorf
|
erected on the A 9 immediately north of the Hermsdorfer Kreuz , the tower is designed in the operator's colors
|
Lucka wind turbine
|
2005
|
0.6
|
1
|
Enercon E-40 / 6.44 (1 ×)
|
Breitenhain
|
ABG
|
51 ° 4 ′ 17 ″ N, 12 ° 19 ′ 1 ″ E
|
Meuselwitz cast
|
|
Marksuhl wind turbine
|
1999
|
0.6
|
1
|
Enercon E-40 / 6.44 (1 ×)
|
Marksuhl
|
WAK
|
50 ° 54 '34 "N, 10 ° 13' 13" E
|
|
|
Mielesdorf wind turbine
|
1998
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Mielesdorf
|
SOK
|
50 ° 32 ′ 3 "N, 11 ° 52 ′ 16" E
|
|
|
Nickelsdorf wind turbine
|
1997
|
0.6
|
1
|
Vestas V44-600kW (1 ×)
|
Nickelsdorf
|
SHK
|
50 ° 58 ′ 31 ″ N, 12 ° 0 ′ 24 ″ E
|
|
|
Wind turbine Oberweißbach
|
1996
|
0.6
|
1
|
Vestas V44-600kW (1 ×)
|
Oberweißbach
|
SLF
|
50 ° 35 ′ 13 ″ N, 11 ° 8 ′ 11 ″ E
|
|
|
Pfersdorf wind turbine
|
1999
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Pfersdorf
|
HBN
|
50 ° 25 ′ 18 "N, 10 ° 40 ′ 34" E
|
|
|
Pontewitz wind turbine
|
1996
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Pontewitz
|
ABG
|
50 ° 57 ′ 29 "N, 12 ° 17 ′ 14" E
|
|
|
Remptendorf wind turbine
|
1999
|
0.6
|
1
|
Enercon E-40 / 6.44 (1 ×)
|
Remptendorf
|
SOK
|
50 ° 32 '12 "N, 11 ° 38' 21" E
|
|
erected next to the Remptendorf substation
|
Ringleben wind turbine
|
1997
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Ring life
|
SÖM
|
51 ° 6 ′ 26 "N, 10 ° 57 ′ 58" E
|
|
|
Rusitz wind turbine
|
2016
|
2.3
|
1
|
Enercon E-70 E4 (1 ×)
|
Rusitz
|
G
|
50 ° 56 '3 "N, 12 ° 3' 48" E
|
|
|
Steinsdorf wind turbine
|
1995
|
0.6
|
1
|
Tacke TW 600 (1 ×)
|
Steinsdorf
|
SLF
|
50 ° 34 ′ 30 ″ N, 11 ° 29 ′ 21 ″ E
|
|
|
Stobra wind turbine
|
1995
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Stobra
|
AP
|
51 ° 0 ′ 18 "N, 11 ° 33 ′ 35" E
|
|
|
Vollmershain wind turbine
|
1994
|
0.75
|
1
|
Micon M1500-750 (1 ×)
|
Vollmershain
|
ABG
|
50 ° 51 ′ 6 "N, 12 ° 18 ′ 46" E
|
|
|
Wernsdorf wind turbine
|
1995
|
0.5
|
1
|
Vestas V39-500kW (1 ×)
|
Wernsdorf
|
SOK
|
50 ° 30 ′ 16 "N, 11 ° 47 ′ 7" E
|
|
erected on the A 9
|
Dingelstädt wind turbines
|
1998 2014
|
4.6
|
2
|
Enercon E-82 E2 (2 ×)
|
Dingelstädt
|
EIC
|
51 ° 17 ′ 33 "N, 10 ° 16 ′ 32" E
|
Eichsfeldwerke
|
Repowering 2014 ( Enercon E-82 E2 (2 ×) instead of north wind NW 40/500 (1 ×))
|
Döbrichau wind turbines
|
2016
|
6.6
|
2
|
Vestas V126-3.3MW (2 ×)
|
Dobrichau
|
SHK
|
51 ° 3 ′ 11 "N, 11 ° 44 ′ 41" E
|
|
|
Grossenstein wind turbines
|
2017
|
6.8
|
2
|
Senvion 3.4M122 (2 ×)
|
Grossenstein
|
GRZ
|
50 ° 53 ′ 8 "N, 12 ° 12 ′ 46" E
|
meridian New Energies GmbH
|
Expansion planned
|
Wind turbines Hausbreitenbach
|
1999 2002
|
1.1
|
2
|
Enercon E-40 / 5.40 (1 ×) Enercon E-40 / 6.44 (1 ×)
|
Hausbreitenbach
|
WAK
|
50 ° 55 ′ 26 "N, 10 ° 6 ′ 25" E
|
|
|
Wind turbines Heukewalde
|
1994 1995
|
1.1
|
2
|
Enercon E-40 / 5.40 (1 ×) Micon M1500-600 (1 ×)
|
Heukewalde
|
ABG
|
50 ° 50 ′ 7 ″ N, 12 ° 16 ′ 14 ″ E
|
Thomas Günzel
|
|
Wind turbines Hörselgau
|
2008
|
4.0
|
2
|
Enercon E-70 (2 ×)
|
Hörselgau
|
GTH
|
50 ° 55 ′ 0 ″ N, 10 ° 34 ′ 3 ″ E
|
|
erected on the A 4
|
Markersdorf wind turbines
|
1997
|
1.1
|
2
|
Micon M1500-600 (1 ×) Micon M1600-500 (1 ×)
|
Markersdorf
|
GRZ
|
50 ° 44 '26 "N, 12 ° 10' 9" E
|
MA-WI wind power
|
|
Mehna wind turbines
|
1993 2004
|
1.75
|
2
|
Micon M530-250 (1 ×) Südwind S77 (1 ×)
|
Mehna
|
ABG
|
50 ° 57 ′ 23 "N, 12 ° 19 ′ 25" E
|
Provent
|
|
Meilitz wind turbines
|
1993 1995 1996
|
0.85
|
2
|
Micon M530-250 (1 ×) Vestas V44-600kW (1 ×)
|
Meilitz
|
SOK
|
50 ° 42 ′ 32 "N, 11 ° 43 ′ 8" E
|
Ute Nürnberger Windenergie
|
another Micon M450-200 was dismantled in 2014
|
Ponitz wind turbines
|
2004
|
3.0
|
2
|
Südwind S77 (2 ×)
|
Ponitz
|
ABG
|
50 ° 50 ′ 25 "N, 12 ° 25 ′ 35" E
|
meridian, Provent
|
|
Wind turbines lubricant
|
1996
|
0.31
|
2
|
Sea wind 20/110 (1 ×) Enercon E-30 / 2.30 (1 ×)
|
Lubricating seat
|
SOK
|
50 ° 43 ′ 6 "N, 11 ° 48 ′ 12" E
|
|
|
Auma wind farm
|
1996 1997 1998 1999
2016
|
7.8
|
6th
|
Enercon E-40 / 5.40 (3 ×) Enercon E-66 / 15.66 (1 ×) Tacke TW 1.5s (1 ×)
Vestas V126-3.3MW (1 ×)
|
Gütterlitz
|
GRZ
|
50 ° 43 '18 "N, 11 ° 53' 30" E
|
meridian, Boreas
|
|
Bucha wind farm
|
2002 2009 2012 2016
|
21.0
|
11
|
REpower MD70 (8 ×) Enercon E-70 E4 (1 ×) Nordex N100 / 2500 (1 ×) Enercon E-141 EP4 (1 ×)
|
Coppanz
|
SHK
|
50 ° 53 ′ 32 "N, 11 ° 30 ′ 26" E
|
meridian, Denker & Wulf
|
Prototype of the Enercon E-141 EP4; Expansion planned
|
Büttstedt-Struth wind farm
|
2001 2002 2003 2004 2008 2013 2014
|
62.7
|
35
|
Enercon E-40 / 6.44 (4 ×) Enercon E-66 / 18.70 (22 ×) Enercon E-70 E4 (4 ×) Enercon E-82 E2 (5 ×)
|
Büttstedt Effelder Struth
|
EIC UH
|
51 ° 14 ′ 30 ″ N, 10 ° 17 ′ 6 ″ E
|
GERES
|
|
Dorndorf-Martinroda wind farm
|
1998 2000 2007 2009 2010
|
21.7
|
16
|
BWU 43/600 (2 ×)
BWU 48/750 (6 ×) Vestas V90-2MW (8 ×)
|
Dorndorf Martinroda
|
WAK
|
50 ° 49 ′ 7 ″ N, 10 ° 3 ′ 35 ″ E
|
Natenco, Olaf Essig, ecopartner.dk
|
3xVestas V90-2MW (ecopartner.dk)
|
Eckolstädt wind farm
|
1996
1997 1999 2001 2002 2003 2012 2013 2014 2018
|
86.3
|
42
|
Enercon E-40 / 5.40 (8 ×) AN Bonus 1300/62 (1 ×) Enercon E-66 / 18.70 (2 ×) Enercon E-53 (1 ×) Enercon E-82 E2 (7 ×) Vestas V90-2MW (13 ×)
Vestas V112-3.45MW (10 ×)
|
Eckolstädt Pfuhlsborn Münchengosserstädt
|
AP
|
51 ° 2 ′ 34 "N, 11 ° 34 ′ 23" E
|
WP Eckolstädt, Energroen, Müller-Heineck, EDF EN , Energie in Bürgerhand Weimar
|
Wind park with solar field; In 2013 one Enercon E-40 / 5.40 was dismantled, then another Enercon E-40 / 5.40 ; Repowering 2018
( Vestas V112-3.45MW (10 ×) instead of AN Bonus 1300/62 (11 ×)); Expansion planned
|
Forstwolfersdorf wind farm
|
2000 2003
|
3.5
|
3
|
NEG Micon NM60 / 1000 (2 ×) GE Wind Energy 1.5sl (1 ×)
|
Forstwolfersdorf
|
GRZ
|
50 ° 43 ′ 26 "N, 11 ° 57 ′ 21" E
|
meridian
|
|
Förtha wind farm
|
1999 2002 2003
|
4.1
|
4th
|
DeWind D4 48/600 (1 ×) Enercon E-58 (2 ×) REpower MD77 (1 ×)
|
Förtha
|
WAK
|
50 ° 55 ′ 20 ″ N, 10 ° 13 ′ 10 ″ E
|
meridian
|
|
Frauenprießnitz-Wetzdorf wind farm
|
2001 2002 2003 2013 2016 2020
|
58.5
|
36
|
Frisia F56 / 850 (2 ×) NEG Micon M1800-750 (2 ×) NEG Micon NM52 / 900 (4 ×) NEG Micon NM60 / 1000 (2 ×) REpower MD77 (14 ×) Nordex N117 / 2400 (10 ×) Enercon E-103 EP2 (2 ×)
|
Frauenprießnitz Wetzdorf
|
SHK
|
51 ° 0 ′ 56 "N, 11 ° 45 ′ 58" E
|
wind7, wpd , Olaf Esig, meridian
|
Repowering planned for 2020 Repowering (2 × Enercon E-103 EP2 instead of 2 × Frisia F56 / 850 )
|
Frienstedt wind farm
|
2014
|
6.4
|
8th
|
Enercon E-53 (8 ×)
|
Frienstedt
|
EF
|
50 ° 56 '27 "N, 10 ° 55' 14" E
|
WP Frienstedt
|
|
Gebersreuth wind farm
|
2017
|
24.0
|
8th
|
Enercon E-115 (8 ×)
|
Gebersreuth
|
SOK
|
50 ° 25 ′ 49 "N, 11 ° 54 ′ 28" E
|
trianel
|
|
Geisleden wind farm
|
1998 2010
|
5.6
|
7th
|
Enercon E-53 (7 ×)
|
Geisleden
|
EIC
|
51 ° 21 ′ 42 "N, 10 ° 12 ′ 51" E
|
wpd
|
Seven Frisia F48 / 750 systems were built at the same location in 1998 , but were dismantled again between 2001 and 2002 due to technical errors
|
Göpfersdorf wind farm
|
1996
|
1.8
|
3
|
Vestas V44-600kW (3 ×)
|
Goepfersdorf
|
ABG
|
50 ° 54 ′ 11 "N, 12 ° 35 ′ 27" E
|
east wind
|
|
Greußen-Gangloffsömmern wind farm
|
2000 2002 2006 2007 2016 2020
|
41.9
|
17th
|
Fuhrländer FL MD77 (1 ×) Vestas V80-2MW (1 ×) Enercon E-82 (1 ×) Vestas V90-2MW (11 ×) Vestas V112-3.0MW (2 ×) Vestas V150-4.2MW (2 ×)
|
Greet Gangloffsommern
|
KYF SÖM
|
51 ° 12 ′ 8 ″ N, 10 ° 57 ′ 22 ″ E
|
meridian, GSW, Boreas
|
Repowering currently (2 × Vestas V150-4.2MW instead of 1 × REpower MD77 )
|
Großberndten wind farm
|
2003 2010
|
21.9
|
13
|
REpower MD77 (10 ×) Enercon E-82 E2 (3 ×)
|
Großberndten
|
KYF
|
51 ° 22 ′ 20 "N, 10 ° 42 ′ 0" E
|
wpd , WP Großberndten
|
|
Großenlupnitz wind farm
|
1999
|
1.8
|
3
|
AN Bonus 600/44 (3 ×)
|
Grossenlupnitz
|
WAK
|
51 ° 0 ′ 5 ″ N, 10 ° 23 ′ 13 ″ E
|
K + W wind power
|
an identical system has already been dismantled
|
Großvargula wind farm
|
2001 2009 2010 2011
|
36.0
|
22nd
|
REpower MD77 (16 ×) Vestas V90-2MW (6 ×)
|
Large vargula
|
UH
|
51 ° 7 ′ 23 "N, 10 ° 45 ′ 13" E
|
Boreas, WP Great Vargula
|
|
Hartha wind farm
|
1995
|
1.8
|
3
|
Micon M1500-600 (3 ×)
|
Hartha
|
ABG
|
50 ° 56 ′ 3 ″ N, 12 ° 15 ′ 3 ″ E
|
|
|
Heldrungen-Reinsdorf wind farm
|
2004 2016 2017
|
19.75
|
9
|
Enercon E-66 / 18.70 (5 ×) Enercon E-92 (2 ×) Enercon E-101 (1 ×) Enercon E-115 (1 ×)
|
Heldrungen Reinsdorf
|
KYF
|
51 ° 19 ′ 4 ″ N, 11 ° 15 ′ 0 ″ E
|
N.prior energy , Sabowind
|
|
Herbsleben wind farm
|
2002 2004 2010 2014 2015 2017
|
21.3
|
10
|
REpower MD77 (4 ×) Vestas V80-2MW (1 ×) Vestas V90-2MW (2 ×) Vestas V112-3.0MW (2 ×) Vestas V126-3.3MW (1 ×)
|
Autumn life
|
UH
|
51 ° 5 ′ 32 "N, 10 ° 49 ′ 14" E
|
Boreas, GSW,
|
Repowering 2017 ( Vestas V126-3.3MW (1 ×) instead of REpower MD77 (1 ×))
|
Hörningen wind farm
|
2001 2003 2006 2010
|
7.55
|
5
|
Enercon E-58 (2 ×) REpower MD77 (1 ×) REpower MM82 (1 ×) Enercon E-82 (1 ×)
|
Hörningen
|
NDH
|
51 ° 32 '7 "N, 10 ° 41' 26" E
|
meridian, ecopartner.dk
|
1xREpower MD77 (ecopartner.dk)
|
Hornsommern wind farm
|
2014
|
12.0
|
4th
|
Vestas V112-3.0MW (4 ×)
|
Hornsummer
|
UH
|
51 ° 12 ′ 32 "N, 10 ° 50 ′ 28" E
|
Boreas, Wind Power Thuringia
|
|
Hottelstedt wind farm
|
2000
|
5.2
|
4th
|
AN Bonus 1300/62 (4 ×)
|
Hottelstedt
|
AP
|
51 ° 2 ′ 0 ″ N, 11 ° 13 ′ 3 ″ E
|
Energy source
|
|
Hötzelsroda-Beuernfeld wind farm
|
2000 2002 2004 2005 2012
|
15.0
|
14th
|
AN Bonus 600/44 (1 ×) Enercon E-40 / 6.44 (2 ×) NEG Micon NM52 / 900 (2 ×) Enercon E-48 (3 ×) Vensys 82/1500 (6 ×)
|
Hötzelsroda Beuernfeld
|
EA WAK
|
51 ° 0 ′ 16 ″ N, 10 ° 22 ′ 18 ″ E
|
Boreas, Green Energy, ecopartner.dk, WP Beuernfeld
|
erected on the A 4 ; 2xNEG Micon NM52 / 900 (ecopartner.dk)
|
Immenrode wind farm
|
1998 2002 2014
|
16.2
|
8th
|
Enercon E-40 / 6.44 (1 ×) Enercon E-66 / 18.70 (1 ×) Enercon E-82 E2 (6 ×)
|
Immenrode
|
KYF
|
51 ° 22 ′ 31 ″ N, 10 ° 43 ′ 22 ″ E
|
Wind power Thuringia
|
Repowering 2014 (6 × Enercon E-82 E2 instead of 8 × Enercon E-40 / 5.40 )
|
Katzenberg wind farm
|
2004 2006 2007 2013
|
13.5
|
16
|
Vestas V52-850kW (14 ×) Enercon E-53 (2 ×)
|
Schwerborn Kerspleben Töttleben
|
EF
|
51 ° 1 ′ 21 ″ N, 11 ° 5 ′ 10 ″ E
|
Ostwind, EnerSys , WP Katzenberg
|
Expansion planned
|
Keula wind farm
|
1997 2002 2019 2020
|
16.8
|
10
|
NEG Micon NM43 / 600 (5 ×) DeWind D4 48/600 (2 ×) Vestas V150-4.2MW (3 ×)
|
Keula
|
KYF
|
51 ° 18 ′ 32 "N, 10 ° 32 ′ 9" E
|
wpd , wind7, PNE Wind, WKN
|
Repowering 2019 ( Vestas V150-4.2MW (1 ×) instead of Enercon E-40 / 6.44 (1 ×))
|
Kirchengel wind farm
|
1998 1999 2004 2016 2017
|
79.3
|
33
|
Frisia F48 / 750 (6 ×) Vestas V80-2MW (11 ×) Vestas V112-3.3MW (13 ×)
Vestas V126-3.3MW (3 ×)
|
Church angel wooden angel western angel
|
KYF
|
51 ° 18 ′ 10 "N, 10 ° 54 ′ 34" E
|
wpd , SeeBA, WKN, CEE
|
5 Frisia F48 / 750 dismantled in the course of repowering
|
Kirchheilingen-Blankenburg-Tottleben wind farm
|
1999 2000 2003 2004 2005 2009 2010 2012 2013 2014 2015 2016 2018
|
68.95
|
30th
|
Jacobs MD70 (1 ×)
Nordex N62 / 1300 (1 ×) Fuhrländer MD77 (1 ×) REpower MD77 (2 ×) Vestas V80-2MW (1 ×) Vestas V90-2MW (8 ×) Enercon E-82 (2 ×) Enercon E-82 E2 ( 1 ×) Vestas V112-3.0MW (4 ×) Nordex N117 / 2400 (5 ×) Vestas V126-3.3MW (3 ×) Vestas V126-3.45MW (1 ×)
|
Kirchheilingen Blankenburg Tottleben
|
UH
|
51 ° 11 '18 "N, 10 ° 43' 23" E
|
Boreas, GSW, ecopartner.dk
|
Repowering 2013 and 2015 (4 × Vestas V112-3.0MW and 2 × Vestas V126-3.3MW instead of 9 × Nordex N62 / 1300 and 2 × Jacobs MD70 );
Expansion planned
|
Kleinbrembach-Vogelsberg wind farm
|
2006 2009
|
16.0
|
8th
|
Vestas V90-2MW (8 ×)
|
Kleinbrembach
Vogelsberg
|
SÖM
|
51 ° 6 ′ 14 "N, 11 ° 15 ′ 28" E
|
ewz WP Kleinbrembach; ewz WP Vogelsberg
|
|
Kleinbrüchter-Großbrüchter wind farm
|
2016
|
16.8
|
7th
|
Nordex N117 / 2400 (7 ×)
|
Small broker large broker
Holzthaleben
|
KYF
|
51 ° 19 ′ 33 "N, 10 ° 37 ′ 40" E
|
|
|
Kleinfalke wind farm
|
2003
|
6.0
|
4th
|
REpower MD77 (4 ×)
|
Small falcon
|
G
|
50 ° 48 ′ 17 "N, 12 ° 9 ′ 2" E
|
wpd , Gewi
|
|
Korbußen wind farm
|
1999 2001
|
2.05
|
3
|
NEG Micon NM48 / 600 (2 ×) Vestas V52-850kW (1 ×)
|
Basket feet
|
GRZ
|
50 ° 52 ′ 28 "N, 12 ° 10 ′ 32" E
|
|
erected on the A 4
|
Kraasa-Naundorf wind farm
|
2012 2013 2015 2016
|
24.1
|
9
|
Enercon E-82 E2 (5 ×) Vestas V112-3.0MW (2 ×) Vestas V112-3.3MW (2 ×)
|
Kraasa Naundorf
|
ABG
|
50 ° 58 ′ 59 ″ N, 12 ° 16 ′ 20 ″ E
|
wpd
|
|
Kutzleben wind farm
|
2006 2015
|
32.0
|
14th
|
Vestas V90-2MW (10 ×) Vestas V112-3.0MW (4 ×)
|
Kutzleben
|
UH
|
51 ° 12 ′ 28 "N, 10 ° 51 ′ 24" E
|
Boreas, Volkswind , WP Kutzleben
|
|
Lindau wind farm
|
1993 1995 2003 2013 2015 2017
|
22.0
|
9
|
GE Wind Energy 1.5sl (1 ×) Nordex N100 / 2500 (7 ×) Senvion 3.0M122 (1 ×)
|
Lindau
|
SHK
|
51 ° 1 ′ 29 "N, 11 ° 54 ′ 21" E
|
meridian
|
Repowering 2013 and 2015 (7 × Nordex N100 / 2500 instead of 1 × Seewind 20/110 and 2 × Seewind 25/132)
|
Mihla-Neukirchen wind farm
|
2015 2016
|
24.4
|
8th
|
Enercon E-101 (8 ×)
|
Mihla Neukirchen
|
WAK EA
|
51 ° 3 ′ 8 ″ N, 10 ° 18 ′ 12 ″ E
|
juwi
|
Expansion planned
|
Möbisburg wind farm
|
2006
|
22.0
|
11
|
Enercon E-70 (11 ×)
|
Möbisburg Waltersleben
|
EF
|
50 ° 54 ′ 20 ″ N, 10 ° 59 ′ 19 ″ E
|
WP Möbisburg
|
erected along the A 4
|
Mohlis wind farm
|
2019
|
14.4
|
4th
|
Vestas V136-3.6MW (4 ×)
|
Nödernitzsch drugs
|
ABG
|
50 ° 54 ′ 21 ″ N, 12 ° 18 ′ 15 ″ E
|
juwi
|
|
Nentzelsrode wind farm
|
1998 2003 2014 2016 2017 2018 2020
|
45.3
|
18th
|
Enercon E-66 / 15.66 (5 ×) Enercon E-82 E2 (3 ×) Senvion 3.4M114 (1 ×) Enercon E-115 (8 ×) Enercon E-138 EP3 (1 ×)
|
Grove Uthleben
|
NDH
|
51 ° 26 ′ 5 ″ N, 10 ° 48 ′ 1 ″ E
|
WKN, wpd , PNE Wind
|
erected next to the repowering landfill 2017/2018 (1 × Senvion 3.4M114 instead of 1 × REpower MD77 )
|
Neukirchen wind farm
|
1998 2000 2002 2004 2007 2008 2013 2014 2016 2017 2018 2019 2020
|
58.05
|
28
|
Enercon E-40 / 5.40 (6 ×) Nordex N62 / 1300 (2 ×) Fuhrländer MD77 (2 ×) REpower MM82 (3 ×) Vensys 62/1200 (1 ×) Vensys 77/1500 (2 ×) Vensys 100/2500 (2 ×) Enercon E-53 (1 ×) Vestas V126-3.45MW (4 ×) Vestas V136-3.45MW (2 ×) Vestas V150-4.2MW (3 ×)
|
Neukirchen Utteroda
|
EA WAK
|
51 ° 2 ′ 11 "N, 10 ° 19 ′ 29" E
|
Boreas, Green Energy
|
Repowering 2018 ( Vestas V126-3.45MW (5 ×) and Vestas V136-3.45MW (1 ×) instead of Nordex N62 / 1300 (6 ×))
|
Oettersdorf wind farm
|
1997 1998 2002
|
2.1
|
3
|
NEG Micon M1800-600 (2 ×) NEG Micon NM52 / 900 (1 ×)
|
Oettersdorf
|
SOK
|
50 ° 35 ′ 35 "N, 11 ° 50 ′ 6" E
|
|
|
Ottenhausen wind farm
|
2007
|
16.0
|
8th
|
Vestas V90-2MW (8 ×)
|
Ottenhausen
|
SÖM
|
51 ° 12 ′ 11 ″ N, 10 ° 59 ′ 9 ″ E
|
Boreas
|
|
Pölzig wind farm
|
1996 2003 2014 2019
|
12.5
|
5
|
Vestas V52-850kW (1 ×) Enercon E-101 (1 ×) Senvion 3.2M114 (2 ×) Vestas V136-3.45MW (1 ×)
|
Beiersdorf
|
GRZ
|
50 ° 57 ′ 32 "N, 12 ° 10 ′ 22" E
|
WP Pölzig, Avel, WSB New Energies
|
Repowering 2019
( Vestas V136-3.45MW (1 ×) instead of Micon M1500-600 (2 ×))
|
Rastenberg-Olbersleben wind farm
|
1997 2000 2005 2006 2009 2012 2013 2014 2017 2018
|
99.15
|
45
|
Enercon E-40 / 5.40 (3 ×) Gamesa G80-2.0MW (6 ×) Enercon E-48 (1 ×) Vestas V90-2MW (21 ×) Vestas V112-3.0MW (8 ×) Enercon E-92 (1 ×) Vestas V126-3.3MW (5 ×)
|
Roldisleben Olbersleben Ostramondra Bachra
|
SÖM
|
51 ° 10 ′ 16 "N, 11 ° 20 ′ 32" E
|
wpd , Boreas, Thüga renewable energies , VIATEC, WP Rastenberg, WP Olbersleben
|
Expansion planned
|
Rauschwitz wind farm
|
2002 2003 2011 2014
|
11.6
|
6th
|
Südwind S77 (2 ×) GE Wind Energy 1.5sl (1 ×) REpower MM92 (2 ×) Nordex N117 / 3000 (1 ×)
|
Rauschwitz
|
SHK
|
50 ° 58 ′ 33 ″ N, 11 ° 48 ′ 3 ″ E
|
meridian
|
|
Rittersdorf-Treppendorf wind farm
|
1999 2012 2014
|
9.4
|
5
|
Enercon E-30 / 2.30 (1 ×) Enercon E-82 E2 (4 ×)
|
Rittersdorf Treppendorf
|
AP SLF
|
50 ° 59 ′ 11 "N, 11 ° 15 ′ 14" E
|
wpd , eolica
|
|
Rodeberg wind farm
|
1998 1999
|
2.2
|
4th
|
Enercon E-40 / 5.40 (2 ×) Enercon E-40 / 6.44 (2 ×)
|
Struth
|
UH
|
51 ° 12 ′ 23 "N, 10 ° 18 ′ 12" E
|
|
|
Roter Berg wind farm (Reinholterode wind farm)
|
1995 1995 2003 2011 2018
|
24.8
|
8th
|
Enercon E-66 / 18.70 (1 ×) Enercon E-82 E2 (1 ×)
Vestas V126-3.45MW (6 ×)
|
Reinholterode
|
EIC
|
51 ° 26 ′ 2 ″ N, 10 ° 12 ′ 25 ″ E
|
WKN
|
Repowering 2011 (1 × Enercon E-82 E2 instead of 1 × Micon M700-225 )
and 2018 ( Vestas V126-3.45MW (6 ×) instead of Enercon E-66 / 15.66 (4 ×))
|
Schloßvippach wind farm
|
1999 2006 2007 2017 2018
|
49.7
|
20th
|
Enercon E-66 / 15.66 (2 ×) Enercon E-70 (10 ×) Vestas V126-3.3MW (6 ×) Vestas V136-3.45MW (2 ×)
|
Vippach Castle Dielsdorf Sprötau
|
SÖM
|
51 ° 6 ′ 4 "N, 11 ° 11 ′ 2" E
|
WP Dielsdorf
|
Expansion planned
|
Schmölln wind farm
|
1996 2011
|
13.0
|
10
|
AN Bonus 600/44 (5 ×) REpower MM92 (5 ×)
|
Kummer Nitzschka Zschöpel
|
ABG
|
50 ° 52 '16 "N, 12 ° 23' 18" E
|
meridian
|
|
Schwabhausen wind farm
|
2000 2001 2004
|
8.0
|
6th
|
AN Bonus 1300/62 (4 ×) Enercon E-58 (1 ×) Enercon E-66 / 18.70 (1 ×)
|
Schwabhausen
|
GTH
|
50 ° 52 ′ 17 "N, 10 ° 52 ′ 34" E
|
Prokon
|
|
St. Bernhard wind farm
|
2019
|
13.95
|
4th
|
Vestas V126-3.45MW (3 ×) Vestas V126-3.6MW (1 ×)
|
St. Bernhard
|
HBN
|
50 ° 25 '22 "N, 10 ° 35' 55" E
|
|
|
Sünna wind farm
|
1998 2000 2006 2009
|
7.12
|
7th
|
Vestas V44-600kW (3 ×) Vestas V47-660kW (2 ×) Vestas V90-2MW (2 ×)
|
Vacha Unterbreizbach Sünna
|
WAK
|
50 ° 49 ′ 4 ″ N, 10 ° 0 ′ 5 ″ E
|
WP Sünna
|
|
Tanna wind farm
|
1998 2002 2004 2009 2014 2016
|
23.3
|
12
|
Enercon E-40 / 5.40 (1 ×) Enercon E-66 / 18.70 (6 ×) Enercon E-66 / 20.70 (1 ×) Enercon E-70 E4 (1 ×) Enercon E-92 (2 ×) Enercon E- 101 (1 ×)
|
Schilbach
|
SOK
|
50 ° 29 ′ 29 ″ N, 11 ° 49 ′ 2 ″ E
|
GERES, Sabowind
|
|
Teutleben wind farm
|
2013 2014
|
24.0
|
8th
|
Vestas V112-3.0MW (8 ×)
|
Teutleben
|
GTH
|
50 ° 57 '13 "N, 10 ° 32' 35" E
|
reconcept, Gewi
|
Expansion planned
|
Thonhausen wind farm
|
2016 2017
|
13.0
|
5
|
Senvion 3.4M114 (1 ×) Nordex N117 / 2400 (4 ×)
|
Thonhausen
|
ABG
|
50 ° 49 ′ 42 "N, 12 ° 20 ′ 24" E
|
meridian
|
|
Trügleben wind farm
|
1999 2002
|
2.05
|
3
|
DeWind D4 48/600 (2 ×) Vestas V52-850kW (1 ×)
|
Deceptive life
|
GTH
|
50 ° 57 ′ 27 "N, 10 ° 37 ′ 51" E
|
meridian
|
|
Tüngeda wind farm
|
2015 2016 2017
|
28.4
|
9
|
Vestas V90-2MW (1 ×) Vestas V112-3.3MW (1 ×) Vestas V126-3.3MW (7 ×)
|
Tüngeda Brüheim
|
WAK GTH
|
51 ° 0 ′ 49 "N, 10 ° 33 ′ 56" E
|
Boreas, meridian, GSW
|
Expansion planned
|
Tüttleben wind farm
|
1999 2000
|
4.2
|
4th
|
Husum shipyard HSW 1000/57 (4 ×)
|
Tüttleben
|
GTH
|
50 ° 57 ′ 16 ″ N, 10 ° 47 ′ 5 ″ E
|
meridian
|
|
Voigtstedt wind farm
|
2001 2002 2004 2006 2007 2017
|
15.5
|
11
|
Enercon E-40 / 6.44 (5 ×) Enercon E-48 (2 ×) Enercon E-70 (2 ×) Vestas V126-3.45MW (2 ×)
|
Voigtstedt Kachstedt
|
KYF
|
51 ° 23 ′ 13 ″ N, 11 ° 16 ′ 18 ″ E
|
Energiequelle , GSW, Sabowind
|
erected on the A 71
|
Waltersdorf-Rositz wind farm
|
2002 2003
|
37.5
|
21st
|
Südwind S70 (9 ×) Vestas V80-2MW (12 ×)
|
Rositz
Waltersdorf Neubraunshain
|
ABG
|
51 ° 7 ′ 2 "N, 12 ° 23 ′ 14" E
|
Wallenborn Project, PNE Wind
|
|
Wangenheim-Hochheim-Ballstädt-Westhausen wind farm
|
1999 2000 2001 2006 2010 2011 2012 2014 2015 2016 2018 2020
|
134.75
|
64
|
Tacke TW 1.5s (6 ×) Enercon E-66 / 15.66 (7 ×) Vestas V90-2MW (17 ×) Enercon E-70 (3 ×) Enercon E-82 (6 ×) Enercon E-92 (1 ×) Vestas V112-3.0MW (7 ×) Vestas V117-3.3MW (1 ×) Vestas V126-3.3MW (5 ×) Vestas V126-3.45MW (1 ×) Vestas V136-3.45MW (1 ×) Vestas V150-4.2MW (2 ×) Nordex N117 / 2400 (7 ×)
|
Wangenheim Hochheim Westhausen Ballstädt Wiegleben
|
GTH UH
|
51 ° 1 ′ 54 "N, 10 ° 37 ′ 41" E
|
Boreas, GSW, Thüga renewable energies
|
largest wind farm in Thuringia;
15 Tacke TW 1.5s were dismantled through repowering between 2016 and 2018 ; Repowering 2020 ( Vestas V126-3.3MW (2 ×), Vestas V117-3.3MW (1 ×) and Enercon E-92 (1 ×) instead of Tacke TW 1.5s (5 ×))
|
Wipperdorf wind farm
|
2017 2019
|
29.4
|
10
|
Nordex N117 / 2400 (6 ×) eno energy 126 (3 ×) Nordex N149 / 4500 (1 ×)
|
Wipperdorf
|
NDH
|
51 ° 27 ′ 34 "N, 10 ° 39 ′ 23" E
|
VSB
|
Nordex N149 / 4500 built on a hybrid tower. Currently the highest and most powerful wind turbine in Thuringia (as of 2019)
|
Wormstedt wind farm
|
1996
|
1.5
|
3
|
NedWind 44/500 (2 ×) WindWorld W4100 (1 ×)
|
Wormstedt
|
AP
|
51 ° 2 ′ 0 ″ N, 11 ° 35 ′ 3 ″ E
|
|
erected on former military grounds , a Lagerwey LW30 / 250 and a NedWind 44/500 have meanwhile been dismantled again
|
Wüllersleben wind farm
|
2006
|
6.4
|
8th
|
Enercon E-48 (8 ×)
|
Wüllersleben
|
IK
|
50 ° 48 ′ 2 "N, 11 ° 3 ′ 11" E
|
Windward
|
|
Wundersleben wind farm
|
1999 2007 2011 2017
|
22.9
|
10
|
Vestas V90-2MW (8 ×) Vestas V112-3.45MW (2 ×)
|
Wonder life Straussfurt
|
SÖM
|
51 ° 9 '36 "N, 11 ° 1' 21" E
|
Turny wind energy, Planet Energy
|
Repowering 2011 (5 × Vestas V90-2MW instead of 5 × AN Bonus 600/44) and 2017 (2 × Vestas V112-3.45MW instead of 2 × AN Bonus 600/44)
|