Surname
|
Construction year
|
Total power (MW)
|
number
|
Type (WKA)
|
place
|
agriculture circle
|
Coordinates
|
Project planner / operator
|
Remarks
|
Altenhain wind turbine
|
1995 1999
|
0.25
|
1
|
Nordex N27 / 150 (1 ×) Nordex N29 / 250 (1 ×)
|
Altenhain
|
L.
|
51 ° 17 ′ 4 "N, 12 ° 42 ′ 16" E
|
|
N27 already dismantled
|
Börnichen wind turbine
|
2002
|
1.8
|
1
|
Enercon E-66 / 18.70 (1 ×)
|
Börnichen
|
ORE
|
50 ° 45 ′ 26 "N, 13 ° 7 ′ 40" E
|
|
|
Ebersdorf wind turbine
|
2004
|
0.6
|
1
|
Enercon E-40 6.44 (1 ×)
|
Ebersdorf
|
GR
|
51 ° 4 ′ 8 "N, 14 ° 40 ′ 39" E
|
|
|
Wind turbine Erlau
|
2002
|
1.5
|
1
|
REpower MD70 (1 ×)
|
Frankenberg
|
FG
|
50 ° 53 ′ 28 "N, 13 ° 2 ′ 54" E
|
|
|
Großtreben-Zwethau wind turbine
|
2002
|
1.0
|
1
|
DeWind D6 62/1000 (1 ×)
|
Großtreben-Zwethau
|
TDO
|
51 ° 39 ′ 14 "N, 12 ° 58 ′ 37" E
|
|
|
Großvoigtsberg wind turbine
|
2008
|
2.0
|
1
|
Enercon E-70 (1 ×)
|
Großvoigtsberg
|
FG
|
50 ° 58 ′ 58 ″ N, 13 ° 16 ′ 46 ″ E
|
|
|
Jiedlitz wind turbine
|
2003
|
2.0
|
1
|
REpower MM82 (1 ×)
|
Jiedlitz
|
BZ
|
51 ° 12 ′ 54 "N, 14 ° 12 ′ 46" E
|
|
|
Kaufbach wind turbine
|
1996
|
1.0
|
1
|
Nordex N54 / 1000 (1 ×)
|
Kaufbach
|
PIR
|
51 ° 3 ′ 38 "N, 13 ° 34 ′ 27" E
|
|
erected on the site of the Dresdner Tor Süd motorway service station
|
Langenbernsdorf wind turbine
|
1995
|
0.225
|
1
|
NEG Micon M700 / 225 (1 ×)
|
Langenbernsdorf
|
Z
|
50 ° 45 ′ 50 ″ N, 12 ° 17 ′ 53 ″ E
|
|
|
Lauba wind turbine
|
2000
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Lauba
|
GR
|
51 ° 4 ′ 39 "N, 14 ° 33 ′ 55" E
|
|
|
Lenkersdorf wind power plant
|
1996
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Lenkersdorf
|
ORE
|
50 ° 38 ′ 17 "N, 12 ° 46 ′ 7" E
|
|
|
Lübau wind turbine
|
2007
|
0.6
|
1
|
Enercon E-40 / 6.44 (1 ×)
|
Lübau
|
PIR
|
50 ° 57 ′ 19 ″ N, 13 ° 36 ′ 17 ″ E
|
WSB
|
|
Mittelherwigsdorf wind power station
|
2007
|
0.25
|
1
|
NEG Micon M750 / 250 ? (1 ×)
|
Mittelherwigsdorf
|
GR
|
50 ° 55 ′ 44 "N, 14 ° 45 ′ 57" E
|
|
|
Lower Saida wind turbine
|
1995
|
0.5
|
1
|
Enercon E-40 / 5.40 (1 ×)
|
Lower Saida
|
FG
|
50 ° 44 ′ 41 ″ N, 13 ° 17 ′ 32 ″ E
|
|
|
Wind turbine Opitzhöhe "Zirbelwirbels Traum"
|
1995
|
0.27
|
1
|
Südwind N3127 / 270 (1 ×)
|
Großopitz
|
PIR
|
50 ° 59 ′ 26 ″ N, 13 ° 36 ′ 5 ″ E
|
Vestibule
|
|
Schlegel wind turbine
|
1999
|
1.0
|
1
|
Enercon E-58 (1 ×)
|
Schlegel
|
GR
|
50 ° 58 '23 "N, 14 ° 51' 48" E
|
|
|
Seifersdorf wind turbine
|
2002
|
0.85
|
1
|
Vestas V52-850kW (1 ×)
|
Seifersdorf
|
FG
|
50 ° 58 ′ 11 "N, 13 ° 15 ′ 17" E
|
|
|
Wind power plant Unterheinsdorf
|
2002
|
1.0
|
1
|
Enercon E-58 (1 ×)
|
Unterheinsdorf
|
V
|
50 ° 36 ′ 9 ″ N, 12 ° 18 ′ 50 ″ E
|
|
|
Wawitz wind turbine
|
1995
|
0.3
|
1
|
AN Bonus 31/300 (1 ×)
|
Joke
|
BZ
|
51 ° 10 ′ 9 ″ N, 14 ° 34 ′ 10 ″ E
|
|
|
Weissenberg wind power plant
|
2001
|
0.3
|
1
|
Enercon E-30 / 3.30 (1 ×)
|
Weissenberg
|
BZ
|
51 ° 11 ′ 46 "N, 14 ° 40 ′ 18" E
|
|
erected on the site of a logistics center
|
Weißkeißel wind turbine
|
2003
|
0.6
|
1
|
DeWind D4 48/600 (1 ×)
|
Whitewash
|
GR
|
51 ° 29 ′ 47 "N, 14 ° 43 ′ 58" E
|
eab
|
|
Zobes wind turbine
|
1995
|
0.5
|
1
|
NedWind 40/500 (1 ×)
|
Zobes
|
V
|
50 ° 30 ′ 13 "N, 12 ° 14 ′ 47" E
|
|
|
Wind turbines Bad Lausick
|
2009
|
4.0
|
2
|
Enercon E-70 (2 ×)
|
Bad Lausick
|
L.
|
51 ° 7 ′ 28 "N, 12 ° 38 ′ 20" E
|
Pro Ventum
|
|
Bockendorf wind turbines
|
2000 2003
|
2.4
|
2
|
Enercon E-40 / 6.44 (1 ×) Enercon E-66 / 18.70 (1 ×)
|
Bockendorf
|
FG
|
50 ° 55 ′ 27 "N, 13 ° 10 ′ 42" E
|
|
|
Cannewitz wind turbines
|
2006
|
4.1
|
2
|
REpower MM82 (2 ×)
|
Cannewitz
|
BZ
|
51 ° 10 ′ 10 "N, 14 ° 15 ′ 23" E
|
Wind world
|
|
Wind turbines Chemnitz-Wittgensdorf
|
1998 2010
|
2.5
|
2
|
Enercon E-40 / 5.40 (1 ×) Enercon E-82 (1 ×)
|
Wittgensdorf
|
C.
|
50 ° 53 ′ 21 ″ N, 12 ° 51 ′ 1 ″ E
|
|
|
Crostwitz wind turbines
|
2001
|
1.7
|
2
|
Vestas V52-850kW (2 ×)
|
Crostwitz
|
BZ
|
51 ° 13 ′ 29 ″ N, 14 ° 14 ′ 3 ″ E
|
|
|
Dittersdorf wind turbines
|
1997
|
1.0
|
2
|
Enercon E-40 / 5.40 (2 ×)
|
Dittersdorf
|
PIR
|
50 ° 49 ′ 11 "N, 13 ° 47 ′ 34" E
|
vento ludens
|
|
Dittmannsdorf wind turbines
|
1994 1999
|
0.87
|
2
|
Südwind N3127 / 270 (1 ×) Enron TW 600a (1 ×)
|
Dittmannsdorf
|
FG
|
51 ° 0 ′ 44 "N, 13 ° 24 ′ 59" E
|
|
|
Wind turbines Frankenheim
|
2007
|
4.6
|
2
|
Enercon E-70 E4 (2 ×)
|
Frankenheim
|
L.
|
51 ° 19 ′ 25 ″ N, 12 ° 13 ′ 16 ″ E
|
EFI wind
|
|
Garsebach wind turbines
|
2001
|
1.0
|
2
|
Enercon E-40 / 5.40 (2 ×)
|
Garsebach
|
MEI
|
51 ° 8 ′ 7 "N, 13 ° 25 ′ 38" E
|
|
|
Großbardau wind turbines
|
2017
|
6.8
|
2
|
Senvion 3.4M114 (2 ×)
|
Großbardau
|
L.
|
51 ° 11 ′ 36 "N, 12 ° 42 ′ 34" E
|
|
|
Großrückerswalde wind turbines
|
2000 2002
|
1.0
|
2
|
Enercon E-40 / 5.40 (2 ×)
|
Großrückerswalde
|
ORE
|
50 ° 37 ′ 16 ″ N, 13 ° 9 ′ 11 ″ E
|
|
|
Großwaltersdorf wind turbines
|
1995 1999
|
0.73
|
2
|
Enercon E-30 / 2.30 (1 ×) Vestas V39-500kW (1 ×)
|
Großwaltersdorf
|
FG
|
50 ° 46 ′ 22 "N, 13 ° 16 ′ 37" E
|
|
|
Hallbach wind turbines
|
1996
|
1.2
|
2
|
Tacke TW 600a (2 ×)
|
Hallbach
|
ORE
|
50 ° 41 ′ 26 "N, 13 ° 19 ′ 36" E
|
eab
|
|
Hartha wind turbines
|
2002
|
3.0
|
2
|
REpower MD77 (2 ×)
|
Hartha
|
FG
|
51 ° 5 ′ 30 "N, 12 ° 57 ′ 23" E
|
|
|
Wind turbines Hartha-Gersdorf
|
1997
|
1.2
|
2
|
Tacke TW 600e (1 ×) Vestas V44-600kW (2 ×)
|
Hartha-Gersdorf
|
FG
|
51 ° 6 ′ 14 "N, 12 ° 57 ′ 15" E
|
|
|
Hermsdorf wind turbines
|
2013
|
6.4
|
2
|
Senvion 3.2M114 (2 ×)
|
Hermsdorf
|
FG
|
51 ° 4 ′ 56 "N, 12 ° 52 ′ 11" E
|
|
|
Wind turbines Kemnitz
|
2009
|
4.0
|
2
|
Enercon E-82 (2 ×)
|
Kemnitz
|
GR
|
51 ° 4 ′ 51 ″ N, 14 ° 48 ′ 57 ″ E
|
|
|
Wind turbines in Kesselsdorf
|
1995 2000
|
1.2
|
2
|
Tacke TW 600 (1 ×) Tacke TW 600e (1 ×)
|
Kesselsdorf
|
PIR
|
51 ° 1 ′ 26 "N, 13 ° 34 ′ 50" E
|
eab
|
|
Kleinröhrsdorf wind turbines
|
1999
|
2.6
|
2
|
Nordex N60 / 1300 ( 3 × 2 ×)
|
Kleinröhrsdorf
|
BZ
|
51 ° 8 ′ 2 "N, 13 ° 57 ′ 29" E
|
|
one plant already dismantled
|
Langenwolmsdorf wind turbines
|
1998
|
1.0
|
2
|
Enercon E-40 / 5.40 (2 ×)
|
Langenwolmsdorf
|
PIR
|
51 ° 2 ′ 25 ″ N, 14 ° 9 ′ 1 ″ E
|
vento ludens
|
|
Lauterbach wind turbines
|
1994
|
1.2
|
2
|
DeWind D4 48/600 ( 3 × 2 ×)
|
Lauterbach
|
ORE
|
50 ° 39 '59 "N, 13 ° 11' 31" E
|
|
a DeWind D4 48/600 already dismantled
|
Lissa wind turbines
|
2001
|
3.0
|
2
|
Enercon E-66 / 15.66 (2 ×)
|
Lissa
|
TDO
|
51 ° 30 ′ 4 "N, 12 ° 17 ′ 2" E
|
PNE, FUTURES
|
|
Wind turbines Niederrossau
|
1999
|
1.32
|
2
|
Vestas V47-660kW (2 ×)
|
Kriebstein-Ehrenberg
|
FG
|
51 ° 2 ′ 1 ″ N, 13 ° 2 ′ 0 ″ E
|
Sabowind
|
|
Rückersdorf wind turbines
|
2002 2005
|
1.8
|
2
|
Enercon E-58 (1 ×) Enercon E-48 (1 ×)
|
Rückersdorf
|
PIR
|
51 ° 3 ′ 0 ″ N, 14 ° 11 ′ 6 ″ E
|
|
|
Seifersbach wind turbines
|
2001
|
3.0
|
2
|
Südwind S70 (2 ×)
|
Seifersbach
|
FG
|
50 ° 58 '39 "N, 13 ° 1' 39" E
|
|
|
Wind turbines Strocken
|
1997
|
1.2
|
2
|
Vestas V44-600KW (2 ×)
|
Strocken
|
FG
|
51 ° 11 ′ 34 "N, 13 ° 0 ′ 36" E
|
|
|
Thallwitz wind turbines
|
2001
|
1.2
|
2
|
Südwind S46 / 600 (2 ×)
|
Thallwitz
|
L.
|
51 ° 26 ′ 22 "N, 12 ° 42 ′ 33" E
|
|
|
Thierfeld wind turbines
|
1995 2014
|
3.6
|
2
|
Tacke TW 600 (1 ×) Vestas V112-3.0MW (1 ×)
|
Thierfeld
|
Z
|
50 ° 40 ′ 29 "N, 12 ° 42 ′ 7" E
|
juwi , Eins Energie in Sachsen
|
|
Wind turbines Ullersdorf
|
1994
|
0.3
|
2
|
Nordex N27 / 150 (2 ×)
|
Ullersdorf
|
FG
|
50 ° 41 ′ 55 ″ N, 13 ° 24 ′ 20 ″ E
|
|
an N27 already dismantled
|
Voigtsdorf-Nord wind turbines (Rudolphberg wind farm)
|
1995
|
1.0
|
2
|
Enercon E-40 / 5.40 (2 ×)
|
Voigtsdorf
|
FG
|
50 ° 45 ′ 30 ″ N, 13 ° 23 ′ 3 ″ E
|
|
|
Wiesenena wind turbines
|
2002
|
4.0
|
2
|
Vestas V80 (2 ×)
|
Wiesenena
|
TDO
|
51 ° 27 '18 "N, 12 ° 9' 35" E
|
Energy source
|
|
Zaulsdorf wind turbines
|
1996
|
2.0
|
2
|
Nordex N54 / 1000 (2 ×)
|
Zaulsdorf
|
V
|
50 ° 25 '33 "N, 12 ° 13' 28" E
|
|
|
Ablass wind farm (incl. Jeesewitz wind farm)
|
1999 2008 2012
|
32.95
|
23
|
NEG Micon NM64 / 1500 (12 ×) Tacke TW 1.5s (1 ×) Enercon E-40 / 5.40 (2 ×) Enercon E-40 / 6.44 (1 ×) Enercon E-70 E4 (3 ×) Nordex N60 / 1300 ? (2 ×) Enercon E-66 / 15.66 ? (1 ×) Vestas V52-850kW ? (1 ×)
|
drain Jeesewitz
|
TDO L
|
51 ° 13 '22 "N, 12 ° 55' 22" E
|
Energy systems FB
|
|
Am Geyersberg wind farm (Ramsdorf wind farm, Schleenhain wind farm)
|
2002 2003 2009 2010
|
19.9
|
10
|
Enercon E-66 / 18.70 (5 ×) Siemens SWT-2.3-101 (3 ×) Enercon E-82 (2 ×)
|
Ramsdorf Berndorf
|
L.
|
51 ° 6 ′ 5 ″ N, 12 ° 21 ′ 12 ″ E
|
MIBRAG
|
erected next to the United Schleenhain opencast mine
|
Wind farm jump
|
1994 1995 1996
|
1.25
|
4th
|
NEG Micon M750 / 250 (3 ×) Micon M1500-500 (1 ×)
|
Jump
|
ORE
|
50 ° 38 ′ 42 "N, 13 ° 16 ′ 2" E
|
|
|
Baeyerhöhe wind farm
|
1997 2003 2004
|
8.7
|
5
|
Enercon E-66 / 15.66 (1 ×) Enercon E-66 / 18.70 (4 ×)
|
Burkhardswalde Seeligstadt
|
MEI
|
51 ° 4 ′ 20 "N, 13 ° 27 ′ 12" E
|
Boreas
|
|
Beerwalde wind farm
|
1995
|
1.25
|
5
|
NEG Micon M750 / 250 (5 ×)
|
Beerwalde
|
PIR
|
50 ° 52 ′ 36 "N, 13 ° 34 ′ 55" E
|
Boreas
|
|
Belgern wind farm
|
1997 2002
|
5.0
|
9
|
Enercon E-40 / 5.40 (4 ×) Enercon E-40 / 6.44 (5 ×)
|
Belgians
|
TDO
|
51 ° 27 '32 "N, 13 ° 7' 20" E
|
ContinoWind, meridian
|
|
Bernsbach wind farm
|
1994
|
0.3
|
3
|
Vestas V20-100kW (3 ×)
|
Bernsbach
|
ORE
|
50 ° 34'26 "N, 12 ° 47'5" E
|
|
Dismantling in September 2014 and reconstruction in Italy
|
Bernsdorf wind farm
|
2001
|
3.0
|
3
|
NEG Micon NM60 / 1000 (3 ×)
|
Bernsdorf
|
BZ
|
51 ° 23 ′ 5 "N, 14 ° 5 ′ 21" E
|
|
|
Bernsdorf-Gersdorf wind farm
|
1998 2012 2017 2019 2020
|
29.6
|
15th
|
Nordex N54 / 1000 (8 ×) Vestas V90-2MW (1 ×) Enercon E-92 (1 ×) Vestas V112-3.45MW (1 ×) Vestas V126-3.45MW (4 ×)
|
Bernsdorf Gersdorf Hohndorf
|
Z
|
50 ° 45 ′ 28 "N, 12 ° 40 ′ 34" E
|
East wind, sabowind
|
Repowering 2019/2020: Vestas V126-3.45MW (3 ×) instead of Nordex N54 / 1000 (1 ×)
|
Bernstadt wind farm
|
2003
|
10.8
|
6th
|
Enercon E-66 / 18.70 (6 ×)
|
Bernstadt ad Eigen
|
GR
|
51 ° 2 ′ 5 "N, 14 ° 49 ′ 21" E
|
WP Bernstadt
|
|
Wind farm BMW plant Leipzig
|
2012 2013
|
10.0
|
4th
|
Nordex N100 / 2500 (4 ×)
|
Leipzig-Plaussig
|
L.
|
51 ° 24 '14 "N, 12 ° 26' 12" E
|
wpd
|
|
Bockelwitz wind farm
|
1999
|
15.0
|
10
|
Tacke TW 1.5i (6 ×) Tacke TW 1.5s (4 ×)
|
Bockelwitz
|
FG
|
51 ° 11 ′ 34 "N, 12 ° 59 ′ 5" E
|
east wind
|
|
Bockwitz wind farm
|
2000 2010
|
3.5
|
4th
|
Enercon E-40 / 5.40 (3 ×) Enercon E-82 (1 ×)
|
Bockwitz
|
L.
|
51 ° 7 ′ 31 ″ N, 12 ° 53 ′ 12 ″ E
|
|
|
Breitenau wind farm
|
1996 2002
|
1.6
|
3
|
Enercon E-40 / 5.40 (2 ×) Enercon E-40 / 6.44 (1 ×)
|
Breitenau
|
PIR
|
50 ° 48 '25 "N, 13 ° 53' 22" E
|
|
|
Burkau wind farm
|
2002 2009 2016 2017
|
14.95
|
7th
|
DeWind D8 80/2000 (2 ×) Vestas V90-2MW (1 ×) REpower MM82 (1 ×) Enercon E-70 E4 (3 ×)
|
Burkau
|
BZ
|
51 ° 10 ′ 8 ″ N, 14 ° 12 ′ 0 ″ E
|
Wind world, Notus energy
|
|
Butterberg wind farm
|
2000
|
4.5
|
3
|
GE Wind Energy 1.5sl (2 ×) REpower MD70 (1 ×)
|
Grottewitz
|
L.
|
51 ° 14 ′ 19 ″ N, 12 ° 49 ′ 5 ″ E
|
|
|
Casabra wind farm
|
2004 2007 2015 2016
|
41.3
|
17th
|
Vestas V80-2MW (7 ×) Vestas V90-2MW (3 ×) Vestas V112-3.0MW (4 ×) Siemens SWT-3.2-113 (3 ×)
|
Casabra
|
TDO
|
51 ° 14 ′ 42 "N, 13 ° 8 ′ 46" E
|
|
2016 repowering (3 × Siemens SWT-3.2-113 instead of 1 × Vestas V80-2MW )
|
Chemnitz-Rabenstein wind farm
|
2001 2011
|
10.6
|
7th
|
DeWind D6 62/1000 (2 ×) DeWind D4 48/600 (1 ×) Enercon E-82 (4 ×)
|
Rabenstein
|
C.
|
50 ° 50 ′ 20 "N, 12 ° 49 ′ 30" E
|
Eins Energie in Sachsen , wpd
|
|
Clausnitz wind farm
|
1995 1996 2017
|
5.2
|
6th
|
Vestas V39-500kW (1 ×) Vestas V44-600kW (2 ×) Tacke TW 600 (2 ×) Enercon E-70 E4 (1 ×)
|
Clausnitz
|
FG
|
50 ° 45 ′ 8 ″ N, 13 ° 28 ′ 16 ″ E
|
|
Repowering 2016: Enercon E-70 E4 (1 ×) instead of Vestas V39-500kW ? (1 ×)
|
Colmnitz wind farm
|
1995 1996 1999 2003
|
4.8
|
6th
|
Tacke TW 600 (1 ×) Tacke TW 600a (3 ×) Vestas V44-600kW (1 ×) Enercon E-66 / 18.70 (1 ×)
|
Colmnitz
|
PIR
|
50 ° 54 ′ 13 ″ N, 13 ° 31 ′ 19 ″ E
|
|
|
Dennheritz wind farm
|
2005 2018
|
7.55
|
3
|
REpower MM82 (2 ×) Vestas V117-3.45MW (1 ×)
|
Dennheritz
|
Z
|
50 ° 49 ′ 38 "N, 12 ° 29 ′ 0" E
|
Sabowind
|
erected on the A 4
|
Diethensdorf wind farm
|
1996 2000
|
2.6
|
3
|
AN Bonus 600/44 (1 ×) Enercon E-58 (2 ×)
|
Diethensdorf
|
FG
|
50 ° 57 ′ 17 "N, 12 ° 51 ′ 8" E
|
|
|
Dittelsdorf wind farm
|
1997 1998 2008 2011
|
12
|
5
|
Enercon E-40 / 5.40 (5 ×) Vestas V90-2MW (3 ×) Vestas V90-3MW (2 ×)
|
Dittelsdorf
|
GR
|
50 ° 57 ′ 7 "N, 14 ° 50 ′ 26" E
|
Ventotec
|
Repowering 2011: Vestas V90-3MW (2 ×) instead of Enercon E-40 / 5.40 (5 ×)
|
Dittmannsdorf wind farm
|
1993 1999 2004
|
3.1
|
6th
|
Enercon E-40 / 5.40 (5 ×) Enercon E-44-0.6MW (1 ×)
|
Dittmannsdorf
|
ORE
|
50 ° 41 ′ 28 "N, 13 ° 23 ′ 34" E
|
Sabowind
|
1 × Tacke TW 600a and 1 × Südwind N3127 / 270 now dismantled
|
Döbernitz wind farm
|
1996 1999 2001 2002 2004
|
11.1
|
7th
|
Nordex N52 / 800 (1 ×) Nordex N54 / 1000 (2 ×) Enercon E-66 / 18.70 (4 ×)
|
Döbernitz Hohenroda
|
TDO
|
51 ° 30 ′ 7 "N, 12 ° 35 ′ 20" E
|
Energy source , terrawatt
|
|
Dörnthal-Voigtsdorf wind farm (Saidenberg wind farm)
|
1994 1995 1999 2001 2002 2008
|
40.4
|
25th
|
Tacke TW 600 (1 ×) Vestas V39-500kW (1 ×) Enercon E-44-0.6MW (1 ×) Enercon E-66 / 15.66 (9 ×) Enercon E-66 / 18.70 (4 ×) Enercon E- 82 (9 ×)
|
Dörnthal Voigtsdorf
|
FG ERZ
|
50 ° 44 ′ 57 "N, 13 ° 21 ′ 14" E
|
|
|
Ebersgrün wind farm (Pausa wind farm)
|
2013
|
8.2
|
4th
|
REpower MM92 (4 ×)
|
Boar green
|
V
|
50 ° 34 '26 "N, 12 ° 1' 23" E
|
WKN Windkraft Nord
|
|
Eichardthöhe wind farm
|
1996 1997 2001
|
3.3
|
5
|
Enercon E-40 / 5.40 (2 ×) Vestas V44-600kW (1 ×) Vestas V52-850kW (2 ×)
|
Eichardt
|
FG
|
51 ° 10 ′ 35 "N, 13 ° 0 ′ 29" E
|
|
|
Elsdorf wind farm (incl. Penig-Lunzenau wind farm)
|
1995 2003 2005 2012
|
12.4
|
11
|
Tacke TW 600 (6 ×) Enercon E-48 (1 ×) Enercon E-66 / 18.70 (2 ×) Enercon E-70 E4 (1 ×) Enercon E-82 E2 (1 ×)
|
Niederelsdorf
|
FG
|
50 ° 58 ′ 13 ″ N, 12 ° 43 ′ 22 ″ E
|
east wind
|
|
Elsterheide wind farm
|
2006 2020
|
22.0
|
11
|
Vestas V90-2MW (11 ×)
|
Elsterheide Hoyerswerda
|
BZ
|
51 ° 28 ′ 14 "N, 14 ° 19 ′ 10" E
|
Boreas
|
|
Erlau-Frankenau wind farm
|
2000 2002 2009 2010 2012 2014
|
19.01
|
11
|
Vestas V47-660kW (1 ×) Vestas V52-850kW (1 ×) Vestas V80-2MW (1 ×) Enercon E-53 (1 ×) Enercon E-66 / 18.70 (3 ×) Enercon E-82 (2 ×) Enercon E-82 E2 (1 ×) Enercon E-101 (1 ×)
|
Erlau
|
FG
|
51 ° 0 ′ 32 "N, 12 ° 55 ′ 20" E
|
Energy systems FB
|
including V52 single system in the south of Erlau
|
Erlbach-Kirchberg wind farm
|
1996 2010
|
3.3
|
3
|
North tank NTK 500/41 ? (2 ×) Enercon E-70 E4 (1 ×)
|
Erlbach-Kirchberg
|
ORE
|
50 ° 46 ′ 25 "N, 12 ° 43 ′ 34" E
|
Sabowind
|
|
Eulendorf wind farm
|
1999
|
1.8
|
3
|
DeWind D4 48/600 (3 ×)
|
Owl Village
|
FG
|
50 ° 56 '18 "N, 13 ° 7' 24" E
|
|
|
Frauenberg wind farm (Niederfrauenberg wind farm, Reinholdshain wind farm)
|
1999 2004
|
9.5
|
6th
|
Enercon E-66 / 15.66 (5 ×) Enercon E-70 (1 ×)
|
Misery Oberfrauendorf
|
PIR
|
50 ° 52 ′ 22 "N, 13 ° 42 ′ 11" E
|
WSB
|
|
Fraureuth wind farm
|
1996 1997 2002 2005 2015
|
3.7
|
5
|
Vestas V44-600kW (2 ×) Enercon E-53 (1 ×) Vestas V52-850kW (2 ×)
|
Fraureuth
|
Z
|
50 ° 39 '56 "N, 12 ° 20' 53" E
|
|
|
Gornau wind farm
|
1996 1999 2008
|
3.86
|
4th
|
Vestas V44-600kW (2 ×) Vestas V47-660kW (1 ×) Vestas V80-2MW (1 ×)
|
Gronau
|
ORE
|
50 ° 45 ′ 4 ″ N, 13 ° 2 ′ 1 ″ E
|
|
|
Großhaenchen wind farm
|
2001
|
8.0
|
4th
|
DeWind D8 80/2000 (4 ×)
|
Big boy
|
BZ
|
51 ° 11 ′ 16 ″ N, 14 ° 15 ′ 8 ″ E
|
|
|
Großlehna wind farm
|
2001 2004 2015
|
9.2
|
6th
|
Enercon E-66 / 18.70 (2 ×) Enercon E-66 / 20.70 (1 ×) Enercon E-70 (1 ×) Enercon E-53 (2 ×)
|
Großlehna
|
L.
|
51 ° 18 ′ 33 ″ N, 12 ° 9 ′ 12 ″ E
|
Energy source , terrawatt
|
erected on the A 9
|
Großtreben-Zwethau wind farm
|
2006
|
5.2
|
4th
|
AN Bonus 1300/62 (4 ×)
|
Großtreben-Zwethau
|
TDO
|
51 ° 38 ′ 57 "N, 13 ° 0 ′ 11" E
|
|
|
Heidersdorf wind farm
|
before 2001
|
3.5
|
7th
|
Enercon E-40 / 5.40 (7 ×)
|
Heidersdorf
|
ORE
|
50 ° 40 ′ 44 "N, 13 ° 23 ′ 16" E
|
|
|
Heynitz-Wendischbora wind farm
|
2000 2002 2003 2017
|
28.0
|
17th
|
NEG Micon NM60 / 1000 (5 ×) Vestas V66-1.65MW (5 ×) Vestas V80-2MW (6 ×) GE Wind Energy 2.75-120 (1 ×)
|
Mahlitzsch Wendischbora Wunschwitz
|
MEI
|
51 ° 4 ′ 23 "N, 13 ° 21 ′ 25" E
|
Ventotec
|
|
Hilmersdorf wind farm
|
2002 2014 2019
|
8.2
|
6th
|
Enercon E-40 / 5.40 (2 ×) Enercon E-44-0.6MW (2 ×) Enercon E-101 (1 ×) Enercon E-115 (1 ×)
|
Hilmersdorf
|
ORE
|
50 ° 39 '56 "N, 13 ° 7' 16" E
|
|
|
Hirtstein wind farm (wind farm statutes)
|
1992
|
0.95
|
4th
|
Micon M530-250 (2 ×) Vestas V27-225kW (2 ×)
Lagerwey LW15 / 75 (1 ×)
|
statute
|
ORE
|
50 ° 32 ′ 1 ″ N, 13 ° 11 ′ 15 ″ E
|
Boreas, Saxon Force
|
first wind farm in Saxony,
Lagerwey plant already dismantled, repowering planned
|
Hoyersdorf wind farm
|
1996 2000
|
1.86
|
3
|
Vestas V44-600kW (2 ×) Vestas V47-660kW (1 ×)
|
Hoyersdorf Reinsdorf
|
FG
|
51 ° 4 ′ 4 "N, 12 ° 57 ′ 6" E
|
Energy systems FB
|
|
Jöhstadt wind farm
|
1994 1996 1997 2006
|
7.55
|
14th
|
Enercon E-40 / 5.40 (5 ×) Nordex N27 / 250 (3 ×) NEG Micon M750 / 400 ( 3 × 2 ×) Vestas V39-500kW (3 ×) Enercon E-70 (1 ×)
|
Jöhstadt
|
ORE
|
50 ° 30 ′ 23 "N, 13 ° 4 ′ 31" E
|
Boreas, WP Jöhstadt
|
a Micon system dismantled in 2012, repowering planned
|
Kaiserburg wind farm (Waldheim-Gebersbach wind farm)
|
1997
|
1.8
|
3
|
North tank NTK 600/43 (3 ×)
|
Gebersbach
|
FG
|
51 ° 5 ′ 9 ″ N, 13 ° 3 ′ 2 ″ E
|
Energy systems FB
|
|
Kittlitz wind farm
|
1993 2006 2008 2012
|
6.8
|
4th
|
Enercon E-40 / 5.40 (1 ×) Enercon E-82 (2 ×) Enercon E-70 E4 (1 ×)
|
Kittlitz
|
GR
|
51 ° 7 ′ 22 ″ N, 14 ° 39 ′ 8 ″ E
|
|
|
Knautkleeberg wind farm
|
1996 2006
|
2.25
|
3
|
Tacke TW 600e (1 ×) Enercon E-48 (1 ×) Vestas V52-850kW (1 ×)
|
Leipzig-Knautkleeberg
|
L.
|
51 ° 17 ′ 11 "N, 12 ° 16 ′ 28" E
|
Zopf GmbH
|
|
Kölsa wind farm
|
1998
|
2.64
|
4th
|
Vestas V47-660kW (4 ×)
|
Kölsa
|
TDO
|
51 ° 29 ′ 2 ″ N, 12 ° 13 ′ 26 ″ E
|
wpd , braid
|
|
Kuhschnappel wind farm
|
1996 2001 2002 2005
|
2.5
|
3
|
Enercon E-48 (1 ×) Vestas V52-850kW (2 ×)
|
Cow snappers
|
Z
|
50 ° 48 ′ 32 "N, 12 ° 38 ′ 2" E
|
eab, east wind
|
Repowering 2005: Enercon E-48 (1 ×) instead of Tacke TW 600a (1 ×);
Tacke TW 600a (3 ×) have now been dismantled
|
Leippe wind farm
|
2001
|
1.8
|
3
|
Jacobs J48-0.6MW (3 ×)
|
Leippe
|
BZ
|
51 ° 24 '35 "N, 14 ° 3' 9" E
|
|
|
Leuben-Schleinitz wind farm
|
2000 2001 2003
|
4.0
|
4th
|
Enercon E-58 (4 ×)
|
Leuben-Schleinitz
|
MEI
|
51 ° 8 ′ 30 ″ N, 13 ° 19 ′ 20 ″ E
|
WHS Gesellschaft für Energietechnik mbH & Co.
|
|
Leubsdorf wind farm
|
1995 2003
|
4.1
|
3
|
Vestas V39-500kW (1 ×) Enercon E-66 / 18.70 (2 ×)
|
Leubsdorf
|
FG
|
50 ° 47 ′ 37 "N, 13 ° 11 ′ 28" E
|
|
|
Leutersdorf wind farm
|
1995 1997
|
3.6
|
6th
|
Tacke TW 600 (4 ×) Tacke TW 600 (1 ×) NEG Micon NM48 / 600 (1 ×)
|
Leuterdsorf
|
GR
|
50 ° 57 ′ 38 "N, 14 ° 37 ′ 43" E
|
|
|
Limbach-Oberfrohna wind farm
|
1997 2000 2003
|
2.7
|
3
|
Tacke TW 600a (2 ×) GE Wind Energy 1.5sl (1 ×)
|
Russdorf
|
Z
|
50 ° 51 ′ 9 "N, 12 ° 42 ′ 35" E
|
east wind
|
|
Littdorf wind farm
|
2000 2012
|
12.8
|
8th
|
Enron Wind 1.5s (7 ×) Enercon E-70 E4 (1 ×)
|
Littdorf
|
FG
|
51 ° 3 ′ 28 ″ N, 13 ° 7 ′ 8 ″ E
|
Sabowind, east wind
|
|
Ludwigsdorf wind farm
(incl. Stöpstal wind farm)
|
2000 2001 2002 2004 2009 2010 2011
|
52.0
|
29
|
Enercon E-66 / 15.66 (8 ×) Enercon E-66 / 18.70 (10 ×) Enercon E-70 (10 ×) Enercon E-82 (1 ×)
|
Ludwigsdorf
|
GR
|
51 ° 12 ′ 0 ″ N, 14 ° 58 ′ 13 ″ E
|
WSB, Drewag
|
|
Lüptitz wind farm
|
1996
|
2.0
|
4th
|
Enercon E-40 / 5.40 (4 ×)
|
Lüptitz
|
L.
|
51 ° 23 ′ 6 "N, 12 ° 47 ′ 3" E
|
|
|
Maltitz wind farm
|
1999 2000 2002
|
1.86
|
3
|
Vestas V47-660kW (1 ×) Enercon E-40 / 6.44 (2 ×)
|
Maltitz
|
L.
|
51 ° 5 ′ 32 "N, 12 ° 17 ′ 3" E
|
Terrawatt, Zopf GmbH
|
|
Mark Sahnau wind farm
|
2009 2010 2015
|
7.3
|
3
|
REpower MM92 (2 ×) Senvion 3.2M114 (1 ×)
|
Crimmitschau
|
Z
|
50 ° 50 ′ 5 ″ N, 12 ° 21 ′ 1 ″ E
|
EST
|
|
Mautitz wind farm
|
1998 2001 2014 2018
|
37.4
|
11
|
DeWind D4 48/600 (5 ×) Enercon E-101 (4 ×) Siemens SWT -3.6-130 (7 ×)
|
Mautitz
|
MEI
|
51 ° 16 ′ 28 "N, 13 ° 12 ′ 26" E
|
Mautitz South Wind Farm; Updraft
|
Repowering 2014: Enercon E-101 (4 ×) instead of DeWind D4 48/600 (5 ×)
|
Melaune wind farm
|
1999 2000 2001 2014
|
13.55
|
8th
|
Tacke TW 1.5s (3 ×) Jacobs Energie MD70 (4 ×) Enercon E-101 (1 ×)
|
Melaune
|
GR
|
51 ° 10 ′ 35 "N, 14 ° 43 ′ 21" E
|
Boreas, Sabowind
|
|
Misslareuth wind farm
|
2009 2018
|
17.7
|
6th
|
REpower MM92 (2 ×) Senvion 3.4M114 (4 ×)
|
Misslareuth
|
V
|
50 ° 26 '13 "N, 11 ° 54' 48" E
|
|
|
Mochau wind farm (Döbeln-Simselwitz wind farm)
|
2000 2003 2010 2014
|
10.05
|
7th
|
NEG Micon NM60 / 1000 (3 ×) GE Wind Energy 1.5sl (2 ×) REpower MM92 (1 ×) Vestas V90-2MW (1 ×)
|
Mochau
|
FG
|
51 ° 7 ′ 30 ″ N, 13 ° 10 ′ 8 ″ E
|
eab new energy, Sabowind
|
erected on the A 14
|
Mohorn wind farm
|
1996 2002 2011 2014 2017
|
7.25
|
4th
|
Enercon E-40 / 6.44 (1 ×) Enercon E-70 (1 ×) Enercon E-70 E4 (1 ×) Enercon E-92 (1 ×)
|
Mohorn
|
PIR
|
50 ° 59 ′ 19 ″ N, 13 ° 27 ′ 10 ″ E
|
eab, ENSO
|
Repowering 2014: Enercon E-70 (1 ×) instead of Enercon E-40 / 5.40 (1 ×)
|
Neuhermsdorf wind farm
|
1995 1997
|
1.5
|
3
|
Enercon E-40 / 5.40 (3 ×)
|
Neuhermsdorf
|
PIR
|
50 ° 44 '26 "N, 13 ° 38' 51" E
|
|
|
Nossen wind farm (Zellsteig wind farm, Augustusberg wind farm)
|
1997 1998
|
3.12
|
5
|
Vestas V44-600kW (3 ×) Vestas V47-660kW (2 ×)
|
Nossen
|
MEI
|
51 ° 2 ′ 44 "N, 13 ° 17 ′ 23" E
|
VSB
|
|
Oberseifersdorf-Eckartsberg wind farm
|
2002 2003 2005
|
13.8
|
8th
|
Enercon E-40 / 6.44 (1 ×) Enercon E-66 / 18.70 (4 ×) Enercon E-70 (3 ×)
|
Oberseifersdorf Eckartsberg
|
GR
|
50 ° 55 ′ 59 "N, 14 ° 48 ′ 59" E
|
Boreas
|
|
Ostritz wind farm
|
1997 2004 2006
|
14.0
|
9
|
Enercon E-40 / 5.40 (2 ×) Enercon E-66 / 15.66 (2 ×) Enercon E-70 (5 ×)
|
Ostritz
|
GR
|
51 ° 2 ′ 42 "N, 14 ° 55 ′ 55" E
|
|
|
Pegau wind farm
|
1999 2006 2009 2011
|
10.9
|
9
|
Nordex N29 / 250 (4 ×) Vestas V90-2MW (1 ×) Enercon E-70 E4 (2 ×) Enercon E-53 (1 ×) REpower MM92 (1 ×)
|
Pegau
|
L.
|
51 ° 10 ′ 25 ″ N, 12 ° 14 ′ 3 ″ E
|
eab new energy, heliotec, EuroWind, Sabowind
|
|
Penig-Markersdorf wind farm
|
1996 2006 2007 2009 2016
|
21.9
|
15th
|
Tacke TW 600 (6 ×) Enercon E-82 (4 ×) Enercon E-70 (4 ×) Enercon E-82 E2 (1 ×)
|
Penig-Markersdorf Dürrengerbisdorf
|
FG Z
|
50 ° 55 ′ 32 "N, 12 ° 39 ′ 12" E
|
East wind, sabowind
|
|
Pfaffengrün wind farm
|
2004 2005 2016
|
6.9
|
4th
|
REpower MD77 (3 ×) Nordex N117 / 2400 (1 ×)
|
Pfaffengrün
|
V
|
50 ° 34 '8 "N, 12 ° 16' 26" E
|
Orb
|
|
Puschwitz wind farm
|
2001 2002
|
20.0
|
10
|
Vestas V80-2MW (10 ×)
|
Puschwitz Neschwitz
|
BZ
|
51 ° 14 ′ 23 "N, 14 ° 18 ′ 5" E
|
Ventotec
|
|
Querbitzsch wind farm
|
1997
|
1.5
|
3
|
Enercon E-40 / 5.40 (3 ×)
|
Querbitzsch
|
TDO
|
51 ° 14 ′ 15 "N, 12 ° 57 ′ 16" E
|
|
|
Rackwitz wind farm
|
1996 1997 1998 1999 2006 2015
|
18.7
|
22nd
|
Tacke TW 600e (3 ×) Vestas V44-600kW (10 ×) Vestas V47-660kW (5 ×) Südwind S70 (2 ×) Enercon E-70 E4 (2 ×)
|
Pintuck Kletzen Rackwitz
|
TDO
|
51 ° 27 '17 "N, 12 ° 23' 1" E
|
ContinoWind, meridian, Sabowind
|
|
Rehbach-Knautnaundorf wind farm
|
1999 2006
|
8.55
|
7th
|
Enercon E-66 / 15.66 (4 ×) Gamesa G58-850kW (3 ×)
|
Leipzig-Knautnaundorf Leipzig-Rehbach
|
L.
|
51 ° 15 ′ 28 "N, 12 ° 15 ′ 14" E
|
Green Energy 3000; Zopf GmbH
|
erected on both sides of the A 38
|
Reichenbach wind farm
|
1996 1999 2001 2006 2009 2010 2017
|
17.45
|
10
|
Enercon E-40 / 5.40 (1 ×) Enercon E-66 / 15.66 ( 5 × 4 ×) Fuhrländer FL MD77 (1 ×) Vestas V90-2MW (3 ×) Vestas V126-3.45MW (1 ×)
|
Reichenbach
|
GR
|
51 ° 8 ′ 26 "N, 14 ° 46 ′ 17" E
|
wpd , Boreas, DREWAG
|
Repowering 2009–2010: Vestas V90-2MW (3 ×) instead of Enercon E-40 / 5.40 (1 ×)
Repowering 2017: Vestas V126-3.45MW (1 ×) instead of Enercon E-66 / 15.66 (1 ×)
|
Reinholdshainer Höhe wind farm (Hausdorf wind farm)
|
1997 2001
|
3.0
|
5
|
Vestas V44-600kW (2 ×) Enercon E-40 / 6.44 (3 ×)
|
House village
|
PIR
|
50 ° 54 ′ 4 "N, 13 ° 47 ′ 26" E
|
WSB
|
|
Reinsdorf wind farm
|
2005 2009 2016 2017
|
11.4
|
5
|
Vestas V66-1.65MW (1 ×) GE Wind Energy 1.5sl (2 ×) Vestas V117-3.45MW (1 ×) Vestas V126-3.3MW (1 ×)
|
Reinsdorf
|
Z
|
50 ° 40 '25 "N, 12 ° 33' 39" E
|
|
erected on the A 72
|
Rennersdorf wind farm (incl. Schmiedefeld wind farm)
|
2002 2011
|
5.0
|
6th
|
Vestas V52-850kW (4 ×) Enercon E-53 (2 ×)
|
Rennersdorf-Neudörfel Schmiedefeld
|
PIR BZ
|
51 ° 4 '22 "N, 14 ° 3' 4" E
|
vento ludens, Sabowind
|
|
Röhrsdorf wind farm
|
1998 1999 2001
|
2.64
|
4th
|
Vestas V47-660kW (4 ×)
|
Röhrsdorf
|
BZ
|
51 ° 17 ′ 31 ″ N, 13 ° 48 ′ 21 ″ E
|
VSB
|
|
Rossau wind farm
|
1998 1999 2005 2011 2012 2019?
|
17.8
|
14th
|
Vestas V47-660kW (5 ×) NEG Micon NM60 / 1000 (2 ×) AN Bonus 1000/54 (1 ×) Enercon E-40 / 6.44 (1 ×) Enercon E-82 E2 (2 ×) Enercon E-70 E4 (1 ×) Vestas V90-2MW (2 ×)
|
Rossau Kriebstein
|
FG
|
50 ° 58 ′ 28 ″ N, 13 ° 1 ′ 16 ″ E
|
Sabowind, energy systems FB
|
|
Rothenfurth-Großschirma wind farm
|
2002 2011 2013
|
14.2
|
7th
|
Enercon E-66 / 18.70 (2 ×) Enercon E-82 (3 ×) Enercon E-82 E2 (2 ×)
|
Rothenfurth Neck Bridge
|
FG
|
50 ° 58 ′ 11 ″ N, 13 ° 20 ′ 1 ″ E
|
WSB, Sabowind
|
|
Rübenau wind farm
|
1995
|
0.45
|
3
|
AN Bonus 150/30 (3 ×)
|
Rübenau
|
ORE
|
50 ° 35 ′ 9 ″ N, 13 ° 18 ′ 38 ″ E
|
|
an AN bonus system already dismantled
|
Ruppersdorf wind farm
|
2003 2004
|
8.2
|
4th
|
REpower MM82 (4 ×)
|
Ruppersdorf
|
GR
|
51 ° 0 ′ 38 "N, 14 ° 43 ′ 5" E
|
|
|
Sadisdorf-Hennersdorf wind farm
|
1997 1999 2009
|
4.7
|
6th
|
Tacke TW 600a (2 ×) Enercon E-40 / 5.40 (3 ×) Enercon E-70 E4 (1 ×)
|
Sadisdorf Hennersdorf
|
PIR
|
50 ° 49 '30 "N, 13 ° 38' 12" E
|
eab
|
|
Saubusch wind farm
|
2000 2001 2002
|
33.3
|
21st
|
Enron Wind 1.5s (15 ×) Enercon E-66 / 18.70 (6 ×)
|
Böhrigen Marbach
|
FG
|
51 ° 2 ′ 5 "N, 13 ° 11 ′ 34" E
|
east wind
|
|
Schanzberg wind farm
|
1998 2002
|
1.5
|
3
|
Enercon E-40 / 5.40 (3 ×)
|
Oberseifersdorf
|
GR
|
50 ° 57 ′ 14 "N, 14 ° 48 ′ 22" E
|
Boreas
|
an Enercon system has already been dismantled
|
Scheibe-Trattendorf wind farm
|
2004
|
10.25
|
5
|
REpower MM82 (5 ×)
|
Castle latch
|
BZ
|
51 ° 26 ′ 31 ″ N, 14 ° 22 ′ 6 ″ E
|
east wind
|
|
Schkortitz wind farm
|
1994 1995 1997 2005
|
3.1
|
5
|
Enercon E-40 / 5.40 (3 ×) Enercon E-48 (1 ×) Enercon E-53 (1 ×)
|
Schkortitz Bröhsen
|
L.
|
51 ° 13 ′ 5 "N, 12 ° 47 ′ 27" E
|
|
|
Schmohlhöhe wind farm
|
2012 2015
|
12.0
|
6th
|
Enercon E-82 (6 ×)
|
Bobritzsch-Hilbersdorf
|
FG
|
50 ° 55 ′ 9 ″ N, 13 ° 24 ′ 35 ″ E
|
|
|
Schuleberg wind farm
|
1996 2008
|
5.2
|
4th
|
Vestas V44-600kW (2 ×) Vestas V90-2MW (2 ×)
|
Lauterbach Langenhessen
|
Z
|
50 ° 45 ′ 44 "N, 12 ° 23 ′ 45" E
|
|
|
Silberberg wind farm (Mutzschen-Gastewitz wind farm)
|
2004 2005 2006 2018
|
23.95
|
11
|
Vestas V90-2MW (7 ×) Enercon E-92 (1 ×) Senvion MM100 (2 ×) Siemens SWT-3.6-136 (1 ×)
|
Gastewitz
|
L.
|
51 ° 15 ′ 11 "N, 12 ° 50 ′ 29" E
|
Terrawatt; E.ON Climate Renewables
|
erected on the A 14
|
Sion wind farm
|
1999 2008 2009
|
6.5
|
4th
|
Tacke TW 1.5s (3 ×) Vestas V90-2MW (1 ×)
|
Manners
|
FG
|
51 ° 12 ′ 34 "N, 12 ° 55 ′ 33" E
|
Ventotec, eab
|
Tacke TW 1.5s (4 ×) already dismantled
|
Sohland wind farm
|
2001 2002 2006 2017
|
18.6
|
9
|
REpower MD70 (4 ×) Vestas V90-2MW (3 ×) Vestas V126-3.3MW (2 ×)
|
Sohland am Rotstein
|
GR
|
51 ° 5 ′ 25 ″ N, 14 ° 48 ′ 19 ″ E
|
Boreas
|
Repowering 2017: Vestas V126-3.3MW (2 ×) instead of REpower MD70 (1 ×)
|
Stolpen-Lauterbach wind farm
|
1998 2000 2002
|
1.8
|
3
|
Südwind S46 / 600 (2 ×) Enercon E-40 / 6.44 (1 ×)
|
Lauterbach
|
PIR
|
51 ° 3 ′ 17 ″ N, 14 ° 8 ′ 25 ″ E
|
|
|
Streumen wind farm
|
1998 2001 2011 2013 2015 2016 2017 2019
|
43.25
|
18th
|
DeWind D4 48/600 (3 ×) Vestas V52-850kW ( 16 × 4 ×) Enercon E-82 E2 (1 ×) Vestas V90-2MW (4 ×) Enercon E-101 (2 ×) Vestas V126-3.3MW ( 5 ×) Vestas V126-3.6MW (1 ×) Vestas V112-3.3MW (1 ×)
|
Marksiedlitz Streumen
|
MEI
|
51 ° 20 ′ 33 "N, 13 ° 22 ′ 23" E
|
Aufwind, Green Energy 3000, eab, Energieanlagen FB, Sabowind, WEB, ENSO
|
Repowering 2013/14: Vestas V90-2MW (4 ×) instead of Vestas V52-850kW (4 ×)
Repowering 2015: Enercon E-101 (2 ×) instead of DeWind D4 48/600 (2 ×)
Repowering 2016: Vestas V126-3.3MW (4 ×) instead of Vestas V52-850kW (8 ×)
Repowering 2017: Vestas V126-3.3MW instead of DeWind D4 48/600 (1 ×)
|
Strölla wind farm
|
1998
|
1.5
|
3
|
Enercon E-40 / 5.40 (3 ×)
|
Strölla
|
FG
|
51 ° 9 ′ 18 "N, 13 ° 4 ′ 38" E
|
|
|
Tautenhain wind farm
|
1996 2003 2012
|
4.1
|
5
|
Enercon E-40 / 5.40 (3 ×) Enercon E-66 / 18.70 (1 ×) Enercon E-53 (1 ×)
|
Tautenhain
|
L.
|
51 ° 5 ′ 21 ″ N, 12 ° 41 ′ 32 ″ E
|
Terrawatt
|
|
Thonberg wind farm
|
2001 2002 2010
|
15.2
|
13
|
Enercon E-40 / 6.44 (4 ×) REpower MD77 (8 ×) Enercon E-53 (1 ×)
|
Prietitz Miltitz
|
BZ
|
51 ° 14 ′ 15 ″ N, 14 ° 9 ′ 8 ″ E
|
Umweltkontor, Bürger-WP Thonberg
|
|
Thräna wind farm
|
2006
|
6.0
|
3
|
Vestas V90-2MW (3 ×)
|
Thrana
|
L.
|
51 ° 4 ′ 23 "N, 12 ° 28 ′ 31" E
|
MBBF
|
|
Threna-Fuchshain wind farm
|
2000 2006
|
2.8
|
4th
|
Enercon E-40 / 6.44 (2 ×) Enercon E-48 (2 ×)
|
Threna Foxhain
|
L.
|
51 ° 16 ′ 3 ″ N, 12 ° 31 ′ 30 ″ E
|
Energy source; Terrawatt
|
|
Tummelberg wind farm (Lommatzsch wind farm)
|
2002 2006 2009 2016
|
18.4
|
9
|
Enercon E-66 / 18.70 (2 ×) Enercon E-70 (5 ×) Enercon E-92 (2 ×)
|
Altlommatzsch Barmenitz
|
MEI
|
51 ° 12 ′ 42 "N, 13 ° 16 ′ 54" E
|
VSB
|
|
Wachau wind farm
|
1995 2000 2011
|
5.8
|
7th
|
Nordex N29 / 250 (2 ×) Enercon E-40 / 6.44(2 ×) Enercon E-70 E4(2 ×)
|
Wachau
|
BZ
|
51 ° 9 ′ 16 ″ N, 13 ° 55 ′ 9 ″ E
|
ENSO
|
the two N29 systems and one of the E-40 systems have already been dismantled
|
Wadewitz wind farm
|
1996
|
2.4
|
4th
|
Enercon E-40 / 6.44 (4 ×)
|
Wadewitz
|
TDO
|
51 ° 23 ′ 2 ″ N, 12 ° 47 ′ 5 ″ E
|
|
|
Weigmannsdorf-Berthelsdorf wind farm
|
2002 2011
|
9.5
|
5
|
GE Wind Energy 1.5sl ? (3 ×) Enercon E-82 (2 ×)
|
Weigmannsdorf
Berthelsdorf
|
FG
|
50 ° 50 ′ 34 "N, 13 ° 22 ′ 5" E
|
Sabowind
|
|
Wetterhöhe wind farm
|
1995 1996 2002
|
2.8
|
3
|
Enercon E-40 / 5.40 (2 ×) Enercon E-66 / 18.70 (1 ×)
|
Horse wine
|
FG
|
51 ° 4 ′ 58 ″ N, 13 ° 13 ′ 13 ″ E
|
|
|
Wölkisch wind farm
|
2015 2016
|
20.5
|
10
|
REpower MM92 (10 ×)
|
Lautzschen Lobschütz Wölkisch
|
MEI
|
51 ° 13 ′ 3 ″ N, 13 ° 20 ′ 52 ″ E
|
VSB
|
|
Zaasch-Rödgen wind farm
|
1998 1999 2000 2007 2011
|
11.52
|
15th
|
Vestas V47-660kW (12 ×) Enercon E-53 (2 ×)
Enercon E-70 (1 ×)
|
Rödgen Zaasch
|
TDO
|
51 ° 33 ′ 7 ″ N, 12 ° 17 ′ 15 ″ E
|
Zopf GmbH
|
|
Zerre wind farm
|
2002 2004 2006 2009
|
21.0
|
11
|
Vestas V52-850kW (1 ×)
Vestas V80-2MW (6 ×) REpower MM82 (3 ×) Enercon E-82 (1 ×)
|
Tug
|
BZ
|
51 ° 32 ′ 0 ″ N, 14 ° 24 ′ 4 ″ E
|
Ostwind, Ventotec
|
|
Zodel wind farm
|
2003 2006
|
18.9
|
11
|
GE Wind Energy 1.5sl (8 ×) Siemens SWT-2.3-93 (3 ×)
|
Neißeaue Deschka
|
GR
|
51 ° 15 ′ 26 "N, 14 ° 59 ′ 48" E
|
|
|
Zschochau wind farm
|
2000
|
1.8
|
3
|
Enercon E-40 / 6.44 (3 ×)
|
Zschochau
|
FG
|
51 ° 11 ′ 24 "N, 13 ° 12 ′ 37" E
|
|
|
Zug wind farm
|
2002 2004 2016
|
4.0
|
4th
|
Enercon E-44-0.6MW (2 ×) Enercon E-53 (1 ×) Enercon E-70 (1 ×)
|
train
|
FG
|
50 ° 53 ′ 0 ″ N, 13 ° 22 ′ 0 ″ E
|
|
|
Zwickau-Lippoldsruh wind farm
|
2006 2015
|
11.9
|
4th
|
Vestas V80-2MW (1 ×) Vestas V112-3.3MW (3 ×)
|
Zwickau
|
Z
|
50 ° 43 ′ 34 "N, 12 ° 33 ′ 15" E
|
Energy systems FB
|
|