List of wind turbines in Schleswig-Holstein
The list of wind turbines in Schleswig-Holstein provides an overview of the installed wind turbines in the federal state of Schleswig-Holstein , with a focus on the installed wind farms . Locations with three or more systems are considered wind parks. Systems with a steel lattice tower are marked in italics . As new wind turbines are constantly being built, this list does not claim to be complete.
Overview
Surname | Construction year | Total power (MW) |
number | Type (WKA) | place | agriculture circle |
Coordinates | Project planner / operator | Remarks |
---|---|---|---|---|---|---|---|---|---|
|
1993 |
|
|
|
Arkebek | HEI | 54 ° 8 ′ 34 "N, 9 ° 15 ′ 13" E | dismantled in 2015 | |
Ascheberg wind turbine | 1999 | 0.225 | 1 | Vestas V29-225kW (1 ×) | Ashberg | PLÖ | 54 ° 9 ′ 8 "N, 10 ° 19 ′ 34" E | ||
Barnitz wind turbine | 1990 | 0.08 | 1 | Enercon-17 (1 ×) | Barnitz | OD | 53 ° 48 ′ 20 "N, 10 ° 29 ′ 4" E | Stadtwerke Reinfeld | |
|
1995 |
|
|
|
Beidenfleth | IZ | 53 ° 53 ′ 11 "N, 9 ° 24 ′ 20" E | Wind turbines dismantled in 2014 | |
Bollingstedt wind turbines | 1995 2010 |
1.2 | 2 | REPower 3.4M104 (2 ×) | Bollingstedt | SL | 54 ° 35 ′ 34 "N, 9 ° 23 ′ 35" E | Geo Mbh | 2010 Repowering (2 × REPower 3.4M104 for 3 × Nordtank NTK-1500 ) |
Boren wind turbines | 1995 | 1.2 | 2 | AN Bonus 44/600 (2 ×) | Bores | SL | 54 ° 37 ′ 32 "N, 9 ° 49 ′ 29" E | 3 plants previously, one dismantled in 2014 | |
Damsdorf wind turbines | 2012 | 6.0 | 2 | Enercon E-115 (2 ×) | Damsdorf | SE | 54 ° 4 ′ 11 ″ N, 10 ° 17 ′ 24 ″ E | Thinker & Wulf | |
Eggebek wind turbine | 2012 | 2.05 | 1 | Senvion MM92 (1 ×) | Eggebek | SL | 54 ° 38 ′ 5 "N, 9 ° 20 ′ 32" E | Erected on the Eggebek solar park | |
Flensburg wind turbine | 1996 | 0.2 | 1 | Enercon E-30 / 2.30 (1 ×) | Sandberg | FL | 54 ° 46 ′ 11 "N, 9 ° 27 ′ 14" E | University of Applied Sciences Flensburg (University of Applied Sciences) | Wind turbine for teaching and research purposes |
Gammelby wind turbine | 1997 | 1.5 | 1 | North tank NTK 1500/64 (1 ×) | Gammelby | RD | 54 ° 30 ′ 8 "N, 9 ° 48 ′ 35" E | ||
Gammendorf wind turbine | 2002 | 0.66 | 1 | Vestas V47-660kW (1 ×) | Gammendorf | OH | 54 ° 29 '32 "N, 11 ° 7' 18" E | ||
Geesthacht pumping station wind turbine | 1994 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Geesthacht | RZ | 53 ° 26 ′ 10 ″ N, 10 ° 19 ′ 13 ″ E | Geesthacht energy park | Combined energy park with PSW Geesthacht and solar park |
Gelting wind turbine | 1995 | 0.6 | 1 | Tacke TW 600 (1 ×) | Gelting | SL | 54 ° 44 ′ 6 ″ N, 9 ° 52 ′ 15 ″ E | ||
Geschendorf wind turbine | 2001 | 1.0 | 1 | NEG Micon NM60 / 1000 (1 ×) | Geschendorf | SE | 53 ° 55 ′ 5 "N, 10 ° 25 ′ 13" E | Thinker & Wulf | erected on the A 20 |
|
1991 1992 |
|
|
WindWorld W2500 (1 ×) |
Gollendorf | OH | 54 ° 27 '21 "N, 11 ° 3' 29" E | dismantled in 2015 | |
Goosefeld wind turbine | 1995 | 0.27 | 1 | Südwind N3127 (1 ×) | Goosefeld | RD | 54 ° 25 ′ 15 ″ N, 9 ° 49 ′ 15 ″ E | ||
Großjörl wind turbine | 1995 | 0.5 | 1 | North tank NTK-500 (1 ×) | Großjörl | SL | 54 ° 36 ′ 59 ″ N, 9 ° 17 ′ 24 ″ E | previously 3 systems, 2 systems now dismantled | |
Wind turbines in Groß Niendorf | 2018 | 7.6 | 2 | GE 3.8-130 (2 ×) | Gross Niendorf | SE | 53 ° 50 ′ 21 ″ N, 10 ° 16 ′ 1 ″ E | PNE | |
Groß Schenkenberg wind turbine | 1987 2003 |
0.6 | 1 | Enercon E-40 / 6.44 (1 ×) | Groß Schenkenberg | RZ | 53 ° 48 ′ 16 "N, 10 ° 35 ′ 19" E | Previously 1 × Enercon-16 | |
Grotsand wind turbines | 2007 | 4.0 | 2 | Enercon E-82 (2 ×) | Grotsand | NF | 54 ° 47 ′ 10 "N, 8 ° 46 ′ 34" E | ||
Grove wind turbine | 1997 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Grove | RZ | 53 ° 31 '24 "N, 10 ° 30' 2" E | ||
Harrislee wind turbine | 1995 | 0.5 | 1 | North tank NTL 500/41 (1 ×) | Harrislee | SL | 54 ° 48 '4 "N, 9 ° 20' 36" E | Balzersen | |
Heiligenhafen wind power station | 1992 | 0.15 | 1 | North tank NTK 150/25 (1 ×) | Heiligenhafen | OH | 54 ° 21 ′ 26 "N, 10 ° 58 ′ 25" E | ||
Jahnshof wind turbines | 1993 1995 |
0.825 | 2 |
Vestas V27-225kW (1 ×) Vestas V44-600kW (1 ×) |
Jahnshof | OH | 54 ° 18 ′ 35 "N, 10 ° 54 ′ 8" E | ||
Johannisberg wind turbine | 1991 | 0.25 | 1 | Tacke TW 250 (1 ×) | Johannisberg | OH | 54 ° 29 ′ 35 ″ N, 11 ° 10 ′ 25 ″ E | ||
Kappeln wind turbine | 1992 | 0.15 | 1 | Nordex N27 / 150 (1 ×) | Kappeln | SL | 54 ° 38 '53 "N, 9 ° 55' 43" E | erected on a sewage treatment plant | |
|
1991 |
|
|
|
Klausdorf | OH | 54 ° 27 '25 "N, 11 ° 14' 9" E | dismantled in 2015 | |
Wind turbines Kragstedt | 2015 | 12.2 | 2 | Senvion 6.2M126 (2 ×) | Kragstedt | SL | 54 ° 39 ′ 29 ″ N, 9 ° 18 ′ 22 ″ E | Denker & Wulff | |
Wind turbines Kraksdorf | 1995 1997 |
1.0 | 2 | Enercon E-40 / 5.40 (2 ×) | Kraksdorf | OH | 54 ° 18 '17 "N, 11 ° 3' 22" E | ||
Wind power plant Krumbecker Hof | 1997 2015 |
2.0 | 1 | Senvion MM100 (1 ×) | Krumbeck | OH | 53 ° 55 ′ 1 ″ N, 10 ° 33 ′ 33 ″ E | 2015 repowering (1 × Senvion MM100 instead of 2 × Enercon E-40 / 5.40 ) | |
Wind turbines Lieth | 2013 | 4.6 | 2 | Enercon E-70 E4 (2 ×) | Lieth | HEI | 54 ° 9 ′ 51 ″ N, 9 ° 4 ′ 11 ″ E | erected north of the Heide refinery
|
|
Wind turbines Meeschendorf | 1995 | 1.0 | 2 | Enercon E-40 / 5.40 (2 ×) | Meeschendorf | OH | 54 ° 19 ′ 21 ″ N, 10 ° 58 ′ 33 ″ E | ||
Neudorf-Bornstein wind turbine | 1993 | 0.15 | 1 | Nordex N27 (1 ×) | Neudorf-Bornstein | RD | 54 ° 25 ′ 9 ″ N, 9 ° 54 ′ 29 ″ E | ||
Neuhof wind turbine | 1994 | 0.1 | 1 | Vestas V20-100kW (1 ×) | Lemkenhafen | OH | 54 ° 27 ′ 2 ″ N, 11 ° 5 ′ 6 ″ E | ||
Neustadt-Holm wind turbine | 1996 | 0.6 | 1 | DeWind D4 / 48 (1 ×) | Neustadt in Holstein | OH | 54 ° 5 ′ 14 "N, 10 ° 47 ′ 17" E | ||
|
1988 |
|
|
|
Rescue woman | OH | 54 ° 6 ′ 2 ″ N, 10 ° 52 ′ 10 ″ E | dismantled in 2015 | |
Ockholm wind turbines | 2013 | 6.8 | 2 | REPower 3.4M104 (2 ×) | Ockholm | NF | 54 ° 39 ′ 20 ″ N, 8 ° 51 ′ 14 ″ E | Geo Mbh | |
Oersberg wind turbine | 1991 | 0.2 | 1 | Vestas V25-200kW (1 ×) | Oersberg | SL | 54 ° 40 ′ 1 ″ N, 9 ° 50 ′ 17 ″ E | ||
Wind turbines Bad Oldesloe | 2001 2016 |
3.5 | 2 |
Enercon E-101 (1 ×) |
Bad Oldesloe | OD | 53 ° 48 ′ 11 "N, 10 ° 19 ′ 23" E | originally 2, the northern one has since been dismantled | |
Oxlund wind turbine | 2018 | 3.7 | 1 | Senvion 3.7M144 (1 ×) | Oxlund | SL | 54 ° 40 ′ 3 ″ N, 9 ° 15 ′ 6 ″ E | Prototype of the Senvion 3.7M144
|
|
|
1997 |
|
|
|
Westermarkesldorf | OH | 54 ° 27 ′ 20 ″ N, 11 ° 2 ′ 1 ″ E | dismantled in 2015 | |
Rader Insel wind turbine | 1990 | 0.15 | 1 | AN Bonus 150/30 (1 ×) | Schacht-Audorf | RD | 54 ° 19 ′ 30 ″ N, 9 ° 43 ′ 9 ″ E | ||
Sahna wind turbine | 1991 | 0.15 | 1 | AN Bonus 150/30 (1 ×) | Sahna | OH | 54 ° 18 ′ 26 ″ N, 11 ° 4 ′ 0 ″ E | ||
Schürsdorf wind turbine | 1990 | 0.15 | 1 | AN Bonus 150/30 (1 ×) | Schürsdorf | OH | 54 ° 0 ′ 16 ″ N, 10 ° 42 ′ 5 ″ E | Nursery Rahlf | |
Stadum wind turbine | 2011 | 2.4 | 1 | Nordex N117 / 2400 (1 ×) | Stadum | NF | 54 ° 44 ′ 59 "N, 9 ° 4 ′ 4" E | Geo Mbh | |
Stakendorf wind turbines | 1995 | 1.0 | 2 | Enercon E-40 / 5.40 (2 ×) | Stakendorf | PLÖ | 54 ° 22 ′ 35 "N, 10 ° 26 ′ 4" E | ||
Stohl wind turbine | 1998 | 0.55 | 1 | Euroturbine ET 550/41 (1 ×) | Stole | RD | 54 ° 28 ′ 17 "N, 10 ° 7 ′ 32" E | 2M wind technology | |
Süderbrarup wind turbines | 2011 | 3.0 | 2 | Vensys 77/1500 (2 ×) | Süderbrarup | SL | 54 ° 37 ′ 18 "N, 9 ° 44 ′ 25" E | Thinker & Wulf | |
Süderschmedeby wind turbines | 1995 | 1.0 | 2 | North tank NTK 500 (2 ×) | Süderschmedeby | SL | 54 ° 39 ′ 22 "N, 9 ° 26 ′ 21" E | ||
Süssau wind turbine | 1994 | 0.3 | 1 | North tank NTK 300/31 (1 ×) | Süssau | OH | 54 ° 16 ′ 22 ″ N, 11 ° 4 ′ 3 ″ E | ||
Sütel wind turbines | 1991 1996 |
0.8 | 2 |
Vestas V25-200kW (1 ×) Vestas V44-600kW (1 ×) |
Sütel | OH | 54 ° 20 ′ 11 "N, 11 ° 3 ′ 2" E | ||
Viöl wind turbines | 1995 | 1.2 | 2 | Micon M1500 / 600 (2 ×) | Viöl | NF | 54 ° 34 ′ 34 "N, 9 ° 9 ′ 22" E | ||
Wandelwitz wind turbine | 1996 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Change joke | OH | 54 ° 19 ′ 31 ″ N, 10 ° 52 ′ 17 ″ E | ||
Wasbek wind turbine | 1990 | 0.08 | 1 | Enercon E-17 (1 ×) | Wasbek | RD | 54 ° 4 ′ 51 ″ N, 9 ° 54 ′ 17 ″ E | ||
Wees wind turbine | 1993 | 0.1 | 1 | Vestas V20-100kW (1 ×) | Wees | SL | 54 ° 48 ′ 21 ″ N, 9 ° 31 ′ 35 ″ E | ||
Wind turbines Weideweg | 2016 | 6.0 | 2 | Enercon E-115 (2 ×) | Wesselburener Deichhhausen | HEI | 54 ° 10 ′ 9 ″ N, 8 ° 57 ′ 13 ″ E | Marsh Association Schleswig-Holstein e. V. |
|
Westermarkelsdorf wind power station | 1996 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Westermarkesldorf | OH | 54 ° 31 '17 "N, 11 ° 7' 31" E | ||
Ahrenviöl wind farm | 2002-2003 2015 2017 |
37.8 | 14th |
Nordex N80 / 2500 (8 ×) Nordex N100 / 2500 (2 ×) Senvion 3.2M114 (4 ×) |
Ahrenviöl | NF | 54 ° 31 ′ 29 ″ N, 9 ° 14 ′ 1 ″ E | Ahrenviöl community wind farm | |
Ahrenviölfeld wind farm | 2003 2015 |
12.5 | 5 |
Nordex N80 / 2500 (3 ×) Nordex N100 / 2500 (2 ×) |
Ahrenviölfeld | NF | 54 ° 31 ′ 27 "N, 9 ° 15 ′ 14" E | Ahrenviölfeld community wind farm | |
Albersdorf wind farm | 2014 2015 |
19.8 | 6th | Vestas V112-3.3MW (6 ×) | Albersdorf | HEI | 54 ° 8 ′ 9 ″ N, 9 ° 15 ′ 16 ″ E | Denker & Wulf, citizen WP Albersdorf | Erected on the A 23 |
Almdorf-Struckum wind farm | 2002 2014 2017 |
11.8 | 5 |
Vestas V80-2MW (2 ×) Enercon E-70 E4 (2 ×) Siemens SWT-3.2-113 (1 ×) |
Almdorf Struckum |
NF | 54 ° 35 ′ 26 "N, 9 ° 0 ′ 32" E | WEB Andresen | 2017 repowering (1 × Siemens SWT-3.2-113 for 1 × Vestas V80-2MW ) |
Alt Bennebek wind farm | 2015-2017 | 36.95 | 12 |
Enercon E-101 (11 ×) Senvion 3.4M114 (1 ×) |
Old Bennebek | SL | 54 ° 23 ′ 1 ″ N, 9 ° 27 ′ 12 ″ E | e3, WPD | |
Altbokhorst wind farm | 2003 2012 |
15.9 | 8th |
Enercon E-66 / 18.70 (5 ×) Enercon E-70 E4 (3 ×) |
Schillsdorf | PLÖ | 54 ° 5 ′ 32 "N, 9 ° 8 ′ 4" E | Windwärts, Ing.Henning Holst | |
Bahrenfleth wind farm | 2014 | 7.5 | 3 | Vensys 100/2500 (3 ×) | Bahrenfleth | IZ | 53 ° 51 ′ 8 "N, 9 ° 28 ′ 22" E | ||
Barlt Ost wind farm | 2015 | 44.0 | 14th |
Senvion 3.2M114 (10 ×) Enercon E-101 (4 ×) |
Barlt | HEI | 54 ° 0 ′ 1 ″ N, 9 ° 3 ′ 29 ″ E | WES-IBS | |
Barslund wind farm | 1995 2008 2017 |
13.0 | 5 |
Enercon E-70 E2 (3 ×) Enercon E-101 (2 ×) |
Barslund | SL | 54 ° 40 ′ 13 ″ N, 9 ° 14 ′ 8 ″ E | Bürgerwindkraft Lindewitt GmbH & Co.KG | 2017 repowering (2 × Enercon E-101 for 4 × NEG-Micon M1500-600 ) |
Basedow wind farm | 2003 | 18.2 | 14th | AN Bonus 1300/62 (14 ×) |
Basedow Lütau |
RZ | 53 ° 25 ′ 5 ″ N, 10 ° 33 ′ 29 ″ E | ORBIS, natural wind | |
Basland wind farm | 1995 | 1.15 | 3 |
North tank NTK-150 (1 ×) North tank NTK-500 (2 ×) |
Silberstedt | SL | 54 ° 34 '10 "N, 9 ° 23' 9" E | ||
Behrendorf wind farm | 2012 2015 2017 |
45.7 | 16 |
Nordex N100 / 2500 (7 ×) Nordex N117 / 2400 (1 ×) Senvion 3.2M114 (6 ×) Nordex N100 / 3300 (2 ×) |
Behrendorf | NF | 54 ° 34 ′ 16 ″ N, 9 ° 12 ′ 25 ″ E | Behrendorf community wind farm | |
Beidenfleth-Wewelsfleth wind farm | 2015 2016 |
21.2 | 7th |
Enercon E-101 (6 ×) Senvion 3.2M114 (1 ×) |
Beidenfleth Wewelsfleth |
IZ | 53 ° 53 ′ 1 ″ N, 9 ° 23 ′ 6 ″ E | ||
Beldorf wind farm | 1999 2001 |
26.2 | 12 |
Enercon E-66 15.66 (1 ×) Enercon E-66 18.70 (2 ×) Enercon E-70 E4 (1 ×) Enercon E-92 (8 ×) |
Beldorf | RD | 54 ° 7 ′ 1 ″ N, 9 ° 21 ′ 21 ″ E | Citizen wind farm Beldorf | 2015 repowering (8 × Enercon E-92 instead of 1 × Enercon E-66 15.66 , 1 × Enercon E-66 18.70 and 1 × Enercon E-40 5.40 )
|
Bendorf wind farm | 2015-2016 | 27.45 | 9 | Enercon E-101 (9 ×) | Bendorf (Holstein) | RD | 54 ° 5 ′ 25 ″ N, 9 ° 21 ′ 22 ″ E | Trianel GmbH | |
Beschendorf wind farm | 2003 2012 |
6.7 | 4th |
Enercon E-66 / 18.70 (1 ×) AN Bonus 1300/62 (2 ×) Enercon E-70 (1 ×) |
Beschendorf | OH | 54 ° 11 ′ 20 "N, 10 ° 53 ′ 9" E | GefuE WP Beschendorf | |
Besdorf-Bokhorst wind farm | 1999 2003 |
10.5 | 10 | HSW 1000 (6 ×) REpower 57/1000 (4 ×) |
Besdorf Bokhorst |
IZ | 54 ° 3 ′ 13 ″ N, 9 ° 23 ′ 6 ″ E | wpd , Gewi, e3 | Erected on the A 23 |
Böel wind farm | 1995 | 2.4 | 4th | Tacke TW 600 (4 ×) | Böel | SL | 54 ° 38 ′ 23 "N, 9 ° 42 ′ 17" E | ||
Bokel-Ellerdorf-Brammer wind farm | 2000 2013 2017 |
21.4 | 7th |
Vestas V112-3.0MW (6 ×) Senvion 3.4M114 (1 ×) |
Bokel Ellerdorf Brammer |
RD | 54 ° 12 ′ 14 "N, 9 ° 48 ′ 21" E | e3, wpd | Repowering 2013 (6 × Vestas V112-3.0MW instead of 1 × NEG Micon NM60 / 1000 and 9 × NEG Micon NM64 / 1500 ) |
Bökingharde-Osterdeich wind farm | 1999-2000 2002 2015 2019 |
25.8 | 8th |
Vestas V90-3MW (2 ×) Vestas V112-3.3MW (6 ×) |
Risum-Lindholm Dagebüll |
NF | 54 ° 43 ′ 33 "N, 8 ° 50 ′ 35" E | eeNORD | Repowering 2015 (6 × Vestas V112-3.0MW instead of 4 × Vestas V66-1.65MW ), further repowering in progress in 2019 |
Bollbrügge wind farm | 2000 2002 |
16.7 | 7th | AN Bonus 1300/62 (6 ×) AN Bonus 2000/76 (1 ×) |
Bollbrugge | OH | 54 ° 19 ′ 22 ″ N, 10 ° 58 ′ 0 ″ E | ||
Bordelum Nord wind farm | 2014 2017 |
36.0 | 12 | Vestas V112-3MW (12 ×) | Bordelum | NF | 54 ° 39 '22 "N, 8 ° 52' 10" E | Citizens' wind farm Bordelum III | |
Bordelum South wind farm | 2008 2015 2017 |
38.1 | 15th |
Enercon E-70 E4 (10 ×) Enercon E-101 (2 ×) Enercon E-115 (3 ×) |
Bordelum | NF | 54 ° 38 ′ 31 ″ N, 8 ° 53 ′ 11 ″ E | Citizens' wind farm Bordelum III | 2017 repowering (3 × Enercon E-115 for 3 × Enercon E-70 E4 ) |
Bosbüll-Klixbüll wind farm | 2002 2004 2017 |
29.7 | 12 |
REpower MM70 (2 ×) REpower MM82 (4 ×) Enercon E-70 (1 ×) Enercon E-92 (2 ×) Senvion 3.4M104 (2 ×) Senvion 4.2M118 (1 ×) |
Bosbull Klixbull |
NF | 54 ° 48 ′ 50 "N, 8 ° 50 ′ 59" E | Erected on the Klixbüll solar park, 2017 repowering (2 × Senvion 3.4M104 , 1 × Senvion 4.2M118 and 2 × Enercon E-92 instead of 2 × Enercon E-66 , 2 × REPower MM70 and 1 × Senvion MM82 ) | |
Böxlund-Weesby wind farm | 2014 | 19.2 | 6th | Senvion 3.2M114 (6 ×) |
Böxlund Weesby |
SL | 54 ° 51 '49 "N, 9 ° 10' 25" E | Citizen wind Medelby | |
Braderup wind farm | 2005 2007 |
23.6 | 8th |
Siemens SWT-2.3-101 (4 ×) Siemens SWT-3.6-107 (4 ×) |
Braderup | NF | 54 ° 49 ′ 15 "N, 8 ° 52 ′ 33" E | Citizens WP Braderup | |
Braderup-Tinningstedt wind farm | 2013 2017 |
30.15 | 9 |
Vestas V112-3.3MW (6 ×) Vestas V117-3.45MW (3 ×) |
Braderup Tinningstedt |
NF | 54 ° 49 ′ 19 ″ N, 8 ° 54 ′ 30 ″ E | Citizens WP Braderup-Tinningstedt | |
Bramstedtlund wind farm | 2020 | 31.5 | 7th | Siemens Gamesa SG-DD-130 (7 ×) | Bramstedtlund | NF | 54 ° 50 ′ 42 "N, 9 ° 6 ′ 20" E | BWP Bramstedtlund | under construction |
Bramstedtlund Süd wind farm | 2016 | 9.0 | 3 | Siemens SWT-3.0-113 (3 ×) | Bramstedtlund | NF | 54 ° 49 ′ 22 ″ N, 9 ° 4 ′ 19 ″ E | Geo-mbh | |
Breitenfelde wind farm | 2015-2016 | 11.75 | 5 | Enercon E-92 (5 ×) | Breitenfelde | NF | 53 ° 35 ′ 17 ″ N, 10 ° 39 ′ 0 ″ E | WPD | |
Breklum-Struckum wind farm | 2002-2003 2007 2014 |
79.2 | 35 |
Enercon E-70 (1 ×) Enercon E-70 E4 (30 ×) Senvion MM82 (4 ×) |
Breklum Struckum |
NF | 54 ° 34 ′ 25 ″ N, 8 ° 58 ′ 25 ″ E | WEB Andresen | 2014 repowering (20 × Enercon E-70 for 13 × Enercon E-66 18.70 ) |
Breklum Nord wind farm | 2004 2014 |
9.2 | 4th | Enercon E-70 E4 (4 ×) | Breklum | NF | 54 ° 37 ′ 18 ″ N, 9 ° 1 ′ 2 ″ E | WEB Andresen | 2014 repowering (4 × Enercon E-70 for 4 × Enercon E-66 18.70 ) |
Brodersby wind farm | 1994 | 1.8 | 3 | Tacke TW 600 (3 ×) | Brodersby | RD | 54 ° 37 ′ 32 "N, 9 ° 59 ′ 35" E | Schwansener energy systems | |
Brunsbüttel wind farm | 2004 2016-2017 |
64.55 | 24 |
Vestas V80-2MW (10 ×) Nordex N100 / 3300 (8 ×) Enercon E-101 (3 ×) Enercon E-115 (3 ×) |
Brunsbuettel | HEI | 53 ° 55 ′ 31 ″ N, 9 ° 6 ′ 4 ″ E | Ventotec | |
Brunsbüttel-West wind farm | 2010 | 41.4 | 18th | Enercon E-82 (18 ×) | Brunsbuettel | HEI | 53 ° 54 ′ 5 ″ N, 9 ° 4 ′ 19 ″ E | Thinker & Wulf | Repowering 2010 (18 × Enercon E-82 instead of 19 × various old systems) |
Brunsbüttelkoog wind farm | 1994 1995 2000 2001 2004 |
12.45 | 8th | AN Bonus 450/37 (1 ×) (1 ×) NEG Micon NM60 / 1000 (1 ×) AN Bonus 1000/54 (1 ×) AN Bonus 2000/76 (1 ×) Enercon E-58 (1 ×) REpower MD77 (2 ×) REpower 5M (1 ×) |
Brunsbüttelkoog | HEI | 53 ° 53 ′ 23 "N, 9 ° 11 ′ 27" E | Certainly | erected on the site of the former Brunsbüttel nuclear power plant , prototypes of the Autoflug A 1200 (two-winged aircraft) and REpower 5M 2014 dismantling of an Autoflug A 1200 |
Burg wind farm on Fehmarn | 1991 1994 1995 |
4.58 | 9 | HSW 250 (1 ×) Micon M700-225 (1 ×) Enercon E-40 / 5.40 (1 ×) Tacke TW 600 (6 ×) |
Castle on Fehmarn | OH | 54 ° 25 ′ 14 "N, 11 ° 10 ′ 26" E | ||
Büttel wind farm | 1995 1997 1998 1999 |
10.22 | 17th |
Vestas V39-500kW (6 ×) AN Bonus 600/41 (4 ×) Enercon E-40 / 5.40 (3 ×) AN Bonus 1000/54 (2 ×) Vestas V47-660kW (2 ×) |
Büttel | IZ | 53 ° 54 ′ 14 "N, 9 ° 14 ′ 11" E | WKN, ContinoWind | |
Büttel-Holstendamm wind farm | 2007 | 25.0 | 5 | REpower 5M (5 ×) | Büttel | IZ | 53 ° 54 ′ 28 "N, 9 ° 13 ′ 25" E | Allianz , WP Büttel | |
Cashagen wind farm | 2017 2020 |
12.7 | 6th |
Senvion MM100 (4 ×) Enercon E-92 (2 ×) |
Cashagen | OH | 53 ° 57 ′ 15 "N, 10 ° 32 ′ 36" E | Ing.Henning Holst | |
Dagebüll wind farm | 1995 2015 |
17.23 | 6th |
Vestas V27-225kW (1 ×) Senvion 3.4M104 (5 ×) |
Dagebüll | NF | 54 ° 43 ′ 14 "N, 8 ° 45 ′ 4" E | ||
Damlos wind farm | 2001 2013 |
9.1 | 5 |
Südwind S70 (3 ×) Enercon E-82 E2 (2 ×) |
Damlos | OH | 54 ° 14 ′ 2 ″ N, 10 ° 54 ′ 6 ″ E | wind7, e3 | Erected on the A1 |
Dammfleth wind farm | 1999 2001 2012 2014 |
37.6 | 20th |
NEG Micon NM64c / 1500 (8 ×) Nordex N60 / 1300 (2 ×) Enercon E-70 (10 ×) |
Dammfleth | IZ | 53 ° 54 '10 "N, 9 ° 23' 4" E | Prokon | Repowering 2012 (2 × Enercon E-70 instead of 3 × Nordex N60 ) and 2014 (8 × Enercon E-70 instead of 3 × Nordex N54 , 2 × Nordex N60 and 4 × NEG Micon NM64c / 1500 ) |
Diekhusen-Fahrstedt Schmedeswurth wind farm | 2016 | 18.0 | 6th | Enercon E-115 (6 ×) |
Diekhusen-Fahrstedt Schmedeswurth |
HEI | 53 ° 56 ′ 20 ″ N, 9 ° 3 ′ 19 ″ E | ||
Dingen-Süderwisch wind farm | 2011 2014 |
37.1 | 11 |
REPower 3.4M104 (8 ×) Vestas V112-3.3MW (3 ×) |
Things Süderwisch |
HEI | 53 ° 57 ′ 11 "N, 9 ° 5 ′ 31" E | ||
Dollerup wind farm | 2001 2007 |
8.6 | 5 |
Südwind S70 (3 ×) REpower MM82 (2 ×) |
Dollerup | SL | 54 ° 45 ′ 29 "N, 9 ° 40 ′ 31" E | seeBA, Jensen & Falke | 2007 Repowering (2 × REpower MM82 for 3 × Nordex N27 ) |
Dbodum wind farm | 2002 2014 |
33.0 | 14th | Bonus B54 / 1000 (1 ×) Enercon E-70 E4 (7 ×) Enercon E-82 E2 (3 ×) Vestas V112-3MW (3 ×) |
Body | NF | 54 ° 38 ′ 23 "N, 9 ° 0 ′ 23" E | Citizens' wind farm Bordelum III | |
Dree Meeden wind farm | 2000 2003 2014 2016 |
52.3 | 24 |
Enercon E-66 (4 ×) Enercon E-70 E4 (12 ×) Senvion MD70 (1 ×) Senvion MM70 (5 ×) Enercon E-115 (2 ×) |
Vollstedt Högel Drelsdorf |
NF | 54 ° 37 '18 "N, 9 ° 3' 23" E | WEB Andresen | 2016 repowering (2 × Enercon E-115 for 2 × NEG Micon NM80 / 2000 ) |
Ecklak wind farm | 2001 2007 2016 |
17.9 | 9 |
Enercon E-66 / 18.70 (5 ×) Enercon E-70 (1 ×) Enercon E-70 E4 (3 ×) |
Ecklak | IZ | 53 ° 55 ′ 34 "N, 9 ° 15 ′ 13" E | HCE Design, NET | 2016 repowering (3 × Enercon E-70 E4 for 3 × Enercon E-66 / 18.70 ) |
Eggstedt-Süderhastedt wind farm | 1998 2004 2011 2014 |
41.5 | 15th |
Repower MM82 (3 ×) REpower MM92 (3 ×) Senvion 3.4M104 (2 ×) Senvion 3.2M114 (7 ×) |
Eggstedt Süderhastedt |
HEI | 54 ° 4 ′ 7 ″ N, 9 ° 14 ′ 20 ″ E | WES-IBS | Repowering 2011 (3 × REpower MM92 instead of 2 × DeWind D4 / 48) |
Ehlerstorf wind farm | 1999 2010 |
10.0 | 5 |
Enercon E-66 / 15.66 (3 ×) Enercon E-70 E4 (2 ×) |
Ehlerstorf | OH | 54 ° 16 ′ 31 ″ N, 10 ° 49 ′ 18 ″ E | Wind energy Ehlerstorf | |
Eichede wind farm | 2004 | 4.0 | 4th | AN Bonus 1300/62 (4 ×) | Eichede | OD | 53 ° 42 ′ 32 "N, 10 ° 25 ′ 33" E | e3, wpd | |
Elisabeth-Sophien-Koog wind farm | 2009 | 13.8 | 6th | Enercon E-70 (6 ×) | Elisabeth-Sophien-Koog | NF | 54 ° 30 '24 "N, 8 ° 53' 28" E | GEO, Botterkooger Windpark, IB Henning Holst | Repowering 2009 (6 × Enercon E-70 instead of 19 × various old systems) |
Ellhöft-Westre wind farm | 2000 2007 2008-2009 |
53.1 | 17th | AN Bonus 1300/62 (4 ×) Siemens SWT-2.3-93 (4 ×) REpower 6M (3 ×) Siemens Gamesa SG-3.2-113 (5 ×) Siemens Gamesa SG-DD-130 (1 ×) |
Ellhöft Westre |
NF | 54 ° 53 ′ 26 ″ N, 8 ° 57 ′ 3 ″ E | Citizens WP Ellhöft, Grenzstrom Vindtved | Prototypes of the Repower 6M Repowering currently in progress (5 × Siemens Gamesa SG-3.2-113 and 1 × Siemens Gamesa SG-DD-130 instead of 2 × AN Bonus 1300/62) |
Ellingstedt wind farm | 2001 2017 |
15.0 | 10 |
Südwind S70 (6 ×) Vensys 77 (4 ×) |
Ellingstedt | SL | 54 ° 29 ′ 31 ″ N, 9 ° 23 ′ 18 ″ E | ||
Elskop wind farm | 2008 | 6.0 | 3 | Enercon E-70 (3 ×) | Elskop | IZ | 53 ° 48 ′ 10 "N, 9 ° 29 ′ 35" E | ||
Emmelsbüll-Horsbüll wind farm | 2008 2011 |
6.0 | 5 |
REPower MM82 (3 ×) Enercon E-70 E4 (2 ×) |
Emmelsbüll-Horsbüll | NF | 54 ° 48 ′ 31 ″ N, 8 ° 39 ′ 22 ″ E | Ing.Henning Holst | |
Enge-Sande wind farm | 2011 2012 2017 |
20.4 | 6th |
Siemens SWT-3.0-101 (2 ×) Siemens SWT-3.6-120 (2 ×) Siemens SWT-3.6-130 (2 ×) |
Narrow sands | NF | 54 ° 42 ′ 52 "N, 9 ° 1 ′ 27" E | Geo Mbh | |
Esmark wind farm | 1995 | 2.4 | 4th | Tacke TW 600 (4 ×) | Esmark | SL | 54 ° 40 ′ 14 "N, 9 ° 35 ′ 32" E | ||
Fehmarn-Mitte wind farm | 2006 | 57.5 | 25th | Enercon E-70 E4 (25 ×) |
Danish village Lemkendorf Vadersdorf |
OH | 54 ° 29 ′ 8 ″ N, 11 ° 6 ′ 23 ″ E | Citizens WP Fehmarn, IB Henning Holst | Repowering 2006 (25 × Enercon E-70 instead of 27 × different old systems) |
Fehmarn-Northwest wind farm | 2000 2007 2008 |
43.5 | 21st |
Enercon E-66 15.66 (6 ×) Enercon E-70 E4 (15 ×) |
Danish village Westermarkelsdorf Schlagsdorf |
OH | 54 ° 30 ′ 23 "N, 11 ° 4 ′ 14" E | Citizens WP Fehmarn | Repowering 2007 (9 × Enercon E-70 instead of 12 × various old systems) |
Fiefbergen wind farm | 1996 1999 |
8.85 | 7th |
Vestas V44-600kW (2 ×) Vestas V66-1.65MW (1 ×) Tacke TW 1.5 (4 ×) |
Fiefbergen | PLÖ | 54 ° 21 ′ 34 "N, 10 ° 20 ′ 25" E | WP Fiefbergen Süd, wotan | |
Friedrichsgabekoog wind farm | 1995 2004 2015 |
29.8 | 21st |
North tank NTK-300 (1 ×) Enercon E-44 (9 ×) Enercon E-66 (1 ×) Enercon E-70 E4 (5 ×) Enercon E-82 E2 (5 ×) |
Friedrichsgabekoog | HEI | 54 ° 9 ′ 13 "N, 8 ° 55 ′ 35" E | Winkra | 2015 repowering (2 × Enercon E-70 E4 for 2 × Enercon E-44 ) |
Friedrich-Wilhelm-Lübke-Koog wind farm | 1990 1998 2004 2005 2008 2012 2014–2015 2017 |
71.1 | 26th |
Vestas V80-2MW (4 ×) REpower MM82 (8 ×) REpower 3.4M104 (4 ×) Senvion MM82 (1 ×) Vestas V117-3.45MW (9 ×) |
Friedrich-Wilhelm-Lübke-Koog | NF | 54 ° 51 ′ 19 ″ N, 8 ° 38 ′ 17 ″ E | Citizen WP Lübke-Koog Sea Peace, eeNORD | Repowering 2004 (14 × Vestas V80-2MW instead of 52 × HSW 250 ) and 2008 (1 × REpower MM82 instead of 3 × Enercon-32 ), 2015 repowering (4 × REpower 3.4M104 for 5 × Enercon E-66 ), 2017 repowering ( 9 × Vestas V117 # -3,45MW for 11 × Vestas V80-2MW ) |
Friedrichskoog wind farm | 1996 2010 2011 2015 |
206.15 | 100 |
Nordtank NTK-500 (2 ×) AN Bonus 37/450 (2 ×) AN Bonus 44/600 (4 ×) Vestas V39-500kW (1 ×) Vestas V44-600kW (1 ×) Enercon E-40 5.40 (9 × ) Enercon E-70 E4 (52 ×) Enercon E-82 E2 (10 ×) Enercon E-92 (7 ×) Nordex N90 / 2500 (1 ×) Nordex N100 / 2500 (1 ×) Senvion 3.4M104 (1 ×) Senvion 3.2M114 (9 ×) |
Friedrichskoog | HEI | 53 ° 58 ′ 26 ″ N, 8 ° 56 ′ 0 ″ E | Thinker & Wulf | |
Galmsbüll wind farm | 1992-1993 2007 2009 |
16.2 | 3 |
Enercon E-82 (2 ×) Repower 3.4M104 (3 ×) |
Galmsbull | NF | 54 ° 45 ′ 34 "N, 8 ° 45 ′ 20" E | 2007 repowering (2 × Enercon E-82 for 6 × old systems), 2009 repowering (3 × Repower 3.4M104 for 4 × Vestas V39 ) | |
Galmsbüll-Norderhof wind farm | 2007 2014 |
37.7 | 13 |
Siemens SWT-2.3-93 (7 ×) Siemens SWT-3.6-120 (3 ×) |
Galmsbull | NF | 54 ° 48 ′ 2 "N, 8 ° 44 ′ 9" E | ||
Goldebek wind farm | 2014 | 8.2 | 4th | Senvion MM82 (4 ×) | Goldebek | NF | 54 ° 40 ′ 35 "N, 9 ° 10 ′ 4" E | WEB Andresen | |
Goldelund wind farm | 2014 | 23.0 | 10 | Enercon E-70 E4 (10 ×) | Goldelund | NF | 54 ° 41 ′ 11 ″ N, 9 ° 7 ′ 5 ″ E | WEB Andresen | |
Görtzer Kamp wind farm | 2001 | 7.2 | 4th | Enercon E-66 / 18.70 (4 ×) | Heringsdorf | OH | 54 ° 17 '17 "N, 11 ° 1' 27" E | WP Görtzer Kamp | |
Gotteskoogdeich wind farm | 2014 | 20.4 | 6th | Senvion 3.4M104 (6 ×) | Gotteskoogdeich | NF | 54 ° 49 ′ 2 "N, 8 ° 44 ′ 17" E | Citizens' wind farm Emmelsbüll-Horsbüll | |
Grammersdorf wind farm | 1996 2002 |
9.45 | 14th |
Vestas V44-600kW (13 ×) Vestas V66-1.65MW (1 ×) |
Grammersdorf | OH | 53 ° 56 ′ 23 "N, 10 ° 47 ′ 31" E | Grammersdorf wind power | Repowering planned |
Grevenkop wind farm | 1995 1999 2001 2015 2017 |
32.8 | 13 | WindWorld W5200 (4 ×) Senvion 3.2M114 (4 ×) Senvion 3.4M114 (5 ×) |
Grevenkop | IZ | 53 ° 50 ′ 34 "N, 9 ° 32 ′ 28" E | Citizens WP Grevenkop | 2015 repowering (4 × Senvion 3.2M114 for 6 × WindWorld W5200, 1 × Tacke TW 600a and 1 × NEG Micon NM60 / 1000 ) |
Grömitz wind farm | 1997 1998 1999 2001 2017 |
9.0 | 5 |
Enercon E-66 / 15.66 (3 ×) Enercon E-40 / 6.44 (1 ×) Enercon E-115 (1 ×) |
Kornick | OH | 54 ° 8 ′ 30 "N, 10 ° 55 ′ 2" E | RWE Innogy , WP Grömitz | 2017 repowering (1 × Enercon E-115 instead of 1 × Enercon E-40 / 5.40 ) |
Großenwiehe wind farm | 2010 2016 2017 |
16.8 | 5 |
Repower 3.4M104 (4 ×) Senvion 3.2M114 (1 ×) |
Grown up | SL | 54 ° 43 ′ 9 ″ N, 9 ° 17 ′ 21 ″ E | ||
Gut Gaarz wind farm | 2000 2003 2007 2012 |
22.8 | 13 |
Vestas V66-1.65MW (6 ×) NEG Micon NM64c / 1500 (4 ×) Enercon E-70 (3 ×) |
Good Gaarz | OH | 54 ° 16 ′ 20 "N, 10 ° 59 ′ 32" E | AT WP Gut Gaarz | |
Handewitt wind farm | 2012 2015 |
32.25 | 14th |
Enercon E82 E2 (13 ×) Enercon E-92 (1 ×) |
Handewitt | SL | 54 ° 44 ′ 7 ″ N, 9 ° 17 ′ 2 ″ E | Denker & Wulff | 2012 repowering (12 × Enercon E82 E2 for 18 × Micon M1500-600 KW ) |
Hasenkrug-Hardebek wind farm | 2000 2013 |
27.6 | 12 | Enercon E-82 E2 (12 ×) |
Hasenkrug Hardebek |
SE | 54 ° 0 ′ 8 "N, 9 ° 52 ′ 3" E | e3, wpd | Repowering 2013 (12 × Enercon E-82 E2 instead of 12 × NEG Micon NM60 / 1000 ) |
Hassenbüttel-Oesterwurth wind farm | 2000 2014-2015 2017 2018 |
54.6 | 24 |
NEG Micon NM48 / 750 (1 ×) Enercon E-53 (1 ×) Enercon E-66 18.70 (1 ×) Enercon E-70 E4 (11 ×) Enercon E-82 E2 (5 ×) Enercon E-92 (1 ×) Enercon E-101 (2 ×) Enercon E-115 (2 ×) |
Wesselburener Deichhausen Oesterwurth |
HEI | 54 ° 11 ′ 14 "N, 8 ° 57 ′ 22" E | Plan 8, WPD | 2018 repowering (1 × Enercon E-92 instead of 1 × Nordtank NTK-300 ) |
Havetoft-Klappholz wind farm | 2002 2003 2011 2015 |
16.9 | 10 |
REpower MD70 (7 ×) REpower MM82 (2 ×) Enercon E-70 (1 ×) |
Havetoft folding wood |
SL | 54 ° 38 ′ 3 ″ N, 9 ° 32 ′ 25 ″ E | Thinker & Wulf | |
Havighorst wind farm | 2002 | 9.0 | 6th | REpower MD70 (6 ×) | Havighorst | OD | 53 ° 51 ′ 35 "N, 10 ° 25 ′ 19" E | Denker & Wulf, WP Havighorst | |
Hedwigenkoog wind farm | 1994 1996 2009-2010 2011-2012 2015 |
57.3 | 23 |
Enercon E-70 E4 (5 ×) Enercon E-82 E2 (14 ×) Senvion 3.4M104 (4 ×) |
Hedwigenkoog | HEI | 54 ° 10 ′ 17 ″ N, 8 ° 51 ′ 29 ″ E | 2009-2010 repowering (14 × Enercon E-82 E2 for 10 × Vestas V39 and 4 × Vestas V27 , 5 × Enercon E-70 E4 and 1 × Enercon E-82 E2 for 5 × Bonus B44 / 500) | |
Hellschen-Heringsand-Unterschaar wind farm | 1994 2007 2014 |
7.3 | 3 |
Vestas V90-2MW (2 ×) Vestas V112-3.3MW (1 ×) |
Hellschen-Herringand-Unterschaar | HEI | 54 ° 12 ′ 10 "N, 8 ° 51 ′ 37" E | ||
Hemme wind farm | 2001 2006 2011 2013 2017 |
147.8 | 93 | AN Bonus 450/37 (1 ×) Vestas V52-0.85MW (14 ×) Enercon E-48 (2 ×) Enercon E-53 (1 ×) REpower 48/600 (26 ×) Vestas V80-2MW (1 ×) REpower MM82 (5 ×) Enercon E-70 (1 ×) Enercon E-70 E4 (31 ×) Enercon E-82 E2 (5 ×) Senvion 3.4M104 (6 ×) |
Inhibit | HEI |
54 ° 16 ′ 4 ″ N, 9 ° 0 ′ 29 ″ E 54 ° 17 ′ 10 ″ N, 9 ° 0 ′ 12 ″ E 54 ° 16 ′ 8 ″ N, 8 ° 58 ′ 24 ″ E |
Hemme community wind farm | Three different locations 2013 repowering (18 × Enercon E-70 E4 instead of 17 × Vestas V52-0.85MW ) and 2017 (4 × Enercon E-82 E2 and 1 × Enercon E-70 E4 instead of 5 × Vestas V47-0.66MW ) |
Hennstedt wind farm | 2001 2005 |
9.5 | 6th |
Enercon E-66 (5 ×) Enercon E-70 (1 ×) |
Hennstedt | HEI | 54 ° 16 '16 "N, 9 ° 9' 23" E | ||
Hennstedt Ost wind farm | 2015 | 23.1 | 7th | Vestas V112-3.3MW (7 ×) | Hennstedt | HEI | 54 ° 17 ′ 11 "N, 9 ° 11 ′ 31" E | Eider community wind farm | |
Herrenkoog wind farm | 2007-2008 | 16.0 | 8th | Enercon E-70 (8 ×) | Herrenkoog | NF | 54 ° 43 ′ 19 ″ N, 8 ° 48 ′ 7 ″ E | ||
Hillgroven wind farm | 1992 2010 |
28.55 | 15th |
Vestas V27-225kw (1 ×) Micon M700-225 (1 ×) Nordtank NTK-500 (1 ×) Enercon E-70 E4 (12 ×) |
Hillgroven | HEI |
54 ° 13 ′ 1 ″ N, 8 ° 51 ′ 29 ″ E 54 ° 13 ′ 51 ″ N, 8 ° 53 ′ 21 ″ E |
2010 repowering (10 × Enercon E-70 E4 for 14 × Bonus B36 / 450) | |
Hochfeld wind farm | 2001 | 11.6 | 8th |
Nordex N60 (2 ×) NEG Micon NM64c / 1500 (6 ×) |
High field | IZ | 53 ° 53 ′ 6 ″ N, 9 ° 22 ′ 2 ″ E | EFI wind | |
Högel wind farm | 1999 2015-2016 |
15.3 | 6th |
Enercon E-70 E4 (4 ×) Enercon E-101 (2 ×) |
Högel | NF | 54 ° 38 ′ 5 ″ N, 9 ° 4 ′ 1 ″ E | Windpark Högel GmbH & Co KG | 2015-2016 repowering (4 × Enercon E-70 E4 and 2 × Enercon E-101 for 7 × Bonus B54 / 1000) |
Holt Nord wind farm | 2014 | 11.6 | 4th | Senvion 3.2M114 (4 ×) | Get | SL | 54 ° 49 ′ 2 ″ N, 9 ° 5 ′ 8 ″ E | Medelby community wind farm | |
Holt Süd wind farm | 2015 | 11.6 | 4th | Senvion 3.2M114 (4 ×) | Get | SL | 54 ° 47 ′ 13 "N, 9 ° 8 ′ 25" E | Medelby community wind farm | |
Holtsee-Altenhof wind farm | 2012 2014 |
11.6 | 10 |
REpower 3.2M114 (2 ×) Senvion 3.2M114 (8 ×) |
Holtsee Altenhof |
RD | 54 ° 25 ′ 15 ″ N, 9 ° 51 ′ 25 ″ E | Thinker & Wulf | |
Holtsee-Hohenlieth wind farm | 2014 | 12.6 | 4th |
Senvion 3.2M114 (3 ×) Senvion 3.0M122 (1 ×) |
Holtsee | RD | 54 ° 24 '12 "N, 9 ° 53' 34" E | Thinker & Wulf | |
Holzacker-Knorburg wind farm | 2014 | 21.0 | 7th | Siemens SWT-3.0-113 (7 ×) | Holzacker-Knorburg | NF | 54 ° 43 ′ 3 ″ N, 9 ° 3 ′ 13 ″ E | Holzacker-Knorburg community wind farm | |
Horsbüll wind farm | 2006 | 8.2 | 4th | REPower MM82 (4 ×) | Horsbull | NF | 54 ° 50 ′ 19 ″ N, 8 ° 39 ′ 5 ″ E | ||
Horst wind farm | 1999 2005 |
14.4 | 10 |
Nordex N60 (8 ×) Vestas V80-2MW (2 ×) |
horst | IZ | 53 ° 49 ′ 19 "N, 9 ° 37 ′ 2" E | Prokon , WKN | |
Horstedt wind farm | 2000 2009 |
12.6 | 6th |
Vestas V80-2MW (4 ×) Enercon E-70 E2 (2 ×) |
Horstedt | NF | 54 ° 30 ′ 31 ″ N, 9 ° 5 ′ 30 ″ E | Citizen wind farm Horstedt | |
Hörup wind farm | 1994 1998 2004 2011 2012 |
63.75 | 24 |
Bonus B82 / 2300 (2 ×) Enercon E-70 E4 (2 ×) REPower MM82 (1 ×) REPower 3.4M104 (8 ×) Enercon E-82 E2 (11 ×) |
Hörup | SL | 54 ° 43 ′ 28 ″ N, 9 ° 7 ′ 1 ″ E | Enni Energie & Umwelt, RWE Innogy, Green Greco | 2011 repowering (2 × Enercon E-70 E2 for 2 × Nordtank NTK-600 ), 2013 repowering (9 × REPower 3.4M104 and 2 × Enercon E-82 E2 for 10 × Nordtank NTK-600 and 4 × Enercon E-40 ) |
Huje wind farm | 2000 | 24.75 | 15th | Vestas V66-1.65MW (15 ×) |
Huje nutteln |
IZ | 53 ° 59 ′ 5 ″ N, 9 ° 24 ′ 31 ″ E | WKN | |
Hüllerup wind farm | 1999 2002 |
22nd | 5 |
Senvion 6.2M126 (2 ×) Senvion 3.2M114 (3 ×) |
Hüllerup | SL | 54 ° 43 ′ 22 "N, 9 ° 18 ′ 18" E | Energy source | |
Husum wind farm | 1999 2002 2007 |
2.85 | 3 | HSW 750 (1 ×) REpower 48/600 (1 ×) REpower MD70 (1 ×) |
Husum | NF | 54 ° 28 ′ 5 ″ N, 9 ° 2 ′ 4 ″ E | Thinker & Wulf | |
Ipernstedt wind farm | 2015 | 9.6 | 3 | Senvion 3.2M114 (3 ×) | Ipernstedt | NF | 54 ° 28 ′ 29 ″ N, 9 ° 10 ′ 5 ″ E | Eff plan | |
Jalm wind farm | 2014 | 19.8 | 6th | Vestas V112-3.3MW (6 ×) | Jalm | SL | 54 ° 38 ′ 20 "N, 9 ° 25 ′ 35" E | Dirkshof | Erected on both sides of the A7 |
Janneby wind farm | 2013 2015 2016 2020 |
28.8 | 9 |
Senvion 3.2M114 (2 ×) Nordex N100 / 3300 (1 ×) Nordex N117 / 3000 (1 ×) Nordex N131 / 3000 (1 ×) Vensys 112/2500 (1 ×) Vensys 120/3000 (1 ×) Senvion 3.4M114 (1 ×) Enercon E-138 EP3 E2 (1 ×) |
Janneby | SL | 54 ° 37 ′ 27 ″ N, 9 ° 19 ′ 9 ″ E | Janneby community wind farm | Test field for wind turbines 2020 Construction of the first prototype of the Enercon E-138 EP3 E2 with improved performance |
Jardelund wind farm | 2014 2015 |
40.15 | 13 |
Senvion 3.2M114 (10 ×) Senvion MM92 (1 ×) Vestas V112-3.0MW (2 ×) |
Jardelund | SL | 54 ° 51 ′ 5 ″ N, 9 ° 12 ′ 21 ″ E | Medelby community wind farm | |
Jerrishoe wind farm | 2014 2015 |
22.1 | 7th |
Vestas V112-3.0MW (2 ×) Senvion 3.2M114 (5 ×) |
Jerrishoe | SL | 54 ° 38 ′ 11 "N, 9 ° 13 ′ 4" E | Eurowind | |
Joldelund South wind farm | 2014 | 32.2 | 14th | Enercon E-70 E4 (14 ×) | Joldelund | NF | 54 ° 37 '29 "N, 9 ° 5' 23" E | WEB Andresen | |
Joldelund Ost wind farm | 2014 | 32.2 | 14th | Enercon E-70 E4 (14 ×) | Joldelund | NF | 54 ° 39 ′ 9 ″ N, 9 ° 9 ′ 27 ″ E | WEB Andresen | |
Jörl wind farm | 1995 2014 2015 |
22.4 | 7th | Senvion 3.2M114 (7 ×) | Jörl | SL | 54 ° 40 ′ 3 ″ N, 9 ° 20 ′ 30 ″ E | WEB Andresen | 2015 repowering (3 × Senvion 3.2M114 instead of 2 × Nordtank NTK500 ) |
Jübek wind farm | 1999 2014 2015 |
24.88 | 12 |
Vestas V47-660KW (3 ×) Senvion MM82 (2 ×) Senvion MM92 (2 ×) Senvion 3.4M104 (2 ×) Senvion 3.2M114 (2 ×) REPower MD70 (1 ×) |
Jübek | SL | 54 ° 32 ′ 23 "N, 9 ° 24 ′ 29" E | ||
Kalkberg wind farm | 2000 | 2.64 | 4th | Vestas V47-660kW (4 ×) | Heringsdorf | OH | 54 ° 17 ′ 0 ″ N, 11 ° 0 ′ 10 ″ E | WP Kalkberg | |
Kattrepel wind farm | 1997 2013 2015 |
37.8 | 16 |
REpower 3.4M104 (10 ×) Enercon E-82 E2 (6 ×) |
Neufeld Brunsbüttel |
HEI | 53 ° 55 ′ 0 ″ N, 9 ° 4 ′ 10 ″ E | Thinker & Wulf | Repowering 2013 (6 × REpower 3.4M104 instead of 3 × Nordex N54 ) |
Kesdorf wind farm | 1995 2001 |
15.1 | 17th | Tacke TW 600 (2 ×) Vestas V42-600kW (3 ×) DeWind D4 / 48 (1 ×) DeWind D6 / 62 (10 ×) Enron Wind 1.5s (1 ×) |
Kesdorf | OH | 54 ° 3 '12 "N, 10 ° 38' 13" E | IB Henning Holst | |
Ketelsby wind farm | 1996 | 1.65 | 3 | AN Bonus 37/450 (1 ×) Tacke TW 600 (2 ×) |
Ketelsby | SL | 54 ° 36 '25 "N, 9 ° 50' 46" E |
|
|
Klanxbüll wind farm | 2005 2011 2017 |
11.0 | 5 |
REPower 3.4M104 (3 ×) Senvion 3.4M104 (2 ×) |
Klanxbull | NF | 54 ° 51 '32 " N , 8 ° 39' 18" E 54 ° 51 '19 "N, 8 ° 39' 11" E | Geo Mbh | 2017 repowering (2 × Senvion 3.4M104 for 3 × Enercon E-70 E4 ) |
Klausdorf wind farm | 1996 2008 |
27.6 | 12 | Enercon E-70 E4 (12 ×) | Klausdorf | OH | 54 ° 27 ′ 31 ″ N, 11 ° 15 ′ 14 ″ E | Geo Mbh | 2007 repowering (12 × Enercon E-70 E4 for 21 × Enercon E-40 5.40 ) |
Klein Bennebek wind farm | 2000 | 9.6 | 6th |
Vestas V66-1.65MW (4 ×) Enercon E-66 (2 ×) |
Little Bennebek | SL | 54 ° 23 ′ 20 ″ N, 9 ° 28 ′ 0 ″ E | e3 | |
Klixbüll wind farm | 2014 2017 |
27.45 | 9 |
Siemens SWT-3.0-113 (8 ×) Vestas V112-3,45MW (1 ×) |
Klixbull | NF | 54 ° 47 ′ 19 ″ N, 8 ° 53 ′ 18 ″ E | Second KlixbüllerEnergie GmbH & Co. KG., Eurowind | |
Klötzin wind farm | 1997 2013 |
6.9 | 3 | Enercon E-70 (3 ×) | Grammersdorf | OH | 53 ° 56 ′ 23 "N, 10 ° 47 ′ 31" E | Grammersdorf wind power | Repowering 2013 (3 × Enercon E-70 instead of 6 × Tacke TW 600) |
Kniphagen wind farm | 2014 2019 |
18.0 | 6th |
Siemens SWT-3.0-113 (5 ×) Siemens Gamesa SG-3.0-113 (1 ×) |
Schönwalde on the Bungsberg | OH | 54 ° 10 ′ 48 "N, 10 ° 47 ′ 45" E | Ing.Henning Holst |
|
Kohlbek wind farm | 2014 | 12.2 | 4th | Enercon E-101 (4 ×) | Kohlbek | IZ | 54 ° 2 ′ 27 "N, 9 ° 25 ′ 7" E | Citizen WP Kohlenbek | Erected on the A 23 |
Köhn wind farm | 1995 | 1.8 | 3 | Micon M1500-600 (1 ×) | Köhn | PLÖ | 54 ° 21 '7 "N, 10 ° 27' 23" E | Thinker & Wulf | |
Kolauerhof wind farm | 2000 | 4.5 | 3 | REpower MD70 (3 ×) | Cismar fields | OH | 54 ° 11 ′ 32 "N, 10 ° 57 ′ 7" E | WP Grömitz | |
Krempdorf wind farm | 2001 2009 |
17.75 | 9 |
Vestas V66-1.75MW (1 ×) Vestas V80-2MW (8 ×) |
Krempdorf | IZ | 53 ° 49 ′ 5 "N, 9 ° 28 ′ 16" E | WKN AG, Enercity | |
Kremsdorf wind farm | 2001 2009 |
16.7 | 9 |
Enercon E-66 / 18.70 (8 ×) Enercon E-70 (1 ×) |
Kremsdorf | OH | 54 ° 18 ′ 3 ″ N, 10 ° 57 ′ 13 ″ E | BAUUNION Wismar, WP Kremsdorf | |
Krogaspe wind farm | 2006 | 4.5 | 3 | Südwind S77 (3 ×) | Crogaspe | RD | 54 ° 7 ′ 29 ″ N, 9 ° 57 ′ 9 ″ E | wotan | erected on the A 7 |
Kronprinzenkoog wind farm | 2006 2010 2015 |
99.05 | 43 |
Enercon E-53 (2 ×) Enercon E-70 E4 (14 ×) Enercon E-82 (3 ×) REPower MM82 (12 ×) REpower MM92 (3 ×) Enercon E-101 (2 ×) Senvion 3.4M104 (3 ×) Senvion 3.2M114 (1 ×) Enercon E-115 (3 ×) |
Crown Prince Koog | HEI | 53 ° 57 ′ 41 ″ N, 8 ° 58 ′ 4 ″ E | ||
Kropp wind farm | 2013-2014 | 12 | 6th | Vestas V112-3.0MW (6 ×) | Kropp | SL | 54 ° 22 ′ 11 ″ N, 9 ° 31 ′ 24 ″ E | WKN AG | |
Krummbek wind farm | 2001 2002 2003 2014 2015 |
21.3 | 14th | DeWind D4 / 48 (2 ×) DeWind D6 / 62 (1 ×) Nordex N62 (2 ×) Vestas V66-1.65MW (5 ×) Nordex N60 (1 ×) Enercon E-70 (1 ×) Enercon E-92 ( 2 ×) |
Bentfeld | OH | 54 ° 9 '10 "N, 10 ° 52' 14" E | WKN WP Krummbek, new energies heeck | Repowering 2015 (2 × Enercon E-92 instead of 2 × Nordex N62 ) |
Krützfleth wind farm | 1994 | 0.6 | 3 | Micon M450-200 (3 ×) | Neuendorf-Sachsenbande | IZ | 53 ° 57 ′ 0 ″ N, 9 ° 19 ′ 1 ″ E | Geo mbH | Repowering planned, originally 6 × Micon M450-200 |
Ladelund-Karlum wind farm | 2014 2016 |
27.0 | 9 | Siemens SWT-3.0-113 (9 ×) |
Ladelund Karlum |
NF | 54 ° 49 ′ 30 ″ N, 9 ° 0 ′ 12 ″ E | Breklum community wind farm | |
Landscheide wind farm | 2001 2007 2015 |
13.5 | 8th |
NEG Micon NM64c / 1500 (6 ×) Enercon E-70 (1 ×) Vensys 112 (1 ×) |
Landscheide | IZ | 53 ° 54 ′ 13 ″ N, 9 ° 16 ′ 5 ″ E | Gewi, wpd | |
Langenhorn wind farm | 2011 2014 2017 |
44.2 | 13 |
Senvion 3.4M104 (10 ×) Senvion 3.4M114 (3 ×) |
Longhorn | NF | 54 ° 40 ′ 1 ″ N, 8 ° 52 ′ 7 ″ E | Windparks Langenhorn GmbH | |
Lasbek wind farm | 2004 2019 |
21.15 | 9 |
Enercon E-66 / 18.70 (6 ×) Vestas V126-3.45MW (3 ×) |
Lasbek | OD | 53 ° 44 ′ 21 ″ N, 10 ° 24 ′ 1 ″ E | RWE Innogy | |
Leckeng wind farm | 2000 2014 2016 2017 |
21.8 | 7th |
Enercon E-70 E4 (1 ×) Vestas V112-3MW (1 ×) Enercon E-115 (5 ×) |
Licking | NF | 54 ° 46 ′ 22 "N, 8 ° 55 ′ 32" E | 2016 repowering (5 × Enercon E-115 for 7 × Enercon E-66 ) | |
Lehmkuhlen-Rethwisch wind farm | 1999 | 4.8 | 8th | Tacke TW 600a (8 ×) | Rethwisch (Lehmkuhlen) | PLÖ | 54 ° 14 ′ 13 ″ N, 10 ° 19 ′ 16 ″ E | ||
Lensahn wind farm | 1998 2001 2002 2013 |
11.9 | 7th |
Enercon E-40 / 5.40 (1 ×) REpower MD70 (1 ×) Enercon E-66 / 15.66 (2 ×) Enercon E-70 (3 ×) |
Lensahn | OH | 54 ° 13 ′ 18 ″ N, 10 ° 54 ′ 16 ″ E | WP Lensahn | Erected on the A 1 , repowering 2013 (3 × Enercon E-70 instead of 3 × Enercon E-40 / 5.40 ) |
Lindewitt-Blye wind farm | 1995 2015 |
26.92 | 10 |
Senvion 3.2M114 (8 ×) Vestas V47-0.66MW (2 ×) |
Blye | SL | 54 ° 41 ′ 1 ″ N, 9 ° 10 ′ 30 ″ E | Dirkshof | 2015 repowering (8 × Senvion 3.2M114 for 15 × old systems such as 7 × NEG Micon NM1500 / 600 ) |
Lindewitt-Linnau wind farm | 2000 2013 |
18.45 | 8th |
Vestas V80-2MW (5 ×) REPower MM92 (1 ×) REPower 3.2M114 (2 ×) |
Linnau | SL | 54 ° 42 ′ 28 "N, 9 ° 9 ′ 17" E | Linnau wind power | 2013 repowering (2 × REPower 3.2M114 and 1 × REPower MM92 for 2 × Tacke TW 600) |
Löhrstorf wind farm | 1999 2007 2012 |
8.55 | 4th |
Vestas V66-1.65MW (1 ×) Enercon E-70 (3 ×) |
Löhrstorf | OH | 54 ° 20 ′ 7 ″ N, 11 ° 0 ′ 22 ″ E | Repowering 2012 (1 × Enercon E-70 instead of 1 × Vestas V66-1.65MW ) | |
Looft wind farm | 2001 2014–2015 |
19.9 | 10 |
Vestas V66-1.65MW (6 ×) Vestas V90-2MW (2 ×) Vestas V112-3.0MW (2 ×) |
Looft | IZ | 54 ° 2 ′ 5 ″ N, 9 ° 32 ′ 19 ″ E | WKN, Wind Power Looft | |
Loose wind farm | 2015-2016 | 15.2 | 5 |
Senvion 3.2M114 (1 ×) Nordex N117 / 3000 (4 ×) |
Loose | RD | 54 ° 31 ′ 11 "N, 9 ° 54 ′ 15" E | Geo Mbh | |
Löwenstedt wind farm | 2013 2014 2015 |
41.8 | 13 |
Senvion 3.4M104 (6 ×) Senvion 3.2M114 (2 ×) Siemens SWT-3.0-113 (5 ×) |
Löwenstedt | NF | 54 ° 38 ′ 56 "N, 9 ° 10 ′ 22" E | Citizens WP Löwenstedt | |
Lübeck-Nord wind farm | 2012 | 4.6 | 2 | Enercon E-82 E2 (2 ×) |
Ivendorf Pöppendorf |
HL | 53 ° 56 ′ 14 "N, 10 ° 49 ′ 18" E | STAWAG, Trave EE | Repowering 2012 (dismantling of the wind farm in Brodten) |
Lütjenholm wind farm | 2013 | 13.6 | 4th | REPower 3.4M104 (4 ×) | Lütjenholm | NF | 54 ° 40 ′ 15 ″ N, 9 ° 2 ′ 7 ″ E | Geo Mbh | |
Lütjenhorn wind farm | 1999 2014 2017 |
23.3 | 8th |
Vestas V112-3MW (2 ×) Enercon E-82 E2 (1 ×) Enercon E-115 (5 ×) |
Lütjenhorn | NF | 54 ° 47 ′ 29 "N, 9 ° 4 ′ 35" E | Geo Mbh | 2017 repowering (5 × Enercon E-115 and 1 × Enercon E-82 E2 for 5 × HSW 1000/57) |
Mannhagen-Bälau wind farm | 2001-2002 | 14.4 | 16 | NEG Micon NM52 / 900 (16 ×) |
Mannhagen Bälau |
RZ | 53 ° 37 ′ 28 "N, 10 ° 37 ′ 16" E | e3 | |
St. Margarethen wind farm | 2001 | 3.9 | 3 | AN Bonus 1300/62 (3 ×) | St. Margarethen | IZ | 53 ° 54 ′ 3 "N, 9 ° 15 ′ 28" E | ||
Marienkoog wind farm | 2012 2014 |
28.8 | 8th |
Siemens SWT-3.6-107 (7 ×) Siemens SWT-3.6-120 (1 ×) |
Marienkoog | NF | 54 ° 46 ′ 27 "N, 8 ° 42 ′ 22" E | Thinker & Wulf | Repowering 2012 (7 × Siemens SWT-3.6-107 instead of 15 × various old systems) |
Medelby-Osterby wind farm | 2014 | 23.3 | 8th |
Senvion 3.2M114 (6 ×) Senvion MM92 (2 ×) |
Medelby Osterby |
SL | 54 ° 47 ′ 31 ″ N, 9 ° 10 ′ 30 ″ E | Citizen wind Medelby | |
Meyn Ost wind farm | 2015 2016 |
23.15 | 8th |
Enercon E-101 (5 ×) Enercon E-82 E2 (2 ×) Vestas V112 3.3MW (1 ×) |
Meyn | SL | 54 ° 44 ′ 20 "N, 9 ° 15 ′ 33" E | WPD | 2015-2016 repowering (5 × Enercon E-101 and 2 × Enercon E-82 E2 for 9 × Südwind S70 / 1500 ) |
St. Michaelisdonn-Volsemenhusen wind farm | 1996 1998 2003 2005 2007 2011-2012 2016-2017 |
46.75 | 21st |
Vestas V44-0.6MW (3 ×) REpower MM82 (3 ×) REPower MM92 (3 ×) Vestas V112-3MW (3 ×) Senvion 3.4M104 (2 ×) Senvion 3.2M114 (4 ×) Enercon E-92 (3 ×) |
St. Michaelisdonn Volsemenhusen |
HEI | 53 ° 59 ′ 1 ″ N, 9 ° 5 ′ 18 ″ E | WES-IBS | 2016-2017 repowering (3 × Enercon E-92 for 2 × REPower MD70 ) |
Bürgerwindpark Mittelholstein (Pemeln) | 2014 | 25.6 | 8th | Senvion 3.2M114 (8 ×) | Pemeln | RD | 54 ° 8 ′ 30 "N, 9 ° 24 ′ 35" E | Citizens WP Mittelholstein | |
Mittelholstein community wind farm (Seefeld-Gokels-Lütjenwestedt) | 2016 | 36.0 | 12 | Enercon E-101 (12 ×) | Gokels | RD | 54 ° 7 ′ 6 ″ N, 9 ° 29 ′ 19 ″ E | Citizens WP Mittelholstein | |
Moorhusen wind farm | 2000 2001 |
23.5 | 16 | AN Bonus 1000/54 (1 ×) NEG Micon NM64c / 1500 (15 ×) |
Moorhusen Krummendiek |
IZ | 53 ° 56 ′ 34 "N, 9 ° 23 ′ 32" E | Ventotec | |
Neuenbrook wind farm | 2001 2012 2017 |
21.3 | 10 |
Vestas V66-1.65MW (4 ×) Vensys 77 (2 ×) Vensys 77 (1 ×) Senvion 3.4M114 (3 ×) |
Neuenbrook | IZ | 53 ° 51 ′ 7 "N, 9 ° 34 ′ 4" E | Bürger-WP Neuenbrook, Butzkies wind project | a Vensys system with a prototype of a "maintenance-free lattice mast" from Butzkies Stahlbau |
Neuengörs-Weede wind farm | 2001 2017 |
29.4 | 12 |
REpower MD70 (6 ×) Senvion 3.4M114 (6 ×) |
Neuengörs Weede |
SE | 53 ° 54 ′ 26 "N, 10 ° 23 ′ 20" E | Thinker & Wulf | erected on the A 20 |
Neuenkirchen-Böddinghusen wind farm | 2015 2017 |
13.6 | 5 |
Enercon E-53 (1 ×) Senvion 3.2M114 (4 ×) |
Neuenkirchen | HEI | 54 ° 15 ′ 7 ″ N, 9 ° 0 ′ 5 ″ E | Community wind farm Neuenkirchen | |
Neuenkirchen-Heuwisch wind farm | 2015 | 19.2 | 6th | Senvion 3.2M114 (4 ×) | Neuenkirchen | HEI | 54 ° 14 ′ 12 "N, 8 ° 57 ′ 11" E | Community wind farm Neuenkirchen | |
Neuenkirchen-Tiebensee wind farm | 2014 2015 |
8.7 | 3 |
Enercon E-70 E4 (1 ×) Senvion 3.2M114 (2 ×) |
Neuenkirchen | HEI | 54 ° 13 ′ 22 "N, 8 ° 59 ′ 56" E | Community wind farm Neuenkirchen | |
Neuenkirchen-Tödienwisch wind farm | 2017 | 15.0 | 5 | Enercon E-115 (5 ×) | Neuenkirchen | HEI | 54 ° 15 ′ 1 ″ N, 8 ° 57 ′ 42 ″ E | Community wind farm Neuenkirchen | |
Neufeld wind farm | 1996 2012 |
36.8 | 16 | Enercon E-82 E2 (16 ×) |
Neufeld Diekhusen-Fahrstedt |
HEI | 53 ° 55 ′ 40 ″ N, 9 ° 0 ′ 1 ″ E | WES-IBS | 2012 repowering (16 × Enercon E-82 E2 for 12 × BWU 41-500) |
Neuratjensdorf wind farm | 1999 2007 2018 |
28.2 | 10 |
REpower MD77 (1 ×) Enercon E-70 E4 (1 ×) Enercon E-101 (8 ×) |
Neuratjensdorf | OH | 54 ° 20 ′ 16 ″ N, 10 ° 59 ′ 10 ″ E | WP Neuratjensdorf Rossee | Repowering 2018 (1 × Enercon E-70 E4 and 8 × Enercon E-101 instead of 8 × Vestas V47-660kW and 3 × Enercon E-66 / 15.66 ) |
Niebüll wind farm | 2012 | 15.0 | 5 | Vestas V112-3MW (5 ×) | Niebüll | NF | 54 ° 47 ′ 31 ″ N, 8 ° 47 ′ 3 ″ E | Geo Mbh | |
Norddeich wind farm | 2009 2011-2012 2016 |
34.8 | 15th |
Enercon E-70 E4 (9 ×) Enercon E-92 (6 ×) |
North dike | HEI | 54 ° 13 ′ 28 "N, 8 ° 54 ′ 17" E | Marsh Association Schleswig-Holstein e. V. | |
Norderheistedt wind farm | 2014 | 16.5 | 5 | Vestas V112-3.3MW (5 ×) | Norderheistedt | HEI | 54 ° 15 ′ 14 "N, 9 ° 7 ′ 14" E | Eider community wind farm | |
Norderwöhrden-Oesterwurth wind farm | 2002 2015 2017 |
110.9 | 38 |
Enercon E-48 (1 ×) Enercon E-70 E4 (14 ×) Vestas V80 (1 ×) Vestas V112-3.45MW (22 ×) |
Norderwöhrden Oesterwurth |
HEI | 54 ° 12 ′ 5 ″ N, 9 ° 0 ′ 23 ″ E | 2017 repowering (22 × Vestas V112-3.45MW for 25 old systems) | |
Nordhackstedt wind farm | 1995 1997 2003 2012 2017 |
20.75 | 9 | Tacke TW 600 (1 ×) REpower 3.4M104 (1 ×) REpower MD77 (3 ×) Senvion MM92 (1 ×) Senvion 3.4M114 (3 ×) |
Nordhackstedt | SL | 54 ° 44 ′ 19 ″ N, 9 ° 11 ′ 11 ″ E | Ing.Henning Holst, L / project | 2013 and 2017 repowering (1 × REPower 3.4M104 for 2 × Vestas V44 ), (3 × Senvion 3.4M114 for 1 × REPower MD70 , 1 × Tacke TW 600 and 2 × Nordtank NTK-500 ) |
Norstedt wind farm | 2003 2014 2017 |
41.4 | 16 |
REpower MD70 (5 ×) REpower MM82 (2 ×) Senvion 3.2M114 (6 ×) Senvion 3.4M114 (1 ×) Siemens SWT-3.6-130 (2 ×) |
Norstedt | NF | 54 ° 36 ′ 25 ″ N, 9 ° 8 ′ 18 ″ E | ||
Nortorf wind farm | 2001 2010 |
17.4 | 10 |
NEG Micon NM64c / 1500 (7 ×) Enercon E-70 E4 (3 ×) |
Nortorf | IZ | 53 ° 55 ′ 22 "N, 9 ° 19 ′ 23" E | Geo mbH, Bürger-WP Nortorf, WP Norderwisch | |
Nortorf West wind farm | 2014 2016 |
34.6 | 10 |
Senvion 3.2M114 (8 ×) Amperax A3000 (3 ×) |
Nortorf | IZ | 53 ° 54 ′ 10 "N, 9 ° 18 ′ 2" E | ||
Community wind farm Obere Arlau | 2013 | 38.4 | 12 | Senvion 3.2M114 (12 ×) |
Hazel and Viöl |
NF | 54 ° 34 ′ 58 ″ N, 9 ° 9 ′ 12 ″ E | Ing.Holst | |
Obernwohlde-Pronstorf wind farm | 2016 | 91.5 | 20th | Enercon E-101 (20 ×) |
Obernwohlde Pronstorf |
OH SE |
53 ° 56 ′ 10 ″ N, 10 ° 34 ′ 12 ″ E | SUSI Renewable Energy Fund II (mutual fund) | |
Oevenum wind farm | 1990 1991 1992 2015 |
6.9 | 3 | Enercon E-70 (3 ×) | Oevenum | NF | 54 ° 44 ′ 28 "N, 8 ° 34 ′ 4" E | Föhrer wind power | Repowering 2015, (3 × Enercon E-70 instead of 5 × Vestas V25-200kW , Vestas V27-225kW and Micon M530-250 ) |
Oldenborstel wind farm | 2014 | 6.4 | 2 | Senvion 3.2M114 (2 ×) | Oldenborstel | IZ | 54 ° 3 ′ 29 ″ N, 9 ° 31 ′ 28 ″ E | iTerra Wind, Citizen WP Oldenborstel | |
Oldenswort wind farm | 2001 2015 |
23.7 | 12 |
Vestas V27 (1 ×) Vestas V80-2MW (6 ×) Enercon E-82 E2 (5 ×) |
Oldens word | NF | 54 ° 23 ′ 22 "N, 8 ° 56 ′ 17" E | Wotan group | |
Oldersbek wind farm | 1997-1998 2013 2017 |
8.95 | 4th |
REPower MM82 (1 ×) Enercon E-82 E2 (3 ×) |
Oldens word | NF | 54 ° 27 '17 "N, 9 ° 9' 29" E | GEWI | 2013 repowering (1 × REPower MM82 for 1 × BWU 57/1000), 2017 repowering (3 × Enercon E-82 E2 for 4 × NEG Micon NM64 / 1500 ) |
Olderup wind farm | 1995 2002 2013 2015 2017 |
44.95 | 20th |
Enercon E-66 (3 ×) Enercon E-70 E2 (8 ×) Senvion MM82 (2 ×) Senvion MM92 (1 ×) Nordex N100 / 3300 (1 ×) Vestas V90-2MW (2 ×) Vestas V117-3.45MW (2 ×) Enercon E-48 (1 ×) |
Olderup | NF | 54 ° 31 ′ 28 ″ N, 9 ° 6 ′ 21 ″ E | Greenbridge, eeNORD | 2015 repowering (1 × Vestas V90-2MW , 1 × Senvion MM82 and 2 × Enercon E-70 E2 for 4 × Vestas V39 ), 2017 repowering (2 × Vestas V117-3.45MW and 1 × Nordex N100 / 3300 for 3 × Vestas V80-2MW ) |
Ostenfeld wind farm (Husum) | 2002 2009 2012 |
9.1 | 5 |
NEG Micon NM64 / 1500 (3 ×) Enercon E-70 E4 (2 ×) |
Ostenfeld (Husum) | NF | 54 ° 27 ′ 1 ″ N, 9 ° 12 ′ 12 ″ E | Ing.Henning Holst | |
Oster-Ohrstedt wind farm | 2002 2014 2017 |
13.8 | 5 | Enercon E-70 E4 (6 ×) | Oster-Ohrstedt | NF | 54 ° 31 '12 "N, 9 ° 13" 25 "E | 2017 repowering (4 × Enercon E-70 E4 for 4 × Enercon E-66 ) | |
Oster-Ohrstedt West wind farm | 2003 2014 2015 |
22.5 | 10 |
Enercon E-66 (1 ×) Enercon E-82 E2 (9 ×) |
Oster-Ohrstedt | NF | 54 ° 30 ′ 14 "N, 9 ° 15 ′ 8" E | 2015 repowering (4 × Enercon E-82 E4 for 4 × Enercon E-66 ) | |
Osterrade wind farm | 2001 2011 2015 |
26.0 | 13 |
Vestas V90-2MW (3 ×) Senvion MM100 (10 ×) |
Bovenau | RD | 54 ° 21 ′ 1 ″ N, 9 ° 51 ′ 5 ″ E | IB Henning Holst | 2015 repowering (10 × Senvion MM100 for 7 × Vestas V66-1.65MW ) |
Owschlag-Boklund wind farm | 2001 | 10.5 | 4th |
GE Wind Energy 1.5sl (4 ×) Südwind S70 (3 ×) |
Owschlag | RD | 54 ° 24 ′ 32 "N, 9 ° 34 ′ 35" E | getproject | |
Owschlag-Norby wind farm | 2001 | 12.0 | 8th | Südwind S70 (8 ×) | Owschlag | RD | 54 ° 24 ′ 20 "N, 9 ° 33 ′ 33" E | e3 | |
Padenstedt wind farm | 2005 | 6.9 | 3 | Enercon E-70 E4 (3 ×) | Padenstedt | RD | 54 ° 1 ′ 1 ″ N, 9 ° 53 ′ 29 ″ E | ||
Petersdorf wind farm | 1991 | 0.9 | 3 | Enercon-32 (3 ×) | Petersdorf (Fehmarn) | OH | 54 ° 28 ′ 13 "N, 11 ° 4 ′ 11" E | ||
Presen wind farm | 2006-2007 | 39.1 | 17th | Enercon E-70 (17 ×) | Presen | OH | 54 ° 29 ′ 6 ″ N, 11 ° 13 ′ 34 ″ E | Citizens WP Fehmarn |
Repowering 2006–2007 (17 × Enercon E-70 instead of 23 × Enercon E-40 ) |
Puls wind farm | 1999 | 16.5 | 10 |
Vestas V66-1.65MW (10 ×) REpower MM82 (1 ×) |
Pulse | IZ | 54 ° 4 ′ 9 ″ N, 9 ° 31 ′ 34 ″ E | WKN | |
Quarnbek wind farm | 2016 | 24.3 | 3 | Siemens SWT-3.2-113 (3 ×) | Quarnbek | RD | 54 ° 19 ′ 10 ″ N, 9 ° 59 ′ 21 ″ E | Thinker & Wulf | |
Quarnstedt wind farm | 2001 2011 |
24.3 | 16 |
AN Bonus B62 / 1300 (11 ×) Vestas V90-2MW (3 ×) Vestas V80-2MW (2 ×) |
Quarnstedt | IZ | 53 ° 58 ′ 7 ″ N, 9 ° 46 ′ 8 ″ E | Prokon | |
Raa-Besenbek wind farm | 2001 2011 2019-2020 |
22.6 | 8th |
REpower MM92 (4 ×) Nordex N117 / 3600 (4 ×) |
Raa-Besenbek | PI | 53 ° 44 ′ 11 "N, 9 ° 35 ′ 31" E | Citizens WP Raa-Besenbek, IB Henning Holst | 2019-2020 repowering (4 × Nordex N117 / 3600 instead of 4 × GE Wind Energy 1.5s ) |
Rabenholz wind farm | 1994 2018 |
11.75 | 5 | Enercon E-92 (5 ×) | Raven wood | SL | 54 ° 42 ′ 28 "N, 9 ° 54 ′ 57" E | 2018 repowering (5 × Enercon E-92 instead of 3 × Tacke TW 600) | |
Rantrum wind farm | 1997-1998 1999 2004 2013 2015 2017 |
29.7 | 8th |
Vestas V66-1.65MW (6 ×) REPower MD70 (3 ×) Senvion 3.4M104 (1 ×) Senvion 3.2M114 (3 ×) Senvion 3.4M114 (2 ×) |
Rantrum | NF | 53 ° 27 '26 "N, 9 ° 9' 17" E | WKN AG | |
Ratjendorf wind farm | 2000 2006 |
7.3 | 4th |
Vestas V66-1.75MW (3 ×) REpower MM82 (1 ×) |
Ratjendorf | PLÖ | 54 ° 21 ′ 19 ″ N, 10 ° 24 ′ 7 ″ E | Laboer wind farm | |
Reher wind farm | 2002 2004 2005 |
21.1 | 11 |
Enercon E-66 / 18.70 (2 ×) REpower MD77 (1 ×) Enercon E-70 (8 ×) |
Reher | IZ | 54 ° 3 ′ 5 ″ N, 9 ° 34 ′ 8 ″ E | BAUUNION Wismar, citizens WP Reher | |
Rehhorst wind farm | 2001 | 7.5 | 5 | NEG Micon NM72c / 1500 (5 ×) | Rehhorst | OD | 53 ° 53 '16 "N, 10 ° 27' 23" E | e3, plan 8 | |
Reinsbüttel wind farm | 2001 | 7.5 | 5 | NEG Micon NM72c / 1500 (5 ×) | Rehhorst | OD | 53 ° 53 '16 "N, 10 ° 27' 23" E | e3, plan 8 | |
Reinsbüttel-Oesterdeichstrich wind farm | 1993 1999 2017 |
21.8 | 12 |
Vestas V27 (1 ×) Vestas V39 (2 ×) Enercon E-70 E4 (9 ×) |
Reinsbüttel Oesterdeichstrich |
HEI | 54 ° 10 ′ 8 ″ N, 8 ° 53 ′ 25 ″ E | 2017 repowering (1 × Enercon E-70 E4 for 3 × Vestas V39 ) | |
Rethwisch wind farm (Stormarn) | 2005 | 4.5 | 3 | NEG Micon NM64c / 1500 (3 ×) | Rethwisch (Stormarn) | OD | 53 ° 46 ′ 17 "N, 10 ° 27 ′ 9" E | e3 | |
Rethwisch wind farm (Steinburg) | 2016 | 53.25 | 16 |
Vestas V112-3.3MW (13 ×) Vestas V112-3.45MW (3 ×) |
Rethwisch (Steinburg) | IZ | 53 ° 53 ′ 2 ″ N, 9 ° 36 ′ 13 ″ E | MDP Group | |
Reußenköge wind farm | 1999 2003 2004 2008 2009-2010 2015-2017 |
225.2 | 82 |
Vestas V80-2MW (10 ×) REpower MM70 (2 ×) REpower MM82 (24 ×) Vestas V112-3.3MW (38 ×) Vestas V112-3.45MW (8 ×) |
Reußenköge | NF | 54 ° 36 '24 "N, 8 ° 54' 8" E | WP Reußenköge I - V, Dirkshof, various | 2014-2017 repowering (34 × Vestas V112 for 34 × old systems such as Senvion MM82 , Vestas V66 , Vestas V80 and NEG Micon NM80 / 2750) |
Riepsdorf wind farm | 2000 2001 2002 |
40.14 | 34 |
Vestas V47-660kW (14 ×) Jacobs MD70 (13 ×) NEG Micon NM64c / 1500 (4 ×) Enercon E-66 / 18.70 (3 ×) |
Riepsdorf Rüting Cismarfelde |
OH | 54 ° 13 ′ 41 ″ N, 10 ° 56 ′ 48 ″ E | RWE Innogy , Koselauer Windenergie | |
Risum-Lindholm wind farm | 2014-2015 | 33.0 | 10 | Vestas V112-3.3MW (10 ×) | Risum-Lindholm | NF | 54 ° 46 ′ 17 "N, 8 ° 54 ′ 11" E | Kohldamm wind farm | |
Rüting wind farm | 2000-2001 | 7.5 | 5 | REpower MD70 (5 ×) | Rüting | OH | 54 ° 12 ′ 12 ″ N, 10 ° 56 ′ 3 ″ E | ||
Schafflund wind farm | 2014 | 9.6 | 3 | REpower 3.2M114 (3 ×) | Schafflund | SL | 54 ° 45 ′ 24 ″ N, 9 ° 8 ′ 16 ″ E | L / project | |
Schafflundfeld wind farm | 1994 1999 2005 2013 2017 2018 |
46.6 | 14th |
REpower 3.2M114 (5 ×) Senvion 3.4M114 (9 ×) |
Schafflundfeld | SL | 54 ° 46 ′ 21 ″ N, 9 ° 7 ′ 28 ″ E | L / project | 2017 and 2018 repowering (8 × Senvion 3.4M114 for 6 × Tacke 1.5s and 3 × Enercon E-70 ) |
Schashagen wind farm | 2002 2017 |
13.25 | 7th |
Enercon E-66 / 18.70 (4 ×) Senvion MM92 (1 ×) Senvion MM100 (2 ×) |
Schashagen | OH | 54 ° 8 ′ 22 "N, 10 ° 53 ′ 16" E | WP Schashagen | |
Schashagen-Albersdorf wind farm | 2002 2017 2018 |
17.55 | 7th |
Enercon E-66 / 18.70 (3 ×) Enercon E-101 (3 ×) Enercon E-115 (1 ×) |
Albersdorf (Schashagen) | OH | 54 ° 8 ′ 24 ″ N, 10 ° 54 ′ 25 ″ E | WP Schashagen | |
Schiphorst wind farm | 2002 | 4.0 | 4th | NEG Micon NM60 / 1000 (4 ×) | Schiphorst | RZ | 53 ° 43 ′ 2 "N, 10 ° 26 ′ 34" E | e3 | |
Schobüll wind farm | 1994 2009 2015 |
24.3 | 10 |
Enercon E-82 (4 ×) Enercon E-82 E2 (2 ×) Enercon E-70 (1 ×) Senvion 3.2M114 (2 ×) Nordex N117 / 3000 (1 ×) |
Grown up | SL | 54 ° 40 ′ 31 ″ N, 9 ° 16 ′ 25 ″ E | Thinker & Wulf | 2009 repowering (4 × Enercon E-82 for 6 × Dewind D4) |
Schönwalde-Altenkrempe wind farm | 2017 | 17.0 | 5 | Senvion 3.4M114 (5 ×) | Schönwalde on the Bungsberg | OH | 54 ° 10 ′ 1 ″ N, 10 ° 49 ′ 34 ″ E | Prokon | |
Schuby wind farm | 1998 2001 |
25.59 | 22nd |
Südwind S70 (14 ×) Vestas V47 / 660KW (4 ×) Nordtank NTK-600 (3 ×) Nordex N27 / 150 (1 ×) |
Schuby | SL | 54 ° 31 ′ 5 ″ N, 9 ° 25 ′ 8 ″ E | ||
Schülp wind farm near Nortorf | 2015 | 10 | 4th | Nordex N100 (4 ×) | Schülp b. Nortorf | RD | 54 ° 8 ′ 28 "N, 9 ° 51 ′ 35" E | ||
Schülp-Oesterwurth wind farm | 1994 2001 2007-2008 2009 2014 2017 |
39.56 | 27 | Tacke TW 500 (5 ×) Nordtank NTK-600/41 (1 ×) Enercon E-48 (2 ×) Enercon E-53 (1 ×) Vestas V47-0.66MW (1 ×) Vestas V52-0.85MW (3 × ) REpower MD70 (1 ×) Senvion MM82 (1 ×) Vestas V80 (1 ×) Enercon E-70 E4 (11 ×) |
Schülp Oesterwurth |
HEI | 54 ° 14 ′ 8 ″ N, 8 ° 56 ′ 20 ″ E | WPD | 2014 repowering (8 × Enercon E-70 E4 for 8 × Tacke TW 600, Nordtank NTK-600 ) and 2016 (2 × Enercon E-70 E4 instead of 2 × Vestas V47-0.66MW ) |
Schülp West wind farm | 1994 2009 2014 |
23.8 | 11 |
Enercon E-48 (1 ×) Enercon E-70 E4 (10 ×) |
Schülp | HEI | 54 ° 14 ′ 6 ″ N, 8 ° 54 ′ 19 ″ E | WPD | 2014 repowering (9 × Enercon E-70 E4 for 8 × NEG Micon NM48 / 750 , Vestas V47 ) and 2016 (1 × Enercon E-70 E4 for 1 × NEG Micon NM48 / 750 ) |
Schwedeneck wind farm | 2000 | 4.5 | 3 | Tacke TW 1.5s (1 ×) | Blast | RD | 54 ° 27 '17 "N, 10 ° 5' 34" E | ||
Schwesing wind farm | 1998 2001 2014-2015 |
22.4 | 8th | REpower 57/1000 (2 ×) Senvion 3.4M104 (6 ×) |
Schwesing | NF | 54 ° 29 ′ 20 "N, 9 ° 9 ′ 33" E | GP joules | 2014-2015 repowering (6 × Senvion 3.4M104 for 9 × REPower 57/1000) |
Schwochel-Wulfsdorf wind farm | 2000 2002 |
21.5 | 14th |
Vestas V66-1.65MW (12 ×) Vestas V52-850kW (2 ×) |
Schwochel Wulfsdorf |
OH | 54 ° 0 ′ 9 "N, 10 ° 38 ′ 33" E | WKN | |
Sehestedt wind farm | 2015 | 12.0 | 4th | Nordex N117 / 3000 (4 ×) | Sehestedt | RD | 54 ° 22 ′ 20 "N, 9 ° 48 ′ 29" E | Thinker & Wulf | |
Silberstedt wind farm | 1994 1995 2016 |
15.65 | 12 |
Enercon E-115 (4 ×) Nordtank NTK-500 (7 ×) Vestas V25-200KW (1 ×) |
Silberstedt | SL | 54 ° 31 '21 "N, 9 ° 23' 29" E | ||
Silberstedt-Rosacker wind farm | 2001 | 14.46 | 15th |
Südwind S70 (6 ×) Tacke TW 600 (8 ×) Vestas V47-600KW (1 ×) |
Rosacker | SL | 54 ° 30 ′ 11 "N, 9 ° 24 ′ 9" E | ||
Sillerup wind farm | 2002 2008 2015 |
46.65 | 24 |
Enercon E-70 E4 (8 ×) Enercon E-82 E2 (3 ×) Enercon E-48 (1 ×) NEG Micon NM48 / 750 (7 ×) Vensys 112/2500 (1 ×) Senvion 3.2M114 (4 ×) |
Sillerup | SL | 54 ° 40 ′ 2 "N, 9 ° 11 ′ 31" E | WPD, revenue | 2015 repowering (3 × Enercon E-82 E2 and 5 × Senvion 3.2M114 for 7 × NEG Micon NM48 / 750 and 1 × Vestas V47 ) 2 NEG Micon NM48 / 750 meanwhile dismantled |
Simonsberg wind farm | 1993-95 2003 2012 |
47.4 | 25th |
Vestas V80-2MW (2 ×) Vestas V112-3MW (4 ×) |
Simonsberg | NF | 54 ° 26 ′ 40 "N, 8 ° 59 ′ 9" E | 2015 repowering (4 × Vestas V112-3MW for 11 × Enercon E-40 ) | |
Sollwitt wind farm | 2014 | 20.4 | 6th | Senvion 3.4M104 (6 ×) | Sollwitt | NF | 54 ° 34 ′ 34 "N, 9 ° 14 ′ 29" E | WEB Andresen | |
Sommerland wind farm | 1999 2016 2018 |
14.0 | 7th | Senvion MM100 (7 ×) | Summer land | IZ | 53 ° 47 ′ 22 "N, 9 ° 31 ′ 34" E | RWE Innogy | 2018 repowering (3 × Senvion MM100 for 4 × Enercon E-66 / 15.66 ) |
Sönnebüll wind farm | 1997 2005-2006 2009 2014 2015 |
20.05 | 8th |
Nordex N80 (1 ×) REpower MM82 (4 ×) Senvion 3.2M114 (1 ×) Senvion 3.2M114 (2 ×) |
Sönnebüll | NF | 54 ° 38 ′ 6 ″ N, 9 ° 0 ′ 19 ″ E | Windpark Sönnebüll GmbH, WEB Andresen | 2009 Repowering (4 × Senvion MM82 for 6 × Nordex N52 ) |
Sörup wind farm | 1999 2015 |
17.6 | 9 |
Senvion MM92 (6 ×) Vestas V80-2MW (1 ×) Vestas V66-1.65MW (2 ×) |
Soerup | SL | 54 ° 44 ′ 9 ″ N, 9 ° 40 ′ 12 ″ E | Ing.Henning Holst, WKN AG | Previously 1 × Vestas V47 |
Sprakebüll wind farm | 1998 2011 2014 2017 |
23.0 | 9 |
Vestas V112-3.0MW (5 ×) Nordex N100 / 2500 (2 ×) Nordex N117 / 3000 (1 ×) |
Sprakebull | NF | 54 ° 46 '43 "N, 9 ° 5' 36" E | Geo Mbh | 2014 repowering (5 × Vestas V112-3MW for 5 × Vestas V66-1.65MW ) |
Steinberg wind farm | 1995 | 1.8 | 3 | Tacke TW 600 (3 ×) | Steinberg | SL | 54 ° 45 ′ 25 "N, 9 ° 48 ′ 22" E | ||
Stelle-Wittenwurth wind farm | 2015 | 19.8 | 6th | Vestas V112-3.3MW (6 ×) | Place-Wittenwurth | HEI | 54 ° 14 ′ 35 "N, 9 ° 2 ′ 23" E | Citizen wind farm Stelle-Wittenwurth | |
Strübbel wind farm | 2016 | 13.6 | 4th | Senvion 3.4M114 (4 ×) | Strübbel | HEI | 54 ° 15 ′ 41 ″ N, 8 ° 56 ′ 48 ″ E | ||
Süderau wind farm | 2000 2002 2015 2017 |
34.85 | 17th | Jacobs J43 / 600 (4 ×) REpower 48/600 (3 ×) Senvion MM92 (1 ×) Senvion 3.2M114 (2 ×) Senvion 3.4M114 (3 ×) Siemens SWT-3.0-113 (4 ×) |
Süderau Greenland |
IZ | 53 ° 50 ′ 0 ″ N, 9 ° 34 ′ 20 ″ E | Wind power Süderau | 2017 repowering (3 × Senvion 3.4M114 for 5 × Tacke TW 600a) |
Süderdeich Nord wind farm | 1993 1995 2012 |
6.9 | 3 | Enercon E-82 E2 (3 ×) | South dike | HEI | 54 ° 12 ′ 16 ″ N, 8 ° 53 ′ 2 ″ E | Süderdeich community wind farm | 2012 repowering (3 × Enercon E-82 E2 instead of 1 × Enercon E-40 5.40 , 2 Micon M700 / 250 and 1 Micon M1500 / 500) |
Süderdeich-Reinsbüttel wind farm | 1999 2004 2010 |
12.9 | 14th |
Vestas V47-0.66MW (10 ×) Vestas V52-0.85MW (2 ×) Enercon E-70 E4 (2 ×) |
Süderdeich Reinsbüttel |
HEI | 54 ° 11 ′ 16 ″ N, 8 ° 55 ′ 16 ″ E | Süderdeich community wind farm | |
Süderdeich-Unterschaar wind farm | 1993 2010 |
23.0 | 10 |
Enercon E-70 E4 (9 ×) Enercon E-82 E2 (1 ×) |
Süderdeich Unterschaar |
HEI | 54 ° 11 ′ 10 ″ N, 8 ° 53 ′ 20 ″ E | Süderdeich community wind farm | 2010 Repowering (7 × Enercon E-70 E4 for 7 × Enercon E-40 and 1 × Mitsubishi MWT-450-39) |
Süderlügum wind farm | 2014 | 39.0 | 13 |
Siemens SWT-3.0-113 (12 ×) Enercon E-101 (1 ×) |
Süderlügum | NF | 54 ° 53 ′ 35 "N, 8 ° 54 ′ 11" E | Süderlügum community wind farm | |
Tating wind farm | 1991 2016 |
20.7 | 9 | Enercon E-70 E4 (9 ×) | Tating | HEI | 54 ° 20 ′ 10 "N, 8 ° 42 ′ 9" E | Ing.Henning Holst | 2016 repowering (9 × Enercon E-70 E4 for 10 × Vestas V39 ) |
Tellingstedt-Süderdorf wind farm | 2014 2016 |
32.9 | 10 |
Vestas V112-3.3MW (9 ×) Senvion 3.2M114 (1 ×) |
Tellingstedt Süderdorf |
HEI | 54 ° 12 ′ 7 ″ N, 9 ° 18 ′ 14 ″ E | Eider community wind farm | |
Tensbüttel wind farm | 2014 2016 |
15.0 | 5 | Vestas V112-3.0MW (5 ×) | Tensbüttel roast | HEI | 54 ° 6 ′ 13 ″ N, 9 ° 16 ′ 5 ″ E | Citizens WP Tensbüttel | Erected on the A 23 |
Timmaspe wind farm | 2001 | 13.0 | 10 | Nordex N60 (10 ×) | Timmaspe | RD | 54 ° 8 ′ 2 "N, 9 ° 51 ′ 35" E | e3 | |
Tralau wind farm | 2001 | 8.0 | 4th | Vestas V80-2MW (4 ×) | Tralau | OD | 53 ° 50 ′ 8 ″ N, 10 ° 16 ′ 14 ″ E | e3 | |
Treia-Ipland wind farm | 2014 2019 |
36.0 | 11 |
REpower 3.2M114 (9 ×) REpower 3.6M114 (2 ×) |
Treia | SL | 54 ° 32 ′ 22 "N, 9 ° 18 ′ 10" E | Citizen wind farm Treia-Ipland | |
Trennewurth wind farm | 1999 2001 2003 2012 2014 |
26.51 | 17th | HAG ET550 / 41 (1 ×) NEG Micon NM48 / 750 (1 ×) Vestas V47-660kW (1 ×) Vestas V66-1.65MW (7 ×) Vestas V80 (3 ×) Enercon E-70 E4 (3 ×) Vensys 70 (1 ×) |
Trennewurth | HEI | 53 ° 59 ′ 22 "N, 9 ° 0 ′ 14" E | Wind7, UMaAG | |
Trennewurth-Barlt wind farm | 2012 2016 |
44.0 | 5 |
REpower 3.4M104 (4 ×) Senvion 3.2M114 (1 ×) |
Trennewurth Barlt |
HEI | 54 ° 0 ′ 32 "N, 9 ° 0 ′ 31" E | WES-IBS | Expansion planned (1 × Enercon E-126 EP3 E2 ) |
Trennewurth-Helse wind farm | 2016 | 24.0 | 8th | Enercon E-115 (8 ×) |
Trennewurth Helse |
HEI | 53 ° 59 ′ 6 ″ N, 9 ° 1 ′ 35 ″ E | ||
Trenter Berg wind farm | 1998 | 3.6 | 6th | Tacke TW 600 (6 ×) |
Wielen Trent |
PLÖ | 54 ° 11 ′ 21 ″ N, 10 ° 21 ′ 2 ″ E | wotan, WinTec | |
Twedt wind farm | 1995 2018 |
27.54 | 14th |
Enercon E-17 (1 ×) Tacke TW 600 (5 ×) Vestas V47-0.66MW (1 ×) Senvion 3.4M114 (7 ×) |
Twedt | SL | 54 ° 36 ′ 13 ″ N, 9 ° 39 ′ 28 ″ E | Ing.Henning Holst | 2018 repowering (7 × Senvion 3.4M114 for 11 × Vestas V47-0.66MW , 1 × Tacke TW 600, 1 × Wind World W2320 / 160 and 1 × Micon M 750/250) |
Uelsby wind farm | 2015 | 9.6 | 3 | Senvion 3.2M114 (3 ×) | Uelsby | SL | 54 ° 37 '16.2 " N , 9 ° 36' 14.2" E 54 ° 37 '10 "N, 9 ° 36' 9" E | Thinker & Wulf | |
Uelvesbüll wind farm | 1991 2001 |
8.8 | 12 | Bonus B54 / 1000 (8 ×) REpower 200 kw (4 ×) |
Uelvesbull | NF | 54 ° 24 ′ 15 ″ N, 8 ° 56 ′ 10 ″ E | Ing.Henning Holst | |
Uetersen wind farm | 2001 | 7.8 | 6th | AN Bonus 1300/62 (6 ×) | Uetersen | PI | 53 ° 41 ′ 16 "N, 9 ° 37 ′ 31" E | Rübsamen Windenergie GmbH | |
Vollstedt wind farm | 1997 2007 2009 2011 |
32.0 | 10 | Enercon E-70 E4 (10 ×) | Vollstedt | NF | 54 ° 37 ′ 28 "N, 9 ° 1 ′ 27" E | WEB Andresen | 2007 repowering (8 × Enercon E-70 E4 for 7 × Enercon E-40 ), 2009 repowering (2 × Enercon E-70 E4 for 2 × Enercon E-66 ) |
Wanderup wind farm | 1995 2012 2015 |
47.6 | 16 |
Senvion 3.2M114 (13 ×) Enercon E-82 (3 ×) |
Wanderup | SL | 54 ° 40 ′ 30 ″ N, 9 ° 17 ′ 16 ″ E | Ing.Henning Holst | 2015 repowering (13 × Senvion 3.2M114 for Vestas V47 / 660 KW ) |
Wangelau wind farm | 2014 | 14.4 | 6th | Nordex N117 / 2400 (6 ×) | Wangelau | RZ | 53 ° 27 '8 "N, 10 ° 33' 30" E | WPD, natural wind | |
Weesby wind farm | 1996 1998 2013 |
12.4 | 4th |
Enercon E-101 (2 ×) Senvion 3.2M114 (2 ×) |
Weesby | SL | 54 ° 51 ′ 15 "N, 9 ° 7 ′ 35" E | Medelby community wind farm | 2013 repowering (2 × Enercon E-101 and 2 × Senvion 3.2M114 for 4 × Enercon E-40 and 4 × NEG Micon 1500/500 ) |
Wesselburener Deichhausen wind farm | 2014 | 9.2 | 4th | Enercon E-70 E4 (4 ×) | Wesselburener Deichhausen | HEI | 54 ° 11 '12 "N, 8 ° 56' 14" E | 2014 repowering (4 × Enercon E-70 E4 instead of 3 × Enercon E-40 5.40 and 1 × Vestas V44-0.6MW ) | |
Wesselburenerkoog wind farm | 2009 2011 2016 |
25.4 | 9 |
Enercon E-70 E4 (9 ×) Enercon E-92 (2 ×) |
Wesselburenerkoog | HEI | 54 ° 14 ′ 16 "N, 8 ° 53 ′ 28" E | ||
Westerau wind farm | 1997 | 6.3 | 6th | REpower 57/1000 (6 ×) | Westerau | OD | 53 ° 46 ′ 16 ″ N, 10 ° 30 ′ 3 ″ E | Thinker & Wulf | |
Westerbelmhusen wind farm | 1994 2013 |
11.5 | 5 | Enercon E-82 E2 (5 ×) | Westerbelmhusen | HEI | 53 ° 54 ′ 31 "N, 9 ° 4 ′ 34" E | Bürgerwind Brunsbüttel | Repowering 2013 (5 × Enercon E-82 E2 instead of 1 × AN Bonus 450/37, 1 × GET Danwin 27, 6 × Enercon E-40 / 5.40 and 1 × Vestas V39-500kW ) |
Wester-Ohrstedt wind farm | 2004 | 6.55 | 4th |
REpower MD70 (3 ×) REpower MM82 (1 ×) |
Wester-Ohrstedt | NF | 54 ° 29 ′ 27 ″ N, 9 ° 10 ′ 13 ″ E | e3, wpd | |
West coast wind farm | 1987 1989 1993 1994 1997 2002 2004 2009 2010 |
51.1 | 24 |
Enercon E-58 (2 ×) Enercon E-66 / 18.70 (2 ×) Enercon E-70 (18 ×) REpower MM82 (2 ×) |
Kaiser Wilhelm Koog | HEI | 53 ° 55 ′ 23 "N, 8 ° 57 ′ 0" E | West coast wind farm | First German wind farm, wind turbine test field, tested wind turbines: MAN Aeroman 30 (20 ×), elektrOmat 25 (5 ×), Enercon E-16 (5 ×), Adler 25 (2 ×), Enercon E-33 (1 ×), HSW 250 T (1 ×), Tacke TW 250 (1 ×), Vestas V27-225 kW (1 ×), Enercon E-40 (1 ×), Vestas V63-1.5MW (1 ×) |
Wiemersdorf wind farm | 2001 2004 2010 |
32.8 | 16 |
Enercon E-66 / 18.70 (6 ×) REpower MD77 (3 ×) Nordex N100 / 2500 (7 ×) |
Wiemersdorf | SE | 53 ° 57 ′ 32 "N, 9 ° 55 ′ 35" E | Bürger-WP Wiemersdorf, Geo mbH, Nordex | built test site for offshore wind turbines
on the A 7 |
Willenscharen-Brokstedt wind farm | 1999 2003 2017 |
24.75 | 16 |
Vestas V66-1.65MW (12 ×) Vestas V52-850kW (3 ×) Nordex N117 / 2400 (1 ×) |
Willenscharen Brokstedt |
IZ | 54 ° 0 ′ 22 "N, 9 ° 50 ′ 13" E | Citizens WP Willenscharen-Brokstedt, DGE | |
Winnert wind farm | 2002 2014 2018 |
16.8 | 7th | REpower 57/1000 (2 ×) Enercon E-58 (3 ×) Enercon E-70 E4 (2 ×) Senvion 3.6M114 (2 ×) |
Winnert | NF | 54 ° 26 '22 "N, 9 ° 11' 11" E | Certainly | |
Wittbek wind farm | 2015 | 19.8 | 6th |
Senvion 3.4M104 (2 ×) Senvion 3.2M114 (2 ×) Vestas V112-3.3MW (2 ×) |
Wittbek | NF | 54 ° 28 ′ 31 ″ N, 9 ° 10 ′ 17 ″ E | GP joules | |
Wittkiel wind farm | 1995 | 1.8 | 3 | Tacke TW 600 (3 ×) | Wittkiel | SL | 54 ° 40 ′ 7 "N, 9 ° 52 ′ 21" E | Schwansener energy systems | |
Wöhrden wind farm | 1998 2008 2009 |
35.9 | 35 |
Enercon E-40 (1 ×) Vestas V47-0.66MW (25 ×) Enercon E-48 (1 ×) Enercon E-70 E4 (7 ×) Vestas V80 (1 ×) |
Woehrden | HEI | 54 ° 10 ′ 15 ″ N, 9 ° 1 ′ 7 ″ E | WKN AG / BGZ | |
Wöhrden Ost wind farm | 2012 | 30.0 | 10 | Vestas V112-3MW (10 ×) | Woehrden | HEI | 54 ° 9 '17 "N, 9 ° 2' 23" E | Dirkshof | |
Wöhrden West wind farm | 1999 2012 |
14.98 | 13 |
Enercon E-40 (1 ×) Vestas V47-0.66MW (8 ×) Enercon E-70 E4 (4 ×) |
Woehrden | HEI | 54 ° 9 ′ 27 "N, 8 ° 57 ′ 31" E | WKN AG / BGZ | 2012 repowering (4 × Enercon E-70 E4 for 3 × Vestas V47-0.66MW and 1 × Enercon E-40 ) |
Woltersdorf wind farm | 2001 | 7.8 | 6th | AN Bonus 1300/62 (6 ×) | Woltersdorf | RZ | 53 ° 35 ′ 4 "N, 10 ° 38 ′ 32" E | e3 | |
Wrohm-Osterrade wind farm | 2014 | 33.0 | 11 | Vestas V112-3.0MW (11 ×) |
Wrohm Easter wheel |
HEI | 54 ° 12 ′ 7 ″ N, 9 ° 24 ′ 7 ″ E | Citizens WP Wrohm-Osterrade | A wind farm destroyed by fire in 2018 |
Wulfshagen wind farm | 2000 2001 |
12.5 | 7th |
NEG Micon NM72 / 2000 (4 ×) NEG Micon NM72c / 1500 (3 ×) |
Tüttendorf Felm |
RD | 54 ° 24 ′ 1 ″ N, 10 ° 1 ′ 28 ″ E | Energy source | Fire in a plant and reconstruction in 2004 |
Zarpen wind farm | 1992 1996 |
0.9 | 3 | AN Bonus 150/30 (2 ×) Vestas V44-600kW (1 ×) |
Zarps | OD | 53 ° 53 ′ 1 ″ N, 10 ° 29 ′ 23 ″ E | ||
Wind test field north | 2007 2009 2014 2016 2017 |
30.45 | 9 |
REpower 3.4M104 (2 ×) REpower MM92 (1 ×) SkyWind SW 3.4 (1 ×) Enercon E-126 EP4 (1 ×) GE 3.2-130 (1 ×) Siemens SWT-3.6-130 (1 ×) Nordex N131 / 3600 (1 ×) Senvion 3.6M140 EBC (1 ×) |
South march | NF | 54 ° 27 ′ 2 ″ N, 9 ° 2 ′ 0 ″ E | Wind test field north | Test field for innovative wind turbines, currently testing a two- wing SkyWind SW 3.4 wind turbine with a novel tower concept, prototype of Siemens SWT-3.6-130, GE Wind Energy 3.2-130, Nordex N131 / 3600 and Senvion 3.6M140 EBC |
Individual evidence
- ↑ Boyens Newspapers of April 6, 2015: Application for two windmills. (No longer available online.) Archived from the original on September 25, 2015 ; accessed on September 24, 2015 .
- ^ Stadtwerke Reinfeld: Wind energy. (No longer available online.) Archived from the original on September 25, 2015 ; accessed on September 24, 2015 .
- ^ FH Flensburg: Enercon E30. (No longer available online.) Archived from the original on March 4, 2016 ; accessed on October 11, 2015 .
- ^ City of Geesthacht: Pumped storage power plant. (No longer available online.) Archived from the original on September 25, 2015 ; accessed on September 24, 2015 .
- ^ Community of Albersdorf: Wind farm - New landmark for Albersdorf. (No longer available online.) Archived from the original on September 28, 2015 ; accessed on September 28, 2015 .
- ↑ Denker & Wulf dated June 9, 2015: The wind farm is complete - the sixth mill will be connected to the grid these days. (No longer available online.) Archived from the original on September 29, 2015 ; accessed on September 28, 2015 .
- ↑ a b Eckernförder Zeitung from June 13, 2014: 20 years of wind power from Brodersby. Retrieved October 11, 2015 .
- ↑ fehmarn24 of January 5, 2007: Largest “repowering wind farm”. Retrieved July 28, 2015 .
- ↑ Hamburger Abendblatt of October 23, 2010: From crazy idea to solar master. Retrieved July 28, 2015 .
- ↑ VR Marketplace: Annual Report 2014. Accessed on September 24, 2015 .
- ^ RWE Innogy : Grömitz. Retrieved September 24, 2015 .
- ↑ a b Ventotec: Moorhusen wind farm. (No longer available online.) Archived from the original on September 28, 2015 ; accessed on September 27, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Norddeutsche Rundschau from October 30, 2014: Community wind farm in Kohlenbek. Retrieved September 27, 2015 .
- ↑ GEO mbH: Wind farm with ten times the capacity. Retrieved September 27, 2015 .
- ^ RWE Innogy : Lasbek. Retrieved September 24, 2015 .
- ↑ Windkraft Journal from December 19, 2014: Project developer WKN AG sells Looft II wind energy project. Accessed on September 27, 2015 .
- ^ Community of Neuenbrook: Bürgerwindpark Neuenbrook. Retrieved September 24, 2015 .
- ^ BWP Obere Arlau GmbH & Co. KG. Retrieved December 16, 2018 .
- ↑ Kieler Nachrichten, Kiel, Schleswig-Holstein, Germany: New wind farm near Pronstorf - Six giants grow into the sky / News from Segeberg / News - KN - Kieler Nachrichten. In: www.kn-online.de. Retrieved April 14, 2016 .
- ↑ LLUR Schleswig-Holstein: Official announcement. (PDF) Retrieved September 28, 2015 .
- ↑ Norddeutsche Rundschau of September 29, 2012: Contract perfect - Oldenborstel gets two wind turbines. Retrieved September 27, 2015 .
- ^ RWE Innogy : Riepsdorf. Retrieved September 24, 2015 .
- ^ RWE Innogy : Sommerland. Retrieved September 24, 2015 .
- ↑ Hamburger Abendblatt dated December 23, 1997: Giants in the village. Retrieved September 24, 2015 .
- ↑ Wiemersdorf wind farm: Tomorrow's wind energy: Tested today in small Wiemersdorf. (PDF) (No longer available online.) Archived from the original on March 3, 2016 ; Retrieved September 25, 2015 .
- ↑ Energy source : Wulfshagen wind farm. (No longer available online.) Archived from the original on September 29, 2015 ; accessed on September 28, 2015 .
- ↑ Sven Janssen: Wulfshagen: The wind turbine burned for six hours. (PDF) Retrieved September 28, 2015 .
- ↑ Husumer Nachrichten of October 16, 2015: Growth in the wind power test field. Retrieved November 15, 2015 .
- ↑ Renewable energies from October 5, 2016: Wind turbine prototypes are being built at Husum. Retrieved January 11, 2017 .
- ↑ The new two-winged aircraft makes trade fair visitors curious . In: Renewable Energies. Das Magazin , September 17, 2015. Retrieved April 9, 2016.
- ↑ 20160323 xl P1030095 wind power plants at Husum.JPG. Wind turbine SW 3.4 from Skywind from Büdelsdorf in the wind test field south of Husum (output: 3.4 megawatts, rotor diameter: 107 meters, hub height: 133.5 meters). commons.wikimedia.org, accessed April 9, 2016 .