List of wind turbines in Baden-Württemberg

from Wikipedia, the free encyclopedia

The list of wind turbines in Baden-Württemberg provides an overview of the installed wind turbines in the state of Baden-Württemberg , with a focus on the installed wind parks. Locations with three or more systems are considered wind parks. Systems with a steel lattice tower are marked in italics . Since new wind turbines are constantly being built and dismantled with or without repowering , this list does not claim to be complete; it shows the status from the end of 2019. The database is the interactive map of the State Agency for the Environment Baden-Württemberg (except for facilities marked with (*)).

In 2017, renewable energy sources (sun, wind, hydropower, biogas, biomass) covered around 37% of Baden-Württemberg's gross electricity demand.

Overview

Surname Construction year Total
power (MW)
number Type (WKA) place agriculture
circle
Coordinates Project planner / operator Remarks
RedoxWind research wind turbine 2017 2.0 1 Qreon Q82 (1 ×) Karlsruhe KA 49 ° 1 ′ 9 ″ N, 8 ° 31 ′ 4 ″ E Fraunhofer ICT Research project with combined battery storage
Alexanderschanze wind turbine 2003 1.5 1 Südwind S70 (1 ×) Bad Peterstal-Griesbach 1st floor 48 ° 28 ′ 22 ″ N, 8 ° 16 ′ 7 ″ E Schmalz, wind turbine "Bei der Schanz" erected on the Schwarzwaldhochstrasse in the area of ​​the Alexanderschanze
Alpirsbach wind turbine 1999
2013
2.3 1 Enercon E-70 E4 (1 ×) Römlinsdorf FDS 48 ° 20 ′ 0 "N, 8 ° 28 ′ 34" E Wind power Römlinsdorf, Stadtwerke Stuttgart Repowering 2013 (previously 1 × Fuhrländer FL 300 )
Auenberg wind turbine 1990 0.095 1 Reymo DANmark 22 (1 ×) House in front of the forest VS 47 ° 53 ′ 19 ″ N, 8 ° 28 ′ 24 ″ E Auenberg pioneer windmill (*); first commercially operated wind power plant in Baden-Württemberg, prototype and only plant of this type
Wind turbine on the Hohwartsattel 1992 0.28 1 Enercon-33 (1 ×) Breitnau FR 47 ° 56 '14 "N, 8 ° 3' 11" E Christian Riesterer, Uwe Tischler (*)
Bad Mergentheim wind power plant 2002 0.8 1 Nordex N50 / 800 (1 ×) Apfelbach TBB 49 ° 26 ′ 10 "N, 8 ° 48 ′ 19" E Glotter
Binselberg wind turbine 2001 1.0 1 Fuhrländer FL 1000 (1 ×) Binselberg SHA 49 ° 16 ′ 5 "N, 9 ° 55 ′ 35" E Binselberg wind power
Birkenzell wind turbine 2014 0.8 1 Enercon E-53 (1 ×) Birch cell AA 48 ° 59 ′ 27 "N, 10 ° 15 ′ 17" E Alois Erhardt
Bronn wind turbine 2015 0.8 1 Enercon E-53 (1 ×) Bronn TBB 49 ° 26 ′ 13 ″ N, 9 ° 54 ′ 8 ″ E NOW Bronn waterworks Self-supply of waterworks
Dauchingen wind turbine 2001 0.85 1 Vestas V52-850kW (1 ×) Dauchingen VS 48 ° 5 ′ 28 "N, 8 ° 31 ′ 30" E
Dewangen wind turbine 1998 0.11 1 Sea wind 20/110 (1 ×) Dewangen AA already dismantled
Dornhan wind turbine 2003 1.5 1 NEG Micon NM82 / 1500 (1 ×) Dornhan RW 48 ° 21 '30 "N, 8 ° 33' 1" E Theolia, Windreich
Dornstetten wind power station 2003 0.85 1 Vestas V52-850kW (1 ×) Dornstetten FDS 48 ° 28 ′ 1 ″ N, 8 ° 31 ′ 25 ″ E Schmelzle wind turbine
Ellenberg wind turbine 2001 1.0 1 Enercon E-58 (1 ×) Ellenberg AA 49 ° 0 ′ 19 ″ N, 10 ° 12 ′ 25 ″ E Uhl wind power
Emmingen wind turbine 1993
1995
0.11 1 Sea wind 20/110 (1 ×) Emmingen CW 48 ° 34 ′ 17 "N, 8 ° 45 ′ 0" E BadenWind, wind power Oberes Gäu (*); an identical sea wind system has already been dismantled
Wind turbine remote height 1996 0.25 1 Nordex N29 / 250 (1 ×) Furtwangen VS 47 ° 59 ′ 29 ″ N, 8 ° 4 ′ 16 ″ E Ottmar Bärmann, Heinz Winterhalder (*)
Fischerbach wind turbine 1997 0.6 1 Nordex N43 / 600 (1 ×) Fischerbach 1st floor RaBe wind energy Probably dismantled in 2008/2009
Wind turbine Fröhnd 2005 2.0 1 Enercon E-70 (1 ×) Happy 47 ° 45 ′ 32 "N, 7 ° 51 ′ 10" E fesa, Ökostrom Freiburg, WP Fröhnd originally two Enercon E-70s , one of which was dismantled in 2005 due to unprofitability
Fürstenberg wind turbine 2003 1.5 1 REpower MD77 (1 ×) Furstenberg VS 47 ° 53 ′ 21 ″ N, 8 ° 35 ′ 0 ″ E Fürstwind GmbH & Co. KG
Glatten wind turbine 2000 0.6 1 Enercon E-40 / 6.44 (1 ×) Smooth FDS 48 ° 26 '25 "N, 8 ° 31' 29" E lard The antenna for the Freudenstadt radio station is located on the tower of the system
Wind turbine Grüner Heiner 2000 0.5 1 Enercon E-40 / 5.40 (1 ×) Weilimdorf S. 48 ° 49 ′ 31 ″ N, 9 ° 5 ′ 30 ″ E Gedea Windkraft Grüner Heiner erected on rubble on the A 81
Herbolzheim wind turbine 1999 0.6 1 Tacke TW 600 (1 ×) Herbolzheim EM 48 ° 13 ′ 23 ″ N, 7 ° 45 ′ 7 ″ E Europa-Park Rasthof Herbolzheim erected on the A 5
Honhardt wind turbine 2007 2.05 1 REpower MM92 (1 ×) Honhardt SHA 49 ° 3 ′ 33 "N, 10 ° 3 ′ 22" E Reg.En GmbH, THEOLIA Naturenergien GmbH
Hornisgrinde wind turbine 1994
1996
2015
2.3 1 Enercon E-70 E4 (1 ×) Seebach 1st floor 48 ° 36 ′ 16 ″ N, 8 ° 12 ′ 4 ″ E Peter Griebl Repowering 2015 (previously 2 × Seewind 20/110 and 1 × Seewind 25/132), highest located wind turbine in Germany (1164 m above sea level)
Ingersheim wind turbine 2012 2.0 1 Enercon E-82 (1 ×) Ingersheim LB 48 ° 58 ′ 17 "N, 9 ° 10 ′ 11" E EG Ingersheim highest wind turbine in the Stuttgart region (hub height 138 m, total height 179 m)
Wind turbine Kreßberg 2006 2.0 1 Enercon E-70 (1 ×) Bergertshofen SHA 49 ° 9 ′ 28 ″ N, 10 ° 13 ′ 1 ″ E
Langenbrand wind turbine 1999 0.75 1 Sea wind 52-750 (1 ×) Long brandy CW 48 ° 48 ′ 11 "N, 8 ° 37 ′ 16" E Prowind Repowering planned (3 × Vestas V112-3.0MW )
Leibertingen wind turbine 1998 0.6 1 Tacke TW 600 (1 ×) Leibertingen SIG 48 ° 3 '3 "N, 9 ° 1' 23" E Baumlehof Leibertingen (*)
Lenzkirch-Kopp wind turbine 2003 1.5 1 Südwind S77 (1 ×) Lenzkirch FR 47 ° 50 ′ 5 ″ N, 8 ° 12 ′ 23 ″ E WKA Lenzkirch-Kopp
Maxau wind turbine 1997 0.11 1 Sea wind 20/110 (1 ×) Maxau KA 49 ° 2 ′ 2 "N, 8 ° 18 ′ 11" E Windmühlenberg Windkraftanlage GmbH & Co. KG (*)
Wind turbine quantities 2002 0.85 1 Vestas V52-850kW (1 ×) Blochingen SIG 48 ° 4 ′ 21 ″ N, 9 ° 21 ′ 19 ″ E Radish engineering office
Mulfingen wind turbine 2006 2.0 1 Enercon E-82 (1 ×) Hollenbach KÜN 49 ° 24 ′ 13 "N, 9 ° 47 ′ 35" E Beermann energy systems
Wind power plant Oberiflingen 2012 2.0 1 Enercon E-82 (1 ×) Oberiflingen FDS 48 ° 24 '8 "N, 8 ° 33' 19" E EnBW wind power projects , ee Rottenburg
Wind power plant Oberkirch 2003 0.055 1 Micon M55-11 (1 ×) Nussbach 1st floor 48 ° 32 ′ 27 "N, 8 ° 2 ′ 12" E Max Rohrhirsch (*); Status on Fehmarn until 2003
Rohrhardsberg wind turbine 2003 1.8 1 Enercon E-66 / 18.70 (1 ×) Yach EM 48 ° 8 ′ 7 ″ N, 8 ° 7 ′ 14 ″ E fesa, green electricity Freiburg
Schweighausen wind turbine 1997
1998
2013
3.05 1 Enercon E-101 (1 ×) Schweighausen 1st floor 48 ° 13 ′ 35 "N, 7 ° 58 ′ 31" E fesa, Stadtwerke Emmendingen Repowering 2012-2013 (previously
1 × Seewind 52-750 and Seewind 20-110 each )
Sontheim wind turbine 1996 0.08 1 Lagerwey LW18 / 80 (1 ×) Sontheim HDH 48 ° 32 ′ 11 ″ N, 10 ° 18 ′ 0 ″ E (*); Two-winged
Ummendorf wind turbine 2001 0.9 1 NEG Micon NM52 / 900 (1 ×) Ummendorf BC 48 ° 3 '22 "N, 9 ° 51' 22" E Ummendorf community wind turbine
Wind power plant Unterkessach 2011 2.0 1 Vestas V90-2MW (1 ×) Lower compartment HN 49 ° 21 '24 "N, 9 ° 26' 25" E Reg.En GmbH, seebaWIND
Wind power plant Untermusbach 2002 1.5 1 Südwind S77 (1 ×) Untermusbach FDS 48 ° 31 ′ 19 ″ N, 8 ° 26 ′ 1 ″ E WKA Kaltenbach
Walzbachtal wind turbine 1997 0.11 1 Sea wind 20/110 (1 ×) Woessingen KA 49 ° 0 ′ 10 "N, 8 ° 37 ′ 4" E Gerd Seel (*)
Wegses wind turbine 2005 1.5 1 Fuhrländer FL MD77 (1 ×) Way SHA 49 ° 7 ′ 4 ″ N, 10 ° 8 ′ 17 ″ E Community wind farm Hohenlohe
Weitingen wind turbine 1998 0.6 1 Nordex N43 / 600 (1 ×) Weitingen FDS 48 ° 28 ′ 5 "N, 8 ° 48 ′ 14" E WKA black
Welzheim wind turbine 2004 1.0 1 Fuhrländer FL 1000 (1 ×) Aichstrut WN 48 ° 53 '22 "N, 9 ° 39" 19 "E Citizen wind Welzheim
Wind turbine rooms 2000 0.8 1 Nordex N50 / 800 (1 ×) Rooms above Rottweil RW 48 ° 10 ′ 29 "N, 8 ° 33 ′ 15" E WKA rooms
Wind turbines Bonndorf 1999
2006
1.1 2 Enercon E-40 / 5.40 (1 ×)
Enercon E-40 / 6.44 (1 ×)
Bonndorf WT 47 ° 49 '30.1 "  N , 8 ° 20' 52"  E Burr wind turbine
Brettenfeld wind turbines 2017 6.6 2 Nordex N131 / 3300 (2 ×) Brettenfeld SHA 49 ° 16 ′ 9 ″ N, 10 ° 0 ′ 33 ″ E
Buchhausen wind turbines 2004
2006
1.4 2 Enercon E-40 / 6.44 (1 ×)
Enercon E-48 (1 ×)
Buchhausen AA 48 ° 57 ′ 27 ″ N, 10 ° 18 ′ 8 ″ E Wind power Buchhausen
Wind turbines Bühlerzimmer 1996 1.0 2 Enercon E-40 / 5.40 (2 ×) Bühler rooms SHA WIKRA, Stadtwerke Schw. Hall, Bürger-WP Hohenlohe Shutdown and dismantling due to repowering in July 2014
Wind turbines in Dürrenmettstetten 2000
2003
1.2 2 Vestas V44-600kW (1 ×)
Enercon E-40 / 6.44 (1 ×)
Dürrenmettstetten RW 48 ° 23 ′ 29 "N, 8 ° 34 ′ 32" E Wind power Kruse, Lothar Kopp Vestas V47-660kW dismantled in 2015
Fluorn-Winzeln wind turbines 2004 3.0 2 REpower MD77 (2 ×) Fluorn tiny RW 48 ° 18 ′ 4 "N, 8 ° 30 ′ 15" E Wind power Fluorn-Winzeln
Wind turbines Gerchsheim 2002
2003
1.6 2 Enercon E-40 / 6.44 (1 ×)
Enercon E-58 (1 ×)
Gerchsheim TBB 49 ° 42 ′ 19 ″ N, 9 ° 46 ′ 1 ″ E BadenWind
Gissigheim wind turbines 2005
2010
1.8 2 Enercon E-58 (1 ×)
Enercon E-48 (1 ×)
Gissigheim TBB 49 ° 35 ′ 1 "N, 9 ° 35 ′ 42" E BadenWind
Wind turbines Hettingen 2002 3.0 2 Fuhrländer FL MD77 (2 ×) Hettingen MOS 49 ° 31 ′ 28 "N, 9 ° 22 ′ 9" E Wind energy S & H, WP Hettinger Eulsberg
Wind turbines wooden bat mat 2003 3.6 2 Enercon E-66 / 18.70 (2 ×) Freiburg FR 47 ° 55 ′ 1 ″ N, 7 ° 52 ′ 23 ″ E fesa, green electricity Freiburg
Horkenberg wind turbines 2014 4.7 2 Enercon E-92 (2 ×) Lion's Arch HN 49 ° 5 ′ 31 ″ N, 9 ° 26 ′ 3 ″ E Kruck + Partner, DSG Energy Fund
Wind turbines Karlsruhe ( Energieberg Karlsruhe ) 1998
2000
2003
2019
3.5 2 Fuhrländer FL MD77 (1 ×)
Senvion MM100 (1 ×)
Karlsruhe KA 49 ° 1 ′ 7 ″ N, 8 ° 19 ′ 35 ″ E Windmühlenberg WKA Repowering 2019 ( Senvion MM100 (1 ×) instead of Seewind 52-750 (2 ×))
Lahr-Seelbach wind turbines (Kempfenbühl-Schlossbühl wind turbines) 2005
2016
4.5 2 Südwind S77 (1 ×)
Enercon E-115 (1 ×)
Lahr
Seelbach
1st floor 48 ° 17 ′ 32 "N, 7 ° 53 ′ 34" E fesa, green electricity Freiburg Another Südwind S77 system was completely destroyed by fire in September 2013, and an Enercon E-115 was installed at the same location in 2016 to replace it


Another Südwind S77 turbine was completely destroyed by fire in February 2019.

Lossburg wind turbines 2001 1.7 2 Vestas V52-850kW (2 ×) Lossburg FDS 48 ° 23 ′ 22 "N, 8 ° 26 ′ 27" E Keinath DYRA-AIR
Wind turbines Nassau 2015 4.7 2 Enercon E-92 (2 ×) Nassau TBB 49 ° 31 ′ 19 ″ N, 9 ° 54 ′ 20 ″ E juwi , Stadtwerke Tübingen
Wind turbines in Nellingen 1999 1.2 2 Tacke TW 600a (2 ×) Nellingen UL 48 ° 32 ′ 7 "N, 9 ° 49 ′ 9" E Swabian wind
Nesselbach wind turbines 2000
2002
2.0 2 Fuhrländer FL 1000 (2 ×) Nesselbach SHA 49 ° 13 ′ 32 "N, 9 ° 49 ′ 35" E Community wind farm Hohenlohe
Neueck wind turbines 2003 1.2 2 Enercon E-40 / 6.44 (2 ×) Guttenbach VS 48 ° 2 ′ 31 ″ N, 8 ° 10 ′ 4 ″ E RENA Renewable Energy
Schalkstetten wind turbines 2001
2002
2.6 2 AN Bonus 1300/62 (2 ×) Schalkstetten UL 48 ° 37 '22 "N, 9 ° 55' 12" E EES renewable energy
Seckach wind turbines 2008 4.1 2 REpower MM92 (2 ×) Großeicholzheim MOS 49 ° 27 '10 "N, 9 ° 16' 11" E Reg.En GmbH, THEOLIA Naturenergien GmbH
Suppingen wind turbines 2000 1.5 2 NEG Micon NM48 / 750 (2 ×) Soup UL 48 ° 27 '4 "N, 9 ° 43' 14" E Glotter, wind power suppingen
Wind turbines Unterriffingen 2000
2003
1.6 2 Enercon E-40 / 6.44 (1 ×)
Enercon E-58 (1 ×)
Unterriffingen AA 48 ° 50 ′ 7 ″ N, 10 ° 18 ′ 25 ″ E Friends of wind and water power Ostalb
Wind turbines in Unterschwarzach 2005 2.6 2 AN Bonus 1300/62 (2 ×) Unterschwarzach RV 47 ° 58 '4 "N, 9 ° 52' 3" E Glotter, WKA IM WAS Wind energy
Weilersbach wind turbines 2001 1.8 2 Enercon E-40 / 5.40 (1 ×)
Nordex N62 / 1300 (1 ×)
Weilersbach VS 48 ° 5 ′ 16 "N, 8 ° 29 ′ 50" E New energies project, wind power Weilersbach
Wolpertshausen wind turbines 2001 1.2 2 DeWind D4 48/600 (2 ×) Wolpertshausen SHA 49 ° 9 ′ 30 "N, 9 ° 51 ′ 34" E Baram Windkraft-Projektierungs GmbH
Heroldstatt wind turbine test field 1989
1990
0.135 2 Enercon-17 (1 ×)
Dornier Darrieus 55 (1 ×)
Ennabeuren UL EVS ( EnBW ) EVS (now EnBW ) test field for testing different types of wind power plants (conventional and Darrieus rotors ) 1989–2000, the first wind power plants built for test purposes in southern Germany; 1989-2013 also Enercon-17 , was dismantled due to gear damage; Darrieus rotor also out of order, but still set up.
Ahorn-Buch wind farm 2017 11.0 4th GE Wind Energy 2.75-120 (4 ×) book TBB 49 ° 32 ′ 21 ″ N, 9 ° 34 ′ 29 ″ E ABO Wind
Ahorn-Schillingstadt wind farm 2011
2016
2017
29.85 11 Enercon E-53 (1 ×)
Enercon E-115 (4 ×)
GE Wind Energy 2.75-120 (5 ×)
Nordex N131 / 3300 (1 ×)
Schilling city TBB 49 ° 28 ′ 17 "N, 9 ° 34 ′ 26" E ABO Wind , Stadtwerke Heidenheim , Energy + Environment Cooperative, Bürgerwindpark Hohenlohe GmbH;

Reg.En GmbH

More than 1,800 citizens of the region are financially involved
Altheimer Höhe wind farm 2000
2011
7.1 5 Fuhrländer FL 1000 (3 ×)
REpower MM92 (2 ×)
Altheim MOS 49 ° 31 '26 "N, 9 ° 28' 22" E Wind energy S&H
Am Hochstrasse wind farm 2001

2002
2003
2018

24.54 13 Vestas V47-660kW (4 ×)
REpower MD77 (5 ×)
Nordex N117 / 3600 (4 ×)
Gussenstadt HDH 48 ° 39 ′ 11 "N, 9 ° 56 ′ 6" E Glotter, Alb-Windkraft, Stadtwerke Fellbach
Amstetten wind farm 1998
2002
3.7 5 DeWind D4 48/600 (4 ×)
AN Bonus 1300/62 (1 ×)
Amstetten UL 48 ° 33 '35 "N, 9 ° 50' 19" E Aufwind, FC Windenergy, Windreich
Amtenhauser Berg wind farm 2017 16.5 5 Vestas V126-3.3MW (5 ×) Immendingen DOES 47 ° 57 ′ 31 ″ N, 8 ° 40 ′ 24 ″ E
Aufhausen wind farm 2002
2005
8.0 4th Vestas V80-2MW (2 ×)
Vestas V90-2MW (2 ×)
Aufhausen GP 48 ° 34 ′ 26 "N, 9 ° 45 ′ 0" E megawatt
Auingen wind farm 2000
2006
2.3 3 NEG Micon NM48 / 750 (2 ×)
Enercon E-48 (1 ×)
Auingen RT 48 ° 24 '8 "N, 9 ° 31' 44" E SoWiTec, Theolia, wks-energy, Windreich
Bad Rippoldsau-Schapbach wind farm 2007
2015
8.35 4th Vestas V90-2MW (3 ×)
Enercon E-92 (1 ×)
Schapbach FDS 48 ° 24 ′ 1 ″ N, 8 ° 17 ′ 6 ″ E vento ludens
Bad Saulgau wind farm (Schellenberg wind farm) 2019 10.35 3 Vestas V136-3.45MW (3 ×) Bad Saulgau SIG 48 ° 1 ′ 16 ″ N, 9 ° 34 ′ 10 ″ E Uhl Windkraft Projektierung GmbH & Co. KG (*)
Berghulen-Blaubeuren wind farm 2002
2009
2012
2017
11.0 6th Enercon E-40 / 6.44 (1 ×)
Enercon E-82 (4 ×)
Nordex N117 / 2400 (1 ×)
Berghulen
Seißen
UL 48 ° 27 ′ 3 "N, 9 ° 45 ′ 29" E EnBW wind power projects ; Wind energy Wennender Heide
Blaufeldern-Langenburg wind farm 2017
2018
40.05 12 Vestas V126-3.3MW (9 ×)
Vestas V126-3.45MW (3 ×)
Blue fields
Langenburg
SHA 49 ° 16 ′ 42 "N, 9 ° 52 ′ 53" E
Bobstadt wind farm 2018 12.0 4th Enercon E-115 (4 ×) Bobstadt TBB 49 ° 28 ′ 4 "N, 9 ° 41 ′ 39" E
Böhmenkirch wind farm 2001
2007
6.0 4th Südwind S70 (4 ×) Böhmenkirch GP 48 ° 41 ′ 31 ″ N, 9 ° 56 ′ 32 ″ E Alb wind power
Böttingen wind farm 2000 2.25 3 NEG Micon NM48 / 750 (3 ×) Boettingen RT 48 ° 24 '7 "N, 9 ° 33' 4" E SoWiTec, Theolia, Windreich
Boxberg wind farm 2004
2017
12.35 6th Vestas V90-2MW (5 ×)
Enercon E-92 (1 ×)
Uiffingen TBB 49 ° 30 ′ 25 ″ N, 9 ° 34 ′ 12 ″ E Global Wind Power, juwi erected on the A 81
Brandberg-Rosenberg-Virngrund wind farm 2014
2016
2017
20.45 7th Enercon E-92 (2 ×)
Nordex N131 / 3300 (2 ×)
Enercon E-115 (3 ×)
Linen ridge
Hohenberg
Hinterlengenberg
AA 48 ° 59 '17 "  N , 10 ° 2' 50"  E EnBW wind power projects , EnBW-ODR ; WIND energies; Stadtwerke Ellwangen
Brandenkopf-Nillkopf wind farm 1997
2002
2018
7.6 4th Tacke TW 600e (1 ×)
Enercon E-58 (1 ×)
Enercon E-115 (2 ×)
Fischerbach
Unterharmersbach
1st floor 48 ° 20 ′ 13 "N, 8 ° 8 ′ 33" E JALBO Windkraft, fesa, Bürgerwindrad Brandenkopf
Braunsbach wind farm 2016 12.0 4th Enercon E-115 (4 ×) Zottishofen SHA 49 ° 14 ′ 16 "N, 9 ° 48 ′ 27" E ZEAG, BE Braunsbach
Bühlertann wind farm 2017 13.2 4th Vestas V126-3.3MW (4 ×) Buhlertann SHA 49 ° 1 ′ 18 ″ N, 9 ° 58 ′ 7 ″ E
Büttenbuch wind farm 2016
2019
10.8 4th Nordex N117 / 2400 (3 ×)
Nordex N117 / 3600 (1 ×)
Eschach
Göggingen
AA 48 ° 52 '13 "N, 9 ° 52' 6" E WIND energies
Dischingen-Ohrberg wind farm 2016 13.75 5 GE Wind Energy 2.75-120 (5 ×) Things HDH 48 ° 43 ′ 3 ″ N, 10 ° 19 ′ 1 ″ E WP Ohrberg
Dittwar wind farm 2017
2018
9.9 3 Vestas V126-3.3MW (3 ×) Dittwar TBB 49 ° 35 ′ 56 "N, 9 ° 36 ′ 58" E erected on the Neuberg near Dittwar
Dunningen wind farm 2000 3.5 3 Enercon E-40 / 5.40 (1 ×)
Enercon E-66 / 15.66 (2 ×)
Dunningen RW 48 ° 13 ′ 10 "N, 8 ° 31 ′ 33" E windwin, Lothar Kopp
Ebnat-Ochsenberg wind farm 2016 33.6 14th Nordex N117 / 2400 (14 ×) Ebnat
Nietheim
AA
HDH
48 ° 45 ′ 26 "N, 10 ° 10 ′ 16" E Blue wind
Ellwanger Berge wind farm 2016
2017
30.5 10 Enercon E-115 (10 ×) Jagstzell
Breitenbach
AA 49 ° 2 '18 "N, 10 ° 3' 15" E Stadtwerke Tübingen , WIND Energies erected on the A 7
Ettenheim-Kippenheim wind farm 2000
2001
7.9 5 Nordex N62 / 1300 (3 ×)
Nordex N80 / 2500 (1 ×)
Südwind S77 (1 ×)
Ettenheim
Kippenheim
1st floor 48 ° 15 ′ 16 "N, 7 ° 52 ′ 14" E fesa, green electricity Freiburg Wind farm with observation tower; Repowering planned
Fichtenau wind farm 2017 9.9 3 Vestas V126-3.3MW (3 ×) Fichtenau SHA 49 ° 5 ′ 30 "N, 10 ° 11 ′ 58" E
Frauental wind farm 2004
2015
6.55 4th REpower MD77 (3 ×)
Senvion MM100 (1 ×)
Frauental TBB 49 ° 30 ′ 20 "N, 10 ° 5 ′ 16" E SEG AG, HWE Hohenloher Windenergie
Freiamt wind farm (including Tännlebühl wind power station) 2001
2002
2004
2011
2014
12.75 6th Enercon E-66 / 18.70 (3 ×)
Enercon E-66 / 20.70 (1 ×)
Enercon E-82 E2 (1 ×)
Enercon E-101 (1 ×)
Freiamt EM 48 ° 10 ′ 16 "N, 7 ° 57 ′ 26" E fesa, Ökostrom Freiburg; Wind energy Tännlebühl
Freudenberg wind farm 2007
2016
20.9 9 REpower MM82 (2 ×)
Nordex N117 / 2400 (7 ×)
Freudenberg TBB 49 ° 44 ′ 26 "N, 9 ° 21 ′ 19" E Reg.En, THEOLIA Naturenergien GmbH, MVV Energie
Gaildorf wind farm ( Gaildorf natural energy storage facility ) 2017 13.6 4th GE Wind Energy 3.4-137 (4 ×) Gaildorf SHA 49 ° 0 ′ 2 "N, 9 ° 48 ′ 15" E MBS natural energy storage Wind farm with integrated 16MW pumped storage power plant , towers stand on 40 m high water storage tanks, when commissioning the highest systems in the world (hub height up to 178 m, total height up to 246.5 m)
Gerabronn wind farm 1998
2002
2005
2.2 3 DeWind D4 48/600 (1 ×)
Nordex N50 / 800 (1 ×)
Enercon E-48 (1 ×)
Gerabronn SHA 49 ° 15 ′ 52 "N, 9 ° 56 ′ 23" E BadenWind, LB-Converter, Steck Energie
Courtstetten wind farm 2018

2020

23.8 6th Enercon E-141 EP4 (4 ×)

Enercon E-138 EP3 (2 ×)

Richtstetten MOS 49 ° 31 '7 "N, 9 ° 30' 36" E
Gnannenweiler wind farm 2009 16.8 9 Enercon E-82 (8 ×)
Enercon E-53 (1 ×)
Gnannenweiler HDH 48 ° 41 ′ 22 "N, 9 ° 59 ′ 34" E Albuch-Wind, Windreich
Goldboden wind farm 2017 9.9 3 Nordex N131 / 3300 (3 ×) Winterbach WN 48 ° 46 ′ 19 ″ N, 9 ° 28 ′ 11 ″ E EnBW wind power projects
Gosbacher Alb wind farm 2000 2.55 3 Vestas V52-850kW (3 ×) Drackenstein GP 48 ° 33 ′ 5 "N, 9 ° 42 ′ 10" E megawatt
Large forest wind farm 2013 16.0 5 REpower 3.2M114 (5 ×) Hettingen
Rinschheim
MOS 49 ° 32 '19 "N, 9 ° 23' 12" E Wind energy S&H
Gütenbach wind farm 1999 3.2 3 Enercon E-40 / 6.44 (2 ×)
Enercon E-66 / 18.70 (1 ×)
Guttenbach VS 48 ° 2 ′ 32 "N, 8 ° 7 ′ 19" E
Harthäuser Wald wind farm 2015
2017
54.9 18th Enercon E-115 (18 ×) Aries
Hardthausen a. K.
Jagsthausen
Möckmühl
Forchtenberg
HN
KÜN
49 ° 17 ′ 28 "N, 9 ° 24 ′ 34" E ZEAG, Citizen Energy Hardthausen most powerful wind farm in Baden-Württemberg and in southern Germany
Hasel wind farm 2017 9.9 3 Vestas V126-3.3MW (3 ×) hazel 47 ° 40 ′ 44 "N, 7 ° 54 ′ 57" E
Heckfeld wind farm 2002
2017
5.05 3 Enercon E-58 (2 ×)
Enercon E-101 (1 ×)
Heckfeld TBB 49 ° 33 ′ 10 "N, 9 ° 39 ′ 4" E BadenWind
Heide wind farm 1997
2000
2002
2003
2004
2005
2010
2011
2012
2015
2016
31.1 15th Enercon E-40 / 5.40 (1 ×)
Enercon E-58 (2 ×)
Enercon E-66 / 18.70 (2 ×)
Enercon E-70 (1 ×)
Enercon E-82 E2 (2 ×)
Senvion MM92 (2 × )
Senvion 3.2M114 (3 ×)
Enercon E-92 (2 ×)
Neubronn TBB 49 ° 28 ′ 26 "N, 9 ° 58 ′ 11" E Naturkraft Tauber, HWE Hohenloher Windenergie, Klaus Wagner
Hilpensberg wind farm 2017 9.0 3 Vensys 120 (2 ×) Hilpensberg SIG 47 ° 51 ′ 56 "N, 9 ° 18 ′ 2" E
Himmelberg wind farm 1995 1.8 3 Micon M1500-600 (3 ×) Melchingen BL 48 ° 22 ′ 5 ″ N, 9 ° 9 ′ 2 ″ E SoWiTec first wind farm in Baden-Württemberg
Hirschlanden wind farm 2004
2016
9.6 4th REpower MM82 (2 ×)
GE Wind Energy 2.75-120 (2 ×)
Hirschlanden MOS v 49 ° 27 ′ 22 ″ N, 9 ° 30 ′ 7 ″ E Rose wind natural power
Höhefeld wind farm 2001
2002
14.25 14th Fuhrländer FL 1000 (3 ×)
Vestas V52-850kW (3 ×)
Fuhrländer FL MD70 (5 ×)
Enercon E-40 / 6.44 (2 ×)

Enercon E-58 (1 ×)

Height field TBB 49 ° 43 ′ 32 "N, 9 ° 36 ′ 2" E BadenWind, Energiequelle, Volta Windkraft, UMaAG
Holzkirch-Neenstetten wind farm 2008 6.15 3 REpower MM92 (3 ×) Holzkirch
Neenstetten
UL 48 ° 31 ′ 35 ″ N, 10 ° 0 ′ 19 ″ E Reg.En, THEOLIA Naturenergien GmbH
Hornberg wind farm 2002
2009
2020
9.05 5 Fuhrländer FL 1000 (2 ×)
Enercon E-82 (2 ×)
Enercon E-115 (1 ×)
Hornberg
Gutach
1st floor 48 ° 14 ′ 12 "N, 8 ° 14 ′ 30" E windwin, Windreich, badenova
Hummelsweiler wind farm 2017 12.0 4th Enercon E-115 (4 ×) Rosenberg AA 49 ° 2 ′ 19 ″ N, 10 ° 0 ′ 10 ″ E WIND energies
Ilshofen-Ruppertshofen wind farm 2006
2007
2014
2015
2017
19.55 7th Fuhrländer FL MD77 (1 ×)
REpower MM92 (1 ×)
Enercon E-101 (2 ×)
Vestas V126-3.3MW (3 ×)
Ruppertshofen
Gerabronn
SHA 49 ° 10 ′ 35 "N, 9 ° 54 ′ 5" E Behlau Energiewende, Reg.En GmbH, ZEAG, THEOLIA Naturenergien GmbH
Kambacher Eck wind farm 2016 12.2 4th Enercon E-115 (4 ×) Biberach
Steinach
1st floor 48 ° 17 ′ 28 "N, 7 ° 59 ′ 10" E badenova , green electricity consulting
Kirchberg wind farm 2000
2009
2016
32.4 11 Vestas V90-2MW (3 ×)
Vestas V126-3.3MW (8 ×)
Kirchberg ad Jagst SHA 49 ° 11 '4 "N, 9 ° 57' 9" E Behlau Energiewende, Bürger-WP Kirchberg, Hohenlohe Wind, reencon GmbH, ingenia, Gerhard Borchers erected on the A 6 , until 2014 there was still a Nordex N50 / 800 in the park, the largest community wind farm in southern Germany
Klosterwald wind farm 2015 25.0 10 GE Wind Energy 2.5-120 (10 ×) Creglingen TBB 49 ° 29 ′ 0 ″ N, 10 ° 4 ′ 30 ″ E WEBW, MVV Energie , Wirthwein
Kohlstrasse wind farm 2015 23.1 7th Vestas V126-3.3MW (7 ×) Michelbach ad Bilz
Gaildorf
Obersontheim
SHA 49 ° 3 ′ 2 "N, 9 ° 47 ′ 20" E Stadtwerke Schwäbisch Hall , Hohenlohe community wind farm erected along the coal road of the same name in the Limpurger Mountains
Krensheim wind farm 2001 1.8 3 Enercon E-40 / 6.44 (3 ×) Krensheim TBB 49 ° 37 ′ 32 ″ N, 9 ° 46 ′ 8 ″ E BadenWind
Külsheim wind farm 2016 12.0 5 Nordex N117 / 2400 (5 ×) Külsheim TBB 49 ° 39 '13 "N, 9 ° 32' 34" E Thüga , Stadtwerk Tauberfranken
Külsheim-Steinbach wind farm 2004 2.4 4th Enercon E-40 / 6.44 (4 ×) Steinbach TBB 49 ° 40 ′ 31 ″ N, 9 ° 29 ′ 19 ″ E BadenWind, WP Külsheim
Lauda-Heckfeld wind farm 2003
2020
8.7 3 Enercon E-66 / 18.70 (1 ×)
Vestas V126-3.45MW (2 ×)
Heckfeld
Dittwar
TBB 49 ° 34 ′ 19 ″ N, 9 ° 38 ′ 4 ″ E juwi erected on the A 81
Lauterburg wind farm 2007 10.25 5 REpower MM92 (5 ×) Lauterburg AA 48 ° 46 ′ 11 "N, 10 ° 0 ′ 6" E WP Lauterburg
Lauterstein wind farm 2016 52.25 19th GE Wind Energy 2.75-120 (19 ×) Lauterstein
Bartholomä
GP
AA
48 ° 44 '14 "N, 9 ° 53' 14" E wpd largest wind farm in Baden-Württemberg and in southern Germany
Leipferdingen wind farm 1997 1.8 3 Vestas V44-600kW (3 ×) Leipferdingen DOES 47 ° 52 ′ 6 "N, 8 ° 41 ′ 9" E Updraft originally four plants of the type had been planned and approved.
Lindlein wind farm 2004 4.5 3 NEG Micon NM82 / 1500 (3 ×) Lindlein SHA 49 ° 18 ′ 23 "N, 10 ° 0 ′ 3" E Community wind farm Hohenlohe, Behlau Energy transition
Lonsee-Ettlenschieß wind farm 2002
2012
4.64 5 Vestas V47-660kW (4 ×)
Vestas V90-2MW (1 ×)
Ettlenschieß UL 48 ° 34 ′ 0 "N, 9 ° 54 ′ 13" E Technical works Schussental , Willibald Heidrich Vestas turbines are two Enercon E-101 repowered be
Nonnenholz-Uhl wind farm 2017 34.85 11 GE Wind Energy 2.75-120 (4 ×)
Vestas V136-3.45MW (6 ×)
Nordex N117 / 3150 (1 ×)
Röhlingen
Zöbingen
AA 48 ° 56 ′ 17 ″ N, 10 ° 16 ′ 22 ″ E ABO Wind
Northern Black Forest wind farm 2007 28.0 14th Vestas V80-2MW (4 ×)
Vestas V90-2MW (10 ×)
Simmersfeld
Seewald
CW
FDS
48 ° 37 ′ 5 "N, 8 ° 27 ′ 28" E Altus, Breeze Two, Glotter Was the largest wind farm in Baden-Württemberg when it was built until 2015, built on a former ammunition depot and along the B 294
Oberkochen wind farm 2015 9.6 4th Nordex N117 / 2400 (4 ×) Oberkochen AA 48 ° 46 '12 "N, 10 ° 7' 16" E juwi , Stadtwerke Tübingen
Obersontheim-Bühlenzell wind farm 2017
2018
32.4 9 Vestas V136-3.6MW (9 ×) Obersontheim
Bühlenzell
SHA 49 ° 0 ′ 15 "N, 9 ° 50 ′ 27" E Uhl wind power
Prechtaler Schanze wind farm 2015
2016
18.3 6th Enercon E-101 (3 ×)
Enercon E-115 (3 ×)
Gutach
Mühlenbach
1st floor 48 ° 13 ′ 16 ″ N, 8 ° 10 ′ 8 ″ E E-Werk Mittelbaden
Pülfringen Nord wind farm 2001
2017
10.8 10 Enercon E-40 / 6.44 (8 ×)
Enercon E-115 (2 ×)
Washing rings TBB 49 ° 35 '24 "N, 9 ° 31' 11" E BadenWind
Pülfringen Süd wind farm 2001
2002
2012
14.7 10 AN Bonus 1300/62 (7 ×)
Enercon E-58 (1 ×)
Enercon E-82 E2 (2 ×)
Pülfringen
Erfeld
TBB
MOS
49 ° 33 ′ 17 "N, 9 ° 30 ′ 32" E PNE wind
Rauhkasten-Steinfirst wind farm 2017 12.2 4th Enercon E-115 (4 ×) Gengenbach
Friesenheim
Hohberg
1st floor 48 ° 22 ′ 5 "N, 7 ° 58 ′ 31" E Enercon
Ravenstein wind farm 2015 10.0 4th GE Wind Energy 2.5-120 (4 ×) Merchingen MOS 49 ° 25 ′ 1 ″ N, 9 ° 29 ′ 9 ″ E Green City Energy erected on the A 81
Ravensteiner Höhe wind farm 2004
2007
6.55 4th REpower MD77 (2 ×)
Fuhrländer FL MD77 (1 ×)
REpower MM92 (1 ×)
Merchingen MOS 49 ° 23 '23 "N, 9 ° 32' 5" E Windenergie S & H, Reg.En GmbH, THEOLIA Naturenergien GmbH
Rechenberg wind farm 2017 9.0 3 Enercon E-115 (3 ×) Rechenberg SHA 49 ° 3 '5 "N, 10 ° 7' 11" E WIND energies
Renquishausen wind farm 1996 1.5 3 Enercon E-40 / 5.40 (3 ×) Renquishausen DOES 48 ° 5 '12 "N, 8 ° 52' 29" E WP Renquishausen another identical system has already been dismantled
Rohrenkopf wind farm (Schopfheim wind farm) 2016
2017
15.0 5 Enercon E-115 (5 ×) Gersbach 47 ° 43 ′ 5 ″ N, 7 ° 56 ′ 22 ″ E EWS A temporary construction freeze was lifted
Roßkopf wind farm 2004 7.2 4th Enercon E-66 / 18.70 (4 ×) Gundelfingen
Freiburg im Breisgau
FR
FR
48 ° 0 ′ 26 "N, 7 ° 54 ′ 8" E fesa, green electricity Freiburg
Rot am See wind farm (Hausen am Bach wind farm) 2016
2019
13.2 4th Vestas V126-3.3MW (4 ×) Hausen by the brook SHA 49 ° 18 ′ 11 "N, 10 ° 7 ′ 32" E juwi , EnBW wind power projects , EnBW-ODR
Rote Steige wind farm 2017
2018
21.6 6th Vestas V136-3.6MW (6 ×) Michelfeld
Mainhardt
SHA 49 ° 5 ′ 10 "N, 9 ° 38 ′ 21" E Stadtwerke Schwäbisch Hall , Uhl Wind Power on federal road 14
Schelklingen wind farm 1999
2000
3.75 5 NEG Micon NM48 / 750 (5 ×) Ingstetten UL 48 ° 23 ′ 19 ″ N, 9 ° 37 ′ 19 ″ E Albwind Ingstetten-Justingen, Theolia, Windreich
Schonach wind farm 2001
2002
2003
7.63 6th Enercon E-12 (1 ×)

Enercon E-40 / 6.44 (1 ×)
south wind S77 (1 ×)
south wind S77 (1 ×)
Enercon E-70 (2 ×)

Schonach VS 48 ° 7 ′ 27 "N, 8 ° 11 ′ 31" E wks-energy, THEOLIA Naturenergien GmbH
St. Peter wind farm (incl. Plattenhöfe wind farm) 2000
2001
2006
2010
2013
16.0 9 NEG Micon NM60 / 1000 (3 ×)
Enercon E-40 / 6.44 (1 ×)
Enercon E-70 (2 ×)
Enercon E-70 E4 (1 ×)
Enercon E-101 (2 ×)
Saw slab
Simonswald
FR
EM
48 ° 3 ′ 6 ″ N, 8 ° 4 ′ 6 ″ E fesa, Ökostrom Freiburg; THEOLIA Naturenergien GmbH, Windreich
Stachenhausen wind farm 2003
2007
2008
9.7 5 REpower MD77 (1 ×)
REpower MM92 (4 ×)
Stachenhausen KÜN 49 ° 20 ′ 23 "N, 9 ° 41 ′ 22" E Reg.En GmbH
Steinbacher Höhe wind farm 2010 6.15 3 REpower MM92 (3 ×) Steinbach MOS 49 ° 33 '17 "N, 9 ° 15' 10" E Naturstrom AG , Windenergie S & H, WP Mudau
Stödtlen wind farm 2006 6.15 3 REpower MM92 (3 ×) Rough AA 48 ° 49 ′ 2 "N, 10 ° 17 ′ 28" E Uhl-Windkraft, Breeze Three Energy Expansion planned
Stötten wind farm 1996
2001
2002
2006
2011
11.7 9 Vestas V44-600kW (1 ×)
Vestas V52-850kW (4 ×)
DeWind D6 62/1000 (1 ×)
Vestas V90-2MW (2 ×)
Schuler SDD 100 2.7MW (1 ×)
Stötten GP 48 ° 39 '28 "N, 9 ° 51' 17" E Megawatts, wpd , Schuler Stötten wind test field since 1956 (founder Ulrich W. Hütter ), commercial wind farm since 1997, prototype and only system of the Schuler SDD 100
Straubenhardt wind farm 2017
2018
33 11 Siemens SWT-3.0-113 (11 ×) Straubenhardt PF 48 ° 48 ′ 54 "N, 8 ° 31 ′ 31" E Wirsol, Wircon GmbH
Striethof wind farm 2004
2009
10.0 5 Vestas V80-2MW (2 ×)
Enercon E-82 (3 ×)
Ruppertshofen
Eschach
AA 48 ° 53 ′ 1 ″ N, 9 ° 50 ′ 5 ″ E WP Striethof
Sturmberg wind farm 1996 3.0 3 Nordex N54 / 1000 (3 ×) Judentenberg SIG 47 ° 53 ′ 8 ″ N, 9 ° 21 ′ 10 ″ E Glotter, updraft
Südliche Ortenau wind farm 2016 19.25 7th GE Wind Energy 2.75-120 (7 ×) Ettenheim
Schuttertal
1st floor 48 ° 15 ′ 16 "N, 7 ° 55 ′ 22" E Green City Energy, Ettenheimer Bürgerenergie
Tegelberg wind farm 2017
2018
8.25 3 GE Wind Energy 2.75-120 (3 ×) Donzdorf GP 48 ° 38 ′ 39 "N, 9 ° 49 ′ 5" E
Tennenbronn wind farm (incl. Steigers Eck wind farm) 2002
2003
2005
2011
2016
2017
21.9 10 Enercon E-66 / 18.70 (1 ×)
Enercon E-70 E4 (1 ×)
Enercon E-115 (2 ×)
REpower MD77 (2 ×)
Vestas V90-2MW (2 ×)
Nordex N117 / 2400 (2 ×)
Tennenbronn
Buchenberg
Langenschiltach
Hornberg
1st floor
RW
VS
48 ° 11 ′ 10 ″ N, 8 ° 18 ′ 13 ″ E Wind power Tennenbronn; vento ludens, dge Wind Brogen, Solarcomplex
Tomerdingen-Bermaringen wind farm (Keltische Schanze wind farm) 2007
2013
2017
21.9 11 Vestas V82-1.5MW (5 ×)
Nordex N117 / 2400 (6 ×)
Tomerdingen
Bermaringen
Temmenhausen
UL 48 ° 8 ′ 7 ″ N, 9 ° 52 ′ 22 ″ E Planet Energy , Solarinvest AG; Efi Wind, THEOLIA Naturenergien GmbH, Windreich erected on the A 8
Verenafohren wind farm 2017 9.9 3 Nordex N131 / 3300 (3 ×) Wiechs on the edge KN 47 ° 46 ′ 7 "N, 8 ° 37 ′ 32" E hegauwind erected directly on the Swiss border
Waldhausen wind farm 2007
2017
30.85 12 REpower MM92 (7 ×)
Vestas V126-3.3MW (5 ×)
Waldhausen AA 48 ° 50 ′ 8 "N, 10 ° 12 ′ 24" E Uhl wind power; ENBW erected on the A 7
Waldmössingen wind farm 2002 3.6 4th NEG Micon NM52 / 900 (4 ×) Waldmössingen RW 48 ° 15 ′ 28 "N, 8 ° 30 ′ 16" E Theolia, Windreich , WP Hummelbühl
Wallhausen wind farm 2011
2018
7.6 4th Enercon E-53 (2 ×)
Enercon E-115 (2 ×)
Schainbach SHA 49 ° 14 '11 "N, 10 ° 3' 9" E Stollmeier
Weilermerkingen-Ohmenheim wind farm 2007
2016
22.65 9 REpower MM92 (3 ×)
GE Wind Energy 2.75-120 (6 ×)
Weilermerkingen
Ohmenheim
AA 48 ° 47 ′ 28 "N, 10 ° 21 ′ 1" E WP Weilermerkingen; WP Ohmenheim On July 17, 2018, a rotor blade of one of the REpower turbines was damaged by a lightning strike
Weissbach wind farm 2001
2016
18.5 7th NEG Micon NM60 / 1000 (2 ×)
Vestas V126-3.3MW (5 ×)
Crispenhofen KÜN 49 ° 19 ′ 23 "N, 9 ° 34 ′ 31" E Specht Windkraft, Bürger-WP Hohenlohe
Wenkheim wind farm 2007 18.0 9 Vestas V80-2MW (9 ×) Wenkheim TBB 49 ° 42 ′ 31 ″ N, 9 ° 41 ′ 7 ″ E Energy source , UMaAG
Werbachhausen wind farm 2012 6.3 3 Enercon E-82 (2 ×)
Enercon E-82 E2 (1 ×)
Werbachhausen TBB 49 ° 40 ′ 16 "N, 9 ° 42 ′ 12" E Windreich , Energie Bals, WIND Energies
Werdeck wind farm 2017 9.9 3 Vestas V126-3.3MW (3 ×) Werdeck SHA 49 ° 13 ′ 55 "N, 9 ° 56 ′ 48" E
Westerheim wind farm 1998
2001
2002
5.1 4th NEG Micon NM48 / 600 (1 ×)
Südwind S70 (1 ×)
REpower MD77 (2 ×)
Westerheim UL 48 ° 32 ′ 3 "N, 9 ° 37 ′ 32" E Alb wind power
Wiesensteig wind farm 1999 4.5 6th NEG Micon NM48 / 750 (6 ×) Wiesensteig GP 48 ° 33 ′ 5 "N, 9 ° 37 ′ 11" E SoWiTec
Wittighausen wind farm 2002 5.94 9 Vestas V47-660kW (9 ×) Unterwittighausen TBB 49 ° 37 ′ 11 "N, 9 ° 48 ′ 10" E UMaAG

Individual evidence

  1. ^ Landesanstalt für Umwelt Baden-Württemberg - Environmental data and maps online (under Climate and Renewable Energies / Wind Turbines / Map View). Retrieved April 26, 2020 .
  2. Share of renewable energies in gross final energy consumption electricity - electricity - BW - data and facts on the development of renewable energies in individual federal states. Retrieved April 26, 2020 .
  3. Fraunhofer ICT: Major project “RedoxWind”. Retrieved August 25, 2017 .
  4. ^ Research project capercaillie & wind energy: Alexanderschanze Germany / Black Forest. Retrieved October 13, 2015 .
  5. ^ Stadtwerke Stuttgart: Citizen wind energy plant Alpirsbach. Retrieved October 13, 2015 .
  6. Badische Zeitung of April 2, 2014: New rotation for old wind turbines. Retrieved October 13, 2015 .
  7. ^ Breitnau municipality: wind power and hipped roofs. Retrieved October 13, 2015 .
  8. Schwäbische.de of September 5, 2014: The Birkenzeller wind turbine is up. Retrieved December 27, 2014 .
  9. Hohenloher Tagblatt from January 30, 2016: More water than ever. Retrieved February 13, 2016 .
  10. fesa GmbH: Fröhnd regional wind farm. Retrieved October 13, 2015 .
  11. ↑ System data , SkyscraperPage
  12. Baden Online from October 30, 2015: Wind turbine turns on the Hornisgrinde. Retrieved November 1, 2015 .
  13. Wind power plant on the Hornisgrinde ( memento of the original from February 22, 2016 in the Internet Archive ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / manugrafie.net
  14. ^ Ingersheim energy cooperative: Wind turbine project. Retrieved October 13, 2015 .
  15. IWR press and mail service of March 14, 2012: EnBW wind energy plant Schopfloch: Highest wind energy plant in the northern Black Forest officially put into operation. (No longer available online.) Formerly in the original ; accessed on October 13, 2015 .  ( Page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Toter Link / www.iwrpressedienst.de  
  16. bathe online from April 30, 2003: Fresh wind power from the Renchtal. Retrieved October 4, 2014 .
  17. fesa GmbH: Regio pinwheel Yach. Retrieved October 13, 2015 .
  18. fesa GmbH: Schweighausen regional wind turbine. Retrieved October 13, 2015 .
  19. Ferienhaus Erna Unterkessach: The Unterkessach wind turbine. (No longer available online.) Archived from the original on March 4, 2016 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.ferienhaus-unterkessach.de
  20. News from the region from June 5, 2012: His windmills are turning in North Korea. (No longer available online.) Archived from the original on February 21, 2016 ; accessed on February 21, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.nadr.de
  21. ^ Hohenlohe community wind farm: Wegses. Retrieved October 13, 2015 .
  22. Südkurier of September 8, 2014: Airy construction site at a height of 80 meters: This is how the rotor blades of wind turbines are replaced. Retrieved October 13, 2015 .
  23. ^ Haller Tagblatt dated November 19, 2014: Near Veinau: The first wind turbines in the region are disappearing from the landscape again. Retrieved October 13, 2015 .
  24. Windpark Hettinger Eulsberg GmbH & Co. KG: Project page Windpark Hettingen. Retrieved May 30, 2017 .
  25. Ökostrom Freiburg: regiowind GmbH & Co. Freiburg. Retrieved October 13, 2015 .
  26. Kruck & Partner: Wind power plant on Horkenberg / Löwenstein. (No longer available online.) Archived from the original on November 28, 2015 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.kruck-partner.de
  27. Voice of June 24, 2014: Start of construction for almost 200 meter high wind turbines. Retrieved June 26, 2012 .
  28. ^ Energieberg Karlsruhe: The history - from the first plans to today ... (No longer available online.) Archived from the original on July 27, 2015 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.energieberg.de
  29. fesa GmbH: regiowind plus Lahr / Seelbach. Retrieved October 13, 2015 .
  30. Baden Onlin from January 7, 2016: Foundation of the wind turbine on the Langenhard is ready. Retrieved January 8, 2016 .
  31. juwi group builds its first wind farm in Baden-Württemberg. Archived from the original on October 6, 2014 ; Retrieved October 4, 2014 .
  32. ^ Hohenlohe community wind farm : Nesselbach wind farm. Retrieved October 13, 2015 .
  33. Stuttgarter Zeitung of February 7, 2013: Wind propeller no longer rotates. Retrieved October 13, 2015 .
  34. ABO Wind: Use of wind energy in the municipality of Ahorn. Retrieved August 10, 2017 .
  35. ABO Wind: Use of wind energy in the municipality of Ahorn. Retrieved June 17, 2016 .
  36. ABO Wind: Press release on public participation from July 20, 2017. Accessed on August 10, 2017 .
  37. ^ Wind energy S & H: Altheimer Höhe wind farm. (No longer available online.) Archived from the original on January 20, 2011 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.windenergie-s-und-h.de
  38. Heidenheimer Zeitung of October 16, 2017: Four more wind turbines for Gussenstadt. Retrieved November 15, 2017 .
  39. vento ludens: Bad Rippoldsau wind farm. (No longer available online.) Archived from the original on May 10, 2015 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.ventoludens.de
  40. Baden online from October 6, 2015: Construction of the fourth wind turbine is progressing. Retrieved October 8, 2015 .
  41. EnBW: Commissioning of the Berghülen wind farm. (No longer available online.) Formerly in the original ; Retrieved December 7, 2012 .  ( Page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Dead Link / www.enbw.com  
  42. SWP of May 19, 2017: Community wind farms win first tender. Retrieved February 25, 2016 .
  43. EnBW: Rosenberg Süd wind farm. Retrieved October 18, 2017 .
  44. fesa GmbH: Brandenkopf community wind turbine. Retrieved October 13, 2015 .
  45. SWP of August 19, 2016: Five turbines in the Braunsbach wind farm under construction. Retrieved September 7, 2016 .
  46. Büttenbuch wind farm near Eschach. In: windparkwaldhausen.de. Retrieved February 11, 2020 .
  47. Heidenheimer Zeitung of October 27, 2015: Ohrberg wind turbines: From December 4, construction will take place. Retrieved December 29, 2015 .
  48. Fränkische Nachrichten: The declared aim is public participation . July 21, 2017. Online at www.fnweb.de. Retrieved September 28, 2019.
  49. Schwäbische Post from September 2, 2015: New wind farm at Ebnat. Retrieved October 13, 2015 .
  50. ^ Stadtwerke Tübingen: Windpark Ellwanger Berge. (No longer available online.) Archived from the original on June 17, 2016 ; Retrieved June 17, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.swtue.de
  51. fesa GmbH: Regio-Windpark Ettenheim. Retrieved October 13, 2015 .
  52. fesa GmbH: Regio wind turbine Mahlberg. Retrieved October 13, 2015 .
  53. Dipl.-Ing. Michael Behlau: Frauental wind farm. (No longer available online.) Archived from the original on March 5, 2013 ; Retrieved September 29, 2012 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.windkraft-franken.de
  54. Fränkische Nachrichten of July 25, 2015: Fourth system is taking shape. Retrieved November 6, 2015 .
  55. fesa GmbH: Freiamt Wind und Sonne. Retrieved October 13, 2015 .
  56. fesa GmbH: Freiamt regional wind farm. Retrieved October 13, 2015 .
  57. SWR of November 5, 2015: MVV is building wind farm near Freudenberg. Retrieved November 6, 2015 .
  58. [1]
  59. a b Windreich: Windreich AG continues its commitment to the expansion of wind power. (No longer available online.) Archived from the original on January 27, 2016 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / windreich.ag
  60. EnBW Energie Baden-Württemberg: Goldboden-Winterbach wind farm. (No longer available online.) Archived from the original on December 21, 2016 ; accessed on December 16, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.enbw.com
  61. ^ Wind park Großer Wald Hettingen / Rinschheim: The project. Retrieved October 13, 2015 .
  62. ZEAG Energie: A wind farm with a model character. (No longer available online.) Archived from the original on September 17, 2015 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.zeag-energie.de
  63. Wind energy Harthäuser Wald: Construction work in full swing. (No longer available online.) Archived from the original on April 2, 2015 ; Retrieved April 1, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.windenergie-harthaeuser-wald.de
  64. Naturkraft Tauber: Windpark Heide. (No longer available online.) Archived from the original on March 4, 2016 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.naturkraft-tauber.de
  65. Main-Tauber-Kreis of August 27, 2015: Immission control permit for wind power plant Klaus Wagner. (No longer available online.) Archived from the original on July 15, 2016 ; accessed on July 16, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.main-tauber-kreis.de
  66. ^ ABO Wind: Wind farm planning in Hirschlanden (Rosenberg). Retrieved June 17, 2016 .
  67. ↑ Höhefeld wind farm. Retrieved October 13, 2015 .
  68. badenova of July 30, 2009: Citizens' power station "sold out". (No longer available online.) Archived from the original on March 4, 2016 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.badenova.de
  69. swp of April 6, 2017: Hummelsweiler wind farm is taking shape. Retrieved October 18, 2017 .
  70. ZEAG Energie: The first ZEAG wind turbine sends a clear message. (No longer available online.) Archived from the original on September 18, 2015 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.zeag-energie.de
  71. a b Badenova of August 7th, 2015: "Windpark Kambacher Eck" - starting signal for construction has been given. (No longer available online.) Archived from the original on January 26, 2016 ; accessed on August 24, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.badenova.de
  72. Kirchberg wind farm from July 24, 2015: Construction will start on Monday, July 27. (No longer available online.) Archived from the original on November 11, 2016 ; Retrieved July 26, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / windpark-kirchberg.de
  73. ^ Hohenlohe community wind farm: Wind energy plant Kirchberg II. Accessed on October 13, 2015 .
  74. Katharina Gabel: The wind farm is growing steadily. (No longer available online.) Formerly in the original ; Retrieved April 25, 2015 .  ( Page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Dead Link / www.swp.de  
  75. ^ Hohenlohe community wind farm: Kohlenstraße. Retrieved October 13, 2015 .
  76. Main-Echo from August 5, 2015: Four rotors for the pigeon hole. Retrieved November 6, 2015 .
  77. Fränkische Nachrichten of November 14, 2015: The towers are visible from afar. Retrieved February 21, 2016 .
  78. Juwi.de: Start of construction at the juwi wind farm Lauda-Heckfeld ( memento of the original from September 28, 2019 in the Internet Archive ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice. . August 20, 2019. Online at www.juwi.de. Retrieved September 28, 2019. @1@ 2Template: Webachiv / IABot / www.juwi.de
  79. ^ WP Waldhausen: Lauterburg wind farm (near Essingen). Retrieved February 21, 2016 .
  80. Gallop in the wind farm . In: Südwestpresse , September 19, 2016. Accessed October 7, 2016.
  81. ^ Hohenlohe community wind farm : Lindlein wind farm. Retrieved October 13, 2015 .
  82. Announcement according to UVPG ( Memento of the original from March 12, 2016 in the Internet Archive ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.alb-donau-kreis.de
  83. Thomas Kappel of March 31, 2017: Nonnenholz wind farm. Retrieved March 31, 2017 .
  84. ALTUS: Northern Black Forest wind farm. (No longer available online.) Archived from the original on March 4, 2016 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.altus-ag.de
  85. Stadtwerke Tübingen acquire wind farm in Oberkochen. (No longer available online.) Archived from the original on April 16, 2015 ; Retrieved April 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.swtue.de
  86. Stadtwerke Tübingen open a new wind farm in Oberkochen. (No longer available online.) Archived from the original on January 16, 2016 ; accessed on January 16, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.swtue.de
  87. Südwest Presse from November 15, 2017: The Gaildorf wind turbines get company. Retrieved November 15, 2017 .
  88. Badische Zeitung of February 28, 2014: Three wind turbines with a height of almost 200 meters. Retrieved March 3, 2014 .
  89. Schwarzwälder Bote from June 18, 2015: Three new wind turbines on Prechtaler Schanze. Retrieved June 20, 2015 .
  90. Baden Online of November 21, 2016: Wind farm near Gengenbach is taking shape. Retrieved November 23, 2015 .
  91. Green City Energy News from January 15, 2015: Start of construction of the Ravenstein wind farm. (No longer available online.) Archived from the original on February 3, 2015 ; Retrieved February 3, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.greencity-energy.de
  92. Windpark Ravensteiner Höhe GmbH & Co. KG: Project page windpark Ravensteiner Höhe. Retrieved May 30, 2017 .
  93. swp of December 16, 2016: Construction of the Rechenberg wind farm has started. Retrieved October 18, 2017 .
  94. Badische Zeitung of November 17, 2015: Preparatory work for the wind farm begins. Retrieved February 21, 2016 .
  95. No construction stop for wind turbines at Rohrenkopf near Schopfheim
  96. fesa GmbH: regio wind Freiburg. Retrieved October 13, 2015 .
  97. EnBW of February 8, 2016: Approved: Wind farm in Rot am See is being built. Retrieved February 21, 2016 .
  98. Wind information on the Rote Steige wind farm. Retrieved November 2, 2017 .
  99. fesa GmbH: regio wind St. Peter. Retrieved October 13, 2015 .
  100. ^ Badische Zeitung of August 21, 2012: Permit for wind turbines. Retrieved January 12, 2013 .
  101. Natural power: Steinbacher Höhe wind farm. Retrieved October 13, 2015 .
  102. Windpark Steinbacher Höhe GmbH & Co. KG: Project page Windpark Steinbacher Höhe. Retrieved May 30, 2017 .
  103. Megawatt: Stötten II wind farm. Accessed on October 13, 2015 .
  104. Rems-Zeitung of November 27, 2009: The rotor blades are currently being mounted on the new wind turbines in Ruppertshofen! Retrieved October 13, 2015 .
  105. Wind power Tennenbronn: Technology. Retrieved October 13, 2015 .
  106. Greenpeace Energy: Tomerdingen wind farm. Retrieved October 13, 2015 .
  107. Greenpeace Energy: Südwest Presse, February 10, 2017. Accessed April 16, 2017 .
  108. hegauwind: Verenafohren project. Retrieved November 8, 2016 .
  109. ^ Thomas Kappel: Waldhausen wind farm. Retrieved September 29, 2012 .
  110. Swabian from August 19, 2001: Four 74 meter high "giants" have been running around since Wednesday. (No longer available online.) Archived from the original on November 11, 2016 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.schwaebische.de
  111. ^ Hohenloher Tagblatt dated September 21, 2011: Windmills near Wallhausen-Schainbach are now being built. (No longer available online.) Formerly in the original ; accessed on October 13, 2015 .  ( Page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Dead Link / www.swp.de  
  112. Thomas Kappel: Weilermerkingen wind farm. Retrieved July 19, 2018 .
  113. ^ Hohenlohe community wind farm: Weissbach community wind farm. Retrieved October 13, 2015 .
  114. Rainer Matthies: Wenkheim wind farm is being built. Retrieved October 13, 2015 .
  115. ^ Alb wind power: Westerheim wind farm information sheet. (No longer available online.) Archived from the original on March 4, 2016 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.alb-windkraft.de
  116. ^ City of Wiesensteig: wind turbines. (No longer available online.) Archived from the original on August 25, 2015 ; accessed on October 13, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.wiesensteig.de
  117. ECO-World of December 17, 2001: UDI from Nuremberg is still offering two wind funds in 2001. Retrieved October 13, 2015 .