List of wind turbines in Hessen
The list of wind turbines in Hessen provides an overview of the installed wind turbines in the state of Hessen , with a focus on the installed wind farms . Locations with three or more systems are considered wind parks. Systems with a steel lattice tower are marked in italics . Plants that have been dismantled again without repowering at the same location are crossed out . As new wind turbines are constantly being built, this list does not claim to be complete.
Overview
Surname | Construction year | Total power (MW) |
number | Type (WKA) | place | agriculture circle |
Coordinates | Project planner / operator | Remarks |
---|---|---|---|---|---|---|---|---|---|
|
1995 | 0.225 |
|
|
Panrod | RÜD | 50 ° 14 ′ 4 "N, 8 ° 8 ′ 34" E | meanwhile dismantled | |
Breuna wind turbines | 1998 | 2.6 | 2 | Nordex N62 (2 ×) | Breuna | KS | 51 ° 25 ′ 6 ″ N, 9 ° 9 ′ 27 ″ E | EBV WP Breuna | erected on the A 44 |
Brauerschwend wind turbines | 2007 | 3.0 | 2 | Fuhrländer FL MD77 (2 ×) | Brauerschwend | VB | 50 ° 41 ′ 15 ″ N, 9 ° 21 ′ 10 ″ E | ||
Wind turbines Eiterfeld | 2002 | 1.7 | 1 | Vestas V52-850kW (2 ×) | Leimbach | FD | 50 ° 44 ′ 34 "N, 9 ° 46 ′ 16" E | BOREAS | |
Bad Endbach-Bottenhorn wind turbine | 2014 | 0.8 | 1 | Enercon E-53 (1 ×) | Bottenhorn | MR | 50 ° 47 ′ 20 "N, 8 ° 29 ′ 36" E | MeusAir Energy | |
Wind turbines Bad Endbach-Hülshof | 1996 | 1.2 | 2 | AN Bonus 600/44 (2 ×) | Hülshof | MR | 50 ° 46 ′ 32 "N, 8 ° 29 ′ 18" E | Wind turbines Schneider | |
Wind turbines Friedrichsbrück | 1998 | 1.2 | 2 | Nordex N43 (2 ×) | Friedrichsbrück | ESW | 51 ° 13 ′ 6 ″ N, 9 ° 45 ′ 2 ″ E | Johann Grotepass | |
Wind turbines Hilgershausen | 2003 2004 |
3.0 | 2 | Südwind S77 (2 ×) | Hilgershausen | MR | 51 ° 5 ′ 23 "N, 9 ° 28 ′ 25" E | Göbel Energy Society | erected on the A 7 |
Hohenstein wind turbines | 2008 | 1.6 | 2 | Enercon E-48 (2 ×) |
Breithardt Strinz-Margarethä |
RÜD | 50 ° 12 ′ 5 ″ N, 8 ° 11 ′ 18 ″ E | juwi | |
Hombergshausen wind turbine | 1994 | 0.15 | 1 | AN Bonus 150/30 (1 ×) | Hombergshausen | MR | 51 ° 3 ′ 28 "N, 9 ° 26 ′ 6" E | L + W wind power | |
Wind turbines Körle | 2002 | 3.0 | 2 | REpower MD77 (2 ×) | Grains | MR | 51 ° 11 ′ 10 "N, 9 ° 30 ′ 32" E | LuV wind energy | |
Lamsberg wind turbine | 1998 | 0.2 | 1 | Enercon E-30 / 2.30 (1 ×) | Gudensberg | MR | 51 ° 10 ′ 23 "N, 9 ° 23 ′ 17" E | Adolf Weingart | |
Lindenholzhausen wind turbine | 1995 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Lindenholzhausen | LM | 50 ° 22 ′ 4 "N, 8 ° 7 ′ 11" E | NET, Kloft | erected in a commercial area on the A3 |
Wind turbine Mauswinkel | 1998 | 0.5 | 1 | Wind World W4200 (1 ×) | Mouse angle | MKK | 50 ° 24 ′ 30 ″ N, 9 ° 18 ′ 26 ″ E | HessenEnergie, Main-Kinzig District Works | previously wind farm, extensive dismantling in 2014 (2 × Enercon E-40 / 5.40 and 1 × Wind World W4200) |
Wind turbines in Ober-Schmitten | 1997 | 1.2 | 2 | AN Bonus 600/44 (2 ×) | Ober-Schmitten | FB | 50 ° 27 '10 "N, 8 ° 1' 35" E | Markus Moufang | |
Offheim wind turbines | 2004 | 1.2 | 2 | DeWind D4 / 48 (2 ×) | Offheim | LM | 50 ° 25 ′ 12 "N, 8 ° 4 ′ 28" E | Laux wind turbines | |
Rainrod wind turbine | 2001 | 0.6 | 1 | Enercon E-40 / 6.44 (1 ×) | Rainrod | VB | 50 ° 42 ′ 28 "N, 9 ° 19 ′ 12" E | WeTaWe | |
Wind turbines Reckerode | 2008 | 4.0 | 2 | Enercon E-82 (2 ×) | Reckerode | MR | 50 ° 50 ′ 32 "N, 8 ° 35 ′ 10" E | Enercon Invest | erected on the A 7 north of the Kirchheimer Dreieck |
Rodenroth wind turbine | 2001 | 0.6 | 1 | Enercon E-40 / 6.44 (1 ×) | Rodenroth | LDK | 50 ° 35 ′ 20 "N, 8 ° 1 ′ 2" E | Deisat wind turbines | |
Romrod-Zell wind turbines | 1994 | 0.45 | 2 | AN Bonus 150/30 (1 ×) AN Bonus 300/33 (1 ×) |
Billertshausen Zell |
VB | 50 ° 43 ′ 13 ″ N, 9 ° 12 ′ 5 ″ E | Manfred Rüger | erected on the A 5 |
Wind turbines Roßdorf-Tannenkopf | 2015 | 5.0 | 2 | GE Wind Energy 2.5-120 (2 ×) |
Rossdorf Gundernhausen |
THERE | 49 ° 52 ′ 32 "N, 8 ° 45 ′ 8" E | juwi , GGEW | |
Ulrichstein-Kopf wind turbines | 2018 | 6.1 | 2 | Enercon E-101 (2 ×) | Ulrichstein | RÜD | 50 ° 35 ′ 18 "N, 9 ° 12 ′ 39" E | Hessen Energie | |
Wind turbines anger | 1999 | 1.0 | 2 | Enercon E-40 / 5.40 (2 ×) | anger | RÜD | 50 ° 9 ′ 8 ″ N, 7 ° 55 ′ 16 ″ E | NET, Wind of Rage | |
Adorf wind farm | 1993 1995 2002 2004 2006 2012 2019 |
25.75 | 19th |
Nordex N27 / 250 (2 ×) Nordex N29 / 250 (5 ×) Enercon E-66 18.70 (8 ×) Nordex S70 (1 ×) NEG Micon NM82 / 1500 (1 ×) Nordex N131 / 3300 (2 ×) |
Adorf | KB | 51 ° 22 ′ 8 "N, 8 ° 50 ′ 23" E | Hurricane Diemelsee, ABO Wind (repowering) | 2019 repowering (2 × Nordex N131 / 3300 instead of 4 × DeWind D6 / 62 and 1 × Enercon E-40 / 5.40 ) |
Alte Höhe wind farm | 2000 2011 |
14.6 | 12 |
NEG Micon NM60 / 1000 (10 ×) Enercon E-82 E2 (2 ×) |
Living area | VB | 50 ° 33 ′ 16 ″ N, 9 ° 8 ′ 5 ″ E | Stadtwerke Ulrichstein, Bürgerwind Ulrichstein, HessenEnergie | |
|
1995 2000 |
|
|
Tacke TW 600 (3 ×) Vestas V42-600kW (2 ×) NEG Micon NM48 / 750 (2 ×) Wind World W4800 (2 ×) NEG Micon NM60 / 1000 (3 ×) |
Immenhausen | KS | 51 ° 24 ′ 33 "N, 9 ° 29 ′ 32" E | Freiherren Waitz , Fraunhofer IWES , Windkraft-Kontor | completely degraded 2012-2013 due to location in the new approach path of the airport Kassel-Calden |
Amöneburg wind farm | 2015-2016 | 18.0 | 7th |
GE Wind Energy 2.5-120 (5 ×) GE Wind Energy 2.75-120 (2 ×) |
Rossdorf | MR | 50 ° 44 ′ 11 "N, 8 ° 54 ′ 19" E | juwi | |
Asslar wind farm | 2017 | 16.5 | 6th | GE Wind Energy 2.75-120 (6 ×) | Asslar | LDK | 50 ° 37 ′ 45 "N, 8 ° 28 ′ 30" E | CEE Group | |
Atzenhain wind farm | 1994 2000 2002 2010 2016 |
9.7 | 8th |
Enercon E-40 / 5.40 (2 ×) Enercon E-40 / 6.44 (3 ×) Enercon E-53 (1 ×) Enercon E-115 (2 ×) |
Atzenhain | VB | 50 ° 38 ′ 22 ″ N, 9 ° 0 ′ 1 ″ E | L. Valentin, HessenEnergie, ovag | built on the A 5 , expansion 2016 |
Wind farm on the plate | 1994 1996 2012 |
16.1 | 7th | Enercon E-82 E2 (7 ×) | Ober-Seibertenrod | VB | 50 ° 35 ′ 28 "N, 9 ° 10 ′ 21" E | HessenEnergie, EG Vogelsberg | Germany's first municipal wind farm (1996-2011), repowering 2012 (previously 8 × Micon M700-225 and 5 × Micon M1500-500 ) |
Bad Emstal wind farm | 1997 2006 2007 2015 |
31.8 | 24 |
AN Bonus 600/44 (4 ×) Enercon E-48 (3 ×) Enercon E-53 (7 ×) Enercon E-70 (6 ×) Enercon E-92 (4 ×) |
Altenstädt Balhorn Istha Martinhagen |
KS | 51 ° 16 ′ 58 ″ N, 9 ° 13 ′ 3 ″ E | Enercon , various | |
Berngerode wind farm | 2014-2015 | 30.36 | 12 | GE Wind Energy 2.5-120 (12 ×) |
Ober-Wegfurth Rimbach |
VB | 50 ° 44'13 "N, 9 ° 32'1" E | ABO Wind , Mainova , WPE, Talanx | |
Betzenrod wind farm | 1995 1998 |
2.15 | 3 | AN Bonus 450/37 (1 ×) Fuhrländer FL 800 (1 ×) Nordex N54 (1 ×) |
Betzenrod | VB | 50 ° 31 '15 "N, 9 ° 7' 14" E | Wind power Betzenrod, Betzenröder wind energy | |
Billertshausen-Zell wind farm | 2002 2003 |
11.4 | 12 | AN Bonus 600/44 (1 ×) AN Bonus 1000/54 (1 ×) DeWind D6 / 62 (10 ×) |
Billertshausen Zell |
VB | 50 ° 44 ′ 26 "N, 9 ° 12 ′ 28" E | HessenEnergie | |
Binselberg wind farm | 1999 2010 |
6.0 | 4th |
Fuhrländer FL 1000 (2 ×) Enercon E-82 (2 ×) |
Klein-Umstadt | THERE | 49 ° 52 ′ 21 ″ N, 8 ° 58 ′ 22 ″ E | Entega , Binselberg wind farm | |
Bleidenrod wind farm | 2004 | 7.2 | 4th | Enercon E-66 / 18.70 (4 ×) | Bleidenrod | VB | 50 ° 40 ′ 27 "N, 9 ° 0 ′ 16" E | Hurricane power | |
Blessenbach-Laubuseschbach wind farm | 2002 2011 |
10.5 | 6th |
Fuhrländer FL 1500 (3 ×) Vestas V90-2MW (3 ×) |
Blessenbach Laubuseschbach |
LM | 50 ° 23 ′ 33 "N, 8 ° 18 ′ 26" E | PNE wind , Wotan | |
Brachttal-Streitberg wind farm | 2002 2005-2006 |
9.0 | 6th |
GE Wind Energy 1.5sl (2 ×) Fuhrländer FL MD77 (4 ×) |
Streitberg | MKK | 50 ° 19 ′ 30 ″ N, 9 ° 15 ′ 5 ″ E | Theolia, Renertec | |
Brachttal-Spielberg-Streitberg wind farm | 2016-2017 | 10.35 | 3 | Vestas V126-3.45MW (3 ×) | Spielberg | MKK | 50 ° 18 ′ 20 "N, 9 ° 14 ′ 27" E | Renertec | |
Breuna wind farm | 1996 | 3.0 | 6th | Enercon E-40 / 5.40 (6 ×) | Singing contests | KS | 51 ° 26 ′ 13 ″ N, 9 ° 10 ′ 20 ″ E | wpd | |
Bromskirchen wind farm | 1996 1997 |
2.5 | 5 | Enercon E-40 / 5.40 (5 ×) | Bromskirchen | KB | 51 ° 5 ′ 23 "N, 8 ° 31 ′ 28" E | wpd | Repowering and expansion planned (22 turbines) |
Buchenau wind farm | 2016 | 16.5 | 5 | Vestas V126-3.3MW (5 ×) | Buchenau | FD | 50 ° 46 ′ 14 "N, 9 ° 44 ′ 11" E | ABO Wind | |
Buchonia wind farm | 2015-2016 | 25.36 | 9 | Senvion 3.2M114 (9 ×) |
Vollmerz Sterbfritz |
MKK | 50 ° 20 ′ 13 "N, 9 ° 38 ′ 14" E | Buchonia Wind, SynEnergie | |
Buhlenberg wind farm | 2020 | 8.25 | 3 | GE 2.75-120 (3 ×) | Weilmünster | LM | 50 ° 27 '14 "N, 8 ° 24' 49" E | Windward | under construction |
Burg-Gemünden wind farm | 2001 | 3.9 | 3 | Nordex N62 (3 ×) | Castle Gemünden | VB | 50 ° 40 ′ 19 ″ N, 9 ° 3 ′ 12 ″ E | ABO Wind | |
Burgwald wind farm | 1996 2011 |
10.4 | 8th | Tacke TW 600 (4 ×) Vestas V90-2MW (4 ×) |
Ernsthausen | KB | 50 ° 58 ′ 32 "N, 8 ° 42 ′ 34" E | Wotan, Stadtwerke Energie Jena-Pößneck, Erlanger Stadtwerke | Expansion planned (8 × eno energy eno 92) |
Bad Camberg wind farm | 2006 2016 |
8.9 | 5 |
Vestas V52-850kW (2 ×) Nordex N117 / 2400 (3 ×) |
Bad Camberg | LM | 50 ° 16 ′ 27 "N, 8 ° 14 ′ 21" E | Glotter, Altus, Ventur | erected on both sides of the A3 |
Crainfeld wind farm | 1995 | 2.4 | 4th | Micon M1500-600 (4 ×) | Crainfeld | VB | 50 ° 28 ′ 19 ″ N, 9 ° 21 ′ 12 ″ E | Ventus | |
Deiselberg / Mittelberg wind farm | 2016 2018 |
25.85 | 8th |
GE 2.75-120 (1 ×) Nordex N131 / 3300 (7 ×) |
Trendelburg | KS | 51 ° 34 ′ 5 ″ N, 9 ° 21 ′ 9 ″ E | VSB Group | |
Wind farm The same | 2015-2016 | 18.3 | 6th | Enercon E-115 (6 ×) |
Schrecksbach Immichenhain |
MR | 50 ° 48 '24 "N, 9 ° 19' 7" E | EAM nature | |
Dörnholzhausen wind farm | 1997 | 2.2 | 4th |
Enercon E-40 / 5.40 (2 ×) Nordex N43 (2 ×) |
Dörnholzhausen | KB | 51 ° 2 ′ 34 "N, 8 ° 52 ′ 28" E | Dörnholzhausen Wind | |
Driedorf-Mademühlen wind farm | 1987 1992 1997 2010-2011 |
5.9 | 4th |
Enercon E-40 / 5.40 (1 ×) Nordex N50 (1 ×) Enercon E-82 E2 (2 ×) |
Mademühlen | LDK | 50 ° 36 '34 "N, 8 ° 9' 8" E | Oelke, Raimund Würz, Erhard u. Ulrich Theis | Repowering 2010–2011 (2 × Enercon E-82 E2 instead of 2 × Enercon E-40 / 5.40 and 1 × Enercon E-33 ), previously 1 × Enercon E-16 (first wind turbine in Hesse) |
Eberschütz wind farm | 1997–1998 1999 2000–2001 2020 |
21.45 | 21st |
Micon 1500-600 (6 ×) Vestas V44-600kW (7 ×) Vestas V47-660kW (5 ×) Vestas V126-3.45MW (3 ×) |
Eberschütz | KS | 51 ° 33 ′ 4 ″ N, 9 ° 19 ′ 35 ″ E | HessenEnergie, WKN | 2020 repowering (3 × Vestas V126-3.45MW instead of 2 × Vestas V44-600kW ) |
Eichberg wind farm | 1998 2005 |
8.4 | 7th |
Nordex N43 (4 ×) Enercon E-70 (3 ×) |
Schenklengsfeld | HEF | 50 ° 47 '35 "N, 9 ° 51' 8" E | Eichberg wind power | Repowering planned (5 × Enercon E-101 instead of 4 × Nordex N43 ) |
Elbenrod wind farm | 2016 | 26.4 | 8th | Vestas V126-3.3MW (8 ×) | Elbenrod | VB | 50 ° 47 '22 "N, 9 ° 21' 11" E | Eurowind | |
Ellerode wind farm | 2017-2018 | 15.25 | 5 | Enercon E-101 (5 ×) | Berlepsch | ESW | 51 ° 24 ′ 0 ″ N, 9 ° 48 ′ 25 ″ E | erected on the A 7 | |
Elzer Berg wind farm | 2016 | 14.4 | 6th | Nordex N117 / 2400 (6 ×) | Elz | LM | 50 ° 24 '22 "N, 7 ° 59' 15" E | ENERGY YIELD | erected on both sides of the A3 |
Erbenhausen-Kirtorf wind farm | 2001-2002 | 6.0 | 6th | DeWind D6 / 62 (6 ×) |
Erbenhausen Kirtorf |
VB | 50 ° 45 ′ 26 "N, 9 ° 5 ′ 14" E | HessenEnergie | Municipal wind farm Kirtorf 2001–2007 (4 turbines), 1 turbine dismantled after an accident in 2011 |
Erbstadt wind farm | 2002 | 2.8 | 4th | DeWind D4 / 48 (3 ×) DeWind D6 / 62 (1 ×) |
Hereditary City | FB | 50 ° 16 ′ 8 ″ N, 8 ° 52 ′ 32 ″ E | red project | |
Erksdorf-Speckswinkel wind farm | 2003 2005 2007 2010 2012 |
31.5 | 19th |
Enercon E-40 / 6.44 (1 ×) DeWind D6 / 62 (3 ×) Enercon E-53 (5 ×) Enercon E-82 E2 (10 ×) |
Erksdorf Speckswinkel |
MR | 50 ° 51 '24 "N, 9 ° 4' 8" E | HessenEnergie, Rudewig Windpower, Entega , Renertec | |
Ersen wind farm | 1996 2018 |
4.55 | 4th |
Micon M1500 / 600 (3 ×) GE 2.75-120 (1 ×) |
Ersen | KS | 51 ° 27 ′ 18 ″ N, 9 ° 14 ′ 7 ″ E | ||
Escheberg wind farm | 2017 | 14.4 | 6th | Nordex N117 / 2400 (6 ×) | Escheberg | KS | 51 ° 23 '24 "N, 9 ° 13' 34" E | Innovent | erected on the A 44 |
Eschenburg wind farm | 1996-1997 | 2.4 | 3 | Fuhrländer FL 800 (3 ×) |
Hirzenhain Lixfeld |
LDK MR |
50 ° 47 '27 "N, 8 ° 23' 31" E | Eschenburg community wind farm | |
Fauerbach wind farm | 2002 | 2.4 | 4th | DeWind D4 / 48 (4 ×) | Fauerbach | FB | 50 ° 24 '17 "N, 9 ° 3' 2" E | red project | |
Feldatal wind farm | 1994 1999 2012 2015 |
41.6 | 19th |
Enercon E-40 / 5.40 (2 ×) Enercon E-82 E2 (15 ×) Enercon E-115 (2 ×) |
Ober-Ohmen Zeilbach |
VB | 50 ° 37 '26 "N, 9 ° 9' 13" E | Renertec, Ohmwind | Expansion and repowering 2012 (15 × Enercon E-82 E2 instead of 3 × Tacke TW 600) |
Felsberg wind farm | 2017 | 18.0 | 6th | Nordex N131 / 3000 (6 ×) | Felsberg | MR | 51 ° 6 ′ 36 "N, 9 ° 29 ′ 38" E | Vortex Energy | erected on the A 7 |
Flechtdorf-Helmscheid wind farm | 2004 2006 2009 |
32.9 | 18th |
NEG Micon NM60 / 1000 (2 ×) Nordex S77 (6 ×) Nordex N90 / 2300 (6 ×) REpower MM92 (2 ×) Vestas V90-2MW (2 ×) |
Flechtdorf Helmscheid |
KB | 51 ° 19 ′ 14 "N, 8 ° 51 ′ 9" E | ABO Wind, HessenEnergie | Repowering 2012 (2 × Vestas V90-2MW instead of 6 × Micon M700-225 ) |
Fleschenbach-Neustall wind farm | 2008-2009 | 18.0 | 9 | Vestas V90-2MW (9 ×) |
Fleschenbach Neustall |
VB MKK |
50 ° 23 ′ 25 ″ N, 8 ° 23 ′ 19 ″ E | Airflow | Expansion planned (1 system) |
Flörsbachtal-Roßkopf wind farm | 2020 | 16.5 | 6th | GE 2.75-120 (6 ×) |
Flörsbachtal Jossgrund |
MKK | 50 ° 9 ′ 12 "N, 9 ° 30 ′ 14" E | Main-Kinzig natural energy | |
Freiensteinau wind farm | 1997 1999 2013-2014 |
12.2 | 4th | Enercon E-101 (4 ×) | Freiensteinau | VB | 50 ° 23 ′ 25 ″ N, 9 ° 23 ′ 19 ″ E | LuV wind energy | Repowering 2013–2014 (previously 3 × AN Bonus 600/44 and 1 × Enercon E-40 / 6.44 ) |
Friedberg wind farm | 2011 | 6.0 | 3 | Vestas V90-2MW (3 ×) |
Bruchenbrücken Ober-Wöllstadt |
FB | 50 ° 18 ′ 5 ″ N, 8 ° 46 ′ 10 ″ E | ABO Wind , EnBW | |
Friedewald wind farm | 2002 2003 2004 2013 |
8.0 | 5 |
Enercon E-40 / 6.44 (1 ×) Enercon E-58 (1 ×) Enercon E-66 / 18.70 (1 ×) Enercon E-82 E2 (2 ×) |
Friedewald Ronshausen |
HEF |
50 ° 53 ′ 0 "N, 9 ° 50 ′ 10" E 50 ° 53 ′ 27 "N, 9 ° 51 ′ 6" E |
BadenWind, Rudewig Windpower, Windenergie Friedewald | erected on the A 4 |
Frischborn wind farm | 2005 | 1.8 | 3 | Enercon E-40 / 6.44 (3 ×) | Frischborn | VB | 50 ° 37 ′ 3 ″ N, 9 ° 21 ′ 8 ″ E | MART energy | first wind farm (3 x Enercon E-66 / 15.66 , 1997) dismantled because of planning mistakes again in 1999, reconstruction in Oederquart ( Nds. ) |
Frohnhausen wind farm | 2012-2013 | 14.4 | 6th | Nordex N117 / 2400 (6 ×) | Frohnhausen | LDK | 50 ° 47 ′ 21 ″ N, 8 ° 16 ′ 27 ″ E | HH group | |
Gedern wind farm | 2015-2016 | 13.2 | 4th | Vestas V126-3.3MW (4 ×) | Wenings | FB | 50 ° 21 '35 "N, 9 ° 12' 12" E | HessenEnergie, ovag | |
Geisberg wind farm | 2013 | 12.0 | 5 | Nordex N117 / 2400 (5 ×) |
Lower Mossau Günterfürst |
ERB | 49 ° 38 ′ 7 "N, 8 ° 56 ′ 35" E | Geisberg wind farm, Viernheim municipal utilities, Bad Vilbel municipal utilities, 3P energy plan | |
Galgenberg wind farm | 2010 2012-2013 |
13.1 | 5 |
Enercon E-82 (3 ×) Enercon E-101 (2 ×) |
Kilian cities | MKK | 50 ° 11 ′ 7 ″ N, 8 ° 51 ′ 29 ″ E | DIF Renewable Energy, Kreiswerke Main-Kinzig | |
Gelber Berg wind farm | 2010 | 8.0 | 4th | Enercon E-82 (4 ×) | Kilian cities | MKK | 50 ° 12 ′ 14 "N, 8 ° 52 ′ 19" E | DIF Renewable Energy | |
Gembeck wind farm | 1995 | 2.5 | 5 | Enercon E-40 / 5.40 (5 ×) | Gembeck | KB | 51 ° 21 ′ 21 ″ N, 8 ° 53 ′ 29 ″ E | Gembeck wind farm | |
Gemünden wind farm | 2016-2017 | 16.8 | 7th | Nordex N117 / 2400 (7 ×) |
Gemünden (Wohra) Schiffelbach |
KB | 50 ° 57 ′ 31 ″ N, 9 ° 0 ′ 32 ″ E | ENOVA , Venture | |
Gethsemane wind farm | 2001 | 7.2 | 4th | Enercon E-66 / 15.66 (4 ×) | gethsemane | HEF | 50 ° 51 ′ 14 "N, 9 ° 56 ′ 4" E | RWE Innogy | |
Gilserberg wind farm | 1999 2000 2013-2014 |
6.9 | 3 | Enercon E-82 E2 (3 ×) | Gilserberg | MR | 50 ° 56 '18 "N, 9 ° 3' 1" E | Wind power Gilserberg, LUV Windenergie | Repowering 2013–2014 (previously 3 × Enercon E-40 / 5.40 and 1 × Enercon E-40 / 6.44 ) |
Gilserberg-Appenhain wind farm | 1996 2001 2013 |
7.4 | 4th |
Enercon E-40 / 5.40 (1 ×) Enercon E-82 E2 (3 ×) |
Appenhain Itzenhain |
MR | 50 ° 55 ′ 31 ″ N, 9 ° 4 ′ 22 ″ E | LUV wind energy | Repowering 2013–2014 (previously also 2 × Enercon E-40 / 5.40 and 1 × Enercon E-40 / 6.44 ) |
Gilserberg-Sebbeterode wind farm | 1997 2006 |
3.2 | 3 |
Nordex N43 (2 ×) Enercon E-70 (1 ×) |
Sebbeterode | MR | 50 ° 57 ′ 9 ″ N, 9 ° 4 ′ 34 ″ E | Wind energy Sebbeterode, Gilserberg | |
Goldner Steinrück wind farm | 1996 1997 1998 2000 2001 2011 2012 2012–2013 |
51.95 | 44 |
Micon M1500-500 (6 ×) Wind World W4200 (8 ×) Enercon E-40 / 5.40 (5 ×) DeWind D6 / 62 (1 ×) Nordex N62 (1 ×) AN Bonus 1300/62 (12 ×) Enercon E -82 E2 (9 ×) Enercon E-101 (1 ×) |
Dirlammen Engelrod Helpershain Meiches |
VB | 50 ° 35 ′ 57 "N, 9 ° 14 ′ 51" E | HessenEnergie, Stadtwerke Ulrichstein, Bürgerwind Ulrichstein, Energiekontor , Cerventus , BMO Windenergie, juwi | Largest and most powerful wind farm in Hessen, repowering planned |
Grävenwiesbach wind farm | 2020 | 16.5 | 6th | GE 2.75-120 (6 ×) | Graevenwiesbach | HG | 50 ° 24 ′ 35 "N, 8 ° 27 ′ 45" E | Siegfriedeiche wind energy project | |
Greiner Eck wind farm | 2016 | 15.25 | 5 | Enercon E-115 (5 ×) | Grein | HP | 49 ° 27 ′ 17 "N, 8 ° 50 ′ 16" E | Greiner Eck GmbH & Co. KG wind farm | Fifth plant as a community wind turbine of the Energiegenossenschaft Starkenburg eG |
Grimelsheim wind farm | 1998 2009 |
6.0 | 4th | Fuhrländer FL MD77 (4 ×) | Grimelsheim | KS | 51 ° 28 ′ 11 "N, 9 ° 13 ′ 23" E | Grimelsheim wind farm | Repowering 2009 |
Haiger wind farm | 2012-2013 | 13.8 | 6th | Siemens SWT-2.3-113 (6 ×) | Haiger | LDK | 50 ° 46 ′ 35 "N, 8 ° 9 ′ 0" E | Entega , EG Haiger | erected on the A 45 |
Haiger-Dillbrecht wind farm | 2015 | 9.0 | 3 | Vestas V112-3.0MW (3 ×) | Dillbrecht | LDK | 50 ° 49 ′ 22 "N, 8 ° 10 ′ 55" E | juwi , AVIA WP Haiger-Dillbrecht | |
Hainhaus wind farm | 2005 2009 2011 2013 2015 |
22.3 | 9 |
Vestas V82-1.5MW (2 ×) Vestas V90-2MW (2 ×) Vestas V112-3.0MW (4 ×) Vestas V126-3.3MW (1 ×) |
Breitenbrunn | ERB | 49 ° 44 ′ 22 ″ N, 9 ° 6 ′ 9 ″ E | whs ENERTEC, Hainhaus wind farm | Erected on the former ammunition depot |
Hassenhausen wind farm | 2016-2017 | 12.0 | 4th | Nordex N131 / 3000 (4 ×) | Hassenhausen | MR | 50 ° 42 ′ 5 ″ N, 8 ° 45 ′ 15 ″ E | Abicon | |
Hattenbach wind farm | 2013 | 8.2 | 4th | REpower MM92 (4 ×) | Hattenbach | HEF | 50 ° 48 '11 "N, 9 ° 32' 14" E | RENPRO, WP Am Scheibelberg | erected along the A 7 east of the Hattenbacher Dreieck |
Haueda wind farm | 1998 2000 |
3.0 | 6th | Enercon E-40 / 5.40 (6 ×) | Haueda | KS | 51 ° 29 ′ 31 ″ N, 9 ° 15 ′ 17 ″ E | Haueda wind farm | Neighboring wind farm in the Dasburg district ( North Rhine-Westphalia ) |
Hausfirste wind farm | 2016 2018 |
54.0 | 18th | Enercon E-115 (18 ×) | Großalmerode | ESW |
51 ° 17 ′ 31 ″ N, 9 ° 46 ′ 2 ″ E 50 ° 16 ′ 20 ″ N, 9 ° 43 ′ 28 ″ E |
Entega | |
Heidenrod wind energy park | 2014-2015 | 30.0 | 12 | GE Wind Energy 2.5-120 (12 ×) | Heidenrod | RÜD | 50 ° 12 ′ 6 ″ N, 7 ° 57 ′ 22 ″ E | Heidenrod wind energy park, Süwag , Heidenrod municipality | |
Hemmrain wind farm | 2015-2016 | 6.1 | 2 | Enercon E-115 (2 ×) | Manderbach | LDK | 50 ° 47 ′ 1 ″ N, 8 ° 15 ′ 29 ″ E | HH group | |
Hesserode wind farm | 2004 | 6.9 | 3 | AN Bonus 2300/82 (3 ×) | Hesserode | MR | 51 ° 4 ′ 25 "N, 9 ° 25 ′ 22" E | L + W wind power | |
Hettersroth wind farm | 2005 | 10.5 | 7th | Fuhrländer FL MD77 (7 ×) | Hettersroth | MKK | 50 ° 21 ′ 7 ″ N, 9 ° 16 ′ 31 ″ E | Theolia, Renertec | |
Hilsberg wind farm | 2014 | 15.25 | 5 | Enercon E-101 (5 ×) | Bottenhorn | MR | 50 ° 48 ′ 7 "N, 8 ° 30 ′ 11" E | Bad Endbach community , Lahn-Dill-Bergland-Therme | |
Hirzenhain wind farm | 2001 | 2.0 | 2 | DeWind D6 / 62 (2 ×) | Glassworks | FB | 50 ° 24 '23 "N, 9 ° 7' 9" E | HessenEnergie | Hirzenhain municipal wind farm 2001–2007, 2014 dismantling of a DeWind D6 / 62 |
Hofbieber-Traisbach wind farm | 2016 | 7.2 | 3 | Nordex N117 / 2400 (3 ×) | Hofbieber | FD | 50 ° 36 ′ 39 "N, 9 ° 47 ′ 4" E | ABO Wind , Friedrich-Wilhelm-Energie Eichenzell | Subsequent restrictions on operation |
Hohenahr wind farm | 2012-2013 | 16.8 | 7th | Nordex N117 / 2400 (7 ×) | Hohensolms | LDK | 50 ° 38 ′ 4 "N, 8 ° 29 ′ 32" E | ABO Wind , Mainova , Aufwind eG | |
Hohenstein-Galgenkopf wind farm | 2008 2015 |
7.5 | 3 | GE Wind Energy 2.5-120 (3 ×) | Hohenstein Castle | RÜD | 50 ° 10 ′ 19 ″ N, 8 ° 2 ′ 13 ″ E | juwi , REWAG | |
|
1998 |
|
|
|
Hohenzell | MKK | 50 ° 19 '15 "N, 9 ° 32' 33" E | Bergwinkel wind turbines | Completely dismantled in 2013, possibly repowering |
Homberg wind farm | 2018 | 10.35 | 3 | Vestas V126-3.45MW (3 ×) | Alsfeld | VB | 50 ° 43 ′ 28 "N, 9 ° 18 ′ 24" E | VSB Energy | |
Wind farm Hünstelden | 2015-2016 | 9.6 | 4th | Nordex N117 / 2400 (4 ×) |
Herring Neesbach |
LM | 50 ° 19 '17 "N, 8 ° 7' 35" E | Trianel Onshore Wind Power Plants, EFI Wind | |
Wind farm in Hünsteldener Wald | 2020 | 13.5 | 3 | Nordex N149 / 4500 (3 ×) | Kirberg | LM | 50 ° 17 '23 "N, 8 ° 7' 44" E | BWP Hünstelden Forest | Wind farm under construction in 2020 |
Kefenrod wind farm | 2013-2014 | 9.2 | 4th | Enercon E-92 (4 ×) | Kefenrod | FB | 50 ° 21 ′ 28 "N, 9 ° 12 ′ 31" E | HessenEnergie, ovag | |
Kemel wind farm | 1997–1998 2000 2012 |
13.75 | 5 |
Enercon E-82 E2 (2 ×) Enercon E-101 (3 ×) |
Kemel | RÜD | 50 ° 9 '32 "N, 8 ° 1' 35" E | Natural energy Heidenrod, Heidewind | Repowering 2012 (previously 7 × Enercon E-40 / 5.40 ) |
Kirchhain wind farm | 2013 2015 2016 |
21.6 | 9 | Nordex N117 / 2400 (9 ×) |
Burgholz Emsdorf Sindersfeld |
MR | 50 ° 51 '23 "N, 8 ° 56' 50" E | ABO Wind , Mainova , CEE | |
Kirchheim wind farm | 2009 2017 |
27.1 | 5 |
Enercon E-82 (2 ×) Nordex N131 / 3300 (3 ×) |
Kirchheim (Hesse) | HEF | 50 ° 50 ′ 52 "N, 9 ° 35 ′ 54" E | ABO Wind | erected on the A 7 at the Kirchheim motorway junction |
Kloppenheim wind farm | 2002 2009 |
6.0 | 4th | DeWind D6 / 62 (2 ×) Vestas V90-2MW (2 ×) |
Kloppenheim | FB | 50 ° 13 '17 "N, 8 ° 43' 11" E | Energy park Kloppenheim, red project | Expansion by 5 plants planned |
Wind farm knot | 2012-2013 | 12.2 | 4th | Enercon E-101 (4 ×) | Arborn | LDK | 50 ° 35 ′ 32 "N, 8 ° 9 ′ 13" E | HH group | |
Kohlgrund wind farm | 1995 2006 2011 |
15.9 | 9 |
Vestas V90-2MW (1 ×) Enercon E-53 (3 ×) Enercon E-82 E2 (5 ×) |
Kohlgrund | KB | 51 ° 26 ′ 6 ″ N, 8 ° 55 ′ 20 ″ E | wpd , weidbusch | Repowering 2011 (1 × Enercon E-53 and 5 × Enercon E-82 E2 instead of 2 × Enercon E-40 / 5.40 ) |
Kirtorf municipal forest wind farm | 2016 | 7.5 | 3 | GE Wind Energy 2.5-120 (4 ×) | Kirtorf | VB | 50 ° 47 ′ 5 "N, 9 ° 7 ′ 13" E | HessenEnergie, ovag , VOBEG Wind | |
Lahn-Dill-Bergland Mitte wind farm | 2015 | 21.35 | 7th | Enercon E-115 (4 ×) |
Günterod Eisemroth Oberweidbach Niederweidbach |
MR LDK |
50 ° 44 ′ 12 "N, 8 ° 26 ′ 25" E 50 ° 44 ′ 2 "N, 8 ° 29 ′ 28" E |
EAM nature | |
Langenthal wind farm | 1997 2014 |
4.6 | 7th |
Vestas V44-600kW (5 ×) Enercon E-53 (2 ×) |
Langenthal | KS | 51 ° 36 ′ 31 ″ N, 9 ° 21 ′ 1 ″ E | WKA Schönhagen | |
Lauterbach wind farm | 2001 | 1.8 | 3 | DeWind D4 / 48 (3 ×) | Reuters | VB | 50 ° 39 ′ 35 "N, 9 ° 21 ′ 18" E | PNE wind | |
Lengers wind farm | 2002 | 4.5 | 3 | Südwind S77 (3 ×) | Lengers | HEF | 50 ° 51 ′ 34 "N, 10 ° 0 ′ 24" E | Energiekontor | |
Liebenau wind farm | 1998 | 3.3 | 5 | Vestas V47-660kW (5 ×) | Liebenau | KS | 51 ° 30 ′ 23 "N, 9 ° 16 ′ 35" E | wpd | |
Lindenberg wind farm | 2014-2015 | 12.0 | 5 | Nordex N117 / 2400 (5 ×) | Breitenbach | KS | 51 ° 17 ′ 34 "N, 9 ° 18 ′ 24" E | GP JOULE | erected on the A 44 |
Lingelbach wind farm | 2003 2016 |
25.2 | 15th | Pfleiderer PWE 650 (6 ×) Nordex N117 / 2400 (9 ×) |
Lingelbach | VB | 50 ° 46 ′ 1 ″ N, 9 ° 24 ′ 35 ″ E | Thüga renewable energies , Alsfeld wind farm | erected on the A 5 |
Ludwigsau-Klosterstein wind farm | 2015-2016 | 23.1 | 7th | Vestas V112-3.3MW (7 ×) |
Hainrode Ersrode |
HEF | 50 ° 58 ′ 7 ″ N, 9 ° 33 ′ 15 ″ E | juwi | |
Mattenberg wind farm | 2015 | 9 | 3 | Enercon E-115 (3 ×) | Oberhörlen | MR | 50 ° 50 ′ 14 "N, 8 ° 24 ′ 6" E | Mattenberg GmbH | |
Marburg wind farm | 2003 2005 |
3.6 | 3 | Pfleiderer PWE 650 (1 ×) Fuhrländer FL 1500 (2 ×) |
Wehrda | MR | 50 ° 51 ′ 0 ″ N, 8 ° 44 ′ 5 ″ E | Stadtwerke Marburg | |
Mariendorf-Udenhausen wind farm | 1996 | 3.0 | 5 | Vestas V44-600kW (5 ×) |
Mariendorf Udenhausen |
KS | 51 ° 27 ′ 12 "N, 9 ° 28 ′ 21" E | Mariendorf-Udenhausen wind farm | Expansion planned (1 × Enercon E-101 ) |
Martenberg wind farm | 2012 | 23.0 | 10 | Enercon E-82 E2 (10 ×) | Adorf | KB | 50 ° 12 ′ 14 "N, 8 ° 52 ′ 19" E | LENPower | |
Massenhausen wind farm | 2011 2012 2014 2016 |
15.3 | 7th |
Vestas V90-2MW (4 ×) Nordex N100 / 2500 (1 ×) Nordex N117 / 2400 (2 ×) |
Massenhausen | KB | 51 ° 24 ′ 12 ″ N, 8 ° 56 ′ 28 ″ E | Thüga Renewable Energies , Cerventus , juwi | |
Mengeringhausen wind farm | 2015 | 14.4 | 6th | Nordex N117 / 2400 (6 ×) | Mengeringhausen | KB | 51 ° 21 ′ 14 "N, 8 ° 57 ′ 7" E | wpd | |
Mengerskirchen wind farm | 2014 | 7.2 | 3 | Nordex N117 / 2400 (3 ×) | Mengerskirchen | LM | 50 ° 35 ′ 4 "N, 8 ° 8 ′ 33" E | Windpark Mengerskirchen GmbH, Süwag | |
Neutscher Höhe wind farm | 1994 2011 |
5.9 | 5 | Tacke TW 600 (3 ×) REpower MM92 (2 ×) |
Neutsch Ober-Beerbach |
THERE | 49 ° 46 ′ 2 "N, 8 ° 42 ′ 11" E | Odenwaldwind, EG Starkenburg | |
Nieder-Seemen wind farm | 2001 2007 |
4.2 | 4th | DeWind D4 / 48 (2 ×) Fuhrländer FL MD77 (2 ×) |
Nieder-Seemen | FB | 50 ° 22 ′ 15 "N, 9 ° 14 ′ 28" E | Theolia, Renertec | |
Niestetal wind farm | 1998 2004 2013 |
8.0 | 5 |
Enercon E-40 / 5.40 (2 ×) AN Bonus 1000/54 (1 ×) Vestas V112-3.0MW (2 ×) |
Sandershausen | KS | 51 ° 19 ′ 34 "N, 9 ° 35 ′ 22" E | Municipal works , Söhrewald / Niestetal wind farm | erected on the A 7 |
Oberdieten wind farm | 1995 2011 2013 |
6.7 | 3 | Tacke TW 600 (1 ×) Enercon E-101 (2 ×) |
Oberdieten | MR | 50 ° 52 ′ 4 "N, 8 ° 24 ′ 23" E | Shrub & shrub | erected on quarry site (see Oberdieten quarry ), repowering in 2011 and 2013 (2 × Enercon E-101 instead of 2 × Tacke TW 600, the Enercon E-101 built in 2011 is the world's first series system of this type) |
Rabenau energy and resource park | 2015 | 15.18 | 6th | GE Wind Energy 2.5-120 (6 ×) |
Geilshausen Odenhausen (Lumda) Weitershain |
GI | 50 ° 39 ′ 10 "N, 8 ° 55 ′ 10" E | WPRI, iTerra Wind, Trianel | |
Rauschenberg wind farm | 2005 | 5.1 | 6th | Frisia F56 / 850 (6 ×) |
Ernsthausen Josbach |
MR | 50 ° 54 ′ 13 ″ N, 8 ° 58 ′ 9 ″ E | Rauschenberg wind farm | |
Rauschenberg II wind farm | 2016 | 15th | 5 | Enercon E-115 (5 ×) | Rauschenberg Sindersfeld | MR | 50 ° 51 '34 "N, 8 ° 53" 19 "E | Pitcher of energy | |
Rebgeshain wind farm | 1996 | 2.5 | 4th |
Enercon E-40 / 5.40 (3 ×) Nordex N54 (3 ×) |
Vine grove | VB | 50 ° 34 '12 "N, 9 ° 13' 17" E | VWE Bohn | |
Rixfeld wind farm | 1996 2011 |
7.9 | 3 | Enercon E-82 E2 (3 ×) | Rixfeld | VB | 50 ° 35 ′ 6 ″ N, 9 ° 23 ′ 5 ″ E | LuV wind energy | Repowering 2011 (previously 5 × AN Bonus 600/44) |
Rödeser Berg wind farm | 2014 | 12.2 | 4th | Enercon E-101 (4 ×) | Niederelsungen | KS | 51 ° 21 ′ 30 "N, 9 ° 11 ′ 22" E | Stadtwerke Wolfhagen, BEG Wolfhagen | |
Rohrberg wind farm | 2015 | 15th | 5 | Enercon E-115 (5 ×) | Hirschhagen | ESW | 51 ° 14 ′ 5 "N, 9 ° 42 ′ 17" E | Municipal works , Rohrberg wind farm | |
Roter Berg wind farm | 2005 | 6.0 | 4th | Vestas V82-1.5MW (4 ×) | Berneburg | ESW | 51 ° 2 ′ 34 "N, 9 ° 53 ′ 17" E | WKN | |
Red Land wind farm | 1996 2001-2002 2008 2013 |
28.7 | 13 |
Vestas V80-2MW (5 ×) Enercon E-82 (1 ×) Enercon E-82 E2 (1 ×) Nordex N117 / 2400 (6 ×) |
Hesperinghausen Neudorf |
KB | 51 ° 27 ′ 13 "N, 8 ° 55 ′ 4" E | Red Land community wind farm | Repowering 2013 (6 × Nordex N117 / 2400 instead of 4 × Vestas V44-600kW ) |
Rüddingshausen wind farm | 2008 2010 |
7.9 | 7th | Gamesa G58 (4 ×) Fuhrländer MD77 (3 ×) |
Ruddingshausen | GI | 50 ° 41 ′ 23 "N, 8 ° 56 ′ 5" E | Iberdrola Renewables | |
Ruhlkirchen wind farm | 2013 | 9.6 | 4th | Nordex N117 / 2400 (4 ×) | Ruhlkirchen | VB | 50 ° 48 ′ 10 "N, 9 ° 12 ′ 17" E | greenValue, WSB | |
Rülfenrod wind farm | 2002 | 7.5 | 5 | GE Wind Energy 1.5sl (5 ×) | Rülfenrod | VB | 50 ° 42 ′ 21 ″ N, 9 ° 4 ′ 17 ″ E | ABO Wind | |
Sachsenhausen wind farm | 1996 2013-2014 |
7.65 | 3 |
Enercon E-82 E2 (2 ×) Enercon E-101 (1 ×) |
Sachsenhausen | KB | 51 ° 15 ′ 16 ″ N, 8 ° 59 ′ 27 ″ E | Sachsenhausen wind farm, Enercon , LENpower | Repowering 2013–2014 (previously 3 × Nordex N43 ) |
Schelder Wald wind farm | 2001 2011 |
12.0 | 6th |
Enron Wind 1.5sl (3 ×) Nordex N100 / 2500 (3 ×) |
Eisemroth Oberscheld |
LDK | 50 ° 44 ′ 17 "N, 8 ° 23 ′ 4" E | ABO Wind , Mainova | |
Schwarzenberg wind farm | 2016 | 21.6 | 9 | Nordex N117 / 2400 (9 ×) |
Breidenbach Biedenkopf |
MR | 50 ° 53 ′ 23 "N, 8 ° 29 ′ 22" E | Schwarzenberg GmbH wind farm | |
Schluechtern wind farm | 2001–2002 2010–2011 |
20.5 | 12 |
Enron Wind 1.5sl (7 ×) Vestas V90-2MW (5 ×) |
Elm | MKK | 50 ° 22 ′ 33 "N, 9 ° 34 ′ 7" E | Energiekontor , Entega , Renertec | |
Schwarzenborn wind farm | 1991 1995 1997 |
2.78 | 6th |
Enercon-18 (1 ×) Tacke TW 600 (2 ×) Enercon E-40 / 5.40 (3 ×) |
Richberg | MR | 50 ° 54 ′ 32 "N, 9 ° 24 ′ 31" E | WENG, various | |
Söhrewald wind farm | 2013 | 15.0 | 5 | Vestas V112-3.0MW (5 ×) | Wellerode | KS | 51 ° 14 ′ 2 ″ N, 9 ° 32 ′ 7 ″ E | Municipal works , Söhrewald / Niestetal wind farm | |
Solz wind farm | 1998 | 2.4 | 4th |
NEG Micon NM 600/48 (2 ×) AN Bonus 600/44 (2 ×) |
Solz | HEF | 51 ° 0 ′ 29 ″ N, 9 ° 52 ′ 19 ″ E | L + W wind power | |
Sontra wind farm | 2014 | 12.0 | 5 | Nordex N117 / 2400 (5 ×) | Diemerode | ESW | 51 ° 5 ′ 15 ″ N, 9 ° 51 ′ 19 ″ E | PNE wind | |
Stammheim wind farm | 2002 | 1.8 | 3 | DeWind D4 / 48 (3 ×) | Stammheim | FB | 50 ° 18 ′ 18 ″ N, 8 ° 56 ′ 14 ″ E | red project | |
Stiftswald wind farm | 2016 | 27.45 | 9 | Enercon E-115 (9 ×) | Helsa , Kaufungen | KS | 51 ° 15 ′ 0 ″ N, 9 ° 39 ′ 1 ″ E | Municipal works | |
Stollberg wind farm | 2020 | 10.8 | 3 | GE 3.6-137 (3 ×) |
Weinbach Weilmünster |
LM | 50 ° 25 ′ 38 "N, 8 ° 19 ′ 24" E | EAM wind energy | |
Twistan Valley wind farm | 1997 | 1.8 | 3 | Nordex N43 (3 ×) | Nieder-Waroldern | KB | 51 ° 18 ′ 33 "N, 8 ° 59 ′ 28" E | ||
Udenhausen wind farm | 1997 1999 2004 |
2.3 | 4th |
Enercon E-40 / 5.40 (1 ×) Enercon E-40 / 6.44 (3 ×) |
Udenhausen | KS | 51 ° 28 ′ 8 ″ N, 9 ° 26 ′ 20 ″ E | ||
Ulrichsteiner Kreuz wind farm | 1997–1998 2003 2011 |
9.7 | 6th | AN Bonus 1000/54 (1 ×) Enercon E-58 (1 ×) Enercon E-66 18.70 (3 ×) Enercon E-82 E2 (1 ×) |
Ulrichstein | VB | 50 ° 33 '23 "N, 9 ° 13' 7" E | VWE Bohn, HessenEnergie | |
Vadenrod wind farm | 1997 2014 |
4.55 | 4th |
Enercon E-40 / 5.40 (3 ×) Enercon E-101 (1 ×) |
Vadenrod | VB | 50 ° 39 '23 "N, 9 ° 17' 5" E | ABO Wind , Heegen-Windkraft, HessenEnergie | |
Vasbeck wind farm | 1994 2003 2006 2014 2015 |
19.6 | 14th |
Nordtank NTK 500/41 (3 ×) REpower MD77 (8 ×) Enercon E-53 (1 ×) Enercon E-82 E2 (1 ×) Enercon E-115 (1 ×) |
Vasbeck | KB | 51 ° 22 ′ 8 ″ N, 8 ° 53 ′ 7 ″ E | ABO Wind , TurboWind | |
Vier Spichten wind farm | 2013-2014 | 36.0 | 12 | Vestas V112-3.0MW (12 ×) |
Breitenborn AW Gettenbach Wächtersbach |
MKK | 50 ° 15 ′ 17 "N, 9 ° 14 ′ 20" E | Renertec, EG Main-Kinzigtal | |
Vogelsberg wind energy park | 1990–1991 1999 2004 2010 |
13.5 | 8th | Tacke TW 1.5i (1 ×) GE Wind Energy 1.5sl (4 ×) Enercon E-82 (3 ×) |
Hartmannshain | VB | 50 ° 27 ′ 31 ″ N, 9 ° 17 ′ 13 ″ E | HessenEnergie | First German wind farm in the low mountain range, first wind farm in Hessen, repowering 2004 (except for Tacke TW 1.5i, previously 1 × Krogmann 15/50, Enercon E-17 , Hüllmann FHW 100, AN Bonus 150/30, MAN Aeroman, Tacke TW 250, HSW 30 and 2 × HSW 250) |
Volkartshain wind farm | 1995 1998 |
3.5 | 6th | AN Bonus 600/41 (3 ×) Vestas V44-600kW (2 ×) Enercon E-40 / 5.40 (1 ×) |
Volkartshain | VB | 50 ° 27 ′ 7 ″ N, 9 ° 16 ′ 16 ″ E | Weber wind turbines | |
Volkmarsen wind farm | 1998 | 3.3 | 5 | Vestas V47-660kW (5 ×) | Ehringen | KB | 51 ° 21 '22 "N, 9 ° 9' 5" E | Vestibule | |
Wächtersbach-Neudorf wind farm | 2013-2014 | 7.5 | 3 | GE Wind Energy 2.5-120 (3 ×) | Neudorf | MKK | 50 ° 16 ′ 16 ″ N, 9 ° 20 ′ 0 ″ E | ABO Wind , Kreiswerke Main-Kinzig | |
Waldaubach-Hohenroth wind farm | 1995 1997 1998 2006 2008 2014 |
9.35 | 10 | Tacke TW 600 (2 ×) Enercon E-40 / 5.40 (5 ×) Enercon E-48 (1 ×) Enercon E-53 (1 ×) Enercon E-101 (1 ×) |
Waldaubach Hohenroth |
LDK | 50 ° 39 ′ 1 ″ N, 8 ° 8 ′ 1 ″ E | Freischlad-Engel Windkraft Driedorf, Neue Energien Windkraft, Rolf Nickel, Gut-Wind, K & N | Repowering 2014 (1 × Enercon E-101 instead of 1 × Enercon E-40 / 5.40 and 2 × Fuhrländer FL 1000 ) |
Wallroth wind farm (Renertec) | 1998 2015 |
18.0 | 9 | Vestas V112-3.0MW (9 ×) |
Kressenbach Wallroth |
MKK | 50 ° 23 ′ 20 "N, 9 ° 28 ′ 33" E | Renertec, EG Main-Kinzigtal | Repowering 2015 (9 × Vestas V112-3.0MW instead of 5 × Enercon E-40 / 5.40 ), 55,000th system of the manufacturer |
Wallroth wind farm (air flow) | 2004 2009 2012 |
8.0 | 4th |
Vestas V80-2MW (3 ×) Vestas V90-2MW (1 ×) |
Wallroth | MKK | 50 ° 24 ′ 19 ″ N, 9 ° 29 ′ 13 ″ E | Airflow | |
Wartenberg wind farm | 2017 | 16.5 | 5 | Vestas V112-3.3MW (5 ×) | Angersbach | VB | 50 ° 39 ′ 5 ″ N, 9 ° 28 ′ 7 ″ E | HessenEnergie, ovag | |
Wattenbach wind farm | 1997-1998 | 4.8 | 5 |
Vestas V44-600kW (3 ×) Vestas V63-1.5MW (2 ×) |
Wattenbach | KS | 51 ° 12 ′ 32 "N, 9 ° 36 ′ 26" E | K / S Soprotho | |
Wehneberg wind farm | 2014 | 15.18 | 6th | GE Wind Energy 2.5-120 (6 ×) | Bad Hersfeld | HEF | 50 ° 54 ′ 19 ″ N, 9 ° 41 ′ 20 ″ E | ABO Wind , Stadtwerke Stuttgart | |
Weilrod wind farm | 2014 | 16.8 | 7th | Nordex N117 / 2400 (7 ×) | Cratzenbach Riedelbach | HG | 50 ° 18 ′ 25 ″ N, 8 ° 21 ′ 54 ″ E | ABO Wind , ABO Invest | |
Weissenberg wind farm | 2016 | 18.3 | 6th | Enercon E-115 (6 ×) |
Dautphetal Biedenkopf |
MR | 50 ° 52 ′ 38 "N, 8 ° 31 ′ 1" E | Weissenberg GmbH wind farm | |
Wenings wind farm | 2001 | 1.8 | 3 | DeWind D4 / 48 (3 ×) | Wenings | FB | 50 ° 23 '25 "N, 9 ° 11' 25" E | ||
(Winde GbRmbH) |
1993 |
|
|
Nordex N29 (2 ×) |
Windhausen | VB | 50 ° 39 '26 " N , 9 ° 11' 53" E 50 ° 39 '16 "N, 9 ° 11' 32" E | Winde GbRmbH | Dismantling around 2013 |
Windhausen wind farm | 1996 2000 |
2.8 | 5 |
Enercon E-40 / 5.40 (2 ×) Enercon E-40 / 6.44 (3 ×) |
Windhausen | VB | 50 ° 39 ′ 6 "N, 9 ° 12 ′ 29" E | ||
Wirmighausen wind farm | 1994 | 1.5 | 4th | Nordex N27 / 150 (4 ×) | Wirmighausen | KB | 51 ° 20 ′ 35 "N, 8 ° 51 ′ 2" E | 8 turbines previously, four Nordex N27 / 150 have now been dismantled | |
Zell-Romrod wind farm | 2017-2018 | 15.0 | 5 | Enercon E-115 (5 ×) |
Romrod Zell |
VB | 50 ° 44 ′ 1 ″ N, 9 ° 13 ′ 26 ″ E | Turbo wind | erected on the A3 |
Blaues Eck wind forest | 2013-2014 | 21.35 | 7th | Enercon E-101 (7 ×) | Freiensteinau | VB | 50 ° 26 ′ 27 "N, 9 ° 25 ′ 5" E | Airflow |
Individual evidence
- ↑ Mittelhessen.de of December 13, 2013: Wind turbine is approved. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Hessische / Niedersächsische Allgemeine from September 7, 2015: The blades of a wind turbine are being replaced. Retrieved July 12, 2016 .
- ↑ natural power region: Hombergshausen wind power plant. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Osthessen News from September 1, 2012: Wind generates green electricity - Member of the Bundestag ROTH: The energy transition is driving Kirchheim forward. Retrieved July 12, 2016 .
- ↑ Frankfurter Rundschau of July 29, 2015: Wind turbines are coming. Retrieved November 1, 2015 .
- ↑ Hessische / Niedersächsische Allgemeine of January 21, 2010: Wind turbines stand in the way of aviators. Retrieved April 6, 2017 .
- ↑ Hessische / Niedersächsische Allgemeine of November 22, 2012: Wind turbines in Immenhausen are now being dismantled. Retrieved February 10, 2013 .
- ↑ Central Hesse: Amöneburg-Roßdorf wind farm on the grid. (No longer available online.) In: www.juwi.de. Archived from the original on July 4, 2016 ; Retrieved July 4, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ First groundbreaking on April 27, 2016 for the Mücke-Atzenhain wind farm. (No longer available online.) In: Hessen. Archived from the original on July 14, 2016 ; accessed on July 15, 2016 .
- ^ Local Advisory Board Naumburg-Altenstädt: Wind power in Altenstädt. Retrieved August 1, 2012 .
- ↑ Schlitzer Bote of March 28, 2014: “Berngerod” wind farm is being continued. Retrieved April 19, 2014 .
- ↑ ABO Wind: Project profile wind farm Schlitz-Berngerode. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ WPE Hessische Windpark Entwicklungs GmbH: Schlitz-Berngerode. (No longer available online.) Archived from the original on June 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ WPE Hessische Windpark Entwicklungs GmbH: hessenWIND IV Gesellschaft mbH & Co. KG. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Entega: Binselberg wind farm. Retrieved March 14, 2016 .
- ↑ aeos energy: Hurricane Power Funding Holding. (No longer available online.) Formerly in the original ; Retrieved August 5, 2012 . ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.
- ↑ www.mittelhessen.de of January 13, 2011: Wind turbines tower above Blessenbach. Archived from the original on January 16, 2011 ; Retrieved August 2, 2012 .
- ↑ Gelnhäusner Neue Zeitung of April 7, 2017: Ten megawatts from renewable energy. Retrieved June 19, 2017 .
- ↑ Frankfurter Rundschau of October 23, 2016: Wind power approved. Retrieved June 19, 2017 .
- ↑ Frankenberger Zeitung of December 12, 2012: Up to 22 wind turbines in the Bromskirchen forest. Retrieved March 24, 2013 .
- ↑ Hersfelder Zeitung of February 10, 2016: RP approves five wind turbines in Buchenau. Retrieved April 10, 2016 .
- ↑ Fuldaer Zeitung of March 19, 2015: Despite a lawsuit: Start of construction in the Buchonia wind farm. Retrieved July 12, 2016 .
- ↑ Waldeckische Landeszeitung from April 7, 2011: From July the "wheels" should turn. Retrieved December 11, 2012 .
- ↑ Hessische / Niedersächsische Allgemeine of March 22, 2012: Eight wind turbines are being built at Wollmar. Retrieved December 11, 2012 .
- ^ Altus: Bad Camberg wind farm. (No longer available online.) Archived from the original on July 12, 2016 ; accessed on February 9, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Hessisch-Niedersächsische Allgemeine from October 1, 2015: Start of construction on the same wind farm. Retrieved April 10, 2016 .
- ↑ Hersfelder Zeitung of March 18, 2011: Space for larger rotors. Retrieved August 4, 2012 .
- ↑ natural power region: Schenklengsfeld wind farm. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Rhein-Zeitung of July 31, 2015: Work is progressing: Elz is building a wind farm near Görgeshausen. Retrieved July 31, 2015 .
- ↑ Frankfurter Rundschau of June 21, 2011: Wind farm is threatened with extinction. Archived from the original on January 28, 2016 ; Retrieved August 3, 2012 .
- ↑ www.AlexanderHitz.de: The Wetterau. Retrieved August 6, 2012 .
- ↑ Achim Holighaus: Why wind energy? Retrieved March 7, 2013 .
- ↑ www.AlexanderHitz.de: The Wetterau. Retrieved August 6, 2012 .
- ↑ Alsfelder Allgemeine of April 17, 2012: Own substation required for large wind farm. Retrieved August 5, 2012 .
- ↑ Wind energy reduces debt. In: Oberhessen-Live. January 30, 2016, accessed July 4, 2016 .
- ↑ Kinzigtal Nachrichten of September 27, 2013: Freiensteinau is expecting 300,000 euros annually from wind power. Retrieved November 7, 2013 .
- ↑ Wetterauer Zeitung of June 16, 2011: Energy giant EnBW buys the Friedberg wind farm. (No longer available online.) Archived from the original on June 20, 2011 ; Retrieved August 5, 2012 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ natural power region: Friedewald wind farm. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Hessische / Niedersächsische Allgemeine of September 2, 2013: Wind turbines are growing on the A 4. Accessed on July 12, 2016 .
- ↑ Fuldaer Zeitung of August 27, 2001: “Steife Brise” brings new wind to old wheels. (No longer available online.) Formerly in the original ; Retrieved August 5, 2012 . ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.
- ↑ EANS-News of December 18, 2012: Growing demand for Nordex N117 from Germany. (No longer available online.) Formerly in the original ; Retrieved January 15, 2013 . ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.
- ↑ Kreis-Anzeiger of July 18, 2015: Wind blows money into the coffers. (No longer available online.) Archived from the original on March 4, 2016 ; accessed on October 15, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ^ Geisberg wind farm: Project. Retrieved July 12, 2016 .
- ↑ Frankfurter Neue Presse of July 13, 2012: Start of construction on Galgenberg. (No longer available online.) Formerly in the original ; Retrieved October 19, 2012 . ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.
- ↑ ENOVA of January 26, 2016: Gemünden wind farm approved: ENOVA as a service provider central partner. Retrieved April 10, 2016 .
- ↑ Hessische / Niedersächsische Allgemeine of May 24, 2012: 31 million euro project: Entrepreneurs want to set up new wind turbines. Retrieved October 19, 2012 .
- ↑ LUV Windenergie: Gilserberg wind farm. Retrieved July 12, 2016 .
- ↑ a b Hessische / Niedersächsische Allgemeine dated August 12, 2013: They make a lot of wind. Retrieved July 12, 2016 .
- ↑ natural power region: Gilserberg wind farm. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ natural power region: Sebbeterode wind power plant. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ^ Rhein-Neckar-Zeitung: The harbingers of the "Greiner Eck" wind farm are unmistakable. February 19, 2016, accessed April 10, 2016 .
- ↑ Home - Greiner Eck GmbH & Co. KG wind farm. Retrieved February 9, 2017 .
- ↑ ORBIS Energie- und Umwelttechnik GmbH: References - Grimelsheim wind farm. Retrieved August 1, 2012 .
- ↑ Vestas is growing on schedule. In: www.mittelhessen.de. Retrieved July 4, 2016 .
- ↑ Reichelsheim-Umgebung.de of May 13, 2012: RP approves another wind turbine in the Hainhaus wind farm. (No longer available online.) Archived from the original on January 19, 2016 ; Retrieved August 8, 2012 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Osthessen News from November 16, 2013: Precision work at lofty heights - mega crane erects 146-meter wind turbines. Retrieved July 12, 2016 .
- ↑ Hessisch-Niedersächsische Allgemeine from March 17, 2016: Ten wind turbines in the Kaufunger Wald: Questions and answers. Retrieved April 10, 2016 .
- ↑ Hemmrain wind farm: Project profile . (No longer available online.) Archived from the original on November 29, 2015 ; accessed on October 15, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ natural power region: Hesserode wind farm. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Windkraft-Journal: ABO Wind sells Windpark Hofbieber to Energiegenossenschaft Eichenzell. July 21, 2016, accessed July 30, 2016 .
- ↑ Michael Pörtner: Red kite slows down wind turbines in Hofbieber. (No longer available online.) In: hessenschau . Hessischer Rundfunk , May 4, 2018, archived from the original on May 11, 2018 ; accessed on May 11, 2018 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ^ Hohenahr municipality: handover of keys at Hohenahr wind farm. Retrieved October 15, 2015 .
- ↑ Wiesbadener Tagblatt of October 31, 2014: Wind farm project in Hohenstein: Cooperative does not get a chance. (No longer available online.) Archived from the original on March 4, 2016 ; accessed on October 15, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ^ Hohenzell.de: Hohenzell wind farm. Retrieved August 5, 2012 .
- ↑ Kinzigtal News of April 2, 2013: Dismantled: Wind farm is history. (No longer available online.) Archived from the original on April 6, 2013 ; Retrieved May 15, 2013 .
- ↑ Wind fair on April 16, 2015: Wind farm in the Kirberger Hügelland near Hünstelden is scheduled to go into operation in 2016. Retrieved December 28, 2015 .
- ↑ Frankfurter Allgemeine from October 15, 2012: Wind turbines continue to be highly controversial. Retrieved October 15, 2015 .
- ↑ ABO Wind: Kirchhain wind farm. (No longer available online.) Archived from the original on June 19, 2015 ; Retrieved June 18, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Oberhessische Presse of May 22, 2015: Three new wind turbines at Burgholz. Retrieved October 15, 2015 .
- ↑ Frankfurter Neue Presse of January 6, 2012: Stormy growth planned. (No longer available online.) Formerly in the original ; Retrieved August 3, 2012 . ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.
- ↑ Frankfurter Neue Presse of January 16, 2013: There should be five rotors: Final discussions about wind farms. (No longer available online.) Formerly in the original ; Retrieved February 10, 2013 . ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.
- ↑ www.mittelhessen.de of September 21, 2012: RP allows four wind turbines at the node. Retrieved October 11, 2012 .
- ↑ Wind service center: Intermunicipal wind farm Lahn-Dill-Bergland center. (No longer available online.) Archived from the original on November 13, 2017 ; accessed on October 15, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ HNA of February 22, 2015: Lindenberg wind farm: Weather favors construction. Retrieved October 15, 2015 .
- ↑ Oberhessische Zeitung of February 11, 2016: The clearing is in full swing. (No longer available online.) Archived from the original on February 13, 2016 ; accessed on February 13, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Hessisch-Niedersächsische Allgemeine dated March 24, 2016: Wind farm at Klosterstein is due to go online in March. Retrieved May 2, 2016 .
- ↑ Hinterländer Anzeiger of November 13, 2014: "Now the practical phase begins". Retrieved June 28, 2015 .
- ↑ Hessische / Niedersächsische Allgemeine from August 6, 2010: Giant wind turbine planned. Retrieved August 8, 2012 .
- ↑ fotoblog.solarstrombauer.de: Martenberg wind farm near Diemelsee-Adorf. Retrieved August 2, 2012 .
- ↑ Hessische / Niedersächsische Allgemeine of October 7, 2012: New Adorfer wind farm supplies electricity for 12,000 households. Retrieved October 9, 2012 .
- ↑ juwi: Massenhausen wind farm. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ^ Thüga Renewable Energies: Windpark Massenhausen. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Waldeckische Landeszeitung of May 13, 2015: Preparing the ground for windmills. Retrieved October 15, 2015 .
- ^ HH Group: Mengerskirchen wind farm profile. (No longer available online.) Formerly in the original ; accessed on October 15, 2015 . ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.
- ↑ Söhrewald / Niestetal wind farm: Niestetal location. Retrieved February 11, 2016 .
- ↑ Windblatt - ENERCON magazine for wind energy 3/2011 Since 4 (PDF; 1.4 MB)
- ↑ energy spectrum from July 6, 2015: Trianel takes over the Rabenau wind farm. Retrieved October 15, 2015 .
- ↑ State Gazette for the State of Hesse 33/2005 ( Memento of the original from January 26, 2016 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. (PDF; 37 kB)
- ↑ Rauschenberg wind farm. (No longer available online.) In: www.krug-energie.de. Archived from the original on October 28, 2016 ; accessed on October 28, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ The groundbreaking ceremony marks the start of construction. Retrieved February 9, 2016 .
- ^ Website of the Rohrberg wind farm. Retrieved February 9, 2016 .
- ↑ HNA of March 21, 2014: The Rotes Land wind farm continues to grow. Retrieved October 15, 2015 .
- ↑ Wildunger Zeitung of November 20, 2013: Green light for wind farm. Retrieved March 4, 2014 .
- ↑ ABO Wind: Siegbach wind farm. Retrieved August 9, 2017 .
- ↑ natural power region: E.ON Schwarzenborn wind power plant. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ natural power region: Schwarzenborn wind farm. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Hessische / Niedersächsische Allgemeine of March 11, 2013: Green light for wind farm. Retrieved March 28, 2013 .
- ↑ Söhrewald / Niestetal wind farm: Söhrewald site. Retrieved February 11, 2016 .
- ^ Website of the Söhrewald / Niestetal wind farm. Retrieved February 9, 2016 .
- ↑ natural power region: Bebra-Solz wind farm. (No longer available online.) Archived from the original on July 12, 2016 ; Retrieved July 12, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ PNE Wind of December 16, 2014: PNE Wind AG has completed the Sontra wind farm and handed it over to the buyer. (No longer available online.) Archived from the original on March 4, 2016 ; accessed on October 24, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ www.AlexanderHitz.de: The Wetterau. Retrieved August 6, 2012 .
- ↑ Hessisch-Niedersächsische Allgemeine from December 1, 2015: Stiftswald: Now, after all, nine wind turbines. Retrieved April 15, 2016 .
- ↑ Hessische Niedersächsische Allgemeine dated October 24, 2014: Plant is smaller: Turbowind erects windmill near Vasbeck. Retrieved May 1, 2015 .
- ↑ Kinzigtal news of September 12, 2014: Wallrother wind turbines are now in Lithuania. Retrieved September 14, 2014 .
- ↑ Vestas of October 15, 2015: Vestas installs its 55,000th turbine and achieves 70 GW of installed capacity. Retrieved October 20, 2015 .
- ↑ One year wind farm on Wehneberg: Confidence and criticism. January 14, 2016, accessed July 4, 2016 .
- ↑ ABO Invest: Weilrod wind farm. Retrieved August 9, 2017 .
- ↑ Kinzigtal Nachrichten of August 31, 2013: The Luftstrom company is probably using an old permit for the wind farm im Hallo. Retrieved November 7, 2013 .
- ↑ Kinzigtal Nachrichten of September 27, 2013: Freiensteinau is expecting 300,000 euros annually from wind power. Retrieved November 7, 2013 .