Surname
|
Construction year
|
Total power (MW)
|
number
|
Type (WKA)
|
place
|
agriculture circle
|
Coordinates
|
Project planner / operator
|
Remarks
|
Badenheim wind turbine
|
2016
|
3.05
|
1
|
Enercon E-101 (1 ×)
|
Badenheim
|
MZ
|
49 ° 49 ′ 58 ″ N, 7 ° 59 ′ 15 ″ E
|
GAIA
|
|
Bärweiler wind turbines
|
2016
|
6.6
|
2
|
Vestas V126-3.3MW (2 ×)
|
Bärweiler
|
KH
|
49 ° 43 ′ 53 "N, 7 ° 34 ′ 55" E
|
ENP New Energies
|
|
Berghausen wind turbine
|
2001
|
1.3
|
1
|
AN Bonus 1300/62 (1 ×)
|
Berghausen
|
EMS
|
50 ° 15 ′ 24 ″ N, 8 ° 1 ′ 0 ″ E
|
VS wind power
|
|
Bleckhausen wind turbine
|
1993
|
0.11
|
1
|
Sea wind 20-110 (1 ×)
|
Bleckhausen
|
DAU
|
50 ° 7 ′ 19 ″ N, 6 ° 46 ′ 31 ″ E
|
|
decommissioned / dismantled 2014
|
Bleialf wind turbine
|
1994
|
0.11
|
1
|
Sea wind 20/110 (1 ×)
|
Lead alf
|
BIT
|
50 ° 15 ′ 6 ″ N, 6 ° 16 ′ 52 ″ E
|
|
decommissioned / dismantled 2014
|
Boxberg wind turbines
|
2001
|
3.0
|
2
|
Südwind S70 (2 ×)
|
Boxberg
|
DAU
|
50 ° 16 ′ 38 "N, 6 ° 51 ′ 52" E
|
|
|
Breitenbach wind turbines
|
1995
|
1.0
|
2
|
Enercon E-40 / 5.40 (2 ×)
|
Breitenbach
|
KUS
|
|
|
dismantled in 2015
|
Brimingen-Auf Herrel wind turbines
|
2002
|
2.6
|
2
|
Nordex N62 (2 ×)
|
Brimingen
|
BIT
|
49 ° 58 ′ 10 "N, 6 ° 20 ′ 50" E
|
Energy source
|
erected on industrial park grounds
|
Brimingen-Am Hohnersberg wind turbine
|
2009
|
0.8
|
1
|
Enercon E-48 (1 ×)
|
Brimingen
|
BIT
|
49 ° 57 ′ 56 "N, 6 ° 21 ′ 58" E
|
DunoAir
|
|
Dambach wind turbine
|
1995
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Dambach
|
BIR
|
49 ° 37 '39 "N, 7 ° 7' 37" E
|
Wind power plants Obere Nahe
|
|
Wind turbines Dannstadt-Schauernheim
|
2010
|
5.0
|
2
|
Kenersys K100 (2 ×)
|
Dannstadt-Schauernheim
|
RP
|
49 ° 24 ′ 0 ″ N, 8 ° 19 ′ 14 ″ E
|
juwi , ATS
|
|
Desloch wind turbines
|
2001
|
3.0
|
2
|
Enron Wind 1.5s (2 ×)
|
Desloch
|
KH
|
49 ° 42 ′ 33 "N, 7 ° 37 ′ 41" E
|
Energy source , UMaAG
|
|
Dirmstein wind turbines
|
2010
|
4.0
|
2
|
Enercon E-82 (2 ×)
|
Dirmstein
|
DÜW
|
49 ° 35 ′ 11 "N, 8 ° 16 ′ 31" E
|
Energy source , GAIA
|
|
Eilscheid wind turbines
|
2017
|
4.6
|
2
|
Enercon E-82 E2 (2 ×)
|
Eilscheid
|
BIT
|
50 ° 7 ′ 52 "N, 6 ° 24 ′ 15" E
|
Boreas
|
|
Elchweiler wind turbine
|
2014
|
3.0
|
1
|
Vestas V112-3.0MW (1 ×)
|
Elk hamlet
|
BIR
|
49 ° 40 ′ 37 "N, 7 ° 11 ′ 11" E
|
EFI Wind, InvestInvent, seebaaWIND
|
|
Enkenbach-Alsenborn wind power station
|
2013
|
3.05
|
1
|
Enercon E-101 (1 ×)
|
Enkenbach-Alsenborn
|
KIB
|
49 ° 30 ′ 40 "N, 7 ° 53 ′ 3" E
|
HegerGuss
|
serves for the self-sufficiency of the company
|
Eppenberg wind turbines
|
1997 1998 2000
|
1.0
|
2
|
Enercon E-40 / 5.40 (2 ×)
|
Eppenberg
|
COC
|
50 ° 14 ′ 30 ″ N, 7 ° 4 ′ 3 ″ E
|
|
One Nordex N43 and one Südwind S46 have meanwhile been dismantled
|
Felsbergerhof wind turbines
|
1996 2001
|
0.7
|
2
|
Enercon E-30 / 2.30 (1 ×) Enercon E-40 / 5.40 (1 ×)
|
Felsbergerhof
|
KIB
|
49 ° 36 ′ 3 ″ N, 7 ° 44 ′ 29 ″ E
|
|
meanwhile dismantled
|
Gundersheim wind turbine
|
2019
|
3.0
|
1
|
Enercon E-115 (1 ×)
|
Gundersheim
|
AZ
|
49 ° 34 ′ 35 "N, 7 ° 44 ′ 44" E
|
juwi
|
|
Hahn am See wind turbine
|
1996
|
0.25
|
1
|
Fuhrländer FL astOs 250 (1 ×)
|
Hahn am See
|
WW
|
50 ° 31 '10 "N, 7 ° 52' 57" E
|
|
|
Hahnweiler wind turbines
|
2017
|
2.5
|
1
|
DeWind D6 / 62 (2 ×)
|
Hahnweiler
|
BIR
|
49 ° 34 ′ 1 ″ N, 7 ° 12 ′ 45 ″ E
|
NET
|
|
Hambuch wind turbines
|
2002
|
2.4
|
1
|
Nordex N117 / 2400 (1 ×)
|
Hambuch
|
COC
|
50 ° 13 ′ 21 ″ N, 7 ° 9 ′ 43 ″ E
|
Gaia mbH
|
|
Harspelt wind turbine
|
1994
|
0.25
|
1
|
Nordex N29 (1 ×)
|
Harpels
|
BIT
|
50 ° 8 ′ 41 ″ N, 6 ° 10 ′ 1 ″ E
|
|
|
Haßloch wind turbines
|
2005
|
3.0
|
2
|
Fuhrländer FL MD77 (2 ×)
|
Hassloch
|
DÜW
|
49 ° 23 ′ 4 "N, 8 ° 16 ′ 11" E
|
seebaWIND
|
erected on the A 65
|
Heidenburg wind turbine
|
1995 2001 2013
|
1.5
|
1
|
Südwind S70 (1 ×)
|
Heidenburg
|
WIL
|
49 ° 47 ′ 51 ″ N, 6 ° 56 ′ 11 ″ E
|
|
Südwind N3127 dismantled in 2013
|
Wind turbines Heinzenbach
|
2016
|
5.3
|
2
|
Enercon E-82 E2 (1 ×) Enercon E-115 (1 ×)
|
Heinzenbach
|
SIM
|
49 ° 58 ′ 33 "N, 7 ° 25 ′ 12" E
|
FUTURA Wind GmbH
|
|
Herchweiler wind turbines
|
2004
|
2.3
|
2
|
Enercon E-40 / 6.44 (1 ×) Enercon E-66 / 18.70 (1 ×)
|
Herchweiler
|
KUS
|
49 ° 30 ′ 16 "N, 7 ° 17 ′ 44" E
|
juwi
|
|
Hettenhausen wind turbine
|
2016
|
2.5
|
1
|
Vensys 112/2500 (1 ×)
|
Hettenhausen
|
PS
|
49 ° 20 ′ 59 "N, 7 ° 33 ′ 20" E
|
|
|
Hodenbachwald wind turbines
|
2018
|
6.6
|
2
|
Vestas V126-3.3MW (2 ×)
|
Herschweiler-Pettersheim
|
KUS
|
|
|
Holbornerhof wind turbine
|
2000
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Holbornerhof
|
KL
|
49 ° 33 ′ 27 ″ N, 7 ° 43 ′ 16 ″ E
|
|
|
Wind power plant Holzhausen ad Haide
|
1997
|
0.6
|
1
|
Tacke TW 600 (1 ×)
|
Holzhausen ad Haide
|
EMS
|
50 ° 12 ′ 40 ″ N, 7 ° 55 ′ 7 ″ E
|
Car glass minor
|
|
Holzheim wind turbine
|
2000
|
0.6
|
1
|
Enercon E-40 / 6.44 (1 ×)
|
Holzheim
|
EMS
|
50 ° 21 '32 "N, 8 ° 3' 34" E
|
GAIA, NET
|
|
Wind turbines Hüffler
|
2007
|
4.0
|
2
|
Vestas V80-2MW (2 ×)
|
Hüffler
|
KUS
|
49 ° 30 ′ 4 "N, 7 ° 24 ′ 16" E
|
WEA Solution
|
|
Wind power plant Ilbesheim
|
1998 1999
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Ilbesheim
|
AZ
|
49 ° 40 ′ 47 "N, 8 ° 4 ′ 36" E
|
juwi
|
previously 1 × Enercon E-40 / 5.40 and Nordex N43 each
|
Irrhausen wind turbine
|
1995
|
0.132
|
1
|
Sea wind 25/132 (1 ×)
|
Irrhausen
|
BIT
|
50 ° 4 ′ 34 "N, 6 ° 14 ′ 11" E
|
|
|
Jettenbach wind turbines
|
2001
|
1.0
|
2
|
Enercon E-40 / 5.40 (2 ×)
|
Jettenbach
|
KUS
|
49 ° 31 '14 "N, 7 ° 33' 16" E
|
|
meanwhile dismantled
|
Karschberg wind turbine
|
2017
|
2.35
|
1
|
Enercon E-92 (1 ×)
|
Hattgenstein
|
BIR
|
49 ° 41 ′ 35 "N, 7 ° 10 ′ 26" E
|
|
|
Katzenelnbogen wind turbine
|
1991
|
0.15
|
1
|
AN Bonus 150/30 (1 ×)
|
Katzenelnbogen
|
EMS
|
50 ° 16 ′ 32 "N, 7 ° 59 ′ 40" E
|
|
Dismantling planned
|
Katzwinkel wind turbine
|
2002
|
1.25
|
1
|
DeWind D6 / 62 (1 ×)
|
Katzwinkel
|
DAU
|
50 ° 15 ′ 25 ″ N, 6 ° 54 ′ 25 ″ E
|
|
|
Kehrig wind turbine
|
1999 2013 2016
|
2.75
|
1
|
GE 2.75-120 (1 ×)
|
Sweeping
|
MYK
|
50 ° 17 ′ 12 "N, 7 ° 12 ′ 28" E
|
ProVento, GVK, WP Kehrig
|
previously 6 × Fuhrländer FL 1000 (dismantled in 2013)
|
Kirburg wind turbine
|
1994 1996 1998
|
0.8
|
1
|
Fuhrländer FL 800 (1 ×)
|
Kirburg
|
WW
|
50 ° 40'58 "N, 7 ° 56'8" E
|
|
The location used to be a wind farm, dismantling in 2013 of 1 × Fuhrländer FL astOs 100 and 2015 of 1 × Fuhrländer FL astOs 100 and 2 × Fuhrländer FL astOs 250
|
Kleinich wind turbine
|
1999
|
1.0
|
1
|
Fuhrländer FL 1000 (1 ×)
|
Ilsbach
|
WIL
|
49 ° 52 ′ 35 "N, 7 ° 10 ′ 20" E
|
|
|
Wind turbines in Köngernheim
|
2010
|
1.6
|
2
|
Enercon E-53 (2 ×)
|
Koengernheim
|
MZ
|
49 ° 51 ′ 0 ″ N, 8 ° 16 ′ 21 ″ E
|
Energy source , GAIA
|
|
Kruchten wind turbine
|
2002
|
1.25
|
1
|
DeWind D6 / 62 (1 ×)
|
Kruchten
|
BIT
|
49 ° 53 ′ 50 "N, 6 ° 17 ′ 56" E
|
|
|
Lahr wind turbine
|
2015
|
3.0
|
1
|
Nordex N131 / 3000 (1 ×)
|
Lahr
|
SIM
|
50 ° 6 ′ 59 ″ N, 7 ° 22 ′ 0 ″ E
|
ABO Wind , Solix
|
|
Lampaden wind turbine
|
1995
|
0.27
|
1
|
Südwind N3127 (1 ×)
|
Lampades
|
TR
|
49 ° 39 ′ 19 ″ N, 6 ° 41 ′ 46 ″ E
|
|
Dismantled in 2016
|
Laudert wind turbines
|
2013
|
6.0
|
2
|
Enercon E-101 (2 ×)
|
Laudert
|
SIM
|
50 ° 5 ′ 7 ″ N, 7 ° 37 ′ 9 ″ E
|
juwi
|
|
Linden wind turbines
|
2013
|
4.8
|
2
|
Nordex N117 / 2400 (2 ×)
|
Linden trees
|
KL
|
49 ° 20 ′ 40 "N, 7 ° 37 ′ 39" E
|
ABO Wind , GGEW
|
|
Martinshöhe wind turbine
|
2001
|
1.0
|
1
|
Fuhrländer FL 1000 (1 ×)
|
Martinshöhe
|
KL
|
49 ° 22 ′ 10 "N, 7 ° 28 ′ 2" E
|
NET, west wind
|
|
Matzerath wind turbine
|
1998
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Matzerath
|
BIT
|
50 ° 9 ′ 17 ″ N, 6 ° 23 ′ 19 ″ E
|
|
|
Matzerath II wind turbine
|
2017
|
3.05
|
1
|
Enercon E-101 (1 ×)
|
Matzerath
|
BIT
|
50 ° 8 ′ 33 ″ N, 6 ° 24 ′ 8 ″ E
|
|
erected on the A 60
|
Wind turbines Merschbach
|
2016
|
6.6
|
2
|
Vestas V126-3.3MW (2 ×)
|
Merschbach
|
WIL
|
49 ° 48 ′ 55 "N, 7 ° 0 ′ 57" E
|
ABO Wind
|
|
Mückeln wind turbine
|
1995 2004
|
1.0
|
1
|
Enercon E-58 (1 ×)
|
Mosquitoes
|
DAU
|
50 ° 5 ′ 26 "N, 6 ° 54 ′ 44" E
|
NET
|
Tacke TW 300 dismantled in 2014
|
Nieder-Olm wind turbine
|
2000
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Nieder-Olm
|
MZ
|
49 ° 54 ′ 56 "N, 8 ° 13 ′ 31" E
|
Energy source , GAIA
|
|
Nisterau wind turbine
|
1997
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Nisterau
|
WW
|
50 ° 40 ′ 4 "N, 7 ° 59 ′ 8" E
|
|
|
Norken wind turbine
|
1993
|
0.1
|
1
|
Fuhrländer FL astOs 100 (1 ×)
|
Norken
|
WW
|
50 ° 39 '56 "N, 7 ° 53' 35" E
|
|
|
Oberbrombach wind turbine
|
1995
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Oberbrombach
|
BIR
|
49 ° 41 ′ 54 "N, 7 ° 15 ′ 0" E
|
WEAG
|
|
Wind power plant Oberdreisbach
|
1993 1995 2017
|
3.2
|
1
|
Contactor VT110 / 3200 (1 ×)
|
Oberdreisbach
|
AK
|
50 ° 42 ′ 53 "N, 7 ° 56 ′ 47" E
|
Wäller Energie, Buhl & Mann WP Weitefeld
|
2017 repowering (1 × contactor VT110 / 3200 instead of 1 × Nordex N27 / 150 and 2 × Nordex N29 / 250 )
|
Wind turbine Oberlauch
|
2003
|
0.6
|
1
|
Enercon E-40 / 6.44 (1 ×)
|
Upper garlic
|
BIT
|
50 ° 9 ′ 38 "N, 6 ° 24 ′ 47" E
|
|
|
Odenbach wind turbines
|
2004
|
1.2
|
2
|
Enercon E-40 / 6.44 (2 ×)
|
Odenbach
|
KUS
|
49 ° 41 ′ 10 "N, 7 ° 39 ′ 57" E
|
GERES
|
|
Wind turbines Olsbrücken
|
2000 2001 2004 2016
|
3.6
|
2
|
Enercon E-66 / 18.70 (2 ×)
|
Olsbrücken
|
KL
|
49 ° 33 ′ 18 "N, 7 ° 39 ′ 18" E
|
juwi
|
2 wind farms dismantled in 2016 (1 × Enercon E-40 / 5.40 and DeWind D6 / 62)
|
Wind power plant Olsdorf
|
2006
|
2.1
|
1
|
Suzlon P. 88 (1 ×)
|
Olsdorf
|
BIT
|
49 ° 56 ′ 50 "N, 6 ° 22 ′ 27" E
|
REETEC, WP Olsdorf WATT, Bürger-EG Energiegewinner
|
Prototype, the manufacturer's first system in Europe
|
Ormont wind turbines
|
1999 2000
|
1.5
|
2
|
Enercon E-40 / 5.40 (1 ×) Enercon E-58 (1 ×)
|
Ormont
|
DAU
|
50 ° 19 ′ 49 "N, 6 ° 25 ′ 47" E
|
|
|
Pintesfeld wind turbine
|
1996
|
0.25
|
1
|
Nordex N29 (1 ×)
|
Pintesfeld
|
BIT
|
50 ° 7 ′ 1 ″ N, 6 ° 22 ′ 20 ″ E
|
|
|
Pleizenhausen wind turbine
|
2014
|
3.2
|
1
|
Senvion 3.2M114 (1 ×)
|
Pleizenhausen
|
SIM
|
50 ° 0 ′ 6 ″ N, 7 ° 33 ′ 2 ″ E
|
ABO Wind , Stadtwerke Tübingen
|
|
Queidersbach wind turbine
|
2002
|
2.0
|
1
|
Vestas V80-2MW (1 ×)
|
Queidersbach
|
KL
|
49 ° 21 ′ 57 "N, 7 ° 37 ′ 10" E
|
juwi
|
|
Wind turbine empire
|
2012
|
3.0
|
1
|
Vestas V112-3.0MW (1 ×)
|
rich
|
SIM
|
50 ° 0 ′ 49 ″ N, 7 ° 26 ′ 22 ″ E
|
juwi
|
Repowering 2013 (previously 4 × Fuhrländer FL 800 )
|
Reifferscheid wind turbine
|
1992
|
0.06
|
1
|
Tacke TW 60 (1 ×)
|
Reifferscheid
|
AW
|
50 ° 24 ′ 20 "N, 6 ° 52 ′ 35" E
|
|
|
Reinsfeld wind turbine
|
1995
|
0.2
|
1
|
Enercon E-30 / 2.30 (1 ×)
|
Reinsfeld
|
TR
|
49 ° 40 ′ 51 "N, 6 ° 53 ′ 53" E
|
|
built at the Reinsfeld biogas plant, transmitter systems on the tower have since been dismantled
|
Rettert wind turbine
|
2002
|
0.6
|
1
|
Enercon E-40 / 6.44 (1 ×)
|
Saves
|
EMS
|
50 ° 14 ′ 13 ″ N, 7 ° 56 ′ 42 ″ E
|
|
|
Roth wind turbines
|
2014
|
6.0
|
2
|
Vestas V112-3.0MW (2 ×)
|
Roth
|
SIM
|
50 ° 4 ′ 44 "N, 7 ° 28 ′ 12" E
|
Boreas, Windkraft Roth im Hunsrück
|
|
Wind turbines Sabershausen
|
2015
|
6.1
|
2
|
Enercon E-115 (2 ×)
|
Sabershausen
|
SIM
|
50 ° 7 ′ 27 "N, 7 ° 26 ′ 37" E
|
ABO Wind
|
|
Sainerholz wind turbine
|
1996
|
0.25
|
1
|
Nordex N29 / 250 (1 ×)
|
Sainerholz
|
WW
|
50 ° 31 '16 "N, 7 ° 51' 28" E
|
|
|
Wind turbines in Salzburg
|
1996
|
0.75
|
2
|
Enercon E-40 / 5.40 (1 ×) Nordex N29 (1 ×)
|
Salzburg
|
WW
|
50 ° 40 ′ 14 "N, 8 ° 3 ′ 10" E
|
|
erected on the Salzburg head
|
Schellweiler wind turbines
|
2019
|
6.0
|
2
|
Enercon E-115 (2 ×)
|
Schellweiler
|
KUS
|
49 ° 30 ′ 58 "N, 7 ° 24 ′ 28" E
|
Pfalzwerke
|
were only allowed to go into operation in May 2020 due to a lawsuit
|
Schleid wind turbine
|
2006
|
1.5
|
1
|
Fuhrländer FL MD77 (1 ×)
|
Schleid
|
BIT
|
50 ° 4 ′ 13 ″ N, 6 ° 29 ′ 6 ″ E
|
RENERTEC
|
|
Stein-Neukirch wind turbine
|
1993
|
0.2
|
1
|
Micon (200 kW) (1 ×)
|
Stein-Neukirch
|
WW
|
50 ° 40 ′ 14 "N, 8 ° 2 ′ 37" E
|
|
|
Steinborn wind turbine
|
1995
|
0.27
|
1
|
Südwind N3127 (1 ×)
|
Steinborn
|
BIT
|
50 ° 4 ′ 1 ″ N, 6 ° 37 ′ 22 ″ E
|
|
|
Talling wind turbines
|
2005
|
4.6
|
2
|
Nordex N90 / 2300 (2 ×)
|
Talling
|
WIL
|
49 ° 46 ′ 10 "N, 6 ° 57 ′ 13" E
|
ABO Wind
|
|
Tiefenthal wind turbines
|
2001
|
3.6
|
2
|
Enercon E-66 / 18.70 (2 ×)
|
Tiefenthal
|
DÜW
|
49 ° 32 ′ 44 "N, 8 ° 7 ′ 17" E
|
Energy source , GAIA
|
erected on the A 6
|
Uersfeld wind turbine
|
2000
|
1.0
|
1
|
Fuhrländer FL 1000 (1 ×)
|
Uersfeld
|
DAU
|
50 ° 14 ′ 45 "N, 6 ° 58 ′ 57" E
|
|
|
Uppershausen wind turbine
|
2004
|
1.8
|
1
|
Enercon E-66 / 18.70 (1 ×)
|
Uppershausen
|
BIT
|
50 ° 3 ′ 1 ″ N, 6 ° 19 ′ 21 ″ E
|
|
|
Üttfeld wind power plant
|
2006
|
2.3
|
1
|
Siemens SWT-2.3-82 (1 ×)
|
Uttfeld
|
BIT
|
50 ° 9 ′ 6 ″ N, 6 ° 15 ′ 42 ″ E
|
|
|
Wind turbine Wahlenau
|
1997
|
0.6
|
1
|
Vestas V44-600kW (1 ×)
|
Wahlenau
|
SIM
|
49 ° 54 ′ 33 "N, 7 ° 15 ′ 11" E
|
Wahler wind
|
Another Vestas V44-600kW by December 2013
|
Waigandshain wind turbine
|
1991
|
0.03
|
1
|
Fuhrländer FL 30 (1 ×)
|
Waigandshain
|
WW
|
50 ° 38 ′ 35 "N, 8 ° 5 ′ 19" E
|
Fuhrländer (formerly)
|
Erected at the former headquarters of the manufacturing company Fuhrländer , the company's first plant, previously still surrounding wind farm with 3 × Fuhrländer FL astOs 100
|
Walshausen wind turbines
|
2009
|
4.0
|
2
|
Vestas V90-2MW (2 ×)
|
Walshausen
|
PS
|
49 ° 12 ′ 55 ″ N, 7 ° 29 ′ 30 ″ E
|
juwi
|
erected on the A 8
|
Wind turbines Weinsheim
|
1998
|
1.0
|
2
|
Enercon E-40 / 5.40 (2 ×)
|
Weinheim
|
BIT
|
50 ° 13 '26 "N, 6 ° 27' 37" E
|
|
|
Weselberg wind turbine
|
2018
|
3.3
|
1
|
Vestas V112-3.3MW (1 ×)
|
Weselberg
|
PS
|
49 ° 20 ′ 59 "N, 7 ° 37 ′ 15" E
|
Boreas
|
|
Wind turbines Wüschheim
|
2009
|
4.0
|
2
|
Enercon E-82 (2 ×)
|
Wüschheim
|
SIM
|
50 ° 1 ′ 7 ″ N, 7 ° 26 ′ 5 ″ E
|
Futura, Enercon
|
|
Zehnhausen wind turbines
|
2009 2010
|
4.0
|
1
|
Enercon E-70 (1 ×) Enercon E-82 (1 ×)
|
Zehnhausen (Rennerod)
|
WW
|
50 ° 39 '26 "N, 8 ° 3' 41" E
|
WP Zehnhausen
|
|
Zornheim wind turbines
|
1999 2000
|
1.6
|
2
|
Nordex N54 (1 ×) Nordex N43 (1 ×)
|
Anger home
|
MZ
|
49 ° 52 ′ 45 ″ N, 8 ° 13 ′ 55 ″ E
|
|
|
Achtelsbach wind farm
|
2014
|
12.2
|
4th
|
Enercon E-101 (4 ×)
|
Achtelsbach
|
BIR
|
49 ° 37 ′ 58 ″ N, 7 ° 4 ′ 5 ″ E
|
GERES
|
|
Alpenrod wind farm
|
1998 2007
|
12.1
|
9
|
Enercon E-40 5.40 (3 ×) Enercon E-40 6.44 (1 ×) Enercon E-82 (5 ×)
|
Alpenrod
|
WW
|
50 ° 37 '18 "N, 7 ° 51' 8" E 50 ° 37 '10 "N, 7 ° 50' 12" E
|
ALTUS
|
|
Alsenz wind farm
|
1999 2014 2017
|
42.3
|
14th
|
Vestas V112-3.0MW (13 ×) Vestas V112-3.3MW (1 ×)
|
Alsenz Oberhausen Niederhausen Munsterappel
|
KIB
|
49 ° 42 ′ 57 "N, 7 ° 50 ′ 45" E 49 ° 44 ′ 18 "N, 7 ° 54 ′ 21" E
|
juwi , Schöller Wind
|
Repowering 2013–2014 (previously 2 × Enercon E-40 / 5.40 and 3 × Nordex N60 ) two spatially separated parking areas with 7 or 6 systems on both sides of the Appelbach valley
|
Alterkülz-Spesenroth wind farm
|
2007 2008 2010 2014
|
20.8
|
10
|
Vestas V90-2MW (7 ×) Enercon E-82 (1 ×) Nordex N117 / 2400 (2 ×)
|
Alterkülz Spesenroth Laubach
|
SIM
|
50 ° 2 ′ 24 "N, 7 ° 28 ′ 36" E
|
juwi , ABO Wind
|
|
Altweidelbach Nord wind farm
|
2015
|
7.05
|
3
|
Enercon E-92 (3 ×)
|
Altweidelbach
|
SIM
|
50 ° 0 ′ 19 ″ N, 7 ° 34 ′ 27 ″ E
|
Futura
|
|
Altweidelbach-Schnorbach wind farm
|
2000 2014 2015
|
8.75
|
3
|
Senvion 3.2M114 (2 ×) Enercon E-92 (1 ×)
|
Altweidelbach
|
SIM
|
49 ° 59 ′ 30 ″ N, 7 ° 35 ′ 1 ″ E
|
Futura, ABO Wind
|
2015 repowering (1 × Enercon E-92 instead of 7 × Fuhrländer FL 1000 )
|
Alzheim wind farm
|
2001 2011 2016
|
6.75
|
3
|
Vestas V90-2MW (2 ×) GE 2.75-120 (1 ×)
|
Alzheim Monreal
|
MYK
|
50 ° 17 ′ 10 "N, 7 ° 12 ′ 29" E
|
ENP, seebaWIND, wp ingenieurbau
|
2013 repowering (2 × Vestas V90-2MW instead of 3 × Fuhrländer FL 1000 )
|
Arnshöfen wind farm
|
2000 2011
|
2.6
|
3
|
Fuhrländer FL 1000 (1 ×) Enercon E-53 (2 ×)
|
Arnshöfen
|
WW
|
50 ° 31 '46 "N, 7 ° 52' 30" E
|
|
|
Bedesbach wind farm
|
2020
|
5.25
|
5
|
Vestas V126-3.45MW (3 ×) Vestas V136-3.45MW (2 ×)
|
Bedesbach Ulmet
|
KUS
|
49 ° 34 ′ 29 "N, 7 ° 28 ′ 53" E
|
BayWA right
|
|
Beinhausen wind farm
|
2002 2003
|
5.25
|
3
|
DeWind D6 / 62 (1 ×) Vestas V80-2MW (2 ×)
|
Beinhausen
|
DAU
|
50 ° 15 '51 "N, 6 ° 53' 53" E
|
NET
|
|
Bellheim wind farm
|
2003 2017
|
7.8
|
4th
|
GE Wind Energy 1.5sl (3 ×) Vestas V126-3.3MW (1 ×)
|
Bellheim
|
GER
|
49 ° 10 ′ 22 "N, 8 ° 15 ′ 50" E
|
pfalzwind
|
|
Beltheim wind farm
|
1995 2010 2017
|
12.1
|
6th
|
Vestas V44-600kW (1 ×) Enercon E-82 E2 (5 ×)
|
Beltheim
|
SIM
|
50 ° 7 ′ 5 ″ N, 7 ° 26 ′ 52 ″ E
|
Höhenwind, juwi , STAWAG , Trave EE
|
Repowering 2010 (4 × Enercon E-82 E2 instead of 2 × Vestas V44-600kW )
|
Beltheim-Gödenroth wind farm
|
2013 2015
|
28.2
|
9
|
REpower 3.2M114 (5 ×) Enercon E-101 (4 ×)
|
Beltheim Gödenroth
|
SIM
|
50 ° 6 ′ 2 "N, 7 ° 30 ′ 3" E
|
juwi , STAWAG , Höhenwind, Trave EE
|
|
BENO wind farm
|
2013-2014
|
27.0
|
9
|
Vestas V112-3.0MW (9 ×)
|
Bechenheim Erbes-Büdesheim Nack Offenheim
|
AZ
|
49 ° 44 '23 "N, 8 ° 1' 10" E
|
juwi
|
|
Benzweiler-Liebshausen wind farm
|
2017
|
13.2
|
4th
|
Vestas V126-3.3MW (4 ×)
|
Benzweiler Liebshausen
|
SIM
|
50 ° 2 ′ 1 ″ N, 7 ° 36 ′ 27 ″ E
|
Prokon
|
|
Berglich-Heidenburg wind farm
|
2002 2004 2011 2012 2017
|
38.4
|
18th
|
Südwind S77 (9 ×) Enercon E-82 E2 (3 ×) Vestas V112-3.3MW (4 ×) Nordex N117 / 2400 (2 ×)
|
Mountain light Heidenburg Büdlich Breit
|
WIL
|
49 ° 46 ′ 47 "N, 6 ° 56 ′ 38" E
|
ABO Wind
|
Wind farm with educational hiking trail ("Hunsrücker Windweg")
|
Berndroth wind farm
|
2001 2013
|
3.8
|
4th
|
Fuhrländer FL 1000 (3 ×) Enercon E-53 (1 ×)
|
Berndroth
|
EMS
|
50 ° 14 ′ 36 "N, 7 ° 58 ′ 11" E
|
Energy source , WEAG
|
|
Berschweiler wind farm
|
2004 2010 2012
|
7.5
|
4th
|
Südwind S70 (1 ×) Südwind S77 (1 ×) Nordex N100 / 2500 (1 ×) Vestas V90-2MW (1 ×)
|
Berschweiler
|
BIR
|
49 ° 34 ′ 8 ″ N, 7 ° 16 ′ 17 ″ E
|
ABO Wind , Stadtwerke Viernheim
|
|
Bickenbach wind farm
|
2008 2010 2017
|
21.75
|
10
|
REpower MM92 (9 ×) Nordex N131 / 3300 (1 ×)
|
Bickenbach Lingerhahn
|
SIM
|
50 ° 6 ′ 20 ″ N, 7 ° 32 ′ 3 ″ E
|
Windkraft Brogen, K&S Regenerative Energy
|
|
Birkenfeld wind farm
|
2014
|
7.05
|
3
|
Enercon E-92 (3 ×)
|
Birch field
|
BIR
|
49 ° 37 ′ 37 ″ N, 7 ° 8 ′ 59 ″ E
|
GERES
|
|
Bistro wind farm
|
1999 2000 2001
|
3.8
|
3
|
Enercon E-40 / 5.40 (1 ×) Enercon E-66 / 15.66 (1 ×) Enercon E-66 / 18.70 (1 ×)
|
Bi-difference
|
KIB
|
49 ° 37 ′ 42 "N, 7 ° 45 ′ 20" E
|
|
|
Bitburg wind farm
|
2001
|
7.5
|
3
|
Nordex N80 (3 ×)
|
Matzo
|
BIT
|
49 ° 59 ′ 41 ″ N, 6 ° 31 ′ 34 ″ E
|
WATT
|
|
Bocksrück wind farm
|
2014
|
9.15
|
3
|
Enercon E-101 (3 ×)
|
Sippersfeld Börrstadt
|
KIB
|
49 ° 33 ′ 44 "N, 7 ° 55 ′ 5" E
|
juwi
|
|
Braunshorn-Frankweiler wind farm
|
2010-2011
|
6.15
|
3
|
REpower MM92 (3 ×)
|
Braunshorn Frankweiler
|
SIM
|
50 ° 5 ′ 58 ″ N, 7 ° 31 ′ 31 ″ E
|
juwi , STAWAG
|
|
Wind farm book
|
2012
|
9.0
|
3
|
Vestas V112-3.0MW (3 ×)
|
book
|
SIM
|
50 ° 4 ′ 51 ″ N, 7 ° 24 ′ 31 ″ E
|
juwi
|
|
Damscheid wind farm
|
2011 2012-2013
|
29.6
|
10
|
Enercon E-82 E2 (4 ×) REpower 3.4M104 (6 ×)
|
Damscheid
|
SIM
|
50 ° 5 ′ 49 ″ N, 7 ° 37 ′ 2 ″ E
|
juwi , Trave EE
|
erected on the A 61 extension planned
|
Dautenheim wind farm
|
2000 2013 2013–2014 2015
|
18.3
|
6th
|
Enercon E-101 (6 ×)
|
Dautenheim
|
AZ
|
49 ° 43 ′ 57 "N, 8 ° 9 ′ 36" E
|
Energiequelle , GAIA, BürgerWIND Dautenheim, Schöller Wind
|
Repowering 2013–2014 (3 × Enercon E-101 instead of 3 × Fuhrländer FL 1000 )
|
Dickesbach wind farm
|
2006 2014
|
12.15
|
5
|
Fuhrländer FL MD77 (2 ×) Enercon E-101 (3 ×)
|
Dickesbach
|
BIR
|
49 ° 42 ′ 6 "N, 7 ° 24 ′ 44" E
|
pfalzwind
|
|
Dienstweiler wind farm
|
2004 2017
|
12.8
|
6th
|
Vestas V90-2MW (4 ×) Nordex N117 / 2400 (2 ×)
|
Service hamlet
|
BIR
|
49 ° 38 ′ 27 "N, 7 ° 12 ′ 36" E
|
Global Wind Power, Gaia mbH
|
|
Dorn-Dürkheim-Dittelsheim-Heßloch-Alsheim wind farm
|
2012-2013 2014
|
42.4
|
17th
|
Enercon E-82 E2 (14 ×) Senvion 3.4M104 (3 ×)
|
Dorn-Dürkheim Dittelsheim-Heßloch Alsheim
|
AZ MZ
|
49 ° 45 ′ 8 ″ N, 8 ° 16 ′ 49 ″ E
|
ABO Wind , EEA
|
|
Dreikopf wind farm
|
2000 2001 2013
|
11.8
|
8th
|
Nordex N62 (5 ×) Südwind S70 (2 ×) Enercon E-82 E2 (1 ×)
|
Lampaden Pellingen
|
TR
|
49 ° 39 ′ 10 "N, 6 ° 40 ′ 42" E
|
DEAG, WEAG
|
Repowering planned
|
Düngenheim-Gamlen wind farm
|
2001 2003 2006 2009 2010 2011 2013 2015
|
32.1
|
20th
|
Enercon E-40 / 6.44 (4 ×) GE Wind Energy 1.5sl (4 ×) Nordex N90 / 2300 (2 ×) Vestas V90-2MW (7 ×) Enercon E-53 (1 ×) Enercon E-82 (1 × ) Enercon E-82 E2 (1 ×)
|
Düngenheim Gamlen
|
COC
|
50 ° 15 ′ 5 ″ N, 7 ° 11 ′ 10 ″ E
|
ABO Wind , ABO Invest, Boreas, ENP Wind, GVK, MEHR Energie, NET, Höhenwind, wp-ingenieurbau
|
|
Ebersheim-Nieder Olm wind farm
|
2000 2007
|
2.6
|
4th
|
Enercon E-40 / 6.44 (3 ×) Enercon E-53 (1 ×)
|
Mainz-Ebersheim Nieder-Olm
|
MZ
|
49 ° 54 '15 "N, 8 ° 13' 40" E
|
Energy source , GAIA
|
|
Eckersweiler-Reichweiler wind farm
|
2006 2016
|
7.9
|
3
|
Nordex N90 / 2300 (2 ×) Vestas V126-3.3MW (1 ×)
|
Eckersweiler Reichweiler
|
BIR KUS
|
> 49 ° 33 ′ 3 ″ N, 7 ° 16 ′ 36 ″ E
|
ABO Wind
|
|
Eimsheim wind farm
|
2002
|
5.8
|
5
|
Enercon E-58 (4 ×) Enercon E-66 / 18.70 (1 ×)
|
Eimsheim Hillesheim
|
MZ
|
49 ° 47 ′ 17 ″ N, 8 ° 16 ′ 37 ″ E
|
Energiequelle , GAIA, Schöller Wind, juwi
|
|
Einöllen wind farm
|
2020
|
15.9
|
3
|
GE 5.3-158 (3 ×)
|
Oiling
|
KUS
|
49 ° 35 ′ 37 "N, 7 ° 38 ′ 19" E
|
ABO Wind
|
under construction
|
Elbinger Lei wind farm
|
2017
|
9.0
|
3
|
Enercon E-115 (3 ×)
|
Elbingen Hahn am See
|
WW
|
50 ° 32 '11 "N, 7 ° 53' 22" E
|
|
|
Eppenrod wind farm
|
2001
|
4.7
|
5
|
Enercon E-40 / 6.44 (2 ×) NEG Micon 52/900 (3 ×)
|
Eppenrod
|
EMS
|
50 ° 23 '45 "N, 7 ° 55' 44" E
|
NET, wpd , SoWiTec
|
Repowering planned (4 × Nordex N117 / 2400 )
|
Erdesbach-Patersbach wind farm
|
2009 2017
|
14.45
|
6th
|
Enercon E-82 (4 ×) Enercon E-115 (1 ×) Vestas V136-3.45MW (1 ×)
|
Erdesbach Patersbach
|
KUS
|
49 ° 33 ′ 38 "N, 7 ° 25 ′ 25" E
|
juwi
|
|
Erlengarten wind farm
|
2015
|
7.05
|
3
|
Enercon E-92 (3 ×)
|
Budenbach Bergenhausen
|
SIM
|
50 ° 1 ′ 49 ″ N, 7 ° 33 ′ 4 ″ E
|
Futura
|
|
Eulgem wind farm
|
2010 2013
|
2.4
|
3
|
Enercon E-53 (3 ×)
|
Eulgem Zettingen
|
COC
|
50 ° 14 ′ 8 "N, 7 ° 10 ′ 40" E
|
Bost Engineering, BBG Eulgem
|
|
Fehl-Ritzhausen wind farm
|
1996 2004
|
2.9
|
3
|
Vestas V44-600kW (1 ×) Enercon E-40 / 5.40 (1 ×) Enercon E-66 / 18.70 (1 ×)
|
Fehl-Ritzhausen
|
WW
|
50 ° 39 ′ 7 ″ N, 8 ° 0 ′ 12 ″ E
|
|
|
Feilbingert wind farm
|
2001
|
1.8
|
3
|
Enercon E-40 / 6.44 (3 ×)
|
Feilbingert
|
KH
|
49 ° 46 '13 "N, 7 ° 47' 45" E
|
Energy source , GAIA
|
|
Finkenbach-Gersweiler wind farm
|
2016
|
12.0
|
4th
|
Enercon E-115 (4 ×)
|
Finkenbach-Gersweiler
|
KIB
|
49 ° 41 ′ 26 "N, 7 ° 43 ′ 41" E
|
BayWa-re
|
|
Fleringen wind farm
|
1998 2000 2003 2004
|
9.9
|
8th
|
Enercon E-40 / 5.40 (3 ×) Südwind S77 (2 ×) Enercon E-66 / 18.70 (3 ×)
|
Fleringen Schwirzheim
|
BIT
|
50 ° 13 ′ 2 ″ N, 6 ° 31 ′ 0 ″ E
|
|
|
Fohren-Linden wind farm
|
2006
|
6.9
|
3
|
Nordex N90 / 2300 (3 ×)
|
Fohren-Linden Eckersweiler
|
BIR
|
49 ° 34 ′ 27 ″ N, 7 ° 16 ′ 2 ″ E
|
ABO Wind , WP Fohren-Linden
|
|
Fohren-Linden-Ruschberg wind farm
|
2016
|
12.8
|
4th
|
Senvion 3.2M114 (4 ×)
|
Fohren-Linden Ruschberg
|
BIR
|
49 ° 36 ′ 2 "N, 7 ° 18 ′ 5" E
|
CEZ Renewable Energies
|
|
Framersheim wind farm
|
1998 2013 2015
|
13.6
|
4th
|
REpower 3.4M104 (2 ×) Senvion 3.4M104 (2 ×)
|
Framersheim
|
AZ
|
49 ° 44 ′ 53 "N, 8 ° 12 ′ 16" E
|
ABO Wind , Stadtwerke Tübingen , ABO Invest AG
|
Repowering 2013 (2 × REpower 3.4M104 instead of 3 × Nordex N54 )
|
Fürfeld-Winterborn wind farm
|
1999 2001 2011 2013–2014 2016
|
31.5
|
13
|
Nordex N43 (3 ×) Kenersys K100 (1 ×) Enercon E-82 E2 (1 ×) Enercon E-101 (6 ×) Vestas V126-3.3MW (2 ×)
|
Fürfeld Winterborn
|
KH
|
49 ° 45 ′ 32 "N, 7 ° 51 ′ 58" E
|
seebaWIND, Energiequelle , GAIA, Stadtwerke Bad Kreuznach, juwi , ATS
|
a temporary construction stop was lifted at the beginning of 2014 2011 repowering (1 × Kenersys K100 instead of 2 × DeWind D4 / 48)
|
Gabsheim wind farm
|
2011–2012
|
15.25
|
5
|
Enercon E-101 (5 ×)
|
Gabsheim
|
AZ
|
49 ° 48 '54 "N, 8 ° 9' 51" E
|
juwi
|
Part of the Wörrstadt energy park
|
Gau-Bickelheim wind farm
|
2005 2012-2013
|
42.4
|
21st
|
Enercon E-48 (5 ×) Kenersys K110 (16 ×)
|
Gau-Bickelheim Wallertheim Flonheim Eckelsheim Gumbsheim
|
AZ
|
49 ° 48 '48 "N, 8 ° 1' 4" E
|
Energiequelle , GAIA, juwi , ATS
|
erected on the A 61 extension under construction (1 × Enercon E-138 EP3 E2 )
|
Gebhardshain wind farm
|
2006
|
16.1
|
7th
|
Nordex N90 / 2300 (7 ×)
|
Gebhardshain
|
AK
|
50 ° 44 '9 "N, 7 ° 47' 39" E
|
Altus
|
|
Gensingen wind farm
|
2015
|
2.4
|
3
|
Enercon E-53 (3 ×)
|
Gensingen
|
MZ
|
49 ° 54 ′ 34 "N, 7 ° 57 ′ 5" E
|
GAIA, WP Gensingen
|
built on both sides of the A 61
|
Giesenhausen wind turbines
|
1995 1998
|
0.85
|
2
|
Fuhrländer FL astOs 250 (1 ×) Vestas V44-600kW (1 ×)
|
Giesenhausen
|
WW
|
50 ° 41 ′ 48 "N, 7 ° 43 ′ 37" E
|
|
by 2015 an additional 1 × Fuhrländer FL astOs 250
|
Gilzem wind farm
|
2010
|
6.1
|
3
|
REpower MM82 (2 ×) Vestas V90-2MW (1 ×)
|
Gilzem
|
BIT
|
49 ° 51 '44 "N, 6 ° 31' 46" E
|
Enovos , seebaWIND
|
|
Gimbweiler wind farm
|
2008 2014
|
8.6
|
4th
|
Vestas V90-2MW (2 ×) Enercon E-82 E2 (2 ×)
|
Gimbweiler
|
BIR
|
49 ° 35 '21 "N, 7 ° 12' 19" E 49 ° 34 '52 "N, 7 ° 12' 28" E
|
wpd , GERES
|
built on both sides of the A 62
|
Girkenroth wind farm
|
2007 2009 2015
|
8.35
|
4th
|
Enercon E-70 (2 ×) Enercon E-82 (1 ×) Enercon E-92 (1 ×)
|
Girkenroth
|
WW
|
50 ° 31 ′ 7 ″ N, 7 ° 59 ′ 13 ″ E
|
juwi , pfalzwind
|
|
Göllheimer Wald wind farm
|
2014
|
12.5
|
5
|
GE Wind Energy 2.5-120 (5 ×)
|
Goellheim
|
KIB
|
49 ° 34 ′ 26 "N, 7 ° 58 ′ 47" E
|
pfalzwind
|
|
Großkampenberg wind farm
|
2017-2018
|
10.35
|
3
|
Vestas V136-3.45MW (3 ×)
|
Großkampenberg
|
BIT
|
50 ° 10 ′ 21 ″ N, 6 ° 11 ′ 46 ″ E
|
ABO Wind
|
|
Groß- / Kleinniedesheim wind farm
|
2016
|
9.6
|
4th
|
Nordex N117 / 2400 (4 ×)
|
Großniedesheim Kleinniedesheim
|
RP
|
49 ° 35 ′ 17 ″ N, 8 ° 18 ′ 7 ″ E
|
GAIA
|
under construction, erected on the A 61
|
Gundersheim-Bermersheim wind farm
|
2014 2017
|
19.2
|
7th
|
GE Wind Energy 2.5-120 (6 ×) Enercon E-141 EP4 (1 ×)
|
Gundersheim Bermersheim Flörsheim-Dalsheim
|
AZ
|
49 ° 40 ′ 44 ″ N, 8 ° 12 ′ 0 ″ E
|
juwi , EG Starkenburg
|
|
Guntersblum wind farm
|
2014
|
15.25
|
5
|
Enercon E-101 (5 ×)
|
Guntersblum
|
MZ
|
49 ° 47 ′ 19 ″ N, 8 ° 18 ′ 55 ″ E
|
Energy source , GAIA
|
|
Gusterath wind farm
|
1995 1999–2000 2000 2012
|
6.05
|
6th
|
Südwind N3127 (1 ×) Vestas V47-660kW (3 ×) Nordex N62 (1 ×) Vensys 100 (1 ×)
|
Gusterath
|
TR
|
49 ° 42 ′ 52 "N, 6 ° 42 ′ 13" E
|
Vernet, WEAG, DEAG, Neven
|
|
Habscheid-Kesfeld wind farm
|
1995 1999 2002 2005 2008 2012 2014
|
30.6
|
20th
|
Tacke TW 600 (2 ×) Enercon E-40 / 5.40 (5 ×) Enercon E-40 / 6.44 (1 ×) Siemens SWT-1.3-62 (2 ×) Siemens SWT-2.3-82 (4 ×) Siemens SWT- 2.3-93 (2 ×) Enercon E-82 E2 (3 ×) Vestas V112-3.0MW (1 ×)
|
Habscheid Kesfeld
|
BIT
|
50 ° 10 ′ 0 ″ N, 6 ° 14 ′ 32 ″ E
|
Enxco, EDF , WP Kesfeld-Heckhuscheid, Evergy
|
Repowering 2012 (2 × Enercon E-82 E2 instead of 2 × Enercon E-40 / 5.40 )
|
Halsdorf wind farm
|
2000
|
10.0
|
10
|
NEG Micon NM60 / 1000 (10 ×)
|
Halsdorf
|
BIT
|
49 ° 56 ′ 10 "N, 6 ° 21 ′ 54" E
|
SS Halsdorf No. 17
|
|
Hangen-Weisheim – Eppelsheim wind farm
|
2012–2013 2013–2014 2014 2015 2016
|
25.6
|
8th
|
REpower 3.4M104 (3 ×) Vestas V112-3.0MW (3 ×) Enercon E-115 (1 ×) Senvion 3.4M114 (1 ×)
|
Hangen-Weisheim Eppelsheim Gau-Heppenheim
|
AZ
|
49 ° 43 ′ 27 "N, 8 ° 10 ′ 28" E
|
juwi , GGEW , Wind Cathedral 3000, Mainz Energy Cooperative
|
|
Hartenfelser Kopf wind farm
|
2006 2009 2012–2013 2014
|
63.35
|
26th
|
Enercon E-70 (12 ×) Enercon E-82 (1 ×) WindWerke VT 110 (8 ×) Enercon E-92 (5 ×)
|
Herschbach Höchstenbach Mündersbach Wied
|
WW
|
50 ° 36 '43 "N, 7 ° 45' 54" E
|
juwi , contactor
|
Prototype of the Schütz WindWerke VT 110
|
Hausbay wind farm
|
2015-2016 2017
|
9.6
|
3
|
Enercon E-115 (1 ×) Nordex N131 / 3300 (2 ×)
|
House bay
|
SIM
|
50 ° 6 ′ 54 ″ N, 7 ° 32 ′ 24 ″ E
|
K&S regenerative energy
|
When it was completed in mid-2016, the Nordex turbine had the greatest hub height of 164 m and a total height of 230 m of all wind turbines in the world
|
Heckhuscheid-Winterspelt wind farm
|
2005 2007
|
15.5
|
7th
|
Siemens SWT-2.3-82 (5 ×) Gamesa G87 (2 ×)
|
Heckhuscheid Winterspelt
|
BIT
|
50 ° 11 '23 "N, 6 ° 13' 5" E
|
WP Kesfeld-Heckhuscheid
|
|
Heilenbach wind farm
|
1997 2004-2005 2006
|
16.0
|
9
|
Enercon E-40 / 5.40 (1 ×) Vestas V80-2MW (7 ×) Fuhrländer FL MD77 (1 ×)
|
Heilenbach
|
BIT
|
50 ° 3 ′ 23 "N, 6 ° 28 ′ 21" E
|
WATT
|
erected on the A 60
|
Heimersheim wind farm
|
2001 2005 2011–2012 2013–2014 2016
|
47.1
|
17th
|
Enercon E-66 / 18.70 (3 ×) Enercon E-48 (2 ×) REpower 3.4M104 (10 ×) Enercon E-101 (1 ×) Enercon E-115 (1 ×)
|
Erbes-Büdesheim Heimersheim Bornheim
|
AZ
|
49 ° 45 ′ 51 ″ N, 8 ° 3 ′ 35 ″ E
|
juwi , e-rp, Stadtwerke Mainz, Energiequelle , GAIA, AVIA WP Heimersheim
|
|
Helenenberg wind farm
|
2002 2006 2009 2010 2011
|
38.9
|
22nd
|
Nordex N60 (5 ×) Südwind S70 (5 ×) Enercon E-82 (1 ×) Vestas V90-2MW (8 ×) Enercon E-82 E2 (3 ×)
|
Welschbillig Eisenach
|
TR BIT
|
49 ° 50 ′ 44 "N, 6 ° 32 ′ 5" E
|
Plambeck New Energies, PNE Wind , Vortex Energy, WEA
|
|
Hermersberg wind farm
|
2007 2017
|
4.9
|
3
|
Enercon E-48 (2 ×) Vestas V112-3.3MW (1 ×)
|
Hermersberg
|
PS
|
49 ° 19 ′ 25 "N, 7 ° 36 ′ 45" E
|
juwi , Evergy, Windkraft Hermersberg, Boreas
|
erected on the A 62
|
Hermersberg II wind farm
|
2017
|
13.2
|
4th
|
Vestas V112-3.3MW (4 ×)
|
Hermersberg
|
PS
|
49 ° 18 ′ 23 "N, 7 ° 38 ′ 37" E
|
Boreas
|
|
Heuchelheim wind farm
|
2002 2004–2005 2012–2013
|
13.1
|
7th
|
Vestas V80-2MW (1 ×) Enercon E-48 (1 ×) Enercon E-70 (5 ×)
|
Heuchelheim Großniedesheim
|
RP
|
49 ° 35 ′ 4 ″ N, 8 ° 17 ′ 16 ″ E
|
Energiequelle , GAIA, Schöller Wind
|
erected on the A 61
|
Hinterweiler wind farm
|
2001 2003 2004
|
6.33
|
5
|
Südwind S77 (2 ×) GE Wind Energy 1.5sl (2 ×) Enercon E-33 (1 ×)
|
Hinterweiler
|
DAU
|
50 ° 14 ′ 20 ″ N, 6 ° 46 ′ 19 ″ E
|
Sunmill, ENERFARM, wind7, energy winners
|
|
Hisel wind farm
|
2005 2011
|
5.0
|
6th
|
Enercon E-40 / 6.44 (5 ×) Vestas V90-2MW (1 ×)
|
Hisel
|
BIT
|
49 ° 57 ′ 44 "N, 6 ° 22 ′ 2" E
|
High wind, net service
|
|
Hocheifel wind farm
|
1997–1998 1999 2000 2001 2002 2004 2007 2013 2014 2016
|
39.7
|
39
|
Enercon E-40 / 5.40 (8 ×) DeWind D6 / 62 (11 ×) Enercon E-58 (3 ×) NEG Micon 60/1000 (3 ×) NEG Micon 64/1500 (1 ×) NEG Micon 64c / 1500 ( 1 ×) DeWind D4 / 48 (3 ×) Enercon E-40 / 6.44 (2 ×) Enercon E-66 / 15.66 (1 ×) Enercon E-70 (1 ×) Enercon E-82 E2 (4 ×) Vestas V90 -2MW (1 ×)
|
Hallschlag Scheid
|
DAU
|
50 ° 21 ′ 31 "N, 6 ° 24 ′ 17" E 50 ° 20 ′ 30 "N, 6 ° 25 ′ 35" E
|
ABO Wind , seebaWIND, wp-ingenieurbau
|
|
Hochstätten wind farm
|
2011–2012
|
9.0
|
3
|
Vestas V90-2MW (3 ×)
|
High places
|
KH
|
49 ° 46 ′ 8 "N, 7 ° 51 ′ 9" E
|
juwi
|
|
Hochwald wind farm
|
2002 2009 2011
|
18.0
|
12
|
Südwind S70 (9 ×) Vensys 77 (2 ×) Vensys 82 (1 ×)
|
Hinzert-Pölert Reinsfeld
|
TR
|
49 ° 41 ′ 18 "N, 6 ° 54 ′ 20" E
|
Nordex Energy , RWE Net, BayWa re
|
erected on both sides of the A1
|
Hof-Salzburg wind farm
|
1993 1994 1995 1996 1997 2003
|
3.45
|
8th
|
Fuhrländer FL astOs 100 (2 ×) Vestas V39-500kW (1 ×) Fuhrländer FL astOs 250 (1 ×) Enercon E-40 / 5.40 (3 ×) Enercon E-58 (1 ×)
|
Salzburg court
|
WW
|
50 ° 40 ′ 2 "N, 8 ° 1 ′ 55" E
|
NET
|
Repowering 2003 (1 × Enercon E-58 instead of 1 × Enercon E-40 / 5.40 ), previously also 3 × Fuhrländer FL astOs 250
|
Höheinöd wind farm
|
2006
|
6.0
|
3
|
Enercon E-70 (3 ×)
|
Altitude
|
PS
|
49 ° 18 ′ 15 "N, 7 ° 36 ′ 43" E
|
juwi
|
erected on the A 62
|
Höhn wind farm
|
2004 2015-2016 2017-2018
|
14.9
|
6th
|
Enercon E-58 (1 ×) GE Wind Energy 2.5-120 (3 ×) GE Wind Energy 3.2-130 (2 ×)
|
Heck
|
WW
|
50 ° 37 ′ 39 ″ N, 8 ° 0 ′ 47 ″ E
|
evm, rhenag
|
|
Hoppstädten wind farm
|
1996
|
1.5
|
3
|
Enercon E-40 / 5.40 (3 ×)
|
Hoppstädten-Weiersbach
|
BIR
|
49 ° 37 ′ 29 ″ N, 7 ° 12 ′ 12 ″ E
|
Wind power plants Obere Nahe
|
|
Horath wind farm
|
2016
|
29.7
|
9
|
Vestas V112-3.3MW (9 ×)
|
horn
|
WIL
|
49 ° 49 ′ 44 "N, 6 ° 58 ′ 39" E
|
ABO Wind
|
|
Horbach wind farm
|
2018
|
9.9
|
3
|
Vestas V126-3.3MW (3 ×)
|
Horbach
|
PS
|
49 ° 20 ′ 33 "N, 7 ° 38 ′ 9" E
|
Boreas
|
|
Horn wind farm
|
2002 2008 2017
|
16.7
|
9
|
Fuhrländer FL 1000 (1 ×) Fuhrländer MD70 (2 ×) Vestas V90-2MW (4 ×) Enercon E-92 (2 ×)
|
horn
|
SIM
|
50 ° 3 '17 "N, 7 ° 32' 53" E
|
Somaka, juwi , International Power Consulted
|
|
Hungerberg wind farm
|
2013-2014 2015
|
33.3
|
11
|
Vestas V112-3.0MW (10 ×) Vestas V126-3.3MW (1 ×)
|
Gauersheim Albisheim Rittersheim Bolanden
|
KIB
|
49 ° 39 '7 "N, 8 ° 2' 53" E
|
juwi , EVO , Cerventus, WP Albisheim
|
|
Idesheim wind farm
|
2002 2008 2011
|
19.5
|
11
|
Südwind S70 (5 ×) Vestas V90-2MW (6 ×)
|
Idesheim
|
BIT
|
49 ° 52 ′ 10 "N, 6 ° 33 ′ 10" E
|
seebaWIND
|
|
Illerich wind farm
|
2008 2010 2012 2016
|
15.3
|
8th
|
Fuhrländer FL MD77 (2 ×) Enercon E-82 (2 ×) Enercon E-70 (1 ×) Vestas V90-2MW (2 ×) Enercon E-82 E2 (1 ×)
|
Illerich
|
COC
|
50 ° 12 ′ 47 "N, 7 ° 9 ′ 34" E
|
Natenco, ENP Wind, wp-ingenieurbau
|
|
Imsweiler wind farm
|
2018-2019
|
9.0
|
3
|
Nordex N117 / 3000 (3 ×)
|
Imsweiler
|
KIB
|
49 ° 36 ′ 21 ″ N, 7 ° 45 ′ 29 ″ E
|
ABO Wind
|
|
Islek wind farm
|
2003 2004 2011
|
21.1
|
12
|
Enercon E-66 / 18.70 (10 ×) Enercon E-53 (1 ×) Enercon E-82 E2 (1 ×)
|
Arzfeld Manderscheid Lichtenborn
|
BIT
|
50 ° 5 ′ 1 ″ N, 6 ° 17 ′ 28 ″ E
|
Islek Energy Wind Farm
|
|
Kahlenberg wind farm
|
1999 2000 2001 2003 2014 2014–2015 2015 2016 2017
|
42.75
|
18th
|
Enercon E-66 / 18.70 (3 ×) GE 2.5-120 (4 ×) GE 2.75-120 (2 ×) Enercon E-101 (2 ×) Enercon E-115 (1 ×) Vestas V112-3.0MW (2 × ) Vestas V112-3.3MW (1 ×) Vestas V126-3.45MW (1 ×)
|
Children's home Ottersheim Zellertal
|
KIB
|
49 ° 36 ′ 55 ″ N, 8 ° 8 ′ 16 ″ E
|
juwi , BWT-Wind, Altus, Pfalzwind, ESWE
|
Repowering 2014–2015 (4 × GE Wind Energy 2.5-120 and 2 × Enercon E-101 instead of 4 × Tacke TW 600 and 1 × Tacke TW 600a) and 2017 (1 × Vestas V112-3.3MW and 1 × Vestas V126-3.45 MW instead of 2 × Enron Wind 1.5s )
|
Kalenborn wind farm
|
2016
|
7.5
|
3
|
GE Wind Energy 2.5-120 (3 ×)
|
Kalenborn
|
COC
|
50 ° 16 ′ 7 ″ N, 7 ° 5 ′ 8 ″ E
|
juwi
|
|
Kandrich wind farm
|
1999 2000 2005 2012–2013 2013 2013–2014
|
44.6
|
16
|
Enercon E-66 / 15.66 (1 ×) Enercon E-66 / 18.70 (1 ×) Enercon E-70 (1 ×) Enercon E-101 (13 ×)
|
Daxweiler
|
KH SIM MZ
|
49 ° 59 ′ 39 "N, 7 ° 43 ′ 45" E
|
GEDEA Ingelheim community wind farm Kandrich, juwi , Thüga , WEMAG
|
erected on former military grounds, first Enercon E-101 with a hub height of 149 m
|
Kapeltal wind farm
|
1999 2014
|
9.0
|
3
|
Vestas V112-3.0MW (3 ×)
|
Mehlingen
|
KL
|
49 ° 28 ′ 28 "N, 7 ° 49 ′ 15" E
|
Energy source , Central Waste Management Kaiserslautern (ZAK)
|
erected on the site of a landfill, repowering 2014 (previously 3 × Enercon E-40 / 5.40 )
|
Kappel wind farm
|
2013
|
16.1
|
7th
|
Enercon E-70 (3 ×) Enercon E-82 E2 (4 ×)
|
Chapel
|
SIM
|
50 ° 0 ′ 16 "N, 7 ° 22 ′ 51" E
|
DunoAir, Guido Bost, Futura
|
|
Kappel-Faas wind farm
|
2013 2014
|
12.3
|
6th
|
Enercon E-82 E2 (5 ×) Enercon E-53 (1 ×)
|
Kappel Wüschheim
|
SIM
|
50 ° 1 ′ 1 ″ N, 7 ° 23 ′ 8 ″ E
|
DunoAir, Enercon
|
|
Kasholz wind farm
|
20018
|
21.0
|
7th
|
Enercon E-115 (7 ×)
|
Wintrich
|
WIL
|
49 ° 50 ′ 41 "N, 6 ° 58 ′ 47" E
|
|
|
Göllheim-Kerzenheim wind farm
|
1999 2000 2003 2014 2015
|
13.05
|
5
|
Vestas V66-1.65MW (1 ×) GE Wind Energy 1.5s (1 ×) Vestas V112-3.3MW (1 ×) Vestas V126-3.3MW (2 ×)
|
Göllheim candles home
|
KIB
|
49 ° 35 ′ 3 "N, 8 ° 4 ′ 47" E
|
GAIA, juwi , Eymann Windkraft, 100% RE-IPP, Aufwind
|
Repowering 2015 (2 × Vestas V126-3.3MW instead of 1 × DeWind D6 / 62 and Nordex N60 )
|
Kisselheide wind farm
|
2013
|
11.5
|
5
|
Enercon E-82 E2 (5 ×)
|
Fronhofen Külz
|
SIM
|
50 ° 0 ′ 14 "N, 7 ° 27 ′ 28" E
|
Futura
|
|
Kirchberg im Faas wind farm
|
2011–2012 2014
|
55.2
|
24
|
Enercon E-82 E2 (24 ×)
|
Kappel Kludenbach Metzenhausen Reich Reckershausen
|
SIM
|
50 ° 0 '6 "N, 7 ° 23' 51" E 49 ° 58 '35 "N, 7 ° 22' 37" E
|
juwi , Cerventus
|
At the time of construction until 2013, the most powerful wind farm in southern Germany
|
Kirf wind farm
|
1994 2004 2005 2008 2012 2014
|
18.8
|
11
|
GE Wind Energy 1.5sl (2 ×) Nordex S77 (3 ×) REpower MM92 (4 ×) Enercon E-53 (1 ×) Enercon E-82 E2 (1 ×)
|
Kirf
|
TR
|
49 ° 33 ′ 29 ″ N, 6 ° 28 ′ 7 ″ E
|
WEAG, WP Kirf
|
2014 repowering (1 × Enercon E-82 E2 instead of 3 × Enercon E-40 / 5.40 )
|
Kirrweiler wind farm
|
2015
|
7.2
|
3
|
Nordex N117 / 2400 (3 ×)
|
Kirrweiler
|
KUS
|
49 ° 38 ′ 44 "N, 7 ° 29 ′ 25" E
|
3P energy plan, WP Kirrweiler, SW Bad Vilbel, SW Viernheim
|
|
Kisselbach wind farm
|
2006-2007
|
22.4
|
10
|
Enercon E-70 E4 (8 ×) Enercon E-82 (2 ×)
|
Kisselbach Liebshausen
|
SIM
|
50 ° 3 ′ 14 "N, 7 ° 37 ′ 52" E
|
juwi
|
erected along the A 61
|
Kleinlangenfeld wind farm
|
2001 2010
|
3.2
|
5
|
Enercon E-40 / 6.44 (4 ×) Enercon E-53 (1 ×)
|
Kleinlangenfeld
|
BIT
|
50 ° 16 ′ 42 "N, 6 ° 29 ′ 9" E
|
|
|
Kloppberg wind farm
|
1995 1998 2006 2010 2015 2017
|
29.9
|
22nd
|
Nordex N43 (7 ×) Fuhrländer FL 1000 (1 ×) Enercon E-48 (5 ×) Enercon E-53 (3 ×) Senvion 3.4M114 (2 ×) Vestas V117-3.45MW (2 ×) Enercon E-82 E2 (2 ×)
|
Dittelsheim-Heßloch Gau-Heppenheim Hochborn
|
AZ
|
49 ° 44 ′ 17 "N, 8 ° 11 ′ 58" E
|
ABO Wind, Energiequelle , GAIA, EWR , seebaWIND, Stadtwerke Tübingen , Stahl Gruppe
|
Repowering 2010 (4 × Enercon E-53 instead of 2 × Micon M530-250) and 2015 (2 × Senvion 3.4M104 instead of 7 × Nordex N43 )
|
Klosterkumbd wind farm
|
2011 2012
|
23.45
|
7th
|
REpower 3.4M104 (6 ×) Enercon E-101 (1 ×)
|
Klosterkumbd Laubach
|
SIM
|
50 ° 2 ′ 15 "N, 7 ° 30 ′ 42" E
|
ABO Wind , Mark-E , Thüga Renewable Energies
|
|
Kolbenstein wind farm
|
2014-2015
|
28.8
|
9
|
REpower 3.2M114 (9 ×)
|
Kratzenburg
|
SIM
|
50 ° 11 '54 "N, 7 ° 33' 36" E
|
Jade natural energy
|
|
Conc wind farm
|
2010 2013 2016 2018
|
4.7
|
4th
|
Enercon E-53 (3 ×) Enercon E-82 E2 (3 ×)
|
Oberemmel
|
TR
|
49 ° 38 ′ 55 "N, 6 ° 39 ′ 44" E
|
WEAG
|
|
Konken wind farm
|
2002
|
3.4
|
4th
|
Vestas V52-850kW (4 ×)
|
Konken
|
KUS
|
49 ° 29 ′ 43 "N, 7 ° 20 ′ 52" E
|
Vernet, NET
|
|
Koxhausen-Neuerburg-Leimbach wind farm
|
1994 1995 2002
|
6.6
|
13
|
Enercon E-40 / 5.40 (12 ×) Enercon E-40 / 6.44 (1 ×)
|
Koxhausen Neuerburg Leimbach
|
BIT
|
50 ° 0 ′ 20 "N, 6 ° 15 ′ 19" E 50 ° 0 ′ 12 "N, 6 ° 16 ′ 34" E 50 ° 1 ′ 12 "N, 6 ° 15 ′ 8" E
|
|
When the expansion was commissioned in 1995, it was the largest inland wind farm in Europe, 3 spatially separated locations
|
Krähenberg wind farm
|
2001 2003
|
6.91
|
6th
|
Vestas V47-660kW (1 ×) DeWind D6 / 62 (5 ×)
|
Crows Mountain
|
PS
|
49 ° 20 ′ 4 "N, 7 ° 29 ′ 21" E
|
ABO Wind
|
|
Kramberg wind farm
|
2001 2002 2006
|
5.3
|
4th
|
Enercon E-58 (2 ×) Enercon E-66 / 18.70 (1 ×) Fuhrländer FL MD77 (1 ×)
|
Weinsheim Rommersheim
|
BIT
|
50 ° 12 ′ 50 "N, 6 ° 28 ′ 44" E
|
renertec, Theolia, Futuren, Kramberg energy wind farm
|
|
Krastel-Leideneck wind farm
|
2014
|
12.2
|
4th
|
Enercon E-101 (4 ×)
|
Krastel Leideneck
|
SIM
|
50 ° 2 ′ 41 ″ N, 7 ° 22 ′ 15 ″ E
|
DunoAir
|
|
Kröppen wind farm
|
2018 2020
|
17.4
|
5
|
Nordex N117 / 3000 (3 ×) Vestas V150-4.2MW (2 ×)
|
Crops
|
PS
|
49 ° 9 ′ 54 "N, 7 ° 29 ′ 54" E
|
Prokon , Juwi
|
|
Külz wind farm
|
2007 2012 2013 2017
|
30.1
|
11
|
Enercon E-70 (4 ×) Enercon E-82 E2 (7 ×) Enercon E-115 (2 ×)
|
Külz Kümbdchen Niederkumbd
|
SIM
|
50 ° 0 ′ 34 "N, 7 ° 30 ′ 58" E
|
Enercon , Futura
|
|
Kundert wind farm
|
2003 2011
|
5.2
|
7th
|
Enercon E-66 / 18.70 (2 ×) Enercon E-53 (2 ×)
|
Kundert
|
WW
|
50 ° 43 ′ 34 "N, 7 ° 48 ′ 1" E
|
juwi
|
|
Kürrenberg wind farm
|
2015
|
15.25
|
5
|
Enercon E-101 (5 ×)
|
Kürrenberg
|
MYK
|
50 ° 19 ′ 40 "N, 7 ° 8 ′ 14" E
|
DunoAir, juwi
|
|
Kyllburgweiler wind farm
|
2003-2004
|
8.0
|
4th
|
Vestas V80-2MW (4 ×)
|
Kyllburgweiler
|
BIT
|
50 ° 3 ′ 37 "N, 6 ° 37 ′ 7" E
|
easyenergy
|
|
Lambsborn-Martinshöhe wind farm
|
2007
|
20.5
|
10
|
REpower MM92 (10 ×)
|
Lambsborn Martinshöhe
|
KL
|
49 ° 21 ′ 26 "N, 7 ° 26 ′ 41" E
|
Prokon
|
|
Lambsheim wind farm
|
2011 2019
|
6.4
|
3
|
Enercon E-82 (2 ×) Nordex N117 / 2400 (1 ×)
|
Lambsheim
|
RP
|
49 ° 31 '48 "N, 8 ° 18" 37 "E
|
Schöller Wind, Energiequelle , GAIA
|
erected on the A 61
|
Landkern wind farm
|
2009
|
8.0
|
4th
|
Enercon E-82 (4 ×)
|
Country core
|
COC
|
50 ° 12 ′ 23 "N, 7 ° 8 ′ 49" E
|
juwi , BKW
|
|
Langenbach wind farm
|
1991 1993 1995 1997 2003
|
3.0
|
6th
|
AN Bonus 150/30 (1 ×) AN Bonus 600/41 (1 ×) Enercon E-40 / 5.40 (2 ×) Fuhrländer FL astOs 250 (1 ×) Enercon E-58 (1 ×)
|
Langenbach
|
WW
|
50 ° 42 ′ 21 "N, 7 ° 56 ′ 48" E
|
|
previously also 1 × AN Bonus 150/30
|
Langwieden wind farm
|
2017 2019
|
15.5
|
5
|
Enercon E-82 E2 (1 ×) Vestas V112-3.3MW (4 ×)
|
Langwieden
|
KL
|
49 ° 22 ′ 46 ″ N, 7 ° 31 ′ 7 ″ E
|
WEAG
|
|
Laubach wind farm
|
1998 2010 2012 2014
|
4.85
|
3
|
Fuhrländer FL 800 (1 ×) REpower MM92 (1 ×) Vestas V90-2MW (1 ×)
|
Laubach
|
SIM
|
50 ° 3 '53 "N, 7 ° 31' 8" E
|
Cron, ABO Wind, juwi , Thüga Renewable Energies , ABO Wind, Stadtwerke Tübingen
|
Repowering 2012 (1 × Vestas V90-2MW instead of 5 × Fuhrländer FL 54/1000 )
|
Lauperath wind farm
|
2002 2011 2013
|
5.65
|
3
|
Enercon E-40 / 6.44 (1 ×) Enercon E-82 (1 ×) Enercon E-101 (1 ×)
|
Halsdorf
|
BIT
|
50 ° 4 ′ 36 "N, 6 ° 19 ′ 54" E
|
vortex energy, Islek's third energy wind farm
|
|
Wind farm Lieg
|
2020
|
16.5
|
5
|
Vestas V126-3.3MW (5 ×)
|
Lying
|
COC
|
50 ° 8 ′ 24 ″ N, 7 ° 19 ′ 28 ″ E
|
26. InvestInvent Lieger Wald
|
|
Jeckenbach-Lauschied wind farm
|
2002 2016
|
9.35
|
6th
|
Vestas V52-850kW (3 ×) Vestas V80-2MW (1 ×) Nordex N117 / 2400 (2 ×)
|
Jeckenbach Lauschied
|
KH
|
49 ° 43 ′ 41 "N, 7 ° 35 ′ 39" E
|
Energiequelle , GAIA, Trianel renewable energies , WP Jeckenbach
|
|
Lettweiler Höhe wind farm
|
2000 2001 2002 2012 2013 2014
|
52.2
|
21st
|
DeWind D6 / 1000 (1 ×) Vestas V80-2MW (1 ×) GE 1.5s (1 ×) REpower 3.4M104 (3 ×) GE Wind Energy 2.5-120 (15 ×)
|
Lettweiler Rehborn Unkenbach Callbach
|
KH KIB
|
49 ° 43 ′ 16 "N, 7 ° 43 ′ 19" E
|
juwi
|
Repowering 2012 (3 × REpower 3.4M104 instead of 2 × DeWind D6 / 62 and 5 × Vestas V66-1.65MW )
|
Lichtenborn wind farm
|
2003 2008 2012 2017
|
13.95
|
7th
|
Fuhrländer FL MD77 (2 ×) Enercon E-70 (2 ×) Enercon E-82 E2 (2 ×) Enercon E-92 (1 ×)
|
Lichtenborn
|
BIT
|
50 ° 6 ′ 48 "N, 6 ° 18 ′ 32" E
|
EEG energy expertise, seebaWIND, natural electricity
|
|
Lingerhahn wind farm
|
2010-2011
|
8.2
|
4th
|
REpower MM92 (4 ×)
|
Linger tap
|
SIM
|
50 ° 5 ′ 35 "N, 7 ° 35 ′ 18" E
|
juwi , Trave EE
|
|
Lirstal wind farm
|
2000 2001
|
3.5
|
3
|
Fuhrländer FL 1000 (2 ×) Fuhrländer FL MD70 (1 ×)
|
Lirstal
|
DAU
|
50 ° 14 '24 "N, 7 ° 2' 45" E 50 ° 15 '10 "N, 7 ° 3' 14" E
|
Sailer & Werther
|
built on the A 48 , the first system MD70 / 77 series from Fuhrländer
|
Lörzweiler wind farm
|
2010
|
2.4
|
3
|
Enercon E-53 (3 ×)
|
Loerzweiler
|
MZ
|
49 ° 53 ′ 7 ″ N, 8 ° 18 ′ 16 ″ E
|
Energy source , GAIA
|
|
Lünebach-Lichtenborn wind farm
|
2018-2019
|
20.7
|
6th
|
Vestas V136-3.45MW (6 ×)
|
Luenebach Lichtenborn
|
BIT
|
50 ° 7 ′ 27 ″ N, 6 ° 19 ′ 11 ″ E
|
ABO Wind
|
|
Mainz wind farm
|
2000 2006 2010 2017 2019
|
15.7
|
7th
|
Enercon E-40 / 5.40 (1 ×) Enercon E-82 (4 ×) Enercon E-115 (1 ×) Enercon E-141 EP4 (1 ×)
|
Mainz-Ebersheim Klein-Winternheim Mainz-Hechtsheim
|
MZ
|
49 ° 56 ′ 21 ″ N, 8 ° 14 ′ 27 ″ E
|
juwi , RIO Energy
|
|
Mastershausen wind farm
|
2007 2010 2012–2013
|
29.2
|
14th
|
Enercon E-70 (7 ×) Enercon E-82 (3 ×) Enercon E-82 E2 (4 ×)
|
Mastershausen
|
SIM
|
50 ° 2 ′ 28 "N, 7 ° 20 ′ 31" E
|
DunoAir, EWO, WP Mastershausen
|
|
Meckel wind farm
|
2000 2005 2009 2014 2015
|
16.3
|
9
|
Nordex N54 / 1000 (1 ×) REpower MD77 (3 ×) REpower MM82 (2 ×) Vestas V90-2MW (1 ×) Enercon E-82 E2 (1 ×) Nordex N117 / 2400 (1 ×)
|
Meckel
|
BIT
|
49 ° 52 ′ 35 "N, 6 ° 30 ′ 45" E
|
Enovos , seebaWIND
|
|
Meckenbach wind farm
|
2014
|
13.85
|
5
|
Enercon E-92 (2 ×) Enercon E-101 (3 ×)
|
Meckenbach
|
BIR
|
49 ° 36 ′ 37 "N, 7 ° 4 ′ 54" E
|
GERES
|
|
Medard wind farm
|
2014 2016
|
7.75
|
3
|
GE Wind Energy 2.5-120 (2 ×) GE Wind Energy 2.75-120 (1 ×)
|
Medard
|
KUS
|
49 ° 40 ′ 36 "N, 7 ° 35 ′ 44" E
|
juwi , WEDIS
|
|
Mehringer Höhe wind farm
|
2005 2011
|
32.3
|
16
|
Enercon E-70 (15 ×) Enercon E-82 E2 (1 ×)
|
Mehring Naurath (forest) notification
|
TR
|
49 ° 45 ′ 11 "N, 6 ° 51 ′ 43" E
|
juwi
|
erected on both sides of the A1
|
Mettweiler wind farm
|
1996 2000 2003 2016
|
3.6
|
4th
|
Enercon E-40 / 5.40 (1 ×) Enercon E-66 / 15.66 (1 ×) Enercon E-40 / 6.44 (1 ×) Enercon E-58 (1 ×)
|
Hoppstädten-Weiersbach
|
BIR
|
49 ° 35 ′ 13 "N, 7 ° 19 ′ 33" E
|
Wind power plants Obere Nahe
|
an Enercon E-40 / 5.40 dismantled in 2016
|
Metzenhausen wind farm
|
2017
|
9.9
|
3
|
Vestas Vestas V126-3.3MW (3 ×)
|
Metzenhausen Upper Costenz
|
SIM
|
49 ° 58 ′ 7 ″ N, 7 ° 22 ′ 28 ″ E
|
Heyne B&P Heiligenroth / Heyne, Denker & Wulf, Heiligenroth
|
|
Minfeld wind farm
|
2004 2009
|
8.0
|
5
|
GE Wind Energy 1.5sl (4 ×) Vestas V90-2MW (1 ×)
|
Minfeld
|
GER
|
49 ° 4 ′ 56 ″ N, 8 ° 9 ′ 7 ″ E
|
juwi , pfalzwind
|
|
Morbach energy landscape
|
2003 2018-2020
|
29.4
|
7th
|
Enercon E-141 EP4 (7 ×)
|
Morbach
|
WIL
|
49 ° 50 ′ 1 ″ N, 7 ° 6 ′ 46 ″ E
|
Wust - wind & sun, community wind energy Morbach
|
Repowering (7 × Enercon E-141 EP4 instead of 14 × Vestas V80-2MW )
|
Mörsdorf-Nord wind farm
|
2014
|
19.2
|
8th
|
Nordex N117 / 2400 (8 ×)
|
Mörsdorf
|
SIM
|
50 ° 6 ′ 47 "N, 7 ° 19 ′ 26" E
|
ABO Wind
|
|
Mörsdorf-Süd wind farm
|
2015
|
7.2
|
3
|
Nordex N117 / 2400 (3 ×)
|
Mörsdorf
|
SIM
|
50 ° 5 ′ 40 "N, 7 ° 21 ′ 37" E
|
ABO Wind
|
|
Mörsfeld wind farm
|
2019-2020
|
10.2
|
3
|
Senvion 3.4M122 (3 ×)
|
Mörsfeld
|
KIB
|
49 ° 43 '59 "N, 7 ° 56" 14 "E
|
|
|
Mörstadt wind farm
|
2009
|
6.0
|
3
|
Vestas V90-2MW (3 ×)
|
Mörstadt
|
AZ
|
49 ° 39 ′ 23 "N, 8 ° 16 ′ 28" E
|
pfalzwind
|
erected on the A 61
|
Neuerkirch wind farm
|
2011 2013
|
21.6
|
9
|
Enercon E-82 E2 (8 ×) REpower 3.2M114 (1 ×)
|
Neuerkirch
|
SIM
|
50 ° 1 ′ 40 "N, 7 ° 30 ′ 16" E
|
juwi , Thüga Renewable Energies
|
|
Neustgewann wind farm
|
2014
|
7.05
|
3
|
Enercon E-92 (3 ×)
|
Nannhausen Fronhofen
|
SIM
|
49 ° 58 ′ 52 "N, 7 ° 27 ′ 31" E
|
Futura
|
|
Nieder Kostenz wind farm
|
2000 2017
|
9.0
|
3
|
Enercon E-115 (3 ×)
|
Low cost
Kirchberg
|
SIM
|
49 ° 56 ′ 54 "N, 7 ° 22 ′ 32" E
|
Barkholz ADW, ENP Berlin, GVK, ProVento, Höhenwind
|
2017 repowering (3 × Enercon E-115 instead of 7 × Fuhrländer FL 1000 )
|
Niederhambach wind farm
|
2012-2013
|
17.0
|
5
|
REpower 3.4M104 (5 ×)
|
Niederhambach
|
BIR
|
49 ° 41 ′ 48 "N, 7 ° 12 ′ 29" E
|
ABO Wind , Mainova , wpe
|
|
Niederkirchen wind farm
|
2004 2005 2006
|
19.2
|
10
|
Enercon E-66 / 18.70 (4 ×) Enercon E-70 (6 ×)
|
Niederkirchen (West Palatinate)
|
KL
|
49 ° 35 ′ 3 "N, 7 ° 43 ′ 34" E
|
juwi , pfalzwind
|
largest wind farm of the operator
|
Norath-Badenhard wind farm
|
2001 2013–2014 2017
|
21.5
|
9
|
Südwind S70 (3 ×) Vestas V112-3.0MW (3 ×) Nordex N117 / 2400 (2 ×) Senvion 3.2M114 (1 ×)
|
Norath Badenhard Leiningen
|
SIM
|
50 ° 7 ′ 54 "N, 7 ° 35 ′ 22" E 50 ° 7 ′ 47 "N, 7 ° 36 ′ 2" E
|
Höhenwind, juwi , KGAL, K&S Regenerative Energy
|
built on both sides of the A 61
|
Nusbaum wind farm
|
1999 2001 2012
|
32.2
|
14th
|
Enercon E-82 E2 (14 ×)
|
Nusbaum Hüttingen Hommerdingen
|
BIT
|
49 ° 55 ′ 30 ″ N, 6 ° 19 ′ 8 ″ E
|
Zephyr Eifelwind, SWT
|
Repowering 2012 (previously 10 × DeWind D4 / 48 and 6 × DeWind D6 / 62)
|
Nussbach-Waldgrehweiler wind farm
|
1998 2002 2003 2011–2012
|
15.3
|
6th
|
Enercon E-40 / 6.44 (1 ×) Enercon E-66 / 18.70 (1 ×) Enercon E-101 (2 ×) REpower 3.4M104 (2 ×)
|
Nussbach Waldgrehweiler
|
KUS KIB
|
49 ° 39 ′ 8 "N, 7 ° 42 ′ 13" E
|
juwi , WEDIS
|
Repowering 2011–2012 (2 × Enercon E-101 instead of 3 × Enercon E-40 / 5.40 )
|
Wind farm Ober Kostenz
|
2001 2007
|
13.5
|
8th
|
Enron Wind 1.5sl (5 ×) Vestas V90-2MW (3 ×)
|
Upper cost
|
SIM
|
49 ° 57 ′ 26 ″ N, 7 ° 22 ′ 7 ″ E
|
PENOK, ENP Berlin, juwi , Evergy
|
|
Oberarnbach wind farm
|
1999 2000
|
3.0
|
3
|
DeWind D6 / 62 (3 ×)
|
Oberarnbach
|
KL
|
49 ° 22 ′ 45 "N, 7 ° 35 ′ 48" E
|
juwi
|
erected on the A 62
|
Obere Kyll wind farm
|
2017
|
66.3
|
21st
|
Enercon E-115 (10 ×)
Vestas V112 (11 ×)
|
Ormont Kerschenbach Stadtkyll
|
DAU
|
50 ° 19 ′ 14 "N, 6 ° 28 ′ 34" E
|
juwi
|
The most powerful wind farm in Rhineland-Palatinate when it was commissioned in 2017.
|
Oberndorf wind farm
|
2014 2015
|
7.5
|
3
|
GE Wind Energy 2.5-120 (3 ×)
|
Oberndorf
|
KIB
|
49 ° 42 ′ 13 "N, 7 ° 49 ′ 27" E
|
pfalzwind
|
|
Obernheim-Kirchenarnbach-Weselberg wind farm
|
2014 2018
|
9.3
|
3
|
Vestas V112-3.0MW (2 ×) Vestas V112-3.3MW (1 ×)
|
Obernheim-Kirchenarnbach Weselberg
|
PS
|
49 ° 21 ′ 29 "N, 7 ° 35 ′ 37" E
|
juwi , Schöller Wind
|
erected on the A 62
|
Offenbach wind farm
|
2008 2013-2014
|
21.2
|
9
|
Vestas V90-2MW (3 ×) GE Wind Energy 2.5-120 (6 ×)
|
Offenbach ad Queich
|
SOUTH
|
49 ° 10 ′ 9 ″ N, 8 ° 12 ′ 16 ″ E
|
pfalzwind juwi
|
|
Olzheim wind farm
|
1998 2003
|
2.1
|
3
|
DeWind D4 / 48 (2 ×) Südwind S77 (1 ×)
|
Olzheim
|
BIT
|
50 ° 16 ′ 51 ″ N, 6 ° 28 ′ 39 ″ E
|
Wind power Olzheimer Berg
|
|
Ormont wind farm
|
1991 1993 2003
|
15.46
|
16
|
Enercon-33 (7 ×) Südwind S70 (9 ×)
|
Ormont
|
DAU
|
50 ° 20 ′ 2 "N, 6 ° 27 ′ 47" E
|
GRE WP Ormont
|
In 1991 it was the first inland wind farm in Germany
|
Petersberg wind farm
|
2017
|
9.9
|
3
|
Vestas V126-3.3MW (3 ×)
|
Petersberg
|
PS
|
49 ° 14 ′ 43 "N, 7 ° 35 ′ 3" E
|
juwi
|
erected on the A 62
|
Peterswald-Löffelscheid wind farm
|
2005 2006 2009
|
9.4
|
10
|
Fuhrländer FL MD77 (2 ×) Enercon E-48 (5 ×) Enercon E-53 (3 ×)
|
Peterswald-Löffelscheid Panzweiler Haserich
|
COC
|
50 ° 1 ′ 33 "N, 7 ° 19 ′ 37" E 50 ° 1 ′ 25 "N, 7 ° 20 ′ 29" E
|
juwi , pfalzwind
|
|
Pittenbach wind farm
|
2003 2010
|
4.8
|
3
|
Enercon E-58 (1 ×) Enercon E-66 / 18.70 (1 ×) Enercon E-82 (1 ×)
|
Pittenbach
|
BIT
|
50 ° 10 ′ 26 "N, 6 ° 19 ′ 37" E
|
|
|
Plütscheid wind farm
|
1998 1999
|
2.5
|
3
|
Enercon E-40 / 5.40 (2 ×) Enercon E-66 / 15.66 (1 ×)
|
Plütscheid Feuerscheid
|
BIT
|
50 ° 5 ′ 38 "N, 6 ° 26 ′ 14" E
|
|
|
Polch wind farm
|
2012
|
10.25
|
5
|
REpower MM92 (5 ×)
|
Polch
|
MYK
|
50 ° 18 ′ 40 "N, 7 ° 15 ′ 36" E
|
juwi , pfalzwind
|
erected on the A 48
|
Ranzenkopf wind farm
|
2018
|
48.0
|
16
|
Enercon E-115 (16 ×)
|
Wintrich Brauneberg
|
WIL
|
49 ° 49 ′ 40 ″ N, 7 ° 1 ′ 7 ″ E
|
|
|
Rascheid wind farm
|
2019
|
20.7
|
6th
|
Vestas V126-3.45MW (6 ×)
|
Swift oath
|
TR
|
49 ° 40 ′ 48 "N, 6 ° 55 ′ 42" E
|
Jade Windpark GmbH
|
|
Ray Various-Bergenhausen wind farm
|
2012
|
17.0
|
5
|
REpower 3.4M104 (5 ×)
|
Ray Various Bergenhausen
|
SIM
|
50 ° 1 '50 "N, 7 ° 35' 25" E
|
ABO Wind , Mark-E
|
|
Reichenbach-Steegen wind farm
|
2003
|
10.0
|
5
|
Vestas V80-2MW (5 ×)
|
Reichenbach-Steegen
|
KL
|
49 ° 31 '10 "N, 7 ° 32' 8" E
|
juwi
|
|
Reuth wind farm
|
2000
|
13.5
|
9
|
Tacke TW 1.5 (9 ×)
|
Reuth
|
DAU
|
50 ° 17 ′ 36 "N, 6 ° 30 ′ 21" E
|
psm
|
|
Wind field Rheinhessen-Pfalz
|
2000 2002 2004 2012 2013
|
61.0
|
25th
|
NEG Micon NM60 / 1000 (1 ×) Enron Wind 1.5s (8 ×) Enercon E-66 / 18.70 (1 ×) REpower 3.2M114 (3 ×) Vestas V112-3.0MW (12 ×)
|
Esselborn Flomborn Stetten
|
AZ KIB
|
49 ° 41 ′ 21 ″ N, 8 ° 6 ′ 25 ″ E
|
juwi , BVT, WEDIS
|
At the time of commissioning, the largest wind farm in southern Germany, repowering 2012 and 2013 (3 × REpower 3.2M114 and 12 × Vestas V112-3.0MW instead of 15 × NEG Micon 60/1000)
|
Riedelberg wind farm
|
2008–2009 2013
|
17.2
|
8th
|
Enercon E-70 (2 ×) Enercon E-82 (2 ×) Enercon E-82 E2 (4 ×)
|
Riedelberg
|
PS
|
49 ° 10 ′ 14 "N, 7 ° 28 ′ 10" E
|
Prokon , GERES, Meinhardt
|
|
Riegenroth wind farm
|
2012
|
16.0
|
5
|
REpower 3.2M114 (5 ×)
|
Riegenroth
|
SIM
|
50 ° 4 ′ 11 "N, 7 ° 35 ′ 0" E
|
juwi , STAWAG , Trave EE
|
|
Roes-Kaifenheim wind farm
|
1996 2008 2016
|
14.3
|
8th
|
Tacke TW 600 (4 ×) Vestas V90-2MW (1 ×) Vestas V112-3.3MW (3 ×)
|
Roes Kaifenheim
|
COC
|
50 ° 14 '24 "N, 7 ° 14' 27" E 50 ° 15 '10 "N, 7 ° 14' 52" E
|
BBB Umwelttechnik, CPC Germania Windpark, eno Energy
|
|
Römerberg wind farm
|
2006
|
6.0
|
3
|
Vestas V90-2MW (3 ×)
|
Römerberg (Palatinate)
|
RP
|
49 ° 17 ′ 46 "N, 8 ° 22 ′ 48" E
|
juwi , Stahl Group
|
|
Roth Ost wind farm
|
2005 2013
|
24.4
|
14th
|
Südwind S77 (9 ×) Enercon E-66 / 20.70 (2 ×) Enercon E-82 E2 (3 ×)
|
Roth near Prüm
|
BIT
|
50 ° 19 ′ 19 ″ N, 6 ° 23 ′ 56 ″ E
|
Infigen, Renerco
|
|
Roth West wind farm
|
2005 2007
|
9.5
|
5
|
Südwind S77 (1 ×) Enercon E-70 (4 ×)
|
Roth near Prüm
|
BIT
|
50 ° 18 ′ 35 "N, 6 ° 21 ′ 46" E
|
Airflow
|
|
Rothenborn wind farm
|
2017
|
9.90
|
3
|
Vestas V112 (3 ×)
|
Reuth
|
DAU
|
50 ° 18 ′ 35 "N, 6 ° 21 ′ 46" E
|
juwi
|
|
Rothselberg wind farm
|
2000 2003 2014–2015
|
37.55
|
11
|
Enercon E-66 / 18.70 (2 ×) Enercon E-101 (10 ×) Vestas V126-3.45MW (1 ×)
|
Rothselberg Kollweiler
|
KUS KL
|
49 ° 31 '54 "N, 7 ° 36" 10 "E
|
juwi , Altus
|
Repowering 2014–2015 (10 × Enercon E-101 instead of 3 × Enercon E-40 / 5.40 ) 2019-2020 Repowering (1 × Vestas V126-3.45MW instead of 1 × Enercon E-66 / 18.70 )
|
Rülzheim-Herxheimweyher wind farm
|
2005 2017
|
25.5
|
11
|
Fuhrländer FL MD77 (6 ×) Vestas V126-3.3MW (5 ×)
|
Rülzheim Herxheimweyher
|
GER SÜW
|
49 ° 9 ′ 56 "N, 8 ° 15 ′ 16" E
|
pfalzwind
|
|
Sarmersbach wind farm
|
2004
|
10.25
|
5
|
REpower MM82 (5 ×)
|
Sarmersbach
|
DAU
|
50 ° 15 '19 "N, 6 ° 53' 53" E
|
|
|
Schneebergerhof -Windhübel
wind farm |
1996 1997 2003 2010 2011 2019
|
28.4
|
6th
|
Enercon E-66 / 18.70 (3 ×) Vestas V80-2MW (1 ×) Enercon E-126 (1 ×) Enercon E-101 (1 ×) Vestas V126-3.45MW (3 ×)
|
Gerbach Kriegsfeld
|
KIB
|
49 ° 40 ′ 41 "N, 7 ° 54 ′ 5" E 49 ° 40 ′ 33 "N, 7 ° 54 ′ 40" E
|
juwi
|
first wind farm of the operator juwi, first Enercon E-126 inland, repowering 2003 (3 × Enercon E-66 / 18.70 instead of 1 × Enercon E-40 / 5.40 ) and 2010 (1 × Enercon E-126 instead of 1 × Enercon E- 66 / 15.66 )
|
Schornsheim wind farm
|
2011 2012
|
7.5
|
5
|
Kenersys K100 (5 ×)
|
Schornsheim Udenheim
|
AZ
|
49 ° 51 ′ 1 ″ N, 8 ° 9 ′ 5 ″ E
|
juwi , ATS, EWR
|
erected along the A 63 , part of the Wörrstadt energy park
|
Schwegenheim wind farm
|
2006 2019
|
18.3
|
7th
|
Fuhrländer FL 77/1500 (3 ×) Vestas V136-3.45MW (4 ×)
|
Schwegenheim
|
GER
|
49 ° 16 ′ 0 ″ N, 8 ° 21 ′ 21 ″ E
|
juwi
|
|
Seffer Soften wind farm
|
2001
|
19.5
|
11
|
Südwind S70 (8 ×) Nordex N80 (3 ×)
|
Seffer soft
|
BIT
|
50 ° 3 '51 "N, 6 ° 31' 53" E 50 ° 2 '47 "N, 6 ° 31' 18" E
|
WATT
|
|
Seiwerath wind farm
|
1998 1999
|
2.4
|
3
|
DeWind D4 (1 ×) NEG Micon NM48 / 750 (2 ×)
|
Seiwerath
|
BIT
|
50 ° 8 ′ 46 "N, 6 ° 29 ′ 26" E
|
Theolia, source of energy
|
|
Selzen wind farm
|
2006
|
2.4
|
3
|
Enercon E-48 (3 ×)
|
Koengernheim Selzen
|
MZ
|
49 ° 51 ′ 11 "N, 8 ° 16 ′ 23" E
|
Energy source , GAIA
|
|
Soonwald wind farm
|
2012 2012–2013
|
71.55
|
16
|
Enercon E-126 7.6MW (5 ×) Enercon E-101 (11 ×)
|
Ellern Seibersbach Dörrebach
|
SIM KH
|
49 ° 58 ′ 20 "N, 7 ° 40 ′ 23" E 49 ° 56 ′ 46 "N, 7 ° 40 ′ 13" E
|
juwi , Verbund AG
|
most powerful wind farm in southern Germany
|
Spiesheim wind farm
|
1997 1998
|
2.5
|
5
|
Enercon E-40 / 5.40 (5 ×)
|
Spiesheim Wörrstadt
|
AZ
|
49 ° 49 ′ 2 ″ N, 8 ° 6 ′ 57 ″ E
|
juwi
|
Part of the Wörrstadt energy park
|
Trierweiler wind farm
|
1991 1995 2002 2012 2013 2014
|
13.85
|
7th
|
Enercon E-40 / 6.44 (1 ×) Enercon E-58 (1 ×) Enercon E-82 E2 (4 ×) Enercon E-101 (1 ×)
|
Trierweiler
|
TR
|
49 ° 46 ′ 34 "N, 6 ° 33 ′ 57" E
|
Wind power Trierweiler, Energy 2030, BayWa re
|
Repowering 2012 (2 × Enercon E-82 E2 instead of 1 × Enercon-18 ) and 2014 (2 × Enercon E-82 E2 instead of 1 × AN Bonus 600/44)
|
Uhler wind farm
|
2009
|
6.0
|
3
|
Vestas V90-2MW (3 ×)
|
Uhler
|
SIM
|
50 ° 5 ′ 30 "N, 7 ° 24 ′ 29" E
|
juwi
|
|
Undenheim wind farm
|
2005 2016
|
10.05
|
5
|
GE Wind Energy 1.5s (2 ×) Enercon E-92 (3 ×)
|
Undenheim
|
MZ
|
49 ° 49 ′ 22 ″ N, 8 ° 12 ′ 5 ″ E
|
ABO Wind , Energiequelle , GAIA
|
|
Unzenberg wind farm
|
2011 2012
|
14.1
|
7th
|
Vestas V90-2MW (5 ×) REpower MM92 (2 ×)
|
Unzenberg
|
SIM
|
49 ° 58 ′ 56 "N, 7 ° 26 ′ 57" E
|
juwi , Thüga Renewable Energies , WEMAG
|
|
Veldenz-Gornhausen wind farm
|
2016 2017
|
27.45
|
9
|
Enercon E-101 (9 ×)
|
Veldenz Gornhausen
|
WIL
|
49 ° 51 '12 "N, 7 ° 3' 54" E
|
juwi
|
|
Vinningen wind farm
|
2000 2001 2003
|
4.8
|
3
|
Vestas V66-1.65MW (2 ×) GE Wind Energy 1.5sl (1 ×)
|
Vinningen Obersimten
|
PS
|
49 ° 9 ′ 9 ″ N, 7 ° 34 ′ 34 ″ E
|
juwi , energy source
|
a wind turbine burnt down in 2018 will not be rebuilt
|
Wachenheim wind farm
|
2012-2013
|
16.0
|
5
|
REpower 3.2M114 (5 ×)
|
Guard home
|
AZ
|
49 ° 37 ′ 24 ″ N, 8 ° 9 ′ 20 ″ E
|
AöR energy projects Monsheim
|
|
Wahlbach wind farm
|
2013
|
9.6
|
3
|
REpower 3.2M114 (3 ×)
|
Wahlbach
|
SIM
|
50 ° 0 ′ 38 "N, 7 ° 36 ′ 11" E
|
eno Energy
|
|
Wahnwegen wind farm
|
2011 2015
|
6.0
|
3
|
Vestas V90-2MW (3 ×)
|
Delusional
|
KUS
|
49 ° 29 ′ 36 "N, 7 ° 21 ′ 41" E
|
Prokon
|
|
Waigandshain-Homberg wind farm
|
2004
|
18.0
|
12
|
Fuhrländer FL MD77 (12 ×)
|
Waigandshain Homberg
|
WW
|
50 ° 39 ′ 6 ″ N, 8 ° 6 ′ 24 ″ E
|
KEVAG , evm , Westerwald wind farm
|
Largest wind farm in Rhineland-Palatinate upon commissioning
|
Waldalgesheim wind farm
|
2011 2012 2014 2016
|
26.25
|
10
|
Enercon E-82 E2 (4 ×) Enercon E-101 (1 ×) GE Wind Energy 2.5-120 (2 ×) Enercon E-92 (3 ×)
|
Waldalgesheim
|
MZ
|
49 ° 58 ′ 30 ″ N, 7 ° 47 ′ 16 ″ E
|
juwi , Stadtwerke Mainz, EDG, GEDEA, Waldalgesheim community wind farm
|
|
Waldfischbach-Burgalben wind farm
|
2007 2016
|
9.3
|
4th
|
Enercon E-82 (3 ×) Vestas V112-3.3MW (1 ×)
|
Waldfischbach-Burgalben Höheinöd
|
PS
|
49 ° 17 ′ 41 ″ N, 7 ° 37 ′ 29 ″ E
|
juwi , DIF
|
erected on the A 62
|
Waldrach wind farm
|
2002 2010 2012
|
12.8
|
10
|
Enercon E-40 / 6.44 (6 ×) Enercon E-82 E2 (4 ×)
|
Waldrach
|
TR
|
49 ° 44 ′ 59 "N, 6 ° 46 ′ 30" E
|
Investwind Ruwertal, Second Investwind Waldrach, Windstrom Waldrach, WEAG
|
|
Walhausen wind farm
|
2005
|
6.0
|
3
|
Enercon E-66 / 20.70 (3 ×)
|
Walhausen
|
COC
|
50 ° 2 ′ 0 ″ N, 7 ° 16 ′ 49 ″ E
|
juwi
|
|
Walsdorf wind farm
|
2003
|
6.5
|
3
|
Südwind S77 (1 ×) Nordex N80 (2 ×)
|
Walsdorf
|
DAU
|
50 ° 16 ′ 4 "N, 6 ° 44 ′ 7" E
|
|
|
Watzerath wind farm
|
2007 2017 2018
|
32.05
|
15th
|
Vestas V90-2MW (13 ×) GE 2.75-120 (1 ×) Vestas V112-3.3MW (1 ×)
|
Watzerath
|
BIT
|
50 ° 11 ′ 23 "N, 6 ° 20 ′ 10" E
|
Global wind power
|
|
Wawern wind farm
|
2005
|
14.0
|
7th
|
Vestas V90-2MW (7 ×)
|
Wawern
|
BIT
|
50 ° 7 ′ 45 ″ N, 6 ° 30 ′ 0 ″ E
|
eno Energy
|
|
Weibern-Rieden wind farm
|
1994 2001 2011
|
21.01
|
14th
|
Sea wind 20/110 (1 ×) Vestas V47-660kW (5 ×) Enercon E-70 (2 ×) Enercon E-82 (4 ×) Nordex N90 / 2500 (2 ×)
|
Women vineyards
|
AW MYK
|
50 ° 24 '30 "N, 7 ° 10' 34" E
|
NET, DunoAir, WP Weibern-Rieden
|
|
Weiersbach wind farm
|
2003 2006 2014 2019
|
14.5
|
8th
|
GE Wind Energy 1.5sl (4 ×) Südwind S77 (1 ×) Enercon E-82 E2 (1 ×) Enercon E-92 (2 ×)
|
Weiersbach
|
BIR
|
49 ° 35 ′ 46 "N, 7 ° 12 ′ 29" E
|
WEAG
|
|
Welchweiler wind farm
|
2003 2007
|
4.55
|
3
|
Vestas V66-1.75MW (1 ×) Enercon E-48 (1 ×) Enercon E-70 (1 ×)
|
Welchweiler
|
KUS
|
49 ° 34 ′ 21 ″ N, 7 ° 29 ′ 32 ″ E
|
juwi , NET, DIF
|
|
Weselberg wind farm
|
2001 2002 2008
|
9.5
|
5
|
Vestas V80-2MW (1 ×) GE Wind Energy 1.5sl (2 ×) Enercon E-82 (2 ×)
|
Weselberg
|
PS
|
49 ° 19 '17 "N, 7 ° 35' 38" E
|
juwi
|
|
Westerburg wind farm
|
2014
|
7.2
|
3
|
Nordex N117 / 2400 (3 ×)
|
Westerburg
|
WW
|
50 ° 33 '54 "N, 7 ° 56" 21 "E
|
Eco-active, WP Westerburg
|
|
Winringen wind farm
|
1998 1999 2001
|
3.0
|
4th
|
Enercon E-40 / 5.40 (3 ×) Tacke TW 1.5s (1 ×)
|
Seiwerath
|
BIT
|
50 ° 8 ′ 36 "N, 6 ° 24 ′ 41" E
|
Theolia
|
erected on the A 60
|
Wintersheim wind farm
|
2013
|
15.25
|
5
|
Enercon E-101 (5 ×)
|
Wintersheim
|
MZ
|
49 ° 46 ′ 35 "N, 8 ° 18 ′ 13" E
|
GAIA, energy source , updraft
|
|
Winterspelt-Habscheid wind farm
|
2005 2007
|
12.0
|
7th
|
AN Bonus 82/2300 (3 ×) Gamesa G80-2MW (4 ×)
|
Winterspelt Habscheid
|
BIT
|
50 ° 11 ′ 31 ″ N, 6 ° 14 ′ 46 ″ E
|
IKEA Germany
|
|
Wirfus wind farm
|
2006
|
10.0
|
5
|
Gamesa G80 (5 ×)
|
Wirfus
|
COC
|
50 ° 12 ′ 44 "N, 7 ° 12 ′ 30" E
|
ENP wind
|
|
Wolfstein wind farm
|
2007-2008
|
9.2
|
4th
|
Enercon E-70 (4 ×)
|
Hefersweiler Relsberg
|
KUS
|
49 ° 36 ′ 29 "N, 7 ° 39 ′ 35" E
|
GERES
|
|
Worms wind farm
|
2001 2006 2011–2012
|
21.0
|
11
|
GE Wind Energy 1.5sl (3 ×) Fuhrländer FL MD77 (1 ×) Vestas V112–3.0MW (7 ×)
|
Pfeddersheim Herrnsheim
|
WHERE
|
49 ° 39 ′ 11 "N, 8 ° 17 ′ 50" E
|
juwi , EEA
|
built on both sides of the A 61
|
Wörrstadt wind farm
|
2009 2011 2011–2012
|
27.6
|
12
|
Enercon E-82 (5 ×) Enercon E-82 E2 (5 ×) Enercon E-101 (2 ×)
|
Wörrstadt
|
AZ
|
49 ° 49 ′ 53 ″ N, 8 ° 8 ′ 24 ″ E
|
juwi
|
built on both sides of the A 63 , part of the Wörrstadt energy park
|
Zettingen wind farm
|
2010
|
13.8
|
6th
|
Nordex N90 / 2300 (6 ×)
|
Zettingen Hambuch
|
COC
|
50 ° 13 ′ 6 ″ N, 7 ° 12 ′ 15 ″ E
|
IKEA Germany
|
|
Zilshausen wind farm
|
2015
|
7.2
|
3
|
Nordex N117 / 2400 (3 ×)
|
Zilshausen
|
SIM
|
50 ° 6 ′ 21 ″ N, 7 ° 23 ′ 51 ″ E
|
ABO Wind
|
|