| Surname
|
Construction year
|
Total power (MW)
|
number
|
Type (WKA)
|
place
|
agriculture circle
|
Coordinates
|
Project planner / operator
|
Remarks
|
| Ackendorf wind turbine
|
2003
|
1.5
|
1
|
GE Wind Energy 1.5sl (1 ×)
|
Ackendorf
|
BK
|
52 ° 13 ′ 29 "N, 11 ° 25 ′ 34" E
|
Germania wind farm
|
|
| Beuna wind turbines
|
2007
|
2.8
|
2
|
Enercon E-48 (1 ×) Enercon E-70 (1 ×)
|
Beuna
|
SK
|
51 ° 19 ′ 23 ″ N, 11 ° 56 ′ 19 ″ E
|
Energy source
|
´
|
| Billberge wind turbine
|
1999
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Billberg
|
SDL
|
52 ° 38 ′ 18 "N, 11 ° 49 ′ 28" E
|
|
|
| Breitenstein wind turbine
|
1998
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Wettelrode
|
MSH
|
51 ° 37 ′ 26 ″ N, 10 ° 56 ′ 29 ″ E
|
|
|
| Brumby wind turbines
|
2001
|
2.6
|
2
|
Nordex N60 / 1300 (2 ×)
|
Brumby
|
SLK
|
51 ° 53 '6 "N, 11 ° 43' 23" E
|
|
|
| Cobbelsdorf wind turbine
|
2002
|
0.6
|
1
|
Enercon E-40 / 6.44 (1 ×)
|
Cobbelsdorf
|
WB
|
51 ° 57 ′ 17 "N, 12 ° 32 ′ 29" E
|
|
|
| Dalena wind turbines
|
2012
|
4.0
|
2
|
Vestas V90-2MW (2 ×)
|
Dalena
|
SK
|
51 ° 38 ′ 32 "N, 11 ° 51 ′ 16" E
|
WP Dalena
|
|
| Wind turbines Danstedt
|
1995 2000
|
0.8
|
2
|
Tacke TW 300 (1 ×) Enercon E-40 / 5.40 (1 ×)
|
Danstedt
|
HZ
|
51 ° 55 ′ 32 "N, 10 ° 53 ′ 25" E
|
|
|
| Ditfurt wind turbines
|
1998
|
1.0
|
2
|
Enercon E-40 / 5.40 (2 ×)
|
Ditfurt
|
HZ
|
51 ° 48 ′ 27 ″ N, 11 ° 13 ′ 4 ″ E
|
|
|
| Dohndorf wind turbine
|
1998
|
0.6
|
1
|
Vestas V44-600kW (1 ×)
|
Dohndorf
|
ABI
|
51 ° 44 ′ 3 ″ N, 11 ° 53 ′ 30 ″ E
|
|
|
| Eimersleben wind turbine
|
2004
|
0.85
|
1
|
Vestas V52-850kW (1 ×)
|
Vorwerk
|
BK
|
52 ° 11 ′ 33 ″ N, 11 ° 12 ′ 6 ″ E
|
Notus energy
|
erected on the A 2
|
| Wind turbines Emden
|
2001
|
1.2
|
2
|
NEG Micon NM600 / 48 (1 ×)
|
Emden
|
BK
|
52 ° 13 ′ 28 "N, 11 ° 15 ′ 33" E
|
|
|
| Farsleben wind turbines
|
2003
|
4.0
|
2
|
Vestas V80-2MW (2 ×)
|
Farsleben
|
BK
|
52 ° 16 ′ 14 "N, 11 ° 38 ′ 16" E
|
|
erected at the Wolmirstedt substation
|
| Wind turbines Förderstedt
|
2005
|
4.0
|
2
|
Vestas V90-2MW (2 ×)
|
Förderstedt
|
SLK
|
51 ° 53 ′ 33 "N, 11 ° 36 ′ 1" E
|
|
|
| Glebitzsch wind turbines
|
2002
|
1.2
|
2
|
Enercon E-40 / 6.44 (2 ×)
|
Glebitzsch
|
SK
|
51 ° 36 ′ 9 ″ N, 12 ° 9 ′ 22 ″ E
|
Energy source
|
|
| Großgräfendorf wind turbine
|
1990
|
0.08
|
1
|
Enercon-18 (1 ×)
|
Großgräfendorf
|
SK
|
51 ° 23 ′ 14 "N, 11 ° 48 ′ 27" E
|
|
First wind power plant in Saxony-Anhalt and second in the former GDR
|
| Gütter wind turbine
|
1995
|
0.6
|
1
|
Micon M1800-600 (1 ×)
|
Gütter
|
JL
|
52 ° 15 ′ 34 "N, 11 ° 54 ′ 9" E
|
|
|
| Halberstadt wind turbine
|
1994
|
0.11
|
1
|
Sea wind 20/110 (1 ×)
|
Halberstadt
|
HZ
|
51 ° 53 ′ 8 ″ N, 11 ° 1 ′ 9 ″ E
|
|
|
| Wind turbines Haldensleben-Nord
|
2008
|
4.0
|
2
|
Enercon E-70 (2 ×)
|
Haldensleben
|
BK
|
52 ° 17 ′ 35 ″ N, 11 ° 26 ′ 9 ″ E
|
Notus energy
|
|
| Harsleben wind turbine
|
1996
|
0.6
|
1
|
Windtec Floda 600 (1 ×)
|
Harsleben
|
HZ
|
51 ° 53 ′ 19 ″ N, 11 ° 7 ′ 0 ″ E
|
|
|
| Wind turbines Henningen
|
2003
|
1.2
|
2
|
Enercon E-40 6.44 (2 ×)
|
Henningen
|
SAW
|
52 ° 50 ′ 2 "N, 10 ° 57 ′ 27" E
|
Windstream
|
|
| Wind turbines Hohendodeleben
|
2001
|
2.3
|
2
|
Nordex N50 / 800 (1 ×) REpower MD70 (1 ×)
|
Hohendodeleben
|
BK
|
52 ° 5 ′ 27 ″ N, 11 ° 29 ′ 1 ″ E
|
|
Tacke TW 600 now dismantled
|
| Hohenwarsleben wind power plant
|
2001
|
1.5
|
1
|
Enron Wind 1.5sl (1 ×)
|
Hohenwarsleben
|
BK
|
52 ° 9 ′ 32 "N, 11 ° 30 ′ 3" E
|
Germania wind farm
|
|
| Wind turbines Höhnstedt
|
2000
|
1.5
|
2
|
WindWorld W5200 (2 ×)
|
Höhnstedt
|
SK
|
51 ° 30 ′ 23 "N, 11 ° 42 ′ 23" E
|
|
|
| Jahrstedt wind turbines
|
2000
|
2.6
|
2
|
AN Bonus 1300/62 (2 ×)
|
Jahrstedt
|
SAW
|
52 ° 34 ′ 21 ″ N, 10 ° 58 ′ 16 ″ E
|
Wind power
|
|
| Kayna wind turbines
|
2003
|
3.0
|
2
|
GE Wind Energy 1.5sl (2 ×)
|
Kayna
|
BLK
|
50 ° 58 ′ 35 ″ N, 12 ° 14 ′ 24 ″ E
|
FraWi energy project
|
|
| Kladen wind turbine
|
1998
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Dumplings
|
SDL
|
52 ° 38 ′ 22 "N, 11 ° 40 ′ 17" E
|
BRAID
|
|
| Langeln wind turbine
|
1993
|
0.25
|
1
|
Micon M530-250 (1 ×)
|
Langeln
|
HZ
|
51 ° 55 ′ 2 ″ N, 10 ° 47 ′ 0 ″ E
|
|
|
| Wind power plant Löbnitz ad Linde
|
1998
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Löbnitz ad Linde
|
ABI
|
51 ° 44 ′ 3 ″ N, 11 ° 53 ′ 30 ″ E
|
|
|
| Wind power plant Magdeburg-Hopfengarten
|
2001
|
0.6
|
1
|
Enercon E-40 / 6.44 (1 ×)
|
Hop garden
|
MD
|
52 ° 5 ′ 27 "N, 11 ° 38 ′ 8" E
|
SKET
|
erected on the premises of the SKET industrial park
|
| Möllendorf wind turbine
|
1999
|
0.66
|
1
|
Vestas V47-660kW (1 ×)
|
Dumplings
|
SDL
|
52 ° 44 ′ 14 "N, 11 ° 49 ′ 29" E
|
|
|
| Wind turbines Nedlitz
|
1998
|
1.0
|
2
|
Enercon E-40 / 5.40 (2 ×)
|
Nedlitz
|
JL
|
52 ° 7 ′ 13 ″ N, 11 ° 50 ′ 17 ″ E
|
|
|
| Neeken wind turbine
|
2003
|
1.5
|
1
|
GE Wind Energy 1.5sl (1 ×)
|
Neeken
|
BK
|
51 ° 53 ′ 16 "N, 12 ° 10 ′ 28" E
|
|
|
| Wind turbines in Niederndodeleben
|
2002
|
3.6
|
2
|
Enercon E-66 / 18.70 (2 ×)
|
Niederndodeleben
|
BK
|
52 ° 7 ′ 4 ″ N, 11 ° 32 ′ 1 ″ E
|
|
erected on the A 14
|
| Wind turbines Niederröblingen
|
1999
|
2.1
|
2
|
HSW 1000/57 (2 ×)
|
Niederröblingen
|
MSH
|
51 ° 25 ′ 20 "N, 11 ° 22 ′ 8" E
|
Certainly
|
|
| Wind turbines Niemberg
|
2011 2014
|
3.1
|
2
|
Enercon E-82 E2 (1 ×) Enercon E-53 (1 ×)
|
Eismannsdorf
|
SK
|
51 ° 34 ′ 7 ″ N, 12 ° 6 ′ 20 ″ E
|
Niemberg Energy Park
|
|
| Paplitz wind turbine
|
2003
|
0.85
|
1
|
Vestas V52-850kW (1 ×)
|
Paplitz
|
JL
|
52 ° 15 ′ 8 ″ N, 12 ° 13 ′ 25 ″ E
|
|
erected on the A 2
|
| Poley wind turbines
|
2003
|
3.6
|
2
|
Enercon E-66 / 18.70 (2 ×)
|
Poley
|
SLK
|
51 ° 46 ′ 31 ″ N, 11 ° 50 ′ 21 ″ E
|
Citizen Stream
|
|
| Wind turbines in Raßnitz
|
2006
|
2.0
|
2
|
Enercon E-70 (2 ×)
|
Rassnitz
|
SK
|
51 ° 24 ′ 27 "N, 12 ° 5 ′ 36" E
|
Aquavent, Naturwerk Energies
|
|
| Reesen wind turbine
|
2002
|
2.0
|
1
|
Vestas V80-2MW (1 ×)
|
Reesen
|
JL
|
52 ° 16 ′ 5 ″ N, 11 ° 55 ′ 21 ″ E
|
|
|
| Sieglitz wind turbines
|
2003
|
4.0
|
2
|
Vestas V80-2MW (2 ×)
|
Sieglitz
|
SLK
|
51 ° 39 '6 "N, 11 ° 51' 5" E
|
Plambeck, PNE Wind
|
|
| Siestedt wind turbines
|
2002
|
2.0
|
2
|
DeWind D8 80/2000 (2 ×)
|
Siestedt
|
BK
|
52 ° 18 ′ 31 ″ N, 11 ° 7 ′ 2 ″ E
|
|
|
| Spören wind turbine
|
1999
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Spying
|
ABI
|
51 ° 36 ′ 5 ″ N, 12 ° 9 ′ 1 ″ E
|
Energy source
|
|
| Wind turbines Staßfurt
|
2000
|
1.0
|
2
|
Enercon E-40 / 5.40 (2 ×)
|
Staßfurt
|
SLK
|
51 ° 49 ′ 27 ″ N, 11 ° 36 ′ 8 ″ E
|
Energy source
|
|
| Stegelitz wind turbine
|
1996
|
0.6
|
1
|
Tacke TW 600 (1 ×)
|
Stegelitz
|
JL
|
52 ° 10 ′ 27 ″ N, 11 ° 54 ′ 7 ″ E
|
|
|
| Tangeln wind turbine
|
2003
|
0.6
|
1
|
Enercon E-40 / 6.44 (1 ×)
|
Tangling
|
SAW
|
52 ° 40 ′ 15 "N, 11 ° 2 ′ 11" E
|
|
|
| Thalheim wind turbines
|
2003
|
1.2
|
2
|
Enercon E-40 / 6.44 (2 ×)
|
Thalheim
|
ABI
|
51 ° 38 ′ 34 "N, 12 ° 12 ′ 23" E
|
|
|
| Trabitz wind turbine
|
2004
|
1.8
|
1
|
Enercon E-66 / 18.70 (1 ×)
|
Trabitz
|
SLK
|
51 ° 53 ′ 30 "N, 11 ° 49 ′ 4" E
|
|
|
| Trebitz wind turbine
|
1995
|
0.27
|
1
|
Südwind N3127 / 270 (1 ×)
|
Trebitz
|
WB
|
51 ° 45 ′ 2 ″ N, 12 ° 45 ′ 15 ″ E
|
|
|
| Weickelsdorf wind turbine
|
1997
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Weickelsdorf
|
BLK
|
51 ° 1 ′ 34 "N, 11 ° 57 ′ 5" E
|
|
previously 1 × Seewind 25/132
|
| Wettelrode wind turbine
|
1997
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Wettelrode
|
MSH
|
51 ° 30 ′ 28 ″ N, 11 ° 16 ′ 15 ″ E
|
|
|
| Wittenberg wind turbines
|
2000
|
2.6
|
2
|
AN Bonus 1300/62 (2 ×)
|
Euper
|
WB
|
51 ° 53 ′ 35 "N, 12 ° 41 ′ 17" E
|
|
|
| Wohlsdorf wind turbines
|
2003
|
3.6
|
2
|
Enercon E-66 / 18.70 (2 ×)
|
Wohlsdorf
|
SLK
|
51 ° 45 ′ 35 "N, 11 ° 51 ′ 3" E
|
Energy source , citizen power
|
|
| Wolmirstedt wind turbines
|
1999 2006 2020
|
2.6
|
2
|
Wind World W4200 (3 ×) Vestas V80-2MW (1 ×)
|
Wolmirstedt
|
BK
|
52 ° 15 ′ 35 "N, 11 ° 36 ′ 19" E
|
MDP, Notus energy
|
Dismantling of 2 Wind World W4200 in March 2020, the third will be dismantled at the end of the year
|
| Wind turbines Zeitz
|
2001
|
3.0
|
2
|
Enron Wind 1.5sl (2 ×)
|
Time
|
SLK
|
51 ° 58 ′ 18 ″ N, 11 ° 47 ′ 30 ″ E
|
Volkswind, wind7
|
|
| Alleringersleben-Eimersleben-Ostingersleben wind farm
|
1997 2002 2006 2008
|
36.5
|
24
|
Enercon E-40 / 5.40 (4 ×) Enercon E-40 / 6.44 (4 ×) REpower MM82 (2 ×) Vestas V80-2MW (14 ×)
|
Alleringersleben Eimersleben Ostingersleben
|
BK
|
52 ° 13 '18 "N, 11 ° 9' 35" E
|
Prokon , Denker & Wulf
|
|
| Alsleben wind farm
|
2005 2007 2016
|
83.35
|
47
|
GE Wind Energy 1.5sl (36 ×) Südwind S77 (1 ×) Vestas V90-2MW (1 ×) GE 2.75-120 (3 ×) Enercon E-92 (1 ×) Enercon E-101 (5 ×)
|
Alsleben Schackstedt
|
SLK
|
51 ° 43 ′ 10 "N, 11 ° 38 ′ 23" E
|
DEW21 , heliotec, eab, Sabowind
|
|
| Amesdorf wind farm
|
2002 2012
|
12.5
|
8th
|
GE Wind Energy 1.5sl (7 ×) Vestas V90-2MW (1 ×)
|
Amesdorf
|
SLK
|
51 ° 45 ′ 32 "N, 11 ° 36 ′ 2" E
|
Energiequelle , Ökofair Energie, Windwärts
|
|
| Arneburg wind farm
|
2001 2016
|
37.8
|
24
|
Enercon E-40 5.40 (1 ×) Enercon E-66 18.70 (1 ×) Enron Wind 1.5sl (20 ×) GE 2.75-120 (2 ×)
|
Arneburg bill mountains
|
SDL
|
52 ° 38 ′ 33 "N, 11 ° 59 ′ 0" E
|
Falck Renewables
|
|
| Arnstedt wind farm
|
2001
|
5.0
|
5
|
Fuhrländer FL 1000 (5 ×)
|
Arnstedt
|
MSH
|
51 ° 41 ′ 32 "N, 11 ° 29 ′ 32" E 51 ° 41 ′ 25 "N, 11 ° 30 ′ 22" E
|
|
|
| Aschersleben wind farm
|
2001
|
2.64
|
4th
|
Vestas V47-660kW (4 ×)
|
Aschersleben
|
SLK
|
51 ° 43 ′ 16 "N, 11 ° 27 ′ 32" E
|
heliotec
|
|
| Asendorfer Kippe wind farm
|
2007
|
26.0
|
13
|
Vestas V90-2MW (13 ×)
|
Stedten Esperstedt
|
MSH SK
|
51 ° 25 ′ 29 "N, 11 ° 42 ′ 23" E
|
ABO Wind
|
erected on recultivated waste dump in the Amsdorf opencast mine
|
| Ausleben-Badeleben-Wormsdorf wind farm
|
1997 1999 2005 2010 2013
|
90.35
|
60
|
Nordtank NTK600 / 43 (17 ×) NEG Micon NM60 / 1000 (1 ×) Nordex N60 / 1300 (4 ×) AN Bonus 1300/62 (10 ×) Enercon E-70 (3 ×) Enercon E-70 E4 (2 × ) Vestas V80-2MW (12 ×) Enercon E-82 E2 (8 ×) Enercon E-101 (3 ×)
|
Live out bathing life in Wormsdorf
|
BK
|
52 ° 7 ′ 16 ″ N, 11 ° 9 ′ 21 ″ E
|
MDP, wind7, WindStrom, Trianel Renewable Energies
|
Repowering 2013 (8 × Enercon E-82 E2 and 3 × Enercon E-101 instead of 11 × Nordex N60 / 1300 )
|
| Baalberge wind farm
|
2001 2015
|
25.65
|
18th
|
Vestas V52-850kW (9 ×) Südwind S70 (4 ×) Nordex N117 / 2400 (5 ×)
|
Baalberg
|
SLK
|
51 ° 45 ′ 30 "N, 11 ° 49 ′ 20" E
|
ETL, east wind, braid
|
|
| Badel wind farm
|
2002 2006 2015–2016
|
26.2
|
13
|
AN Bonus 1300/62 (6 ×) Vestas V80-2MW (2 ×) Nordex N117 / 2400 (1 ×) Nordex N117 / 3000 (4 ×)
|
Thüritz lie
|
SAW
|
52 ° 44 ′ 21 ″ N, 11 ° 21 ′ 10 ″ E
|
Citizens' electricity, WindStrom, Badel wind energy
|
2016 repowering (2 × Nordex N117 / 3000 instead of 2 × AN Bonus 1300/62 )
|
| Badingen-Querstedt wind farm
|
2002
|
13.86
|
21st
|
Vestas V47-660kW (21 ×)
|
Badingen Querstedt
|
SDL
|
52 ° 35 ′ 25 "N, 11 ° 38 ′ 32" E
|
CALLISTON, WP Badingen
|
|
| Barnstädt wind farm
|
1996
|
2.0
|
4th
|
Enercon E-40 / 5.40 (4 ×)
|
Barnstädt
|
SK
|
51 ° 19 ′ 19 ″ N, 11 ° 37 ′ 16 ″ E
|
WSB
|
|
| Beesenstedt-Rottelsdorf wind farm
|
1999 2000 2003 2004 2006 2008 2010 2015 2020
|
96.5
|
49
|
Tacke TW 1.5s (11 ×) Enron Wind 1.5s (8 ×) GE Wind Energy 1.5sl (3 ×) Vestas V80-2MW (5 ×) Vestas V90-2MW (2 ×) Enercon E-82 (4 ×) Enercon E-82 E2 (8 ×) REpower 3.2M114 (3 ×) Senvion 3.2M122 (3 ×) Vestas V126-3.45MW (2 ×)
|
Beesenstedt Rottelsdorf
|
SK MSH
|
51 ° 34 ′ 24 "N, 11 ° 42 ′ 0" E
|
Ostwind, heliotec, Nuscheler estate, Sabowind
|
Repowering 2020 in progress
|
| Benndorf wind farm
|
2001 2015
|
9.0
|
7th
|
NEG Micon NM60 / 1000 (5 ×) Vestas V90-2MW (2 ×)
|
Benndorf
|
MSH
|
51 ° 34 ′ 54 ″ N, 11 ° 27 ′ 24 ″ E
|
MDP, WEMAG
|
|
| Bertkow-Baben wind farm
|
2004 2009 2014
|
95.0
|
51
|
GE 1.5sl (1 ×) Enercon E-66 / 18.70 (40 ×) Enercon E-70 (5 ×) Enercon E-82 E2 (5 ×)
|
Bertkow Baben
|
SDL
|
52 ° 42 ′ 27 "N, 11 ° 53 ′ 23" E
|
new energies heeck
|
|
| Beyersdorf wind farm
|
1998 2001
|
2.83
|
4th
|
Vestas V47-660kW (3 ×) Vestas V52-850kW (1 ×)
|
Beyersdorf
|
ABI
|
51 ° 35 ′ 4 ″ N, 12 ° 11 ′ 5 ″ E
|
ContinoWind, Heiwista
|
|
| Biere-Borne wind farm
|
1999 2000 2001 2002 2004 2008 2009 2011 2012 2016
|
132.7
|
68
|
WindWorld W5200 (4 ×) NEG Micon NM52 / 900 (3 ×) NEG Micon NM60 / 1000 (3 ×) NEG Micon NM72c / 1500 (6 ×) NEG Micon NM82 / 1500 (11 ×) Vestas V80-2MW (1 ×) Vestas V90-3MW (1 ×) Enercon E-82 E3 (9 ×) Enercon E-82 (15 ×) Enercon E-82 E2 (13 ×) Vestas V112-3.3MW (2 ×)
|
Beers Borne
|
SLK
|
51 ° 57 '26 "N, 11 ° 36' 13" E
|
MDP, wind7, wpd
|
Repowering 2011 and 2012 (13 × Enercon E-82 E2 instead of 19 × Wind World W5200)
|
| Bismark-Garlipp wind farm
|
1998 2001 2012 2014 2015 2017
|
43.32
|
17th
|
Vestas V44-600kW (2 ×) Vestas V47-660kW (2 ×) Vestas V112-3.0MW (7 ×) Vestas V112-3.3MW (3 ×) Vestas V117-3.3MW (10 ×)
|
Bismark Garlipp
|
SDL
|
52 ° 38 ′ 31 ″ N, 11 ° 35 ′ 18 ″ E
|
Project group of companies
|
|
| Blankenheim wind farm
|
1997
|
1.8
|
3
|
Tacke TW 600 (3 ×)
|
Blankenheim
|
MSH
|
51 ° 30 ′ 35 "N, 11 ° 24 ′ 31" E
|
heliotec, Germania wind farm
|
|
| Blauer Warthe wind farm
|
1999 2002 2003 2004 2009 2012 2013 2014 2016
|
85.25
|
52
|
WindWorld W5200 (16 ×) NEG Micon NM72 / 1500 (5 ×) NEG Micon NM52 / 900 (2 ×) REpower MD77 (1 ×) Enercon E-70 (10 ×) Enercon E-70 E4 (14 ×) REpower 3.2M114 (1 ×) Enercon E-92 (3 ×)
|
Aschersleben Strummendorf
|
SLK
|
51 ° 48 ′ 2 "N, 11 ° 29 ′ 29" E
|
Energiequelle , MDP, wpd , SAB WindTeam, WP Blaue Warthe I – III
|
2016 repowering (1 × Enercon E-92 instead of 1 × WindWorld W5200)
|
| Bornstedt-Holdenstedt-Osterhausen wind farm
|
2006 2007 2011
|
47.0
|
27
|
GE Wind Energy 1.5sl (8 ×) Fuhrländer FL MD77 (6 ×) Vestas V90-2MW (13 ×)
|
Bornstedt Holdenstedt Osterhausen
|
MSH
|
51 ° 27 ′ 18 "N, 11 ° 28 ′ 11" E
|
heliotec, QUADA, Schöller Wind
|
|
| Bornstedt-Rottmersleben wind farm
|
2000 2001 2003 2006
|
88.3
|
48
|
Enercon E-40 / 5.40 (6 ×) AN Bonus 2300/82 (16 ×) GE Wind Energy 1.5sl (7 ×) Vestas V80-2MW (19 ×)
|
Bornstedt Nordgermersleben Rottmersleben Schackensleben
|
BK
|
52 ° 11 ′ 32 "N, 11 ° 22 ′ 11" E
|
Germania Windpark, Prokon , WindStrom
|
erected on the A 2
|
| Bröckau wind farm
|
2012 2014
|
10.4
|
5
|
REpower MM92 (4 ×) eno energy 92 (1 ×)
|
Broeckau
|
BLK
|
50 ° 57 ′ 19 ″ N, 12 ° 14 ′ 4 ″ E
|
eno energy, Schöller Wind
|
|
| Chüden wind farm
|
1996 2002 2005 2016
|
19.85
|
12
|
Enercon E-40 / 5.40 (4 ×) Enron Wind 1.5s (2 ×) GE Wind Energy 1.5sl (3 ×) Vestas V117-3.45MW (3 ×)
|
Chudes
|
SAW
|
52 ° 50 ′ 9 ″ N, 11 ° 13 ′ 25 ″ E
|
Ventotec, UKA Group
|
|
| Colno wind farm
|
1997 1999
|
4.0
|
4th
|
Enercon E-40 / 5.40 (2 ×) Enercon E-66 / 15.66 (2 ×)
|
Colno
|
SLK
|
51 ° 52 ′ 10 "N, 11 ° 51 ′ 9" E
|
Citizen Stream
|
|
| Cösitz-Schortewitz-Weißandt-Gölzau wind farm
|
1999 2003 2004 2005 2006 2008 2010 2016
|
47.1
|
26th
|
Nordex N60 / 1300 (2 ×) Vestas V52-850kW (6 ×) Nordex N80 / 2500 (6 ×) GE Wind Energy 1.5sl (6 ×) Enercon E-66 15.66 (1 ×) Enercon E-70 (1 ×) Vestas V80-2MW (1 ×) Vestas V126-3.3MW (3 ×)
|
Cösitz Schortewitz Weißandt-Gölzau
|
ABI
|
51 ° 40 ′ 14 "N, 12 ° 2 ′ 25" E 51 ° 39 ′ 20 "N, 12 ° 2 ′ 31" E
|
Aufwind, e.disnatur, Energiequelle , Saxovent, Notus energy, VSB
|
Park includes a wind turbine built in 1996 on a factory chimney
|
| Dobberkau wind farm
|
2006 2007 2015 2016
|
50.5
|
23
|
Vestas V90-2MW (14 ×) GE Wind Energy 2.5-120 (9 ×)
|
Arensberg Dobberkau
|
SDL
|
52 ° 41 ′ 22 "N, 11 ° 35 ′ 2" E
|
wpd , DIF Renewable Energy
|
|
| Dorna-Kemberg-Schnellin wind farm
|
2000 2002 2005 2012 2014
|
79.4
|
44
|
Enercon E-66 / 15.66 (13 ×) Vestas V80-2MW (10 ×) Südwind S70 (10 ×) Vestas V90-2MW (6 ×) Nordex N117 / 2400 (4 ×) Vestas V112-3.3MW (1 ×)
|
Dorna Kemberg Schnellin
|
WB
|
51 ° 46 ′ 19 "N, 12 ° 41 ′ 35" E
|
EnBW , E.ON Climate & Renewables , WP Dorna
|
|
| Dornbock wind farm
|
2002
|
15.0
|
10
|
GE Wind Energy 1.5sl (10 ×)
|
Dornbock
|
ABI
|
51 ° 50 ′ 18 ″ N, 11 ° 53 ′ 0 ″ E
|
EOS
|
|
| Drebenstedt wind farm
|
2016
|
14.4
|
6th
|
Nordex N117 / 2400 (6 ×)
|
Drebenstedt
|
SAW
|
52 ° 42 ′ 34 "N, 10 ° 53 ′ 9" E
|
wpd , WP Jübar-Drebenstedt
|
|
| Drohndorf wind farm
|
1999 2000 2003 2004 2017 2020
|
91.55
|
43
|
WindWorld W5200 / 750 (7 ×) DeWind D6 64/1000 (4 ×) REpower MD77 (10 ×) REpower MM82 (6 ×) Vensys 120/3000 (4 ×) Vensys 136/3500 (12 ×)
|
Drohndorf Mehringen
|
SLK
|
51 ° 43 ′ 7 ″ N, 11 ° 33 ′ 27 ″ E
|
MDP
|
2020 repowering (12 × Vensys 136/3500 instead of 7 × WindWorld W5200 / 750 and 5 × DeWind D6 64/1000 )
|
| Drosa wind farm
|
2005
|
6.0
|
4th
|
GE Wind Energy 1.5sl (4 ×)
|
Drosa
|
ABI
|
51 ° 49 ′ 13 "N, 11 ° 52 ′ 28" E
|
MBBF
|
|
|
Druiberg wind farm
|
1993 1995 2004 2005 2006 2010 2014 2015 2015-2016 2016
|
88.75
|
41
|
Micon M1500-600 (1 ×) Enercon E-66 / 20.70 (16 ×) Enercon E-70 (12 ×) Enercon E-112 (1 ×) Enercon E-82 E2 (4 ×) Enercon E-92 (3 × ) Enercon E-101 (2 ×) Enercon E-115 (1 ×) Enercon E-53 (1 ×)
|
Badersleben Dardesheim Rohrsheim
|
HZ
|
51 ° 59 ′ 14 "N, 10 ° 50 ′ 0" E
|
Energiepark Druiberg, SAB WindTeam
|
Repowering 2014 (2 × Enercon E-82 E2 instead of 2 × Micon M1500-600 ), until 2013 3 × Lagerwey LW 30/250 and until 2014 1 × Lagerwey LW 18/80 , 2016 1 × Enercon E-53 instead of 1 × Micon M1500-600
|
| Düsedau-Erxleben wind farm
|
2002 2013-2014 2016 2017
|
36.45
|
15th
|
NEG Micon NM72c / 1500 (5 ×) Enercon E-92 (2 ×) Enercon E-101 (5 ×) Enercon E-115 (3 ×)
|
Düsedau Erxleben
|
SDL
|
52 ° 45 ′ 2 "N, 11 ° 48 ′ 36" E
|
SoWiTec, wpd
|
Repowering planned
|
| Ebendorf wind farm
|
2001 2002
|
13.8
|
8th
|
Enercon E-66 / 18.70 (6 ×) GE Wind Energy 1.5sl (2 ×)
|
Ebendorf Niederndodeleben
|
BK
|
52 ° 10 ′ 20 ″ N, 11 ° 33 ′ 5 ″ E
|
MBBF
|
erected at the Magdeburg motorway junction
|
| Edersleben-Riethnordhausen wind farm
|
1997 2002 2007
|
23.8
|
20th
|
Nordtank NTK600 (3 ×) NEG Micon NM60 / 1000 (12 ×) Vestas V90-2MW (5 ×)
|
Edersleben Riethnordhausen
|
MSH
|
51 ° 24 ′ 18 ″ N, 11 ° 15 ′ 12 ″ E
|
MDP, E.ON Climate & Renewables , SoWiTec
|
|
|
Egeln-Nord wind farm
|
1997 1999 2000 2001 2002 2005 2009 2010 2019-2020
|
85.2
|
41
|
Enercon E-66 / 18.70 (9 ×) Enercon E-112 (1 ×) GE Wind Energy 1.5sl (3 ×) Vestas V90-2MW (18 ×) Südwind S77 (3 ×) Fuhrländer FL MD77 (2 ×) Vestas V117 -3.3MW (5 ×)
|
Egeln-Nord Etgersleben
|
SLK
|
51 ° 58 ′ 26 ″ N, 11 ° 27 ′ 1 ″ E
|
Volkswind , Prokon
|
Prototype of the Enercon E-112 with 4.5 MW nominal output 2019-2020 repowering (5 × Vestas V117-3.3MW instead of 2 × Enercon E-40 / 5.40 )
|
| Eilsleben-Ovelgünne wind farm
|
1999 2006
|
26.9
|
23
|
Nordex N60 / 1300 (13 ×) Vestas V80-2MW (10 ×)
|
Eilsleben Ovelgünne
|
BK
|
52 ° 9 ′ 11 "N, 11 ° 14 ′ 34" E
|
Prokon
|
|
| Elster wind farm
|
2000 2001 2002 2007 2012
|
44.9
|
57
|
Enercon E-40 / 6.44 (50 ×) Enercon E-70 (4 ×) Enercon E-82 E2 (3 ×)
|
Elster Gentha Listerfehrda Meltendorf Ruhlsdorf
|
WB
|
51 ° 50 ′ 11 "N, 12 ° 52 ′ 19" E
|
wpd , WSB
|
|
| Ermsleben wind farm
|
2002
|
7.5
|
5
|
NEG Micon NM72 / 1500 (5 ×)
|
Endorf
|
HZ
|
51 ° 43 ′ 15 "N, 11 ° 23 ′ 33" E
|
MDP
|
|
| Esperstedt-Obhausen wind farm
|
2001 2006 2010 2012 2013
|
125.4
|
59
|
Enercon E-66 / 18.70 (30 ×) Enercon E-70 (5 ×) Fuhrländer FL 2500 (16 ×) Enercon E-53 (1 ×) Enercon E-82 E2 (1 ×) Enercon E-101 (6 ×)
|
Asendorf Dornstedt Esperstedt Neuweidenbach Nemsdorf
|
SK
|
51 ° 23 ′ 26 "N, 11 ° 42 ′ 20" E
|
HSE , MBBF, Global Wind Power, N-ERGIE
|
erected on both sides of the A 38
|
| Farnstädt wind farm
|
2004 2007
|
41.0
|
22nd
|
NEG Micon NM82 / 1500 (6 ×) Vestas V90-2MW (16 ×)
|
Farnstädt Gatterstädt
|
SK
|
51 ° 24 ′ 28 "N, 11 ° 35 ′ 8" E
|
e3 GmbH
|
|
| Ferchland-Nielebock wind farm
|
2001 2002 2003
|
23.7
|
17th
|
Nordex N60 / 1300 (4 ×) AN Bonus 1300/62 (5 ×) GE Wind Energy 1.5sl (8 ×)
|
Ferchland Nielebock
|
JL
|
52 ° 25 ′ 32 "N, 12 ° 2 ′ 12" E
|
Prokon , BVT
|
|
| Fischbeck wind farm
|
2002 2013 2015
|
28.5
|
16
|
GE Wind Energy 1.5sl (10 ×) Siemens SWT-2.3-113 (5 ×) Vestas V90-2MW (1 ×)
|
Cable seat
|
JL
|
52 ° 31 '31 "N, 12 ° 2' 32" E
|
enercity
|
|
| Fleetmark wind farm
|
2002 2017
|
37.5
|
19th
|
Enercon E-40 / 6.44 (2 ×) REpower MD77 (11 ×) Vestas V117-3.3MW (6 ×)
|
Fleetmark Kerkau
|
SAW
|
52 ° 48 ′ 5 ″ N, 11 ° 24 ′ 9 ″ E
|
Prokon
|
|
| Flessau-Storbeck wind farm
|
2014
|
22.95
|
9
|
Enercon E-82 E2 (6 ×) Enercon E-101 (3 ×)
|
Storbeck
|
SDL
|
52 ° 45 ′ 20 "N, 11 ° 42 ′ 22" E
|
Wind power
|
|
| Freckleben wind farm
|
1999 2007
|
6.0
|
5
|
DeWind D6 62/1000 (4 ×) DeWind D8 80/2000 (1 ×)
|
Freckleben
|
SLK
|
51 ° 41 ′ 34 "N, 11 ° 34 ′ 18" E
|
WP Freckleben
|
|
| Wind farm Freiheit III
|
1999 2003 2004 2006 2010 2011–2012 2012
|
25.2
|
17th
|
DeWind D4 48/600 (4 ×) Südwind S77 (3 ×) DeWind D8 80/2000 (7 ×) Enercon E-53 (2 ×) Nordex N100 / 2500 (1 ×)
|
Brehna Roitzsch
|
ABI
|
51 ° 34 '17 "N, 12 ° 13' 25" E
|
Yield
|
built next to the former toxic waste dump
|
| Gadegast wind farm
|
2016
|
22.0
|
8th
|
GE 2.75-120 (8 ×)
|
Gadegast
|
WB
|
51 ° 54 ′ 31 ″ N, 12 ° 51 ′ 31 ″ E
|
Vortex Energy
|
|
| Gagel-Dewitz wind farm
|
2017
|
39.0
|
13
|
Enercon E-115 (13 ×)
|
Gagel Dewitz
|
SDL
|
52 ° 50 ′ 16 "N, 11 ° 35 ′ 30" E
|
Prokon
|
|
| Galgenberg wind farm
|
1996
|
3.0
|
5
|
Nordtank NTK600 (1 ×) GET Danwin 600/41 (4 ×)
|
Allstedt Nienstedt
|
MSH
|
51 ° 25 ′ 16 "N, 11 ° 23 ′ 33" E
|
MDP, Raiffeisen Emsland Süd
|
|
| Gardelegen wind farm
|
2000 2001 2018
|
17.4
|
11
|
DeWind D6 62/1000 (9 ×) Enercon E-141 EP4 (2 ×)
|
Guards
|
SAW
|
52 ° 32 '32 "N, 11 ° 25' 4" E
|
Ökofair energy
|
|
| Genthin wind farm
|
2009
|
6.0
|
3
|
Enercon E-82 (3 ×)
|
Genthin
|
JL
|
52 ° 26 ′ 0 ″ N, 12 ° 9 ′ 11 ″ E
|
WP Genthin
|
|
| Gerbstedt-Ihlewitz wind farm
|
1999 2000 2001 2002 2008 2009
|
55.8
|
41
|
Nordex N60 / 1300 (22 ×) Enron Wind 1.5s (9 ×) AN Bonus 1300/62 (1 ×) GE Wind Energy 1.5sl (4 ×) Vestas V90-2MW (2 ×) Enercon E-53 (3 ×)
|
Gerbstedt Ihlewitz Zabenstedt
|
MSH
|
51 ° 38 ′ 25 ″ N, 11 ° 39 ′ 23 ″ E
|
eno energy, Ostwind, SeeBA, wpd
|
|
| Gommern wind farm
|
2008 2010
|
26.0
|
13
|
Vestas V90-2MW (11 ×) Enercon E-70 (2 ×)
|
Nedlitz
|
JL
|
52 ° 7 ′ 4 ″ N, 11 ° 51 ′ 15 ″ E
|
Boreas
|
|
| Grabow-Reesen wind farm
|
2012
|
18.4
|
8th
|
Enercon E-82 E2 (8 ×)
|
Grabow Reesen
|
JL
|
52 ° 16 ′ 20 ″ N, 11 ° 57 ′ 19 ″ E
|
WP Grabow-Reesen
|
|
| Grana wind farm
|
2001
|
1.8
|
3
|
Enercon E-40 / 6.44 (3 ×)
|
Grana
|
BLK
|
51 ° 2 ′ 35 "N, 12 ° 5 ′ 23" E
|
PNE Wind , Pommer & Black
|
|
| Gröningen wind farm
|
2007 2011
|
26.0
|
13
|
Enercon E-70 (2 ×) Vestas V90-2MW (11 ×)
|
Groeningen
|
BK
|
51 ° 54 ′ 22 "N, 11 ° 14 ′ 16" E
|
WP Gröningen
|
|
| Großkorbetha wind farm
|
1994 2005 2017
|
7.7
|
7th
|
Enercon E-40 / 5.40 (3 ×) Enercon E-40 / 6.44 (1 ×) Enercon E-58 (1 ×) Enercon E-82 E2 (2 ×)
|
Großkorbetha Wengelsdorf
|
BLK
|
51 ° 16 ′ 9 ″ N, 12 ° 0 ′ 11 ″ E
|
Aquavent
|
2017 repowering (2 × Enercon E-82 E2 instead of 1 × Enercon E-40 / 5.40 )
|
| Groß Santersleben-Nord wind farm
(Lower Börde)
|
1997 2001 2003 2006 2006-2007
|
28.8
|
18th
|
Tacke TW 600 (4 ×) Enercon E-66 / 18.70 (3 ×) GE Wind Energy 1.5sl (2 ×) Vestas V80-2MW (6 ×) Enercon E-70 (3 ×)
|
Groß Santersleben Hermsdorf Gutenswegen
|
BK
|
52 ° 12 ′ 18 ″ N, 11 ° 28 ′ 3 ″ E
|
Germania Windpark, WP Hermsdorf, Vensol, Notus energy
|
|
| Groß Santersleben-Süd wind farm
|
1997 2000 2003 2010 2017
|
20.3
|
11
|
Tacke TW 600 (1 ×) GE 1.5sl (6 ×) GE 2.5xl (3 ×) GE 3.2-130 (1 ×)
|
Great Santersleben
|
BK
|
52 ° 10 ′ 17 ″ N, 11 ° 27 ′ 20 ″ E
|
Germania Windpark, Stadtwerke Rheine
|
erected on the A 2 2017 repowering (1 × GE 3.2-130 instead of 2 × Tacke TW 1.5s )
|
|
Große Schanze wind farm
|
2012
|
42.0
|
21st
|
Vestas V90-2MW (21 ×)
|
Holleben
|
SK
|
51 ° 25 ′ 13 ″ N, 11 ° 50 ′ 2 ″ E
|
Saxovent-Notus energy, Terrawatt planning company
|
built on both sides of the A 143
|
| Hookstedt wind farm
|
2001 2003 2006 2008 2011
|
66.1
|
36
|
Nordex N62 / 1300 (6 ×) Vestas V80-2MW (28 ×) Enercon E-82 E2 (1 ×)
|
Groppendorf Hakenstedt
|
BK
|
52 ° 10 ′ 11 ″ N, 11 ° 17 ′ 20 ″ E
|
Prokon , WindStrom
|
|
| Haldensleben-Süd wind farm
|
2006
|
5.8
|
3
|
Vestas V80-2MW (2 ×) Enercon E-66 18.66 (1 ×)
|
Wedringen
|
BK
|
52 ° 14 ′ 27 ″ N, 11 ° 28 ′ 6 ″ E
|
Notus energy
|
|
| Helbra wind farm
|
2000
|
3.9
|
4th
|
NEG Micon NM52 / 900 (1 ×) NEG Micon NM60 / 1000 (3 ×)
|
Helbra
|
MSH
|
51 ° 33 ′ 18 "N, 11 ° 30 ′ 24" E
|
MDP
|
|
| Hillersleben wind farm
|
1999
|
1.8
|
3
|
Tacke TW 600a (3 ×)
|
Hillersleben
|
BK
|
52 ° 17 ′ 23 "N, 11 ° 28 ′ 7" E
|
Energy source
|
|
| Hindenburg wind farm
|
2000
|
5.1
|
6th
|
Frisia F56 / 850 (1 ×)
|
Hindenburg
|
SDL
|
52 ° 44 ′ 17 "N, 11 ° 54 ′ 36" E
|
wpd
|
|
| Hohe Wuhne wind farm
|
2000 2007 2009 2011
|
43.35
|
22nd
|
Nordex N60 / 1300 (5 ×) REpower MM92 (7 ×) Enercon E-82 (5 ×) Nordex N90 / 2500 (5 ×)
|
Förderstedt Hohenerxleben
|
SLK
|
51 ° 52 ′ 22 "N, 11 ° 39 ′ 16" E
|
Prokon
|
|
| Hohenberg-Krusemark wind farm
|
1997
|
1.8
|
3
|
Tacke TW 600 (3 ×)
|
Hohenberg-Krusemark
|
SDL
|
52 ° 44 ′ 8 "N, 11 ° 58 ′ 13" E
|
Germania wind farm
|
|
| Hohenmölsen wind farm
|
2014 2015
|
28.6
|
13
|
eno energy 92 (13 ×)
|
Hohenmölsen
|
BLK
|
51 ° 9 '2 "N, 12 ° 3' 26" E
|
eno energy
|
|
| Holleben wind farm
|
2004
|
25.0
|
17th
|
GE Wind Energy 1.5sl (17 ×)
|
Holleben
|
SK
|
51 ° 25 ′ 33 ″ N, 11 ° 52 ′ 10 ″ E
|
heliotec
|
|
| Höwisch wind farm
|
2017
|
9.0
|
3
|
Enercon E-115 (3 ×)
|
Sneer
|
SAW
|
52 ° 51 ′ 24 ″ N, 11 ° 36 ′ 21 ″ E
|
Prokon
|
|
| Hübitz wind farm
|
1997
|
2.4
|
4th
|
Vestas V44-600kW (4 ×)
|
Huebitz
|
MSH
|
51 ° 35 ′ 8 ″ N, 11 ° 33 ′ 2 ″ E
|
east wind
|
|
| Hüselitz wind farm
|
2015-2016 2017
|
152.4
|
46
|
Vestas V112-3.3MW (42 ×) Vestas V126-3.45MW (4 ×)
|
Hüselitz
|
SDL
|
52 ° 31 ′ 6 ″ N, 11 ° 47 ′ 15 ″ E
|
CPC Germania, ETE wind farm
|
|
| Immekath wind farm
|
2001 2002
|
2.4
|
4th
|
Enercon E-40 6.44 (4 ×)
|
Immekath
|
SAW
|
52 ° 36 ′ 50 ″ N, 11 ° 4 ′ 20 ″ E
|
|
|
| Jeetze wind farm
|
2002
|
2.4
|
4th
|
Enercon E-40 / 6.44 (4 ×)
|
Jeetze
|
SAW
|
52 ° 43 ′ 21 ″ N, 11 ° 25 ′ 25 ″ E
|
Ventotec
|
|
| Jeetze-Kahrstedt wind farm
|
2006 2011 2013
|
53.9
|
24
|
Enercon E-70 (16 ×) Enercon E-82 E2 (3 ×) Vestas V112-3.0MW (5 ×)
|
Jeetze Kahrstedt Brunau
|
SAW
|
52 ° 43 '29 "N, 11 ° 26' 24" E
|
wpd
|
|
| Jeggeleben-Liesten wind farm
|
2004 2014 2015
|
45.4
|
25th
|
Vestas V82-1.5MW (18 ×) Vestas V112-3.0MW (3 ×) Enercon E-92 (4 ×)
|
Jeggelleben Liesten
|
SAW
|
52 ° 46 ′ 13 ″ N, 11 ° 17 ′ 28 ″ E
|
deag, MDP, wind power
|
|
| Kassieck-Lindstedt wind farm
|
2012 2015
|
52.9
|
23
|
Enercon E-82 E2 (23 ×)
|
Kassieck Lindstedt
|
SAW
|
52 ° 34 ′ 24 "N, 11 ° 30 ′ 25" E
|
Wind power
|
|
| Klein Rodensleben wind farm
|
2000
|
4.95
|
3
|
Vestas V66-1.65MW (3 ×)
|
Klein Rodensleben
|
BK
|
52 ° 7 ′ 7 "N, 11 ° 25 ′ 11" E
|
WKN Windkraft Nord, wind power
|
|
| Klein Schwechten wind farm
|
2001
|
1.98
|
3
|
Vestas V47-660kW (3 ×)
|
Little weak ones
|
SDL
|
52 ° 43 ′ 5 "N, 11 ° 59 ′ 28" E
|
|
|
| Kleinpaschleben wind farm
|
2005
|
18.0
|
12
|
GE Wind Energy 1.5sl (12 ×)
|
Kleinpaschleben Drosa
|
ABI
|
51 ° 48 ′ 10 "N, 11 ° 52 ′ 50" E
|
EOS
|
|
| Wind farm experts
|
2003 2008
|
33.6
|
17th
|
AN Bonus 1300/62 (5 ×) AN Bonus 2300/82 (10 ×) REpower MM82 (2 ×)
|
Könnern Kirchedlau
|
SLK
|
51 ° 41 ′ 4 "N, 11 ° 48 ′ 2" E
|
Prokon
|
erected on the A 14
|
| Krevese-Rossau wind farm
|
1997 2001 2002 2003 2013-2014 2017
|
78.4
|
28
|
Enercon E-66 / 18.70 (1 ×) Vestas V80-2MW (8 ×) Vestas V112-3.0MW (11 ×) Vestas V112-3.45MW (8 ×)
|
Krevese Rossau
|
SDL
|
52 ° 49 ′ 2 "N, 11 ° 40 ′ 2" E
|
Germania Windpark, Global Wind Power, Wenger-Rosenau, Notus energy
|
2017 repowering (8 × Vestas V112-3.45MW instead of 7 × Vestas V80-2MW and 2 × Tacke TW 600 )
|
| Krusemark wind farm
|
1998 2001 2004 2005 2007
|
33.6
|
26th
|
Enercon E-40 / 5.40 (5 ×) Enercon E-40 / 6.44 (4 ×) Enercon E-66 18.70 (9 ×) GE 1.5sl (7 ×) Enercon E-70 (1 ×)
|
Krusemark Groß Ellingen
|
SDL
|
52 ° 42 ′ 2 ″ N, 11 ° 56 ′ 9 ″ E
|
RWE Innogy
|
|
| Langendorf wind farm
|
2001
|
22.5
|
15th
|
Enron Wind 1.5sl (15 ×)
|
Langendorf Traupitz
|
BLK
|
51 ° 5 ′ 27 "N, 12 ° 16 ′ 13" E 51 ° 5 ′ 25 "N, 12 ° 14 ′ 17" E
|
WP Langendorf, AEZ Dienstleistungs-GmbH, 3U ENERGY
|
|
| Langeneichstädt wind farm
|
1997 2002
|
2.2
|
4th
|
Enercon E-40 / 5.40 (2 ×) Enercon E-40 / 6.44 (2 ×)
|
Langeneichstädt
|
SK
|
51 ° 20 ′ 2 "N, 11 ° 44 ′ 25" E
|
WP Langeneichstädt
|
|
| Langenweddingen wind farm
|
2002 2004
|
8.4
|
6th
|
Enercon E-40 / 6.44 (2 ×) Enercon E-66 / 18.70 (4 ×)
|
Langenweddingen
|
BK
|
52 ° 3 ′ 0 ″ N, 11 ° 30 ′ 1 ″ E
|
|
|
| Lindtorf wind farm
|
2014
|
16.5
|
5
|
Vestas V112-3.3MW (5 ×)
|
Lindtorf
|
SDL
|
52 ° 41 ′ 23 "N, 11 ° 55 ′ 29" E
|
Green plants
|
|
| Löberitz wind farm
|
2003
|
4.25
|
5
|
Vestas V52-850kW (5 ×)
|
Löberitz
|
ABI
|
51 ° 39 ′ 33 ″ N, 12 ° 11 ′ 16 ″ E
|
wpd
|
|
| Löberitz-Großzöberitz-Zörbig wind farm
|
1999 2001 2002 2003
|
40.5
|
27
|
Enercon E-66 / 15.66 (5 ×) Vestas V52-850kW (8 ×) Enercon E-66 / 18.70 (9 ×) Vestas V80-2MW (3 ×) Vestas V90-2MW (2 ×)
|
Großzöberitz Löberitz Zörbig
|
ABI
|
51 ° 38 ′ 14 "N, 12 ° 10 ′ 6" E
|
Contino Wind, wpd
|
|
| Lockstedt wind farm
|
2008
|
26.0
|
13
|
Enercon E-70 (13 ×)
|
Lockstedt
|
BK
|
52 ° 23 '19 "N, 11 ° 5' 22" E
|
Natural wind
|
|
| Löderburg wind farm
|
1998 2006 2009
|
9.0
|
6th
|
Enercon E-40 / 5.40 (2 ×) Vestas V80-2MW (2 ×) Enercon E-70 (2 ×)
|
Löderburg lust
|
SLK
|
51 ° 53 '35 "N, 11 ° 32' 35" E 51 ° 54 '19 "N, 11 ° 32' 13" E
|
Energy source , greenwind
|
|
| Luko wind farm
|
2017
|
30.0
|
12
|
GE 2.5-120 (12 ×)
|
Luko
|
WB
|
51 ° 56 ′ 6 ″ N, 12 ° 20 ′ 6 ″ E
|
VSB Group, Sabowind
|
|
|
Magdeburg-Rothensee wind farm
|
2000 2005 2006 2010
|
15.1
|
5
|
Enercon E-66 / 18.70 (2 ×) Enercon E-70 (1 ×) Enercon E-82 (1 ×) Enercon E-126 (1 ×)
|
Rothensee
|
MD
|
52 ° 11 ′ 35 "N, 11 ° 40 ′ 20" E
|
Enercon wind farm , Magdeburg Municipal Works
|
erected next to the Enercon plant and on Steinkopfinsel , prototypes of the Enercon E-82 and the improved Enercon E-126 with a nominal output of 7.6 MW
|
| Mahlwinkel-Nord wind farm
|
2008
|
32.0
|
16
|
Enercon E-82 (16 ×)
|
Grinding angle
|
BK
|
52 ° 24 ′ 1 ″ N, 11 ° 49 ′ 5 ″ E
|
Ventotec
|
|
| Mahlwinkel-Süd wind farm
|
2014-2015
|
46.0
|
20th
|
Enercon E-82 E2 (20 ×)
|
Grinding angle
|
BK
|
52 ° 22 ′ 30 ″ N, 11 ° 49 ′ 16 ″ E
|
Ventotec
|
erected on former military grounds
|
| Mangelsdorf wind farm
|
2002 2014
|
39.4
|
18th
|
Nordex N62 / 1300 (10 ×) Vestas V112-3.3MW (8 ×)
|
Mangelsdorf
|
JL
|
52 ° 31 '26 "N, 12 ° 3' 32" E
|
PNE Wind , EECH, Enercity
|
|
| Meineweh-Droy says wind farm
|
2004 2005 2007 2008
|
19.15
|
13
|
NEG Micon NM48 / 750 (1 ×) NEG Micon NM60 / 1000 (2 ×) Vestas V72-1.5MW (5 ×) REpower MM92 (2 ×) Vestas V90-2MW (2 ×) Enercon E-53 (1 ×)
|
Droyanzig Quesnitz Thierbach
|
BLK
|
51 ° 3 ′ 33 ″ N, 11 ° 59 ′ 9 ″ E 51 ° 3 ′ 5 ″ N, 12 ° 0 ′ 3 ″ E
|
wpd , SoWiTec, ATM
|
|
| Meitzendorf wind farm
|
2002
|
5.4
|
3
|
Enercon E-66 / 18.70 (3 ×)
|
Meitzendorf
|
BK
|
52 ° 13 '10 "N, 11 ° 33' 1" E
|
|
|
| Merbitz-Domnitz-Neutz wind farm
|
1999 2009 2012
|
64.6
|
31
|
Enercon E-66 / 15.66 (4 ×) Enercon E-70 (2 ×) Enercon E-82 (4 ×) Enercon E-82 E2 (3 ×) eno energy 82 (6 ×) Enercon E-92 (1 ×) Enercon E-101 (1 ×) eno energy 92 (10 ×)
|
Merbitz Neutz
|
SK
|
51 ° 37 ′ 3 ″ N, 11 ° 51 ′ 1 ″ E
|
WP Merbitz, eno energy, Energieallianz Bayern
|
erected on the A 14
|
| Molau-Leislau wind farm
|
2002 2009 2010 2011 2012
|
58.0
|
31
|
Vestas V66-1.65MW (16 ×) Enercon E-82 (12 ×) Enercon E-82 E2 (2 ×) Vestas V112-3.0MW (1 ×)
|
Aue Molau Leislau Meyhen
|
BLK
|
51 ° 4 ′ 13 ″ N, 11 ° 47 ′ 13 ″ E
|
Ostwind, MDP, GGEW
|
|
| Mosigkau-Quellendorf-Libbesdorf wind farm
|
2003 2005 2007
|
43.5
|
22nd
|
Enercon E-66 / 18.70 (4 ×) Enercon E-70 (18 ×)
|
Mosigkau spring village Libbesdorf
|
DE ABI
|
51 ° 46 ′ 27 ″ N, 12 ° 7 ′ 20 ″ E
|
WSB
|
|
| Müelte-Oechlitz wind farm
|
2003 2011
|
8.7
|
3
|
Nordex N43 / 600 (3 ×) Enercon E-82 E2 (3 ×)
|
Munch
|
SK
|
51 ° 18 ′ 25 ″ N, 11 ° 44 ′ 8 ″ E
|
EFI wind
|
|
| Mühlanger wind farm
|
2007
|
14.0
|
7th
|
Enercon E-70 (7 ×)
|
Mühlanger Zörnigall
|
WB
|
51 ° 52 ′ 2 "N, 12 ° 43 ′ 33" E
|
WSB
|
|
| Neuendorf-Kakerbeck wind farm
|
2001
|
22.95
|
27
|
Frisia F56 / 850 (27 ×)
|
Neuendorf Kakerbeck
|
SAW
|
52 ° 40 ′ 1 ″ N, 11 ° 14 ′ 22 ″ E
|
NEVAG
|
Repowering of the plants planned for 2021
|
| Neuferchau-Kusey wind farm
|
2001 2014
|
44.6
|
20th
|
NEG Micon NM60 / 1000 (8 ×) Enercon E-101 (12 ×)
|
Neuferchau Kusey
|
SAW
|
52 ° 35 ′ 4 "N, 11 ° 3 ′ 18" E
|
MDP, wind7, energy source
|
|
| Ochtmersleben wind farm
(Wartberg wind farm)
|
1999 2002 2006
|
14.5
|
8th
|
Tacke TW 1.5 (1 ×) GE Wind Energy 1.5sl (2 ×) Vestas V80-2MW (5 ×)
|
Waves Ochtmersleben
|
BK
|
52 ° 9 ′ 25 "N, 11 ° 25 ′ 31" E 52 ° 8 ′ 26 "N, 11 ° 25 ′ 1" E
|
Citizens' electricity, Germania Windpark, Notus energy
|
|
| Osterburg wind farm
|
2019
|
10.8
|
3
|
Vestas V136-3.6MW (3 ×)
|
Osterburg Erxleben
|
SDL
|
52 ° 45 ′ 27 "N, 11 ° 43 ′ 15" E
|
FEFA
|
|
| Parey wind farm
|
2005
|
8.0
|
4th
|
Vestas V80-2MW (4 ×)
|
Parey
|
JL
|
52 ° 22 ′ 15 ″ N, 12 ° 0 ′ 16 ″ E
|
wind7
|
|
| Pettstädt wind farm
|
1996 1998
|
3.0
|
6th
|
Enercon E-40 / 5.40 (6 ×)
|
Pettstädt
|
BLK
|
51 ° 13 ′ 22 ″ N, 11 ° 51 ′ 13 ″ E
|
|
|
| Pobzig wind farm
|
2002
|
7.5
|
5
|
GE Wind Energy 1.5sl (5 ×)
|
Pobzig
|
SLK
|
51 ° 48 ′ 31 ″ N, 11 ° 52 ′ 9 ″ E
|
EOS
|
|
| Polleben wind farm
|
1997 2012 2013 2016
|
13.0
|
5
|
Enercon E-53 (1 ×) Enercon E-101 (4 ×)
|
Pollen life
|
MSH
|
51 ° 34 ′ 20 "N, 11 ° 37 ′ 4" E
|
Germania wind farm, Trianel
|
Dismantling of the Tacke TW 600 2016
|
| Pollitz wind farm
|
2016
|
11.0
|
5
|
eno energy 100 2.2MW (5 ×)
|
Pollitz
|
SAW
|
52 ° 57 ′ 9 ″ N, 11 ° 37 ′ 2 ″ E
|
|
|
| Prettin wind farm
|
2001 2005-2006
|
27.5
|
15th
|
Enron Wind 1.5sl (5 ×) Enercon E-70 (10 ×)
|
Labrun Plossig Prettin
|
WB
|
51 ° 40 ′ 31 ″ N, 12 ° 57 ′ 1 ″ E
|
GSW, Repower , WSB
|
|
| Purzien wind farm
|
2007
|
3.2
|
4th
|
Enercon E-48 (4 ×)
|
Purzien
|
WB
|
51 ° 45 ′ 22 ″ N, 12 ° 59 ′ 0 ″ E
|
WSB
|
|
| Queis-Reußen wind farm
|
2003
|
25.2
|
14th
|
Enercon E-66 / 18.70 (14 ×)
|
Queis Reuss
|
SK
|
51 ° 29 ′ 19 ″ N, 12 ° 8 ′ 14 ″ E
|
WSB New Energies
|
|
| Quenstedt wind farm
|
2000 2004 2016
|
25.15
|
14th
|
Tacke TW 1.5s (8 ×) Enercon E-66 / 18.70 (3 ×) Enercon E-92 (2 ×) Enercon E-101 (1 ×)
|
Quenstedt
|
MSH
|
51 ° 42 ′ 30 "N, 11 ° 27 ′ 29" E
|
Enertrag , Prokon , SAB WindTeam GmbH
|
|
| Quenstedt-Arnstedt wind farm
|
2000 2007 2008 2009
|
13.44
|
11
|
Vestas V47-660kW (4 ×) GE Wind Energy 1.5sl (4 ×) Enercon E-53 (1 ×) Vestas V80-2MW (2 ×)
|
Quenstedt Arnstedt
|
MSH
|
51 ° 41 ′ 3 "N, 11 ° 28 ′ 23" E
|
N.prior energy , eno energy, SAB WindTeam
|
|
| Redekin-Wulkow wind farm
|
2009 2011
|
22.0
|
11
|
Enercon E-82 (8 ×) Vestas V90-2MW (3 ×)
|
Kleinwulkow Redekin
|
JL
|
52 ° 28 '25 "N, 12 ° 5' 34" E
|
Prokon , Ventotec
|
|
| Reinstedt wind farm
|
1998 2001 2010 2011
|
62.25
|
34
|
WindWorld W5200 (3 ×) NEG Micon NM72 / 1500 (18 ×) Enercon E-82 (5 ×) Enercon E-82 E2 (10 ×)
|
Reinstedt
|
HZ
|
51 ° 45 ′ 16 ″ N, 11 ° 23 ′ 7 ″ E
|
MDP
|
|
| Rippachtal wind farm
|
2016 2017
|
12.0
|
5
|
Nordex N117 / 2400 (5 ×)
|
Small basket
|
BLK
|
51 ° 14 '22 "N, 12 ° 4' 7" E
|
Aquavent
|
erected at the Rippachtal cross
|
| Roßberg wind turbine
|
1996 1997
|
0.6
|
1
|
North tank NTK 600/41 (1 ×)
|
Thürungen
|
MSH
|
51 ° 27 '23 "N, 11 ° 2' 8" E
|
MDP
|
Dismantling of the GET Danwin 600/41 (2 ×) and Nordtank NTK 600/41 (2 ×) in 2018
|
| Samswegen wind farm
|
2000
|
4.0
|
4th
|
AN Bonus 1000/54 (4 ×)
|
Samswegen
|
BK
|
52 ° 15 ′ 30 "N, 11 ° 35 ′ 11" E
|
wpd
|
|
| Schafstädt wind farm
|
1999 2002
|
2.2
|
4th
|
Enercon E-40 / 5.40 (2 ×) Enercon E-40 / 6.44 (2 ×)
|
Schafstädt
|
SK
|
51 ° 22 ′ 5 ″ N, 11 ° 46 ′ 19 ″ E
|
WSB
|
|
| Schermen wind farm
|
2001 2007
|
17.0
|
10
|
Enercon E-40 5.40 (2 ×) Vestas V90-2MW (8 ×)
|
Shame
|
JL
|
52 ° 12 ′ 31 ″ N, 11 ° 49 ′ 22 ″ E
|
EWZ
|
|
| Schinne-Grassau wind farm
|
2007 2012 2014 2020
|
84.4
|
40
|
Enercon E-70 (27 ×) Enercon E-82 E2 (9 ×) Enercon E-92 (4 ×)
|
Grassau Schinne
|
SDL
|
52 ° 39 ′ 29 "N, 11 ° 42 ′ 17" E
|
Enercon Invest
|
|
| Schkortleben wind farm
|
2006-2007
|
27.6
|
12
|
Siemens SWT-2.3-93 (12 ×)
|
Schkortleben
|
BLK
|
51 ° 15 ′ 12 ″ N, 11 ° 59 ′ 0 ″ E
|
MBBF
|
|
| Schochwitz wind farm
|
1999
|
1.8
|
3
|
Nordex N43 / 600 (3 ×)
|
Schochwitz
|
SK
|
51 ° 32 ′ 34 "N, 11 ° 44 ′ 29" E
|
|
|
| Schwanebeck wind farm
|
2003 2008 2009
2010 2013
|
47.3
|
27
|
NEG Micon NM82 / 1500 (14 ×) Enercon E-82 (3 ×) Enercon E-70 E4 (1 ×) Vestas V80-2MW (1 ×) Vestas V90-2MW (8 ×)
|
Schwanebeck
|
HZ
|
51 ° 59 ′ 29 "N, 11 ° 7 ′ 29" E
|
Energy source , wpd
|
|
| Schwenda wind farm
|
1996 1997
|
0.9
|
3
|
Enercon E-30 / 2.30 (2 ×) Enercon E-40 / 5.40 (1 ×)
|
Schwenda
|
MSH
|
51 ° 33 '29 "N, 11 ° 2' 26" E
|
|
|
| Schwerz wind farm
|
2003 2007 2009
|
14.5
|
7th
|
Enercon E-66 / 18.70 (2 ×) Enercon E-70 (5 ×)
|
Schwerz
|
SK
|
51 ° 33 '34 "N, 12 ° 9' 23" E
|
Environmental plan
|
|
| Sichau wind farm
|
2002 2003 2015
|
18.3
|
9
|
Vestas V80-2MW (8 ×) Enercon E-82 E2 (1 ×)
|
Sichau
|
SAW
|
52 ° 30 ′ 29 ″ N, 11 ° 12 ′ 17 ″ E
|
Wind concept
|
|
| Siersleben wind farm
|
2001 2009 2011
|
20.0
|
11
|
Enron Wind 1.5s (4 ×) Vestas V90-2MW (7 ×)
|
Siersleben
|
MSH
|
51 ° 36 ′ 28 "N, 11 ° 31 ′ 14" E
|
Prokon , eno energy, wind7, eab
|
|
| Siestedt wind farm
|
2008
|
26.0
|
13
|
Enercon E-70 (13 ×)
|
Behnsdorf Ribbensdorf
|
BK
|
52 ° 19 ′ 31 ″ N, 11 ° 7 ′ 24 ″ E
|
Wind power
|
|
| Sietzsch wind farm
|
2003 2006 2009
|
8.4
|
6th
|
Vestas V80-2MW (3 ×) Enercon E-53 (3 ×)
|
Sietzsch
|
SK
|
51 ° 29 ′ 10 ″ N, 12 ° 9 ′ 0 ″ E
|
easyenergy, WP Sietzsch
|
|
| Sonnenberg wind farm
|
2005 2011
|
75.2
|
37
|
Enercon E-70 (33 ×) Enercon E-82 E2 (4 ×)
|
Groß Germersleben Klein Oschersleben
|
BK
|
52 ° 1 ′ 27 ″ N, 11 ° 22 ′ 2 ″ E
|
Enertrag , Infigen
|
|
| Sotterhausen wind farm
|
2008 2010
|
10.0
|
5
|
Vestas V90-2MW (5 ×)
|
Sotterhausen
|
MSH
|
51 ° 26 ′ 34 "N, 11 ° 22 ′ 30" E
|
eno energy, AREF
|
|
| Spitzer Berg wind farm
|
2001 2005 2006 2007 2009
|
49.6
|
29
|
Enercon E-40 / 6.44 (6 ×) Enercon E-70 (6 ×) Enercon E-66 / 29.70 (2 ×) Vestas V90-2MW (12 ×) Enercon E-82 (3 ×)
|
Buden Woltersdorf
|
JL
|
52 ° 9 ′ 31 ″ N, 11 ° 48 ′ 3 ″ E
|
Yield
|
|
| Staßfurt wind farm
|
2001
|
4.5
|
3
|
Südwind S77 (3 ×)
|
Staßfurt
|
SLK
|
51 ° 52 ′ 26 "N, 11 ° 35 ′ 27" E
|
|
|
| Stegelitz wind farm
|
2009
|
27.0
|
9
|
Enercon E-82 E3 (9 ×)
|
Stegelitz
|
JL
|
52 ° 10 ′ 25 ″ N, 11 ° 53 ′ 5 ″ E
|
Germania wind farm, Lorica
|
|
| Stlocken-Osterfeld wind farm
|
1997 2000 2005 2014
|
37.0
|
22nd
|
Enercon E-40 / 5.40 (3 ×) Enercon E-66 / 15.66 (8 ×) Enercon E-70 (6 ×) Enercon E-82 E2 (5 ×)
|
Push Osterfeld
|
BLK
|
51 ° 6 ′ 0 ″ N, 11 ° 55 ′ 16 ″ E
|
|
previously 2 × Enercon E-40 / 5.40
|
|
Stoß-Teuchern wind farm
|
1999 2001 2002 2005 2010 2012 2013 2020
|
194.9
|
82
|
Enercon E-66 / 15.66 (25 ×) GE Wind Energy 1.5sl (8 ×) Enercon E-70 (10 ×) Enercon E-82 (1 ×) Enercon E-82 E2 (12 ×) Enercon E-126 (3 ×) Vestas V112-3.0MW (4 ×) Enercon E-101 (10 ×) Enercon E-115 (2 ×) Enercon E-126 EP3 (3 ×) Enercon E-138 EP3 (4 ×)
|
Krauschwitz Nessa Prittitz Groebitz bumps
|
BLK
|
51 ° 7 ′ 32 "N, 11 ° 57 ′ 31" E
|
AEZ GmbH, Thüga, WP Prittitz
|
builds repowering on both sides of the A 9 2020 (3 × Enercon E-126 EP3 and 4 × Enercon E-138 EP3 instead of 10 × GE Wind Energy 1.5sl )
|
| Straach wind farm
|
2006
|
15.0
|
10
|
REpower MD77 (10 ×)
|
Straach
|
WB
|
51 ° 57 ′ 33 "N, 12 ° 36 ′ 34" E
|
Prokon
|
previously 1 × Südwind S46 / 600 , dismantled in 2018
|
| Straguth wind farm
|
2006 2009
|
8.45
|
10
|
Gamesa G58-850kW (9 ×) Enercon E-53 (1 ×)
|
Zerbst / Anhalt
|
ABI
|
52 ° 1 ′ 19 "N, 12 ° 10 ′ 34" E
|
wpd
|
|
| Sylda wind farm
|
2002 2015 2015–2016
|
17.15
|
8th
|
Enercon E-66 / 20.70 (3 ×) Enercon E-92 (5 ×)
|
Sylda
|
MSH
|
51 ° 39 ′ 33 "N, 11 ° 25 ′ 33" E
|
Windward
|
|
| Thurland wind farm
|
2002 2005–2006 2007 2013
|
62.7
|
32
|
GE Wind Energy 1.5sl (5 ×) DeWind D8 80/2000 (5 ×) Enercon E-66 / 20.70 (4 ×) Enercon E-70 (17 ×) Enercon E-82 E2 (1 ×)
|
Thurland Siebenhausen Wolfen Bobbau Raguhn
|
ABI
|
51 ° 42 ′ 17 "N, 12 ° 14 ′ 13" E
|
Enertrag , WSB, WP Thurland
|
|
| Trebbichau wind farm
|
2001 2011
|
33.7
|
19th
|
AN Bonus 1300/62 (10 ×) Enercon E-82 E2 (9 ×)
|
Hohnsdorf Wieskau
|
ABI
|
51 ° 39 ′ 26 "N, 11 ° 57 ′ 13" E
|
wpd , Lüdtke & Scheer, WP Trebbichau
|
|
| Uhrsleben wind farm
|
1997
|
1.5
|
3
|
Enercon E-40 / 5.40 (3 ×)
|
Watch life
|
BK
|
52 ° 12 ′ 3 ″ N, 11 ° 17 ′ 20 ″ E
|
BAUUNION-Wismar
|
|
| Uhrsleben-Süd wind farm
|
2003 2005
|
23.6
|
13
|
Enercon E-66 / 18.70 (12 ×) Enercon E-70 (1 ×)
|
Watch life
|
BK
|
52 ° 11 ′ 14 "N, 11 ° 16 ′ 19" E
|
Land wind
|
erected on the A 2
|
| Unseburg wind farm
|
2006 2009
|
16.0
|
8th
|
Vestas V80-2MW (7 ×) Enercon E-70 (1 ×)
|
Unseburg
|
SLK
|
51 ° 55 ′ 21 ″ N, 11 ° 33 ′ 14 ″ E 51 ° 55 ′ 18 ″ N, 11 ° 32 ′ 9 ″ E
|
ATM, company , greenwind, SAB Windteam
|
|
| Volkstedt wind farm
|
2013
|
13.8
|
6th
|
Enercon E-82 E2 (6 ×)
|
Volkstedt
|
MSH
|
51 ° 30 ′ 12 "N, 11 ° 32 ′ 1" E
|
Trianel
|
|
| Whale Hill wind farm
|
2000 2002 2009 2017
|
43.65
|
23
|
Enercon E-66 / 18.70 (19 ×) Enercon E-70 (3 ×) Vestas V126-3.45MW (1 ×)
|
Bernburg Güsten Ilberstedt
|
SLK
|
51 ° 46 ′ 16 ″ N, 11 ° 39 ′ 19 ″ E
|
Volkswind , WP Walkhügel
|
erected on the A 14
|
| Walsleben-Goldbeck wind farm
|
1996 2014
|
18.9
|
7th
|
Vestas V44-0.6MW (1 ×) Enercon E-101 (6 ×)
|
Experience
|
SDL
|
52 ° 42 ′ 2 "N, 11 ° 48 ′ 6" E
|
WindStrom, Erxlebener wind energy
|
|
| Wansleben am See wind farm
|
2002 2006 2014-2015 2019
|
39.4
|
16
|
Südwind S70 (5 ×) Vestas V82-1.5MW (2 ×) Vestas V90-2MW (1 ×) Vestas V112-3.0MW (2 ×) Vestas V136-3.45MW (2 ×) eno energy 114 3.5MW (4 ×)
|
Wansleben at the lake Steuden
|
MSH SK
|
51 ° 26 ′ 34 "N, 11 ° 45 ′ 27" E
|
Ostwind, wind7, MDP, REWAG , eno energy
|
2019 repowering (2 × Vestas V136-3.45MW instead of 3 × Südwind S70 )
|
| Wegeleben wind farm
|
2007 2008
|
24.25
|
12
|
REpower MM82 (5 ×) Enercon E-82 (7 ×)
|
Rodersdorf
|
HZ
|
51 ° 53 ′ 28 "N, 11 ° 14 ′ 17" E
|
WP way life
|
|
| Welbsleben wind farm
|
2001
|
7.5
|
5
|
NEG Micon NM72 / 1500 (5 ×)
|
World life
|
MSH
|
51 ° 43 ′ 11 ″ N, 11 ° 24 ′ 7 ″ E
|
MDP, Umweltkontor
|
|
| Wind farm waves
|
2002 2003 2006
|
13.5
|
8th
|
GE Wind Energy 1.5sl (2 ×) Fuhrländer FL MD77 (3 ×) Vestas V80-2MW (3 ×)
|
waves
|
BK
|
52 ° 7 ′ 29 "N, 11 ° 24 ′ 30" E
|
seebaWIND, Notus energy
|
|
| Wenddorf wind farm
|
2013
|
11.5
|
5
|
Enercon E-82 E2 (5 ×)
|
Wenddorf Sandbeiendorf
|
BK
|
52 ° 22 ′ 34 "N, 11 ° 43 ′ 11" E
|
Lorica energy systems
|
|
| Westeregeln wind farm
|
1998 2001 2011
|
20.7
|
11
|
AN Bonus 1000/54 (2 ×) Nordex N62 / 1300 (2 ×) Enercon E-82 E2 (7 ×)
|
Western rules
|
SLK
|
51 ° 57 ′ 19 ″ N, 11 ° 21 ′ 19 ″ E
|
WP West rules
|
|
| Wimmelburg wind farm
|
1999 2007
|
14.48
|
8th
|
Vestas V47-660kW (3 ×) Nordex N90 / 2500 (5 ×)
|
Wimmelburg
|
MSH
|
51 ° 30 ′ 25 ″ N, 11 ° 27 ′ 19 ″ E
|
ge3000, Windcom
|
|
| Wörbzig wind farm
|
1999
|
31.5
|
12
|
Vestas V66-1.65MW (6 ×) Vestas V136-3.6MW (6 ×)
|
Wörbzig Pfaffendorf
|
ABI
|
51 ° 42 ′ 24 "N, 11 ° 54 ′ 27" E
|
ge3000
|
2019 repowering (6 × Vestas V136-3.6MW instead of 12 × Vestas V66-1.65MW )
|
| Wulferstedt wind farm
|
2003
|
9.0
|
6th
|
NEG Micon NM82 / 1500 (6 ×)
|
Wulferstedt
|
BK
|
52 ° 0 ′ 20 ″ N, 11 ° 6 ′ 2 ″ E
|
WP Wulferstedt
|
|
| Zeitz wind farm
|
2002
|
3.9
|
3
|
AN Bonus 1300/62 (3 ×)
|
Geussnitz
|
BLK
|
51 ° 1 ′ 11 "N, 12 ° 10 ′ 2" E
|
|
|
| Zerbst wind farm
|
2015 2017
|
44.4
|
14th
|
Siemens SWT3.0-113 (10 ×) Siemens SWT3.6-130 (4 ×)
|
Zerbst / Anhalt
|
ABI
|
52 ° 0 '8 "N, 12 ° 7' 23" E
|
|
|
| Zerbst-Ost wind farm
|
2005 2009 2014
|
15.15
|
8th
|
GE Wind Energy 1.5sl (2 ×) Enercon E-70 (3 ×) eno energy 82 (3 ×)
|
Zerbst / Anhalt
|
ABI
|
51 ° 58 ′ 33 ″ N, 12 ° 7 ′ 0 ″ E
|
WKN Windkraft Nord, eno energy
|
|
| Zieko wind farm
|
1999 2007
|
9.85
|
10
|
Nordex N60 / 1300 (3 ×) Gamesa G58-850kW (7 ×)
|
Zieko
|
WB
|
51 ° 54 ′ 4 "N, 12 ° 24 ′ 11" E
|
Prokon
|
|
| Ziepel wind farm
|
2008 2009
|
16.0
|
8th
|
Vestas V90-2MW (8 ×)
|
Ziepel
|
JL
|
52 ° 10 '4 "N, 11 ° 53' 6" E
|
Drewag , Boreas, WP Ziepel
|
|
| Zorbau wind farm
|
2003 2010
|
12.8
|
6th
|
Enercon E-66 / 18.70 (2 ×) Enercon E-82 E2 (4 ×)
|
Zorbau
|
BLK
|
51 ° 10 ′ 12 ″ N, 12 ° 1 ′ 4 ″ E
|
Terrawatt, SAB WindTeam
|
|
|
Zschornewitz wind farm
|
1999
|
8.0
|
8th
|
DeWind D6 62/1000 (8 ×)
|
Zschornewitz
|
WB
|
51 ° 41 ′ 34 "N, 12 ° 24 ′ 21" E
|
Umweltkontor
|
erected on recultivated waste dumps in the Gröbern opencast mine
|