List of wind turbines in Schleswig-Holstein

from Wikipedia, the free encyclopedia

The list of wind turbines in Schleswig-Holstein provides an overview of the installed wind turbines in the federal state of Schleswig-Holstein , with a focus on the installed wind farms . Locations with three or more systems are considered wind parks. Systems with a steel lattice tower are marked in italics . As new wind turbines are constantly being built, this list does not claim to be complete.

Overview

Surname Construction year Total
power (MW)
number Type (WKA) place agriculture
circle
Coordinates Project planner / operator Remarks
Arkebek wind turbines 1993 0.22 2 Sea wind 20/110 (2 ×) Arkebek HEI 54 ° 8 ′ 34 "N, 9 ° 15 ′ 13" E dismantled in 2015
Ascheberg wind turbine 1999 0.225 1 Vestas V29-225kW (1 ×) Ashberg PLÖ 54 ° 9 ′ 8 "N, 10 ° 19 ′ 34" E
Barnitz wind turbine 1990 0.08 1 Enercon-17 (1 ×) Barnitz OD 53 ° 48 ′ 20 "N, 10 ° 29 ′ 4" E Stadtwerke Reinfeld
Beidenfleth wind turbines 1995 1.2 2 Vestas V44-600kW (2 ×) Beidenfleth IZ 53 ° 53 ′ 11 "N, 9 ° 24 ′ 20" E Wind turbines dismantled in 2014
Bollingstedt wind turbines 1995
2010
1.2 2 REPower 3.4M104 (2 ×) Bollingstedt SL 54 ° 35 ′ 34 "N, 9 ° 23 ′ 35" E Geo Mbh 2010 Repowering (2 × REPower 3.4M104 for 3 × Nordtank NTK-1500 )
Boren wind turbines 1995 1.2 2 AN Bonus 44/600 (2 ×) Bores SL 54 ° 37 ′ 32 "N, 9 ° 49 ′ 29" E 3 plants previously, one dismantled in 2014
Damsdorf wind turbines 2012 6.0 2 Enercon E-115 (2 ×) Damsdorf SE 54 ° 4 ′ 11 ″ N, 10 ° 17 ′ 24 ″ E Thinker & Wulf
Eggebek wind turbine 2012 2.05 1 Senvion MM92 (1 ×) Eggebek SL 54 ° 38 ′ 5 "N, 9 ° 20 ′ 32" E Erected on the Eggebek solar park
Flensburg wind turbine 1996 0.2 1 Enercon E-30 / 2.30 (1 ×) Sandberg FL 54 ° 46 ′ 11 "N, 9 ° 27 ′ 14" E University of Applied Sciences Flensburg (University of Applied Sciences) Wind turbine for teaching and research purposes
Gammelby wind turbine 1997 1.5 1 North tank NTK 1500/64 (1 ×) Gammelby RD 54 ° 30 ′ 8 "N, 9 ° 48 ′ 35" E
Gammendorf wind turbine 2002 0.66 1 Vestas V47-660kW (1 ×) Gammendorf OH 54 ° 29 '32 "N, 11 ° 7' 18" E
Geesthacht pumping station wind turbine 1994 0.5 1 Enercon E-40 / 5.40 (1 ×) Geesthacht RZ 53 ° 26 ′ 10 ″ N, 10 ° 19 ′ 13 ″ E Geesthacht energy park Combined energy park with PSW Geesthacht and solar park
Gelting wind turbine 1995 0.6 1 Tacke TW 600 (1 ×) Gelting SL 54 ° 44 ′ 6 ″ N, 9 ° 52 ′ 15 ″ E
Geschendorf wind turbine 2001 1.0 1 NEG Micon NM60 / 1000 (1 ×) Geschendorf SE 53 ° 55 ′ 5 "N, 10 ° 25 ′ 13" E Thinker & Wulf erected on the A 20
Gollendorf wind turbines 1991
1992
0.42 2 Vestas V25-200kW (1 ×)
WindWorld W2500 (1 ×)
Gollendorf OH 54 ° 27 '21 "N, 11 ° 3' 29" E dismantled in 2015
Goosefeld wind turbine 1995 0.27 1 Südwind N3127 (1 ×) Goosefeld RD 54 ° 25 ′ 15 ″ N, 9 ° 49 ′ 15 ″ E
Großjörl wind turbine 1995 0.5 1 North tank NTK-500 (1 ×) Großjörl SL 54 ° 36 ′ 59 ″ N, 9 ° 17 ′ 24 ″ E previously 3 systems, 2 systems now dismantled
Wind turbines in Groß Niendorf 2018 7.6 2 GE 3.8-130 (2 ×) Gross Niendorf SE 53 ° 50 ′ 21 ″ N, 10 ° 16 ′ 1 ″ E PNE
Groß Schenkenberg wind turbine 1987
2003
0.6 1 Enercon E-40 / 6.44 (1 ×) Groß Schenkenberg RZ 53 ° 48 ′ 16 "N, 10 ° 35 ′ 19" E Previously 1 × Enercon-16
Grotsand wind turbines 2007 4.0 2 Enercon E-82 (2 ×) Grotsand NF 54 ° 47 ′ 10 "N, 8 ° 46 ′ 34" E
Grove wind turbine 1997 0.5 1 Enercon E-40 / 5.40 (1 ×) Grove RZ 53 ° 31 '24 "N, 10 ° 30' 2" E
Harrislee wind turbine 1995 0.5 1 North tank NTL 500/41 (1 ×) Harrislee SL 54 ° 48 '4 "N, 9 ° 20' 36" E Balzersen
Heiligenhafen wind power station 1992 0.15 1 North tank NTK 150/25 (1 ×) Heiligenhafen OH 54 ° 21 ′ 26 "N, 10 ° 58 ′ 25" E
Jahnshof wind turbines 1993
1995
0.825 2 Vestas V27-225kW (1 ×)
Vestas V44-600kW (1 ×)
Jahnshof OH 54 ° 18 ′ 35 "N, 10 ° 54 ′ 8" E
Johannisberg wind turbine 1991 0.25 1 Tacke TW 250 (1 ×) Johannisberg OH 54 ° 29 ′ 35 ″ N, 11 ° 10 ′ 25 ″ E
Kappeln wind turbine 1992 0.15 1 Nordex N27 / 150 (1 ×) Kappeln SL 54 ° 38 '53 "N, 9 ° 55' 43" E erected on a sewage treatment plant
Klausdorf wind turbine 1991 0.15 1 WindWorld W2100 (1 ×) Klausdorf OH 54 ° 27 '25 "N, 11 ° 14' 9" E dismantled in 2015
Wind turbines Kragstedt 2015 12.2 2 Senvion 6.2M126 (2 ×) Kragstedt SL 54 ° 39 ′ 29 ″ N, 9 ° 18 ′ 22 ″ E Denker & Wulff
Wind turbines Kraksdorf 1995
1997
1.0 2 Enercon E-40 / 5.40 (2 ×) Kraksdorf OH 54 ° 18 '17 "N, 11 ° 3' 22" E
Wind power plant Krumbecker Hof 1997
2015
2.0 1 Senvion MM100 (1 ×) Krumbeck OH 53 ° 55 ′ 1 ″ N, 10 ° 33 ′ 33 ″ E 2015 repowering (1 × Senvion MM100 instead of 2 × Enercon E-40 / 5.40 )
Wind turbines Lieth 2013 4.6 2 Enercon E-70 E4 (2 ×) Lieth HEI 54 ° 9 ′ 51 ″ N, 9 ° 4 ′ 11 ″ E erected north of the Heide refinery


Wind turbines Meeschendorf 1995 1.0 2 Enercon E-40 / 5.40 (2 ×) Meeschendorf OH 54 ° 19 ′ 21 ″ N, 10 ° 58 ′ 33 ″ E
Neudorf-Bornstein wind turbine 1993 0.15 1 Nordex N27 (1 ×) Neudorf-Bornstein RD 54 ° 25 ′ 9 ″ N, 9 ° 54 ′ 29 ″ E
Neuhof wind turbine 1994 0.1 1 Vestas V20-100kW (1 ×) Lemkenhafen OH 54 ° 27 ′ 2 ″ N, 11 ° 5 ′ 6 ″ E
Neustadt-Holm wind turbine 1996 0.6 1 DeWind D4 / 48 (1 ×) Neustadt in Holstein OH 54 ° 5 ′ 14 "N, 10 ° 47 ′ 17" E
Neustadt-Rettin wind turbine 1988 0.2 1 Vestas V25-200kW (1 ×) Rescue woman OH 54 ° 6 ′ 2 ″ N, 10 ° 52 ′ 10 ″ E dismantled in 2015
Ockholm wind turbines 2013 6.8 2 REPower 3.4M104 (2 ×) Ockholm NF 54 ° 39 ′ 20 ″ N, 8 ° 51 ′ 14 ″ E Geo Mbh
Oersberg wind turbine 1991 0.2 1 Vestas V25-200kW (1 ×) Oersberg SL 54 ° 40 ′ 1 ″ N, 9 ° 50 ′ 17 ″ E
Wind turbines Bad Oldesloe 2001
2016
3.5 2 Enercon E-40 / 5.40 (1 ×)
Enercon E-101 (1 ×)
Bad Oldesloe OD 53 ° 48 ′ 11 "N, 10 ° 19 ′ 23" E originally 2, the northern one has since been dismantled
Oxlund wind turbine 2018 3.7 1 Senvion 3.7M144 (1 ×) Oxlund SL 54 ° 40 ′ 3 ″ N, 9 ° 15 ′ 6 ″ E Prototype of the Senvion 3.7M144


Püttsee wind turbine 1997 0.2 1 Vestas V25-200kW (1 ×) Westermarkesldorf OH 54 ° 27 ′ 20 ″ N, 11 ° 2 ′ 1 ″ E dismantled in 2015
Rader Insel wind turbine 1990 0.15 1 AN Bonus 150/30 (1 ×) Schacht-Audorf RD 54 ° 19 ′ 30 ″ N, 9 ° 43 ′ 9 ″ E
Sahna wind turbine 1991 0.15 1 AN Bonus 150/30 (1 ×) Sahna OH 54 ° 18 ′ 26 ″ N, 11 ° 4 ′ 0 ″ E
Schürsdorf wind turbine 1990 0.15 1 AN Bonus 150/30 (1 ×) Schürsdorf OH 54 ° 0 ′ 16 ″ N, 10 ° 42 ′ 5 ″ E Nursery Rahlf
Stadum wind turbine 2011 2.4 1 Nordex N117 / 2400 (1 ×) Stadum NF 54 ° 44 ′ 59 "N, 9 ° 4 ′ 4" E Geo Mbh
Stakendorf wind turbines 1995 1.0 2 Enercon E-40 / 5.40 (2 ×) Stakendorf PLÖ 54 ° 22 ′ 35 "N, 10 ° 26 ′ 4" E
Stohl wind turbine 1998 0.55 1 Euroturbine ET 550/41 (1 ×) Stole RD 54 ° 28 ′ 17 "N, 10 ° 7 ′ 32" E 2M wind technology
Süderbrarup wind turbines 2011 3.0 2 Vensys 77/1500 (2 ×) Süderbrarup SL 54 ° 37 ′ 18 "N, 9 ° 44 ′ 25" E Thinker & Wulf
Süderschmedeby wind turbines 1995 1.0 2 North tank NTK 500 (2 ×) Süderschmedeby SL 54 ° 39 ′ 22 "N, 9 ° 26 ′ 21" E
Süssau wind turbine 1994 0.3 1 North tank NTK 300/31 (1 ×) Süssau OH 54 ° 16 ′ 22 ″ N, 11 ° 4 ′ 3 ″ E
Sütel wind turbines 1991
1996
0.8 2 Vestas V25-200kW (1 ×)
Vestas V44-600kW (1 ×)
Sütel OH 54 ° 20 ′ 11 "N, 11 ° 3 ′ 2" E
Viöl wind turbines 1995 1.2 2 Micon M1500 / 600 (2 ×) Viöl NF 54 ° 34 ′ 34 "N, 9 ° 9 ′ 22" E
Wandelwitz wind turbine 1996 0.5 1 Enercon E-40 / 5.40 (1 ×) Change joke OH 54 ° 19 ′ 31 ″ N, 10 ° 52 ′ 17 ″ E
Wasbek wind turbine 1990 0.08 1 Enercon E-17 (1 ×) Wasbek RD 54 ° 4 ′ 51 ″ N, 9 ° 54 ′ 17 ″ E
Wees wind turbine 1993 0.1 1 Vestas V20-100kW (1 ×) Wees SL 54 ° 48 ′ 21 ″ N, 9 ° 31 ′ 35 ″ E
Wind turbines Weideweg 2016 6.0 2 Enercon E-115 (2 ×) Wesselburener Deichhhausen HEI 54 ° 10 ′ 9 ″ N, 8 ° 57 ′ 13 ″ E Marsh Association Schleswig-Holstein e. V.


Westermarkelsdorf wind power station 1996 0.5 1 Enercon E-40 / 5.40 (1 ×) Westermarkesldorf OH 54 ° 31 '17 "N, 11 ° 7' 31" E
Ahrenviöl wind farm 2002-2003
2015
2017
37.8 14th Nordex N80 / 2500 (8 ×)
Nordex N100 / 2500 (2 ×)
Senvion 3.2M114 (4 ×)
Ahrenviöl NF 54 ° 31 ′ 29 ″ N, 9 ° 14 ′ 1 ″ E Ahrenviöl community wind farm
Ahrenviölfeld wind farm 2003
2015
12.5 5 Nordex N80 / 2500 (3 ×)
Nordex N100 / 2500 (2 ×)
Ahrenviölfeld NF 54 ° 31 ′ 27 "N, 9 ° 15 ′ 14" E Ahrenviölfeld community wind farm
Albersdorf wind farm 2014
2015
19.8 6th Vestas V112-3.3MW (6 ×) Albersdorf HEI 54 ° 8 ′ 9 ″ N, 9 ° 15 ′ 16 ″ E Denker & Wulf, citizen WP Albersdorf Erected on the A 23
Almdorf-Struckum wind farm 2002
2014
2017
11.8 5 Vestas V80-2MW (2 ×)
Enercon E-70 E4 (2 ×)
Siemens SWT-3.2-113 (1 ×)
Almdorf
Struckum
NF 54 ° 35 ′ 26 "N, 9 ° 0 ′ 32" E WEB Andresen 2017 repowering (1 × Siemens SWT-3.2-113 for 1 × Vestas V80-2MW )
Alt Bennebek wind farm 2015-2017 36.95 12 Enercon E-101 (11 ×)
Senvion 3.4M114 (1 ×)
Old Bennebek SL 54 ° 23 ′ 1 ″ N, 9 ° 27 ′ 12 ″ E e3, WPD
Altbokhorst wind farm 2003
2012
15.9 8th Enercon E-66 / 18.70 (5 ×)
Enercon E-70 E4 (3 ×)
Schillsdorf PLÖ 54 ° 5 ′ 32 "N, 9 ° 8 ′ 4" E Windwärts, Ing.Henning Holst
Bahrenfleth wind farm 2014 7.5 3 Vensys 100/2500 (3 ×) Bahrenfleth IZ 53 ° 51 ′ 8 "N, 9 ° 28 ′ 22" E
Barlt Ost wind farm 2015 44.0 14th Senvion 3.2M114 (10 ×)
Enercon E-101 (4 ×)
Barlt HEI 54 ° 0 ′ 1 ″ N, 9 ° 3 ′ 29 ″ E WES-IBS
Barslund wind farm 1995
2008
2017
13.0 5 Enercon E-70 E2 (3 ×)
Enercon E-101 (2 ×)
Barslund SL 54 ° 40 ′ 13 ″ N, 9 ° 14 ′ 8 ″ E Bürgerwindkraft Lindewitt GmbH & Co.KG 2017 repowering (2 × Enercon E-101 for 4 × NEG-Micon M1500-600 )
Basedow wind farm 2003 18.2 14th AN Bonus 1300/62 (14 ×) Basedow
Lütau
RZ 53 ° 25 ′ 5 ″ N, 10 ° 33 ′ 29 ″ E ORBIS, natural wind
Basland wind farm 1995 1.15 3 North tank NTK-150 (1 ×)
North tank NTK-500 (2 ×)
Silberstedt SL 54 ° 34 '10 "N, 9 ° 23' 9" E
Behrendorf wind farm 2012
2015
2017
45.7 16 Nordex N100 / 2500 (7 ×)
Nordex N117 / 2400 (1 ×)
Senvion 3.2M114 (6 ×)
Nordex N100 / 3300 (2 ×)
Behrendorf NF 54 ° 34 ′ 16 ″ N, 9 ° 12 ′ 25 ″ E Behrendorf community wind farm
Beidenfleth-Wewelsfleth wind farm 2015
2016
21.2 7th Enercon E-101 (6 ×)
Senvion 3.2M114 (1 ×)
Beidenfleth
Wewelsfleth
IZ 53 ° 53 ′ 1 ″ N, 9 ° 23 ′ 6 ″ E
Beldorf wind farm 1999
2001
26.2 12 Enercon E-66 15.66 (1 ×)
Enercon E-66 18.70 (2 ×)
Enercon E-70 E4 (1 ×)
Enercon E-92 (8 ×)
Beldorf RD 54 ° 7 ′ 1 ″ N, 9 ° 21 ′ 21 ″ E Citizen wind farm Beldorf 2015 repowering (8 × Enercon E-92 instead of 1 × Enercon E-66 15.66 , 1 × Enercon E-66 18.70 and 1 × Enercon E-40 5.40 )


Bendorf wind farm 2015-2016 27.45 9 Enercon E-101 (9 ×) Bendorf (Holstein) RD 54 ° 5 ′ 25 ″ N, 9 ° 21 ′ 22 ″ E Trianel GmbH
Beschendorf wind farm 2003
2012
6.7 4th Enercon E-66 / 18.70 (1 ×)
AN Bonus 1300/62 (2 ×)
Enercon E-70 (1 ×)
Beschendorf OH 54 ° 11 ′ 20 "N, 10 ° 53 ′ 9" E GefuE WP Beschendorf
Besdorf-Bokhorst wind farm 1999
2003
10.5 10 HSW 1000 (6 ×)
REpower 57/1000 (4 ×)
Besdorf
Bokhorst
IZ 54 ° 3 ′ 13 ″ N, 9 ° 23 ′ 6 ″ E wpd , Gewi, e3 Erected on the A 23
Böel wind farm 1995 2.4 4th Tacke TW 600 (4 ×) Böel SL 54 ° 38 ′ 23 "N, 9 ° 42 ′ 17" E
Bokel-Ellerdorf-Brammer wind farm 2000
2013
2017
21.4 7th Vestas V112-3.0MW (6 ×)
Senvion 3.4M114 (1 ×)
Bokel
Ellerdorf
Brammer
RD 54 ° 12 ′ 14 "N, 9 ° 48 ′ 21" E e3, wpd Repowering 2013 (6 × Vestas V112-3.0MW instead of 1 × NEG Micon NM60 / 1000 and 9 × NEG Micon NM64 / 1500 )
Bökingharde-Osterdeich wind farm 1999-2000
2002
2015
2019
25.8 8th Vestas V90-3MW (2 ×)
Vestas V112-3.3MW (6 ×)
Risum-Lindholm
Dagebüll
NF 54 ° 43 ′ 33 "N, 8 ° 50 ′ 35" E eeNORD Repowering 2015 (6 × Vestas V112-3.0MW instead of 4 × Vestas V66-1.65MW ), further repowering in progress in 2019
Bollbrügge wind farm 2000
2002
16.7 7th AN Bonus 1300/62 (6 ×)
AN Bonus 2000/76 (1 ×)
Bollbrugge OH 54 ° 19 ′ 22 ″ N, 10 ° 58 ′ 0 ″ E
Bordelum Nord wind farm 2014
2017
36.0 12 Vestas V112-3MW (12 ×) Bordelum NF 54 ° 39 '22 "N, 8 ° 52' 10" E Citizens' wind farm Bordelum III
Bordelum South wind farm 2008
2015
2017
38.1 15th Enercon E-70 E4 (10 ×)
Enercon E-101 (2 ×)
Enercon E-115 (3 ×)
Bordelum NF 54 ° 38 ′ 31 ″ N, 8 ° 53 ′ 11 ″ E Citizens' wind farm Bordelum III 2017 repowering (3 × Enercon E-115 for 3 × Enercon E-70 E4 )
Bosbüll-Klixbüll wind farm 2002
2004
2017
29.7 12 REpower MM70 (2 ×)
REpower MM82 (4 ×)
Enercon E-70 (1 ×)
Enercon E-92 (2 ×)
Senvion 3.4M104 (2 ×)
Senvion 4.2M118 (1 ×)
Bosbull
Klixbull
NF 54 ° 48 ′ 50 "N, 8 ° 50 ′ 59" E Erected on the Klixbüll solar park, 2017 repowering (2 × Senvion 3.4M104 , 1 × Senvion 4.2M118 and 2 × Enercon E-92 instead of 2 × Enercon E-66 , 2 × REPower MM70 and 1 × Senvion MM82 )
Böxlund-Weesby wind farm 2014 19.2 6th Senvion 3.2M114 (6 ×) Böxlund
Weesby
SL 54 ° 51 '49 "N, 9 ° 10' 25" E Citizen wind Medelby
Braderup wind farm 2005
2007
23.6 8th Siemens SWT-2.3-101 (4 ×)
Siemens SWT-3.6-107 (4 ×)
Braderup NF 54 ° 49 ′ 15 "N, 8 ° 52 ′ 33" E Citizens WP Braderup
Braderup-Tinningstedt wind farm 2013
2017
30.15 9 Vestas V112-3.3MW (6 ×)
Vestas V117-3.45MW (3 ×)
Braderup
Tinningstedt
NF 54 ° 49 ′ 19 ″ N, 8 ° 54 ′ 30 ″ E Citizens WP Braderup-Tinningstedt
Bramstedtlund wind farm 2020 31.5 7th Siemens Gamesa SG-DD-130 (7 ×) Bramstedtlund NF 54 ° 50 ′ 42 "N, 9 ° 6 ′ 20" E BWP Bramstedtlund under construction
Bramstedtlund Süd wind farm 2016 9.0 3 Siemens SWT-3.0-113 (3 ×) Bramstedtlund NF 54 ° 49 ′ 22 ″ N, 9 ° 4 ′ 19 ″ E Geo-mbh
Breitenfelde wind farm 2015-2016 11.75 5 Enercon E-92 (5 ×) Breitenfelde NF 53 ° 35 ′ 17 ″ N, 10 ° 39 ′ 0 ″ E WPD
Breklum-Struckum wind farm 2002-2003
2007
2014
79.2 35 Enercon E-70 (1 ×)
Enercon E-70 E4 (30 ×)
Senvion MM82 (4 ×)
Breklum
Struckum
NF 54 ° 34 ′ 25 ″ N, 8 ° 58 ′ 25 ″ E WEB Andresen 2014 repowering (20 × Enercon E-70 for 13 × Enercon E-66 18.70 )
Breklum Nord wind farm 2004
2014
9.2 4th Enercon E-70 E4 (4 ×) Breklum NF 54 ° 37 ′ 18 ″ N, 9 ° 1 ′ 2 ″ E WEB Andresen 2014 repowering (4 × Enercon E-70 for 4 × Enercon E-66 18.70 )
Brodersby wind farm 1994 1.8 3 Tacke TW 600 (3 ×) Brodersby RD 54 ° 37 ′ 32 "N, 9 ° 59 ′ 35" E Schwansener energy systems
Brunsbüttel wind farm 2004
2016-2017
64.55 24 Vestas V80-2MW (10 ×)
Nordex N100 / 3300 (8 ×)
Enercon E-101 (3 ×)
Enercon E-115 (3 ×)
Brunsbuettel HEI 53 ° 55 ′ 31 ″ N, 9 ° 6 ′ 4 ″ E Ventotec
Brunsbüttel-West wind farm 2010 41.4 18th Enercon E-82 (18 ×) Brunsbuettel HEI 53 ° 54 ′ 5 ″ N, 9 ° 4 ′ 19 ″ E Thinker & Wulf Repowering 2010 (18 × Enercon E-82 instead of 19 × various old systems)
Brunsbüttelkoog wind farm 1994
1995
2000
2001
2004
12.45 8th AN Bonus 450/37 (1 ×)
(1 ×)
NEG Micon NM60 / 1000 (1 ×)
AN Bonus 1000/54 (1 ×)
AN Bonus 2000/76 (1 ×)
Enercon E-58 (1 ×)
REpower MD77 (2 ×)
REpower 5M (1 ×)
Brunsbüttelkoog HEI 53 ° 53 ′ 23 "N, 9 ° 11 ′ 27" E Certainly erected on the site of the former Brunsbüttel nuclear power plant , prototypes of the Autoflug A 1200 (two-winged aircraft) and REpower 5M
2014 dismantling of an Autoflug A 1200
Burg wind farm on Fehmarn 1991
1994
1995
4.58 9 HSW 250 (1 ×)
Micon M700-225 (1 ×)
Enercon E-40 / 5.40 (1 ×)
Tacke TW 600 (6 ×)
Castle on Fehmarn OH 54 ° 25 ′ 14 "N, 11 ° 10 ′ 26" E
Büttel wind farm 1995
1997
1998
1999
10.22 17th Vestas V39-500kW (6 ×)
AN Bonus 600/41 (4 ×)
Enercon E-40 / 5.40 (3 ×)
AN Bonus 1000/54 (2 ×)
Vestas V47-660kW (2 ×)
Büttel IZ 53 ° 54 ′ 14 "N, 9 ° 14 ′ 11" E WKN, ContinoWind
Büttel-Holstendamm wind farm 2007 25.0 5 REpower 5M (5 ×) Büttel IZ 53 ° 54 ′ 28 "N, 9 ° 13 ′ 25" E Allianz , WP Büttel
Cashagen wind farm 2017
2020
12.7 6th Senvion MM100 (4 ×)
Enercon E-92 (2 ×)
Cashagen OH 53 ° 57 ′ 15 "N, 10 ° 32 ′ 36" E Ing.Henning Holst
Dagebüll wind farm 1995
2015
17.23 6th Vestas V27-225kW (1 ×)
Senvion 3.4M104 (5 ×)
Dagebüll NF 54 ° 43 ′ 14 "N, 8 ° 45 ′ 4" E
Damlos wind farm 2001
2013
9.1 5 Südwind S70 (3 ×)
Enercon E-82 E2 (2 ×)
Damlos OH 54 ° 14 ′ 2 ″ N, 10 ° 54 ′ 6 ″ E wind7, e3 Erected on the A1
Dammfleth wind farm 1999
2001
2012
2014
37.6 20th NEG Micon NM64c ​​/ 1500 (8 ×)
Nordex N60 / 1300 (2 ×)
Enercon E-70 (10 ×)
Dammfleth IZ 53 ° 54 '10 "N, 9 ° 23' 4" E Prokon Repowering 2012 (2 × Enercon E-70 instead of 3 × Nordex N60 ) and 2014 (8 × Enercon E-70 instead of 3 × Nordex N54 , 2 × Nordex N60 and 4 × NEG Micon NM64c ​​/ 1500 )
Diekhusen-Fahrstedt Schmedeswurth wind farm 2016 18.0 6th Enercon E-115 (6 ×) Diekhusen-Fahrstedt
Schmedeswurth
HEI 53 ° 56 ′ 20 ″ N, 9 ° 3 ′ 19 ″ E
Dingen-Süderwisch wind farm 2011
2014
37.1 11 REPower 3.4M104 (8 ×)
Vestas V112-3.3MW (3 ×)
Things
Süderwisch
HEI 53 ° 57 ′ 11 "N, 9 ° 5 ′ 31" E
Dollerup wind farm 2001
2007
8.6 5 Südwind S70 (3 ×)
REpower MM82 (2 ×)
Dollerup SL 54 ° 45 ′ 29 "N, 9 ° 40 ′ 31" E seeBA, Jensen & Falke 2007 Repowering (2 × REpower MM82 for 3 × Nordex N27 )
Dbodum wind farm 2002
2014
33.0 14th Bonus B54 / 1000 (1 ×)
Enercon E-70 E4 (7 ×)
Enercon E-82 E2 (3 ×)
Vestas V112-3MW (3 ×)
Body NF 54 ° 38 ′ 23 "N, 9 ° 0 ′ 23" E Citizens' wind farm Bordelum III
Dree Meeden wind farm 2000
2003
2014
2016
52.3 24 Enercon E-66 (4 ×)
Enercon E-70 E4 (12 ×)
Senvion MD70
(1 ×) Senvion MM70 (5 ×)
Enercon E-115 (2 ×)
Vollstedt
Högel
Drelsdorf
NF 54 ° 37 '18 "N, 9 ° 3' 23" E WEB Andresen 2016 repowering (2 × Enercon E-115 for 2 × NEG Micon NM80 / 2000 )
Ecklak wind farm 2001
2007
2016
17.9 9 Enercon E-66 / 18.70 (5 ×)
Enercon E-70 (1 ×)
Enercon E-70 E4 (3 ×)
Ecklak IZ 53 ° 55 ′ 34 "N, 9 ° 15 ′ 13" E HCE Design, NET 2016 repowering (3 × Enercon E-70 E4 for 3 × Enercon E-66 / 18.70 )
Eggstedt-Süderhastedt wind farm 1998
2004
2011
2014
41.5 15th Repower MM82 (3 ×)
REpower MM92 (3 ×)
Senvion 3.4M104 (2 ×)
Senvion 3.2M114 (7 ×)
Eggstedt
Süderhastedt
HEI 54 ° 4 ′ 7 ″ N, 9 ° 14 ′ 20 ″ E WES-IBS Repowering 2011 (3 × REpower MM92 instead of 2 × DeWind D4 / 48)
Ehlerstorf wind farm 1999
2010
10.0 5 Enercon E-66 / 15.66 (3 ×)
Enercon E-70 E4 (2 ×)
Ehlerstorf OH 54 ° 16 ′ 31 ″ N, 10 ° 49 ′ 18 ″ E Wind energy Ehlerstorf
Eichede wind farm 2004 4.0 4th AN Bonus 1300/62 (4 ×) Eichede OD 53 ° 42 ′ 32 "N, 10 ° 25 ′ 33" E e3, wpd
Elisabeth-Sophien-Koog wind farm 2009 13.8 6th Enercon E-70 (6 ×) Elisabeth-Sophien-Koog NF 54 ° 30 '24 "N, 8 ° 53' 28" E GEO, Botterkooger Windpark, IB Henning Holst Repowering 2009 (6 × Enercon E-70 instead of 19 × various old systems)
Ellhöft-Westre wind farm 2000
2007
2008-2009
53.1 17th AN Bonus 1300/62 (4 ×)
Siemens SWT-2.3-93 (4 ×)
REpower 6M (3 ×)
Siemens Gamesa SG-3.2-113 (5 ×)
Siemens Gamesa SG-DD-130 (1 ×)
Ellhöft
Westre
NF 54 ° 53 ′ 26 ″ N, 8 ° 57 ′ 3 ″ E Citizens WP Ellhöft, Grenzstrom Vindtved Prototypes of the Repower 6M
Repowering currently in progress (5 × Siemens Gamesa SG-3.2-113 and 1 × Siemens Gamesa SG-DD-130 instead of 2 × AN Bonus 1300/62)
Ellingstedt wind farm 2001
2017
15.0 10 Südwind S70 (6 ×)
Vensys 77 (4 ×)
Ellingstedt SL 54 ° 29 ′ 31 ″ N, 9 ° 23 ′ 18 ″ E
Elskop wind farm 2008 6.0 3 Enercon E-70 (3 ×) Elskop IZ 53 ° 48 ′ 10 "N, 9 ° 29 ′ 35" E
Emmelsbüll-Horsbüll wind farm 2008
2011
6.0 5 REPower MM82 (3 ×)
Enercon E-70 E4 (2 ×)
Emmelsbüll-Horsbüll NF 54 ° 48 ′ 31 ″ N, 8 ° 39 ′ 22 ″ E Ing.Henning Holst
Enge-Sande wind farm 2011
2012
2017
20.4 6th Siemens SWT-3.0-101 (2 ×)
Siemens SWT-3.6-120 (2 ×)
Siemens SWT-3.6-130 (2 ×)
Narrow sands NF 54 ° 42 ′ 52 "N, 9 ° 1 ′ 27" E Geo Mbh
Esmark wind farm 1995 2.4 4th Tacke TW 600 (4 ×) Esmark SL 54 ° 40 ′ 14 "N, 9 ° 35 ′ 32" E
Fehmarn-Mitte wind farm 2006 57.5 25th Enercon E-70 E4 (25 ×) Danish
village Lemkendorf
Vadersdorf
OH 54 ° 29 ′ 8 ″ N, 11 ° 6 ′ 23 ″ E Citizens WP Fehmarn, IB Henning Holst Repowering 2006 (25 × Enercon E-70 instead of 27 × different old systems)
Fehmarn-Northwest wind farm 2000
2007
2008
43.5 21st Enercon E-66 15.66 (6 ×)
Enercon E-70 E4 (15 ×)
Danish village
Westermarkelsdorf
Schlagsdorf
OH 54 ° 30 ′ 23 "N, 11 ° 4 ′ 14" E Citizens WP Fehmarn Repowering 2007 (9 × Enercon E-70 instead of 12 × various old systems)
Fiefbergen wind farm 1996
1999
8.85 7th Vestas V44-600kW (2 ×)
Vestas V66-1.65MW (1 ×)
Tacke TW 1.5 (4 ×)
Fiefbergen PLÖ 54 ° 21 ′ 34 "N, 10 ° 20 ′ 25" E WP Fiefbergen Süd, wotan
Friedrichsgabekoog wind farm 1995
2004
2015
29.8 21st North tank NTK-300 (1 ×)
Enercon E-44 (9 ×)
Enercon E-66 (1 ×)
Enercon E-70 E4 (5 ×)
Enercon E-82 E2 (5 ×)
Friedrichsgabekoog HEI 54 ° 9 ′ 13 "N, 8 ° 55 ′ 35" E Winkra 2015 repowering (2 × Enercon E-70 E4 for 2 × Enercon E-44 )
Friedrich-Wilhelm-Lübke-Koog wind farm 1990
1998
2004
2005
2008
2012
2014–2015
2017
71.1 26th Vestas V80-2MW (4 ×)
REpower MM82 (8 ×)
REpower 3.4M104 (4 ×)
Senvion MM82 (1 ×)
Vestas V117-3.45MW (9 ×)
Friedrich-Wilhelm-Lübke-Koog NF 54 ° 51 ′ 19 ″ N, 8 ° 38 ′ 17 ″ E Citizen WP Lübke-Koog Sea Peace, eeNORD Repowering 2004 (14 × Vestas V80-2MW instead of 52 × HSW 250 ) and 2008 (1 × REpower MM82 instead of 3 × Enercon-32 ), 2015 repowering (4 × REpower 3.4M104 for 5 × Enercon E-66 ), 2017 repowering ( 9 × Vestas V117 # -3,45MW for 11 × Vestas V80-2MW )
Friedrichskoog wind farm 1996
2010
2011
2015
206.15 100 Nordtank NTK-500 (2 ×)
AN Bonus 37/450 (2 ×)
AN Bonus 44/600 (4 ×)
Vestas V39-500kW (1 ×)
Vestas V44-600kW (1 ×)
Enercon E-40 5.40 (9 × )
Enercon E-70 E4 (52 ×)
Enercon E-82 E2 (10 ×)
Enercon E-92 (7 ×)
Nordex N90 / 2500 (1 ×)
Nordex N100 / 2500 (1 ×)
Senvion 3.4M104 (1 ×)
Senvion 3.2M114 (9 ×)
Friedrichskoog HEI 53 ° 58 ′ 26 ″ N, 8 ° 56 ′ 0 ″ E Thinker & Wulf
Galmsbüll wind farm 1992-1993
2007
2009
16.2 3 Enercon E-82 (2 ×)
Repower 3.4M104 (3 ×)
Galmsbull NF 54 ° 45 ′ 34 "N, 8 ° 45 ′ 20" E 2007 repowering (2 × Enercon E-82 for 6 × old systems), 2009 repowering (3 × Repower 3.4M104 for 4 × Vestas V39 )
Galmsbüll-Norderhof wind farm 2007
2014
37.7 13 Siemens SWT-2.3-93 (7 ×)
Siemens SWT-3.6-120 (3 ×)
Galmsbull NF 54 ° 48 ′ 2 "N, 8 ° 44 ′ 9" E
Goldebek wind farm 2014 8.2 4th Senvion MM82 (4 ×) Goldebek NF 54 ° 40 ′ 35 "N, 9 ° 10 ′ 4" E WEB Andresen
Goldelund wind farm 2014 23.0 10 Enercon E-70 E4 (10 ×) Goldelund NF 54 ° 41 ′ 11 ″ N, 9 ° 7 ′ 5 ″ E WEB Andresen
Görtzer Kamp wind farm 2001 7.2 4th Enercon E-66 / 18.70 (4 ×) Heringsdorf OH 54 ° 17 '17 "N, 11 ° 1' 27" E WP Görtzer Kamp
Gotteskoogdeich wind farm 2014 20.4 6th Senvion 3.4M104 (6 ×) Gotteskoogdeich NF 54 ° 49 ′ 2 "N, 8 ° 44 ′ 17" E Citizens' wind farm Emmelsbüll-Horsbüll
Grammersdorf wind farm 1996
2002
9.45 14th Vestas V44-600kW (13 ×)
Vestas V66-1.65MW (1 ×)
Grammersdorf OH 53 ° 56 ′ 23 "N, 10 ° 47 ′ 31" E Grammersdorf wind power Repowering planned
Grevenkop wind farm 1995
1999
2001
2015
2017
32.8 13 WindWorld W5200 (4 ×)
Senvion 3.2M114 (4 ×)
Senvion 3.4M114 (5 ×)
Grevenkop IZ 53 ° 50 ′ 34 "N, 9 ° 32 ′ 28" E Citizens WP Grevenkop 2015 repowering (4 × Senvion 3.2M114 for 6 × WindWorld W5200, 1 × Tacke TW 600a and 1 × NEG Micon NM60 / 1000 )
Grömitz wind farm 1997
1998
1999
2001
2017
9.0 5 Enercon E-66 / 15.66 (3 ×)
Enercon E-40 / 6.44 (1 ×)
Enercon E-115 (1 ×)
Kornick OH 54 ° 8 ′ 30 "N, 10 ° 55 ′ 2" E RWE Innogy , WP Grömitz 2017 repowering (1 × Enercon E-115 instead of 1 × Enercon E-40 / 5.40 )
Großenwiehe wind farm 2010
2016
2017
16.8 5 Repower 3.4M104 (4 ×)
Senvion 3.2M114 (1 ×)
Grown up SL 54 ° 43 ′ 9 ″ N, 9 ° 17 ′ 21 ″ E
Gut Gaarz wind farm 2000
2003
2007
2012
22.8 13 Vestas V66-1.65MW (6 ×)
NEG Micon NM64c ​​/ 1500 (4 ×)
Enercon E-70 (3 ×)
Good Gaarz OH 54 ° 16 ′ 20 "N, 10 ° 59 ′ 32" E AT WP Gut Gaarz
Handewitt wind farm 2012
2015
32.25 14th Enercon E82 E2 (13 ×)
Enercon E-92 (1 ×)
Handewitt SL 54 ° 44 ′ 7 ″ N, 9 ° 17 ′ 2 ″ E Denker & Wulff 2012 repowering (12 × Enercon E82 E2 for 18 × Micon M1500-600 KW )
Hasenkrug-Hardebek wind farm 2000
2013
27.6 12 Enercon E-82 E2 (12 ×) Hasenkrug
Hardebek
SE 54 ° 0 ′ 8 "N, 9 ° 52 ′ 3" E e3, wpd Repowering 2013 (12 × Enercon E-82 E2 instead of 12 × NEG Micon NM60 / 1000 )
Hassenbüttel-Oesterwurth wind farm 2000
2014-2015
2017
2018
54.6 24 NEG Micon NM48 / 750 (1 ×)
Enercon E-53 (1 ×)
Enercon E-66 18.70 (1 ×)
Enercon E-70 E4 (11 ×)
Enercon E-82 E2 (5 ×)
Enercon E-92 (1 ×)
Enercon E-101 (2 ×)
Enercon E-115 (2 ×)
Wesselburener Deichhausen
Oesterwurth
HEI 54 ° 11 ′ 14 "N, 8 ° 57 ′ 22" E Plan 8, WPD 2018 repowering (1 × Enercon E-92 instead of 1 × Nordtank NTK-300 )
Havetoft-Klappholz wind farm 2002
2003
2011
2015
16.9 10 REpower MD70 (7 ×)
REpower MM82 (2 ×)
Enercon E-70 (1 ×)
Havetoft
folding wood
SL 54 ° 38 ′ 3 ″ N, 9 ° 32 ′ 25 ″ E Thinker & Wulf
Havighorst wind farm 2002 9.0 6th REpower MD70 (6 ×) Havighorst OD 53 ° 51 ′ 35 "N, 10 ° 25 ′ 19" E Denker & Wulf, WP Havighorst
Hedwigenkoog wind farm 1994
1996
2009-2010
2011-2012
2015
57.3 23 Enercon E-70 E4 (5 ×)
Enercon E-82 E2 (14 ×)
Senvion 3.4M104 (4 ×)
Hedwigenkoog HEI 54 ° 10 ′ 17 ″ N, 8 ° 51 ′ 29 ″ E 2009-2010 repowering (14 × Enercon E-82 E2 for 10 × Vestas V39 and 4 × Vestas V27 , 5 × Enercon E-70 E4 and 1 × Enercon E-82 E2 for 5 × Bonus B44 / 500)
Hellschen-Heringsand-Unterschaar wind farm 1994
2007
2014
7.3 3 Vestas V90-2MW (2 ×)
Vestas V112-3.3MW (1 ×)
Hellschen-Herringand-Unterschaar HEI 54 ° 12 ′ 10 "N, 8 ° 51 ′ 37" E
Hemme wind farm 2001
2006
2011
2013
2017
147.8 93 AN Bonus 450/37 (1 ×)
Vestas V52-0.85MW (14 ×)
Enercon E-48 (2 ×)
Enercon E-53 (1 ×)
REpower 48/600 (26 ×)
Vestas V80-2MW (1 ×)
REpower MM82 (5 ×)
Enercon E-70 (1 ×)
Enercon E-70 E4 (31 ×)
Enercon E-82 E2 (5 ×)
Senvion 3.4M104 (6 ×)
Inhibit HEI 54 ° 16 ′ 4 ″ N, 9 ° 0 ′ 29 ″ E
54 ° 17 ′ 10 ″ N, 9 ° 0 ′ 12 ″ E
54 ° 16 ′ 8 ″ N, 8 ° 58 ′ 24 ″ E
Hemme community wind farm Three different locations
2013 repowering (18 × Enercon E-70 E4 instead of 17 × Vestas V52-0.85MW ) and 2017 (4 × Enercon E-82 E2 and 1 × Enercon E-70 E4 instead of 5 × Vestas V47-0.66MW )
Hennstedt wind farm 2001
2005
9.5 6th Enercon E-66 (5 ×)
Enercon E-70 (1 ×)
Hennstedt HEI 54 ° 16 '16 "N, 9 ° 9' 23" E
Hennstedt Ost wind farm 2015 23.1 7th Vestas V112-3.3MW (7 ×) Hennstedt HEI 54 ° 17 ′ 11 "N, 9 ° 11 ′ 31" E Eider community wind farm
Herrenkoog wind farm 2007-2008 16.0 8th Enercon E-70 (8 ×) Herrenkoog NF 54 ° 43 ′ 19 ″ N, 8 ° 48 ′ 7 ″ E
Hillgroven wind farm 1992
2010
28.55 15th Vestas V27-225kw (1 ×)
Micon M700-225 (1 ×)
Nordtank NTK-500 (1 ×)
Enercon E-70 E4 (12 ×)
Hillgroven HEI 54 ° 13 ′ 1 ″ N, 8 ° 51 ′ 29 ″ E
54 ° 13 ′ 51 ″ N, 8 ° 53 ′ 21 ″ E
2010 repowering (10 × Enercon E-70 E4 for 14 × Bonus B36 / 450)
Hochfeld wind farm 2001 11.6 8th Nordex N60 (2 ×)
NEG Micon NM64c ​​/ 1500 (6 ×)
High field IZ 53 ° 53 ′ 6 ″ N, 9 ° 22 ′ 2 ″ E EFI wind
Högel wind farm 1999
2015-2016
15.3 6th Enercon E-70 E4 (4 ×)
Enercon E-101 (2 ×)
Högel NF 54 ° 38 ′ 5 ″ N, 9 ° 4 ′ 1 ″ E Windpark Högel GmbH & Co KG 2015-2016 repowering (4 × Enercon E-70 E4 and 2 × Enercon E-101 for 7 × Bonus B54 / 1000)
Holt Nord wind farm 2014 11.6 4th Senvion 3.2M114 (4 ×) Get SL 54 ° 49 ′ 2 ″ N, 9 ° 5 ′ 8 ″ E Medelby community wind farm
Holt Süd wind farm 2015 11.6 4th Senvion 3.2M114 (4 ×) Get SL 54 ° 47 ′ 13 "N, 9 ° 8 ′ 25" E Medelby community wind farm
Holtsee-Altenhof wind farm 2012
2014
11.6 10 REpower 3.2M114 (2 ×)
Senvion 3.2M114 (8 ×)
Holtsee
Altenhof
RD 54 ° 25 ′ 15 ″ N, 9 ° 51 ′ 25 ″ E Thinker & Wulf
Holtsee-Hohenlieth wind farm 2014 12.6 4th Senvion 3.2M114 (3 ×)
Senvion 3.0M122 (1 ×)
Holtsee RD 54 ° 24 '12 "N, 9 ° 53' 34" E Thinker & Wulf
Holzacker-Knorburg wind farm 2014 21.0 7th Siemens SWT-3.0-113 (7 ×) Holzacker-Knorburg NF 54 ° 43 ′ 3 ″ N, 9 ° 3 ′ 13 ″ E Holzacker-Knorburg community wind farm
Horsbüll wind farm 2006 8.2 4th REPower MM82 (4 ×) Horsbull NF 54 ° 50 ′ 19 ″ N, 8 ° 39 ′ 5 ″ E
Horst wind farm 1999
2005
14.4 10 Nordex N60 (8 ×)
Vestas V80-2MW (2 ×)
horst IZ 53 ° 49 ′ 19 "N, 9 ° 37 ′ 2" E Prokon , WKN
Horstedt wind farm 2000
2009
12.6 6th Vestas V80-2MW (4 ×)
Enercon E-70 E2 (2 ×)
Horstedt NF 54 ° 30 ′ 31 ″ N, 9 ° 5 ′ 30 ″ E Citizen wind farm Horstedt
Hörup wind farm 1994
1998
2004
2011
2012
63.75 24 Bonus B82 / 2300 (2 ×)
Enercon E-70 E4 (2 ×)
REPower MM82 (1 ×)
REPower 3.4M104 (8 ×)
Enercon E-82 E2 (11 ×)
Hörup SL 54 ° 43 ′ 28 ″ N, 9 ° 7 ′ 1 ″ E Enni Energie & Umwelt, RWE Innogy, Green Greco 2011 repowering (2 × Enercon E-70 E2 for 2 × Nordtank NTK-600 ), 2013 repowering (9 × REPower 3.4M104 and 2 × Enercon E-82 E2 for 10 × Nordtank NTK-600 and 4 × Enercon E-40 )
Huje wind farm 2000 24.75 15th Vestas V66-1.65MW (15 ×) Huje
nutteln
IZ 53 ° 59 ′ 5 ″ N, 9 ° 24 ′ 31 ″ E WKN
Hüllerup wind farm 1999
2002
22nd 5 Senvion 6.2M126 (2 ×)
Senvion 3.2M114 (3 ×)
Hüllerup SL 54 ° 43 ′ 22 "N, 9 ° 18 ′ 18" E Energy source
Husum wind farm 1999
2002
2007
2.85 3 HSW 750 (1 ×)
REpower 48/600 (1 ×)
REpower MD70 (1 ×)
Husum NF 54 ° 28 ′ 5 ″ N, 9 ° 2 ′ 4 ″ E Thinker & Wulf
Ipernstedt wind farm 2015 9.6 3 Senvion 3.2M114 (3 ×) Ipernstedt NF 54 ° 28 ′ 29 ″ N, 9 ° 10 ′ 5 ″ E Eff plan
Jalm wind farm 2014 19.8 6th Vestas V112-3.3MW (6 ×) Jalm SL 54 ° 38 ′ 20 "N, 9 ° 25 ′ 35" E Dirkshof Erected on both sides of the A7
Janneby wind farm 2013
2015
2016
2020
28.8 9 Senvion 3.2M114 (2 ×)
Nordex N100 / 3300 (1 ×)
Nordex N117 / 3000 (1 ×)
Nordex N131 / 3000 (1 ×)
Vensys 112/2500 (1 ×)
Vensys 120/3000 (1 ×)
Senvion 3.4M114 (1 ×)
Enercon E-138 EP3 E2 (1 ×)
Janneby SL 54 ° 37 ′ 27 ″ N, 9 ° 19 ′ 9 ″ E Janneby community wind farm Test field for wind turbines
2020 Construction of the first prototype of the Enercon E-138 EP3 E2 with improved performance
Jardelund wind farm 2014
2015
40.15 13 Senvion 3.2M114 (10 ×)
Senvion MM92 (1 ×)
Vestas V112-3.0MW (2 ×)
Jardelund SL 54 ° 51 ′ 5 ″ N, 9 ° 12 ′ 21 ″ E Medelby community wind farm
Jerrishoe wind farm 2014
2015
22.1 7th Vestas V112-3.0MW (2 ×)
Senvion 3.2M114 (5 ×)
Jerrishoe SL 54 ° 38 ′ 11 "N, 9 ° 13 ′ 4" E Eurowind
Joldelund South wind farm 2014 32.2 14th Enercon E-70 E4 (14 ×) Joldelund NF 54 ° 37 '29 "N, 9 ° 5' 23" E WEB Andresen
Joldelund Ost wind farm 2014 32.2 14th Enercon E-70 E4 (14 ×) Joldelund NF 54 ° 39 ′ 9 ″ N, 9 ° 9 ′ 27 ″ E WEB Andresen
Jörl wind farm 1995
2014
2015
22.4 7th Senvion 3.2M114 (7 ×) Jörl SL 54 ° 40 ′ 3 ″ N, 9 ° 20 ′ 30 ″ E WEB Andresen 2015 repowering (3 × Senvion 3.2M114 instead of 2 × Nordtank NTK500 )
Jübek wind farm 1999
2014
2015
24.88 12 Vestas V47-660KW (3 ×)
Senvion MM82 (2 ×)
Senvion MM92 (2 ×)
Senvion 3.4M104 (2 ×)
Senvion 3.2M114 (2 ×)
REPower MD70 (1 ×)
Jübek SL 54 ° 32 ′ 23 "N, 9 ° 24 ′ 29" E
Kalkberg wind farm 2000 2.64 4th Vestas V47-660kW (4 ×) Heringsdorf OH 54 ° 17 ′ 0 ″ N, 11 ° 0 ′ 10 ″ E WP Kalkberg
Kattrepel wind farm 1997
2013
2015
37.8 16 REpower 3.4M104 (10 ×)
Enercon E-82 E2 (6 ×)
Neufeld
Brunsbüttel
HEI 53 ° 55 ′ 0 ″ N, 9 ° 4 ′ 10 ″ E Thinker & Wulf Repowering 2013 (6 × REpower 3.4M104 instead of 3 × Nordex N54 )
Kesdorf wind farm 1995
2001
15.1 17th Tacke TW 600 (2 ×)
Vestas V42-600kW (3 ×)
DeWind D4 / 48 (1 ×)
DeWind D6 / 62 (10 ×)
Enron Wind 1.5s (1 ×)
Kesdorf OH 54 ° 3 '12 "N, 10 ° 38' 13" E IB Henning Holst
Ketelsby wind farm 1996 1.65 3 AN Bonus 37/450 (1 ×)
Tacke TW 600 (2 ×)
Ketelsby SL 54 ° 36 '25 "N, 9 ° 50' 46" E


Klanxbüll wind farm 2005
2011
2017
11.0 5 REPower 3.4M104 (3 ×)
Senvion 3.4M104 (2 ×)
Klanxbull NF 54 ° 51 '32 "  N , 8 ° 39' 18"  E 54 ° 51 '19 "N, 8 ° 39' 11" E Geo Mbh 2017 repowering (2 × Senvion 3.4M104 for 3 × Enercon E-70 E4 )
Klausdorf wind farm 1996
2008
27.6 12 Enercon E-70 E4 (12 ×) Klausdorf OH 54 ° 27 ′ 31 ″ N, 11 ° 15 ′ 14 ″ E Geo Mbh 2007 repowering (12 × Enercon E-70 E4 for 21 × Enercon E-40 5.40 )
Klein Bennebek wind farm 2000 9.6 6th Vestas V66-1.65MW (4 ×)
Enercon E-66 (2 ×)
Little Bennebek SL 54 ° 23 ′ 20 ″ N, 9 ° 28 ′ 0 ″ E e3
Klixbüll wind farm 2014
2017
27.45 9 Siemens SWT-3.0-113 (8 ×)
Vestas V112-3,45MW (1 ×)
Klixbull NF 54 ° 47 ′ 19 ″ N, 8 ° 53 ′ 18 ″ E Second KlixbüllerEnergie GmbH & Co. KG., Eurowind
Klötzin wind farm 1997
2013
6.9 3 Enercon E-70 (3 ×) Grammersdorf OH 53 ° 56 ′ 23 "N, 10 ° 47 ′ 31" E Grammersdorf wind power Repowering 2013 (3 × Enercon E-70 instead of 6 × Tacke TW 600)
Kniphagen wind farm 2014
2019
18.0 6th Siemens SWT-3.0-113 (5 ×)
Siemens Gamesa SG-3.0-113 (1 ×)
Schönwalde on the Bungsberg OH 54 ° 10 ′ 48 "N, 10 ° 47 ′ 45" E Ing.Henning Holst


Kohlbek wind farm 2014 12.2 4th Enercon E-101 (4 ×) Kohlbek IZ 54 ° 2 ′ 27 "N, 9 ° 25 ′ 7" E Citizen WP Kohlenbek Erected on the A 23
Köhn wind farm 1995 1.8 3 Micon M1500-600 (1 ×) Köhn PLÖ 54 ° 21 '7 "N, 10 ° 27' 23" E Thinker & Wulf
Kolauerhof wind farm 2000 4.5 3 REpower MD70 (3 ×) Cismar fields OH 54 ° 11 ′ 32 "N, 10 ° 57 ′ 7" E WP Grömitz
Krempdorf wind farm 2001
2009
17.75 9 Vestas V66-1.75MW (1 ×)
Vestas V80-2MW (8 ×)
Krempdorf IZ 53 ° 49 ′ 5 "N, 9 ° 28 ′ 16" E WKN AG, Enercity
Kremsdorf wind farm 2001
2009
16.7 9 Enercon E-66 / 18.70 (8 ×)
Enercon E-70 (1 ×)
Kremsdorf OH 54 ° 18 ′ 3 ″ N, 10 ° 57 ′ 13 ″ E BAUUNION Wismar, WP Kremsdorf
Krogaspe wind farm 2006 4.5 3 Südwind S77 (3 ×) Crogaspe RD 54 ° 7 ′ 29 ″ N, 9 ° 57 ′ 9 ″ E wotan erected on the A 7
Kronprinzenkoog wind farm 2006
2010
2015
99.05 43 Enercon E-53 (2 ×)
Enercon E-70 E4 (14 ×)
Enercon E-82 (3 ×)
REPower MM82 (12 ×)
REpower MM92 (3 ×)
Enercon E-101 (2 ×)
Senvion 3.4M104 (3 ×)
Senvion 3.2M114 (1 ×)
Enercon E-115 (3 ×)
Crown Prince Koog HEI 53 ° 57 ′ 41 ″ N, 8 ° 58 ′ 4 ″ E
Kropp wind farm 2013-2014 12 6th Vestas V112-3.0MW (6 ×) Kropp SL 54 ° 22 ′ 11 ″ N, 9 ° 31 ′ 24 ″ E WKN AG
Krummbek wind farm 2001
2002
2003
2014
2015
21.3 14th DeWind D4 / 48 (2 ×)
DeWind D6 / 62 (1 ×)
Nordex N62 (2 ×)
Vestas V66-1.65MW (5 ×)
Nordex N60 (1 ×)
Enercon E-70 (1 ×)
Enercon E-92 ( 2 ×)
Bentfeld OH 54 ° 9 '10 "N, 10 ° 52' 14" E WKN WP Krummbek, new energies heeck Repowering 2015 (2 × Enercon E-92 instead of 2 × Nordex N62 )
Krützfleth wind farm 1994 0.6 3 Micon M450-200 (3 ×) Neuendorf-Sachsenbande IZ 53 ° 57 ′ 0 ″ N, 9 ° 19 ′ 1 ″ E Geo mbH Repowering planned, originally 6 × Micon M450-200
Ladelund-Karlum wind farm 2014
2016
27.0 9 Siemens SWT-3.0-113 (9 ×) Ladelund
Karlum
NF 54 ° 49 ′ 30 ″ N, 9 ° 0 ′ 12 ″ E Breklum community wind farm
Landscheide wind farm 2001
2007
2015
13.5 8th NEG Micon NM64c ​​/ 1500 (6 ×)
Enercon E-70 (1 ×)
Vensys 112 (1 ×)
Landscheide IZ 53 ° 54 ′ 13 ″ N, 9 ° 16 ′ 5 ″ E Gewi, wpd
Langenhorn wind farm 2011
2014
2017
44.2 13 Senvion 3.4M104 (10 ×)
Senvion 3.4M114 (3 ×)
Longhorn NF 54 ° 40 ′ 1 ″ N, 8 ° 52 ′ 7 ″ E Windparks Langenhorn GmbH
Lasbek wind farm 2004
2019
21.15 9 Enercon E-66 / 18.70 (6 ×)
Vestas V126-3.45MW (3 ×)
Lasbek OD 53 ° 44 ′ 21 ″ N, 10 ° 24 ′ 1 ″ E RWE Innogy
Leckeng wind farm 2000
2014
2016
2017
21.8 7th Enercon E-70 E4 (1 ×)
Vestas V112-3MW (1 ×)
Enercon E-115 (5 ×)
Licking NF 54 ° 46 ′ 22 "N, 8 ° 55 ′ 32" E 2016 repowering (5 × Enercon E-115 for 7 × Enercon E-66 )
Lehmkuhlen-Rethwisch wind farm 1999 4.8 8th Tacke TW 600a (8 ×) Rethwisch (Lehmkuhlen) PLÖ 54 ° 14 ′ 13 ″ N, 10 ° 19 ′ 16 ″ E
Lensahn wind farm 1998
2001
2002
2013
11.9 7th Enercon E-40 / 5.40 (1 ×)
REpower MD70 (1 ×)
Enercon E-66 / 15.66 (2 ×)
Enercon E-70 (3 ×)
Lensahn OH 54 ° 13 ′ 18 ″ N, 10 ° 54 ′ 16 ″ E WP Lensahn Erected on the A 1 , repowering 2013 (3 × Enercon E-70 instead of 3 × Enercon E-40 / 5.40 )
Lindewitt-Blye wind farm 1995
2015
26.92 10 Senvion 3.2M114 (8 ×)
Vestas V47-0.66MW (2 ×)
Blye SL 54 ° 41 ′ 1 ″ N, 9 ° 10 ′ 30 ″ E Dirkshof 2015 repowering (8 × Senvion 3.2M114 for 15 × old systems such as 7 × NEG Micon NM1500 / 600 )
Lindewitt-Linnau wind farm 2000
2013
18.45 8th Vestas V80-2MW (5 ×)
REPower MM92 (1 ×)
REPower 3.2M114 (2 ×)
Linnau SL 54 ° 42 ′ 28 "N, 9 ° 9 ′ 17" E Linnau wind power 2013 repowering (2 × REPower 3.2M114 and 1 × REPower MM92 for 2 × Tacke TW 600)
Löhrstorf wind farm 1999
2007
2012
8.55 4th Vestas V66-1.65MW (1 ×)
Enercon E-70 (3 ×)
Löhrstorf OH 54 ° 20 ′ 7 ″ N, 11 ° 0 ′ 22 ″ E Repowering 2012 (1 × Enercon E-70 instead of 1 × Vestas V66-1.65MW )
Looft wind farm 2001
2014–2015
19.9 10 Vestas V66-1.65MW (6 ×)
Vestas V90-2MW (2 ×)
Vestas V112-3.0MW (2 ×)
Looft IZ 54 ° 2 ′ 5 ″ N, 9 ° 32 ′ 19 ″ E WKN, Wind Power Looft
Loose wind farm 2015-2016 15.2 5 Senvion 3.2M114 (1 ×)
Nordex N117 / 3000 (4 ×)
Loose RD 54 ° 31 ′ 11 "N, 9 ° 54 ′ 15" E Geo Mbh
Löwenstedt wind farm 2013
2014
2015
41.8 13 Senvion 3.4M104 (6 ×)
Senvion 3.2M114 (2 ×)
Siemens SWT-3.0-113 (5 ×)
Löwenstedt NF 54 ° 38 ′ 56 "N, 9 ° 10 ′ 22" E Citizens WP Löwenstedt
Lübeck-Nord wind farm 2012 4.6 2 Enercon E-82 E2 (2 ×) Ivendorf
Pöppendorf
HL 53 ° 56 ′ 14 "N, 10 ° 49 ′ 18" E STAWAG, Trave EE Repowering 2012 (dismantling of the wind farm in Brodten)
Lütjenholm wind farm 2013 13.6 4th REPower 3.4M104 (4 ×) Lütjenholm NF 54 ° 40 ′ 15 ″ N, 9 ° 2 ′ 7 ″ E Geo Mbh
Lütjenhorn wind farm 1999
2014
2017
23.3 8th Vestas V112-3MW (2 ×)
Enercon E-82 E2 (1 ×)
Enercon E-115 (5 ×)
Lütjenhorn NF 54 ° 47 ′ 29 "N, 9 ° 4 ′ 35" E Geo Mbh 2017 repowering (5 × Enercon E-115 and 1 × Enercon E-82 E2 for 5 × HSW 1000/57)
Mannhagen-Bälau wind farm 2001-2002 14.4 16 NEG Micon NM52 / 900 (16 ×) Mannhagen
Bälau
RZ 53 ° 37 ′ 28 "N, 10 ° 37 ′ 16" E e3
St. Margarethen wind farm 2001 3.9 3 AN Bonus 1300/62 (3 ×) St. Margarethen IZ 53 ° 54 ′ 3 "N, 9 ° 15 ′ 28" E
Marienkoog wind farm 2012
2014
28.8 8th Siemens SWT-3.6-107 (7 ×)
Siemens SWT-3.6-120 (1 ×)
Marienkoog NF 54 ° 46 ′ 27 "N, 8 ° 42 ′ 22" E Thinker & Wulf Repowering 2012 (7 × Siemens SWT-3.6-107 instead of 15 × various old systems)
Medelby-Osterby wind farm 2014 23.3 8th Senvion 3.2M114 (6 ×)
Senvion MM92 (2 ×)
Medelby
Osterby
SL 54 ° 47 ′ 31 ″ N, 9 ° 10 ′ 30 ″ E Citizen wind Medelby
Meyn Ost wind farm 2015
2016
23.15 8th Enercon E-101 (5 ×)
Enercon E-82 E2 (2 ×)
Vestas V112 3.3MW (1 ×)
Meyn SL 54 ° 44 ′ 20 "N, 9 ° 15 ′ 33" E WPD 2015-2016 repowering (5 × Enercon E-101 and 2 × Enercon E-82 E2 for 9 × Südwind S70 / 1500 )
St. Michaelisdonn-Volsemenhusen wind farm 1996
1998
2003
2005
2007
2011-2012
2016-2017
46.75 21st Vestas V44-0.6MW (3 ×)
REpower MM82 (3 ×)
REPower MM92 (3 ×)
Vestas V112-3MW (3 ×)
Senvion 3.4M104 (2 ×)
Senvion 3.2M114 (4 ×)
Enercon E-92 (3 ×)
St. Michaelisdonn
Volsemenhusen
HEI 53 ° 59 ′ 1 ″ N, 9 ° 5 ′ 18 ″ E WES-IBS 2016-2017 repowering (3 × Enercon E-92 for 2 × REPower MD70 )
Bürgerwindpark Mittelholstein (Pemeln) 2014 25.6 8th Senvion 3.2M114 (8 ×) Pemeln RD 54 ° 8 ′ 30 "N, 9 ° 24 ′ 35" E Citizens WP Mittelholstein
Mittelholstein community wind farm (Seefeld-Gokels-Lütjenwestedt) 2016 36.0 12 Enercon E-101 (12 ×) Gokels RD 54 ° 7 ′ 6 ″ N, 9 ° 29 ′ 19 ″ E Citizens WP Mittelholstein
Moorhusen wind farm 2000
2001
23.5 16 AN Bonus 1000/54 (1 ×)
NEG Micon NM64c ​​/ 1500 (15 ×)
Moorhusen
Krummendiek
IZ 53 ° 56 ′ 34 "N, 9 ° 23 ′ 32" E Ventotec
Neuenbrook wind farm 2001
2012
2017
21.3 10 Vestas V66-1.65MW (4 ×)
Vensys 77 (2 ×)
Vensys 77 (1 ×)
Senvion 3.4M114 (3 ×)
Neuenbrook IZ 53 ° 51 ′ 7 "N, 9 ° 34 ′ 4" E Bürger-WP Neuenbrook, Butzkies wind project a Vensys system with a prototype of a "maintenance-free lattice mast" from Butzkies Stahlbau
Neuengörs-Weede wind farm 2001
2017
29.4 12 REpower MD70 (6 ×)
Senvion 3.4M114 (6 ×)
Neuengörs
Weede
SE 53 ° 54 ′ 26 "N, 10 ° 23 ′ 20" E Thinker & Wulf erected on the A 20
Neuenkirchen-Böddinghusen wind farm 2015
2017
13.6 5 Enercon E-53 (1 ×)
Senvion 3.2M114 (4 ×)
Neuenkirchen HEI 54 ° 15 ′ 7 ″ N, 9 ° 0 ′ 5 ″ E Community wind farm Neuenkirchen
Neuenkirchen-Heuwisch wind farm 2015 19.2 6th Senvion 3.2M114 (4 ×) Neuenkirchen HEI 54 ° 14 ′ 12 "N, 8 ° 57 ′ 11" E Community wind farm Neuenkirchen
Neuenkirchen-Tiebensee wind farm 2014
2015
8.7 3 Enercon E-70 E4 (1 ×)
Senvion 3.2M114 (2 ×)
Neuenkirchen HEI 54 ° 13 ′ 22 "N, 8 ° 59 ′ 56" E Community wind farm Neuenkirchen
Neuenkirchen-Tödienwisch wind farm 2017 15.0 5 Enercon E-115 (5 ×) Neuenkirchen HEI 54 ° 15 ′ 1 ″ N, 8 ° 57 ′ 42 ″ E Community wind farm Neuenkirchen
Neufeld wind farm 1996
2012
36.8 16 Enercon E-82 E2 (16 ×) Neufeld
Diekhusen-Fahrstedt
HEI 53 ° 55 ′ 40 ″ N, 9 ° 0 ′ 1 ″ E WES-IBS 2012 repowering (16 × Enercon E-82 E2 for 12 × BWU 41-500)
Neuratjensdorf wind farm 1999
2007
2018
28.2 10 REpower MD77 (1 ×)
Enercon E-70 E4 (1 ×)
Enercon E-101 (8 ×)
Neuratjensdorf OH 54 ° 20 ′ 16 ″ N, 10 ° 59 ′ 10 ″ E WP Neuratjensdorf Rossee Repowering 2018 (1 × Enercon E-70 E4 and 8 × Enercon E-101 instead of 8 × Vestas V47-660kW and 3 × Enercon E-66 / 15.66 )
Niebüll wind farm 2012 15.0 5 Vestas V112-3MW (5 ×) Niebüll NF 54 ° 47 ′ 31 ″ N, 8 ° 47 ′ 3 ″ E Geo Mbh
Norddeich wind farm 2009
2011-2012
2016
34.8 15th Enercon E-70 E4 (9 ×)
Enercon E-92 (6 ×)
North dike HEI 54 ° 13 ′ 28 "N, 8 ° 54 ′ 17" E Marsh Association Schleswig-Holstein e. V.
Norderheistedt wind farm 2014 16.5 5 Vestas V112-3.3MW (5 ×) Norderheistedt HEI 54 ° 15 ′ 14 "N, 9 ° 7 ′ 14" E Eider community wind farm
Norderwöhrden-Oesterwurth wind farm 2002
2015
2017
110.9 38 Enercon E-48 (1 ×)
Enercon E-70 E4 (14 ×)
Vestas V80 (1 ×)
Vestas V112-3.45MW (22 ×)
Norderwöhrden
Oesterwurth
HEI 54 ° 12 ′ 5 ″ N, 9 ° 0 ′ 23 ″ E 2017 repowering (22 × Vestas V112-3.45MW for 25 old systems)
Nordhackstedt wind farm 1995
1997
2003
2012
2017
20.75 9 Tacke TW 600 (1 ×)
REpower 3.4M104 (1 ×)
REpower MD77 (3 ×)
Senvion MM92 (1 ×)
Senvion 3.4M114 (3 ×)
Nordhackstedt SL 54 ° 44 ′ 19 ″ N, 9 ° 11 ′ 11 ″ E Ing.Henning Holst, L / project 2013 and 2017 repowering (1 × REPower 3.4M104 for 2 × Vestas V44 ), (3 × Senvion 3.4M114 for 1 × REPower MD70 , 1 × Tacke TW 600 and 2 × Nordtank NTK-500 )
Norstedt wind farm 2003
2014
2017
41.4 16 REpower MD70 (5 ×)
REpower MM82 (2 ×)
Senvion 3.2M114 (6 ×)
Senvion 3.4M114 (1 ×)
Siemens SWT-3.6-130 (2 ×)
Norstedt NF 54 ° 36 ′ 25 ″ N, 9 ° 8 ′ 18 ″ E
Nortorf wind farm 2001
2010
17.4 10 NEG Micon NM64c ​​/ 1500 (7 ×)
Enercon E-70 E4 (3 ×)
Nortorf IZ 53 ° 55 ′ 22 "N, 9 ° 19 ′ 23" E Geo mbH, Bürger-WP Nortorf, WP Norderwisch
Nortorf West wind farm 2014
2016
34.6 10 Senvion 3.2M114 (8 ×)
Amperax A3000 (3 ×)
Nortorf IZ 53 ° 54 ′ 10 "N, 9 ° 18 ′ 2" E
Community wind farm Obere Arlau 2013 38.4 12 Senvion 3.2M114 (12 ×) Hazel and
Viöl
NF 54 ° 34 ′ 58 ″ N, 9 ° 9 ′ 12 ″ E Ing.Holst
Obernwohlde-Pronstorf wind farm 2016 91.5 20th Enercon E-101 (20 ×) Obernwohlde
Pronstorf
OH
SE
53 ° 56 ′ 10 ″ N, 10 ° 34 ′ 12 ″ E SUSI Renewable Energy Fund II (mutual fund)
Oevenum wind farm 1990
1991
1992
2015
6.9 3 Enercon E-70 (3 ×) Oevenum NF 54 ° 44 ′ 28 "N, 8 ° 34 ′ 4" E Föhrer wind power Repowering 2015, (3 × Enercon E-70 instead of 5 × Vestas V25-200kW , Vestas V27-225kW and Micon M530-250 )
Oldenborstel wind farm 2014 6.4 2 Senvion 3.2M114 (2 ×) Oldenborstel IZ 54 ° 3 ′ 29 ″ N, 9 ° 31 ′ 28 ″ E iTerra Wind, Citizen WP Oldenborstel
Oldenswort wind farm 2001
2015
23.7 12 Vestas V27 (1 ×)
Vestas V80-2MW (6 ×)
Enercon E-82 E2 (5 ×)
Oldens word NF 54 ° 23 ′ 22 "N, 8 ° 56 ′ 17" E Wotan group
Oldersbek wind farm 1997-1998
2013
2017
8.95 4th REPower MM82 (1 ×)
Enercon E-82 E2 (3 ×)
Oldens word NF 54 ° 27 '17 "N, 9 ° 9' 29" E GEWI 2013 repowering (1 × REPower MM82 for 1 × BWU 57/1000), 2017 repowering (3 × Enercon E-82 E2 for 4 × NEG Micon NM64 / 1500 )
Olderup wind farm 1995
2002
2013
2015
2017
44.95 20th Enercon E-66 (3 ×)
Enercon E-70 E2 (8 ×)
Senvion MM82 (2 ×)
Senvion MM92 (1 ×)
Nordex N100 / 3300 (1 ×)
Vestas V90-2MW (2 ×)
Vestas V117-3.45MW (2 ×)
Enercon E-48 (1 ×)
Olderup NF 54 ° 31 ′ 28 ″ N, 9 ° 6 ′ 21 ″ E Greenbridge, eeNORD 2015 repowering (1 × Vestas V90-2MW , 1 × Senvion MM82 and 2 × Enercon E-70 E2 for 4 × Vestas V39 ), 2017 repowering (2 × Vestas V117-3.45MW and 1 × Nordex N100 / 3300 for 3 × Vestas V80-2MW )
Ostenfeld wind farm (Husum) 2002
2009
2012
9.1 5 NEG Micon NM64 / 1500 (3 ×)
Enercon E-70 E4 (2 ×)
Ostenfeld (Husum) NF 54 ° 27 ′ 1 ″ N, 9 ° 12 ′ 12 ″ E Ing.Henning Holst
Oster-Ohrstedt wind farm 2002
2014
2017
13.8 5 Enercon E-70 E4 (6 ×) Oster-Ohrstedt NF 54 ° 31 '12 "N, 9 ° 13" 25 "E 2017 repowering (4 × Enercon E-70 E4 for 4 × Enercon E-66 )
Oster-Ohrstedt West wind farm 2003
2014
2015
22.5 10 Enercon E-66 (1 ×)
Enercon E-82 E2 (9 ×)
Oster-Ohrstedt NF 54 ° 30 ′ 14 "N, 9 ° 15 ′ 8" E 2015 repowering (4 × Enercon E-82 E4 for 4 × Enercon E-66 )
Osterrade wind farm 2001
2011
2015
26.0 13 Vestas V90-2MW (3 ×)
Senvion MM100 (10 ×)
Bovenau RD 54 ° 21 ′ 1 ″ N, 9 ° 51 ′ 5 ″ E IB Henning Holst 2015 repowering (10 × Senvion MM100 for 7 × Vestas V66-1.65MW )
Owschlag-Boklund wind farm 2001 10.5 4th GE Wind Energy 1.5sl (4 ×)
Südwind S70 (3 ×)
Owschlag RD 54 ° 24 ′ 32 "N, 9 ° 34 ′ 35" E getproject
Owschlag-Norby wind farm 2001 12.0 8th Südwind S70 (8 ×) Owschlag RD 54 ° 24 ′ 20 "N, 9 ° 33 ′ 33" E e3
Padenstedt wind farm 2005 6.9 3 Enercon E-70 E4 (3 ×) Padenstedt RD 54 ° 1 ′ 1 ″ N, 9 ° 53 ′ 29 ″ E
Petersdorf wind farm 1991 0.9 3 Enercon-32 (3 ×) Petersdorf (Fehmarn) OH 54 ° 28 ′ 13 "N, 11 ° 4 ′ 11" E
Presen wind farm 2006-2007 39.1 17th Enercon E-70 (17 ×) Presen OH 54 ° 29 ′ 6 ″ N, 11 ° 13 ′ 34 ″ E Citizens WP Fehmarn Repowering 2006–2007
(17 × Enercon E-70 instead of 23 × Enercon E-40 )
Puls wind farm 1999 16.5 10 Vestas V66-1.65MW (10 ×)
REpower MM82 (1 ×)
Pulse IZ 54 ° 4 ′ 9 ″ N, 9 ° 31 ′ 34 ″ E WKN
Quarnbek wind farm 2016 24.3 3 Siemens SWT-3.2-113 (3 ×) Quarnbek RD 54 ° 19 ′ 10 ″ N, 9 ° 59 ′ 21 ″ E Thinker & Wulf
Quarnstedt wind farm 2001
2011
24.3 16 AN Bonus B62 / 1300 (11 ×)
Vestas V90-2MW (3 ×)
Vestas V80-2MW (2 ×)
Quarnstedt IZ 53 ° 58 ′ 7 ″ N, 9 ° 46 ′ 8 ″ E Prokon
Raa-Besenbek wind farm 2001
2011
2019-2020
22.6 8th REpower MM92 (4 ×)
Nordex N117 / 3600 (4 ×)
Raa-Besenbek PI 53 ° 44 ′ 11 "N, 9 ° 35 ′ 31" E Citizens WP Raa-Besenbek, IB Henning Holst 2019-2020 repowering (4 × Nordex N117 / 3600 instead of 4 × GE Wind Energy 1.5s )
Rabenholz wind farm 1994
2018
11.75 5 Enercon E-92 (5 ×) Raven wood SL 54 ° 42 ′ 28 "N, 9 ° 54 ′ 57" E 2018 repowering (5 × Enercon E-92 instead of 3 × Tacke TW 600)
Rantrum wind farm 1997-1998
1999
2004
2013
2015
2017
29.7 8th Vestas V66-1.65MW (6 ×)
REPower MD70 (3 ×)
Senvion 3.4M104 (1 ×)
Senvion 3.2M114 (3 ×)
Senvion 3.4M114 (2 ×)
Rantrum NF 53 ° 27 '26 "N, 9 ° 9' 17" E WKN AG
Ratjendorf wind farm 2000
2006
7.3 4th Vestas V66-1.75MW (3 ×)
REpower MM82 (1 ×)
Ratjendorf PLÖ 54 ° 21 ′ 19 ″ N, 10 ° 24 ′ 7 ″ E Laboer wind farm
Reher wind farm 2002
2004
2005
21.1 11 Enercon E-66 / 18.70 (2 ×)
REpower MD77 (1 ×)
Enercon E-70 (8 ×)
Reher IZ 54 ° 3 ′ 5 ″ N, 9 ° 34 ′ 8 ″ E BAUUNION Wismar, citizens WP Reher
Rehhorst wind farm 2001 7.5 5 NEG Micon NM72c / 1500 (5 ×) Rehhorst OD 53 ° 53 '16 "N, 10 ° 27' 23" E e3, plan 8
Reinsbüttel wind farm 2001 7.5 5 NEG Micon NM72c / 1500 (5 ×) Rehhorst OD 53 ° 53 '16 "N, 10 ° 27' 23" E e3, plan 8
Reinsbüttel-Oesterdeichstrich wind farm 1993
1999
2017
21.8 12 Vestas V27 (1 ×)
Vestas V39 (2 ×)
Enercon E-70 E4 (9 ×)
Reinsbüttel
Oesterdeichstrich
HEI 54 ° 10 ′ 8 ″ N, 8 ° 53 ′ 25 ″ E 2017 repowering (1 × Enercon E-70 E4 for 3 × Vestas V39 )
Rethwisch wind farm (Stormarn) 2005 4.5 3 NEG Micon NM64c ​​/ 1500 (3 ×) Rethwisch (Stormarn) OD 53 ° 46 ′ 17 "N, 10 ° 27 ′ 9" E e3
Rethwisch wind farm (Steinburg) 2016 53.25 16 Vestas V112-3.3MW (13 ×)
Vestas V112-3.45MW (3 ×)
Rethwisch (Steinburg) IZ 53 ° 53 ′ 2 ″ N, 9 ° 36 ′ 13 ″ E MDP Group
Reußenköge wind farm 1999
2003
2004
2008
2009-2010
2015-2017
225.2 82 Vestas V80-2MW (10 ×)
REpower MM70 (2 ×)
REpower MM82 (24 ×)
Vestas V112-3.3MW (38 ×)
Vestas V112-3.45MW (8 ×)
Reußenköge NF 54 ° 36 '24 "N, 8 ° 54' 8" E WP Reußenköge I - V, Dirkshof, various 2014-2017 repowering (34 × Vestas V112 for 34 × old systems such as Senvion MM82 , Vestas V66 , Vestas V80 and NEG Micon NM80 / 2750)
Riepsdorf wind farm 2000
2001
2002
40.14 34 Vestas V47-660kW (14 ×)
Jacobs MD70 (13 ×)
NEG Micon NM64c ​​/ 1500 (4 ×)
Enercon E-66 / 18.70 (3 ×)
Riepsdorf
Rüting
Cismarfelde
OH 54 ° 13 ′ 41 ″ N, 10 ° 56 ′ 48 ″ E RWE Innogy , Koselauer Windenergie
Risum-Lindholm wind farm 2014-2015 33.0 10 Vestas V112-3.3MW (10 ×) Risum-Lindholm NF 54 ° 46 ′ 17 "N, 8 ° 54 ′ 11" E Kohldamm wind farm
Rüting wind farm 2000-2001 7.5 5 REpower MD70 (5 ×) Rüting OH 54 ° 12 ′ 12 ″ N, 10 ° 56 ′ 3 ″ E
Schafflund wind farm 2014 9.6 3 REpower 3.2M114 (3 ×) Schafflund SL 54 ° 45 ′ 24 ″ N, 9 ° 8 ′ 16 ″ E L / project
Schafflundfeld wind farm 1994
1999
2005
2013
2017
2018
46.6 14th REpower 3.2M114 (5 ×)
Senvion 3.4M114 (9 ×)
Schafflundfeld SL 54 ° 46 ′ 21 ″ N, 9 ° 7 ′ 28 ″ E L / project 2017 and 2018 repowering (8 × Senvion 3.4M114 for 6 × Tacke 1.5s and 3 × Enercon E-70 )
Schashagen wind farm 2002
2017
13.25 7th Enercon E-66 / 18.70 (4 ×)
Senvion MM92 (1 ×)
Senvion MM100 (2 ×)
Schashagen OH 54 ° 8 ′ 22 "N, 10 ° 53 ′ 16" E WP Schashagen
Schashagen-Albersdorf wind farm 2002
2017
2018
17.55 7th Enercon E-66 / 18.70 (3 ×)
Enercon E-101 (3 ×)
Enercon E-115 (1 ×)
Albersdorf (Schashagen) OH 54 ° 8 ′ 24 ″ N, 10 ° 54 ′ 25 ″ E WP Schashagen
Schiphorst wind farm 2002 4.0 4th NEG Micon NM60 / 1000 (4 ×) Schiphorst RZ 53 ° 43 ′ 2 "N, 10 ° 26 ′ 34" E e3
Schobüll wind farm 1994
2009
2015
24.3 10 Enercon E-82 (4 ×)
Enercon E-82 E2 (2 ×)
Enercon E-70 (1 ×)
Senvion 3.2M114 (2 ×)
Nordex N117 / 3000 (1 ×)
Grown up SL 54 ° 40 ′ 31 ″ N, 9 ° 16 ′ 25 ″ E Thinker & Wulf 2009 repowering (4 × Enercon E-82 for 6 × Dewind D4)
Schönwalde-Altenkrempe wind farm 2017 17.0 5 Senvion 3.4M114 (5 ×) Schönwalde on the Bungsberg OH 54 ° 10 ′ 1 ″ N, 10 ° 49 ′ 34 ″ E Prokon
Schuby wind farm 1998
2001
25.59 22nd Südwind S70 (14 ×)
Vestas V47 / 660KW (4 ×)
Nordtank NTK-600 (3 ×)
Nordex N27 / 150 (1 ×)
Schuby SL 54 ° 31 ′ 5 ″ N, 9 ° 25 ′ 8 ″ E
Schülp wind farm near Nortorf 2015 10 4th Nordex N100 (4 ×) Schülp b. Nortorf RD 54 ° 8 ′ 28 "N, 9 ° 51 ′ 35" E
Schülp-Oesterwurth wind farm 1994
2001
2007-2008
2009
2014
2017
39.56 27 Tacke TW 500 (5 ×)
Nordtank NTK-600/41 (1 ×)
Enercon E-48 (2 ×)
Enercon E-53 (1 ×)
Vestas V47-0.66MW (1 ×)
Vestas V52-0.85MW (3 × )
REpower MD70 (1 ×)
Senvion MM82 (1 ×)
Vestas V80 (1 ×)
Enercon E-70 E4 (11 ×)
Schülp
Oesterwurth
HEI 54 ° 14 ′ 8 ″ N, 8 ° 56 ′ 20 ″ E WPD 2014 repowering (8 × Enercon E-70 E4 for 8 × Tacke TW 600, Nordtank NTK-600 ) and 2016 (2 × Enercon E-70 E4 instead of 2 × Vestas V47-0.66MW )
Schülp West wind farm 1994
2009
2014
23.8 11 Enercon E-48 (1 ×)
Enercon E-70 E4 (10 ×)
Schülp HEI 54 ° 14 ′ 6 ″ N, 8 ° 54 ′ 19 ″ E WPD 2014 repowering (9 × Enercon E-70 E4 for 8 × NEG Micon NM48 / 750 , Vestas V47 ) and 2016 (1 × Enercon E-70 E4 for 1 × NEG Micon NM48 / 750 )
Schwedeneck wind farm 2000 4.5 3 Tacke TW 1.5s (1 ×) Blast RD 54 ° 27 '17 "N, 10 ° 5' 34" E
Schwesing wind farm 1998
2001
2014-2015
22.4 8th REpower 57/1000 (2 ×)
Senvion 3.4M104 (6 ×)
Schwesing NF 54 ° 29 ′ 20 "N, 9 ° 9 ′ 33" E GP joules 2014-2015 repowering (6 × Senvion 3.4M104 for 9 × REPower 57/1000)
Schwochel-Wulfsdorf wind farm 2000
2002
21.5 14th Vestas V66-1.65MW (12 ×)
Vestas V52-850kW (2 ×)
Schwochel
Wulfsdorf
OH 54 ° 0 ′ 9 "N, 10 ° 38 ′ 33" E WKN
Sehestedt wind farm 2015 12.0 4th Nordex N117 / 3000 (4 ×) Sehestedt RD 54 ° 22 ′ 20 "N, 9 ° 48 ′ 29" E Thinker & Wulf
Silberstedt wind farm 1994
1995
2016
15.65 12 Enercon E-115 (4 ×)
Nordtank NTK-500 (7 ×)
Vestas V25-200KW (1 ×)
Silberstedt SL 54 ° 31 '21 "N, 9 ° 23' 29" E
Silberstedt-Rosacker wind farm 2001 14.46 15th Südwind S70 (6 ×)
Tacke TW 600 (8 ×)
Vestas V47-600KW (1 ×)
Rosacker SL 54 ° 30 ′ 11 "N, 9 ° 24 ′ 9" E
Sillerup wind farm 2002
2008
2015
46.65 24 Enercon E-70 E4 (8 ×)
Enercon E-82 E2 (3 ×)
Enercon E-48 (1 ×)
NEG Micon NM48 / 750 (7 ×)
Vensys 112/2500 (1 ×)
Senvion 3.2M114 (4 ×)
Sillerup SL 54 ° 40 ′ 2 "N, 9 ° 11 ′ 31" E WPD, revenue 2015 repowering (3 × Enercon E-82 E2 and 5 × Senvion 3.2M114 for 7 × NEG Micon NM48 / 750 and 1 × Vestas V47 )
2 NEG Micon NM48 / 750 meanwhile dismantled
Simonsberg wind farm 1993-95
2003
2012
47.4 25th Vestas V80-2MW (2 ×)
Vestas V112-3MW (4 ×)
Simonsberg NF 54 ° 26 ′ 40 "N, 8 ° 59 ′ 9" E 2015 repowering (4 × Vestas V112-3MW for 11 × Enercon E-40 )
Sollwitt wind farm 2014 20.4 6th Senvion 3.4M104 (6 ×) Sollwitt NF 54 ° 34 ′ 34 "N, 9 ° 14 ′ 29" E WEB Andresen
Sommerland wind farm 1999
2016
2018
14.0 7th Senvion MM100 (7 ×) Summer land IZ 53 ° 47 ′ 22 "N, 9 ° 31 ′ 34" E RWE Innogy 2018 repowering (3 × Senvion MM100 for 4 × Enercon E-66 / 15.66 )
Sönnebüll wind farm 1997
2005-2006
2009
2014
2015
20.05 8th Nordex N80 (1 ×)
REpower MM82 (4 ×)
Senvion 3.2M114 (1 ×)
Senvion 3.2M114 (2 ×)
Sönnebüll NF 54 ° 38 ′ 6 ″ N, 9 ° 0 ′ 19 ″ E Windpark Sönnebüll GmbH, WEB Andresen 2009 Repowering (4 × Senvion MM82 for 6 × Nordex N52 )
Sörup wind farm 1999
2015
17.6 9 Senvion MM92 (6 ×)
Vestas V80-2MW (1 ×)
Vestas V66-1.65MW (2 ×)
Soerup SL 54 ° 44 ′ 9 ″ N, 9 ° 40 ′ 12 ″ E Ing.Henning Holst, WKN AG Previously 1 × Vestas V47
Sprakebüll wind farm 1998
2011
2014
2017
23.0 9 Vestas V112-3.0MW (5 ×)
Nordex N100 / 2500 (2 ×)
Nordex N117 / 3000 (1 ×)
Sprakebull NF 54 ° 46 '43 "N, 9 ° 5' 36" E Geo Mbh 2014 repowering (5 × Vestas V112-3MW for 5 × Vestas V66-1.65MW )
Steinberg wind farm 1995 1.8 3 Tacke TW 600 (3 ×) Steinberg SL 54 ° 45 ′ 25 "N, 9 ° 48 ′ 22" E
Stelle-Wittenwurth wind farm 2015 19.8 6th Vestas V112-3.3MW (6 ×) Place-Wittenwurth HEI 54 ° 14 ′ 35 "N, 9 ° 2 ′ 23" E Citizen wind farm Stelle-Wittenwurth
Strübbel wind farm 2016 13.6 4th Senvion 3.4M114 (4 ×) Strübbel HEI 54 ° 15 ′ 41 ″ N, 8 ° 56 ′ 48 ″ E
Süderau wind farm 2000
2002
2015
2017
34.85 17th Jacobs J43 / 600 (4 ×)
REpower 48/600 (3 ×)
Senvion MM92 (1 ×)
Senvion 3.2M114 (2 ×)
Senvion 3.4M114 (3 ×)
Siemens SWT-3.0-113 (4 ×)
Süderau
Greenland
IZ 53 ° 50 ′ 0 ″ N, 9 ° 34 ′ 20 ″ E Wind power Süderau 2017 repowering (3 × Senvion 3.4M114 for 5 × Tacke TW 600a)
Süderdeich Nord wind farm 1993
1995
2012
6.9 3 Enercon E-82 E2 (3 ×) South dike HEI 54 ° 12 ′ 16 ″ N, 8 ° 53 ′ 2 ″ E Süderdeich community wind farm 2012 repowering (3 × Enercon E-82 E2 instead of 1 × Enercon E-40 5.40 , 2 Micon M700 / 250 and 1 Micon M1500 / 500)
Süderdeich-Reinsbüttel wind farm 1999
2004
2010
12.9 14th Vestas V47-0.66MW (10 ×)
Vestas V52-0.85MW (2 ×)
Enercon E-70 E4 (2 ×)
Süderdeich
Reinsbüttel
HEI 54 ° 11 ′ 16 ″ N, 8 ° 55 ′ 16 ″ E Süderdeich community wind farm
Süderdeich-Unterschaar wind farm 1993
2010
23.0 10 Enercon E-70 E4 (9 ×)
Enercon E-82 E2 (1 ×)
Süderdeich
Unterschaar
HEI 54 ° 11 ′ 10 ″ N, 8 ° 53 ′ 20 ″ E Süderdeich community wind farm 2010 Repowering (7 × Enercon E-70 E4 for 7 × Enercon E-40 and 1 × Mitsubishi MWT-450-39)
Süderlügum wind farm 2014 39.0 13 Siemens SWT-3.0-113 (12 ×)
Enercon E-101 (1 ×)
Süderlügum NF 54 ° 53 ′ 35 "N, 8 ° 54 ′ 11" E Süderlügum community wind farm
Tating wind farm 1991
2016
20.7 9 Enercon E-70 E4 (9 ×) Tating HEI 54 ° 20 ′ 10 "N, 8 ° 42 ′ 9" E Ing.Henning Holst 2016 repowering (9 × Enercon E-70 E4 for 10 × Vestas V39 )
Tellingstedt-Süderdorf wind farm 2014
2016
32.9 10 Vestas V112-3.3MW (9 ×)
Senvion 3.2M114 (1 ×)
Tellingstedt
Süderdorf
HEI 54 ° 12 ′ 7 ″ N, 9 ° 18 ′ 14 ″ E Eider community wind farm
Tensbüttel wind farm 2014
2016
15.0 5 Vestas V112-3.0MW (5 ×) Tensbüttel roast HEI 54 ° 6 ′ 13 ″ N, 9 ° 16 ′ 5 ″ E Citizens WP Tensbüttel Erected on the A 23
Timmaspe wind farm 2001 13.0 10 Nordex N60 (10 ×) Timmaspe RD 54 ° 8 ′ 2 "N, 9 ° 51 ′ 35" E e3
Tralau wind farm 2001 8.0 4th Vestas V80-2MW (4 ×) Tralau OD 53 ° 50 ′ 8 ″ N, 10 ° 16 ′ 14 ″ E e3
Treia-Ipland wind farm 2014
2019
36.0 11 REpower 3.2M114 (9 ×)
REpower 3.6M114 (2 ×)
Treia SL 54 ° 32 ′ 22 "N, 9 ° 18 ′ 10" E Citizen wind farm Treia-Ipland
Trennewurth wind farm 1999
2001
2003
2012
2014
26.51 17th HAG ET550 / 41 (1 ×)
NEG Micon NM48 / 750 (1 ×)
Vestas V47-660kW (1 ×)
Vestas V66-1.65MW (7 ×)
Vestas V80 (3 ×)
Enercon E-70 E4 (3 ×)
Vensys 70 (1 ×)
Trennewurth HEI 53 ° 59 ′ 22 "N, 9 ° 0 ′ 14" E Wind7, UMaAG
Trennewurth-Barlt wind farm 2012
2016
44.0 5 REpower 3.4M104 (4 ×)
Senvion 3.2M114 (1 ×)
Trennewurth
Barlt
HEI 54 ° 0 ′ 32 "N, 9 ° 0 ′ 31" E WES-IBS Expansion planned (1 × Enercon E-126 EP3 E2 )
Trennewurth-Helse wind farm 2016 24.0 8th Enercon E-115 (8 ×) Trennewurth
Helse
HEI 53 ° 59 ′ 6 ″ N, 9 ° 1 ′ 35 ″ E
Trenter Berg wind farm 1998 3.6 6th Tacke TW 600 (6 ×) Wielen
Trent
PLÖ 54 ° 11 ′ 21 ″ N, 10 ° 21 ′ 2 ″ E wotan, WinTec
Twedt wind farm 1995
2018
27.54 14th Enercon E-17 (1 ×)
Tacke TW 600 (5 ×)
Vestas V47-0.66MW (1 ×)
Senvion 3.4M114 (7 ×)
Twedt SL 54 ° 36 ′ 13 ″ N, 9 ° 39 ′ 28 ″ E Ing.Henning Holst 2018 repowering (7 × Senvion 3.4M114 for 11 × Vestas V47-0.66MW , 1 × Tacke TW 600, 1 × Wind World W2320 / 160 and 1 × Micon M 750/250)
Uelsby wind farm 2015 9.6 3 Senvion 3.2M114 (3 ×) Uelsby SL 54 ° 37 '16.2 "  N , 9 ° 36' 14.2"  E 54 ° 37 '10 "N, 9 ° 36' 9" E Thinker & Wulf
Uelvesbüll wind farm 1991
2001
8.8 12 Bonus B54 / 1000 (8 ×)
REpower 200 kw (4 ×)
Uelvesbull NF 54 ° 24 ′ 15 ″ N, 8 ° 56 ′ 10 ″ E Ing.Henning Holst
Uetersen wind farm 2001 7.8 6th AN Bonus 1300/62 (6 ×) Uetersen PI 53 ° 41 ′ 16 "N, 9 ° 37 ′ 31" E Rübsamen Windenergie GmbH
Vollstedt wind farm 1997
2007
2009
2011
32.0 10 Enercon E-70 E4 (10 ×) Vollstedt NF 54 ° 37 ′ 28 "N, 9 ° 1 ′ 27" E WEB Andresen 2007 repowering (8 × Enercon E-70 E4 for 7 × Enercon E-40 ), 2009 repowering (2 × Enercon E-70 E4 for 2 × Enercon E-66 )
Wanderup wind farm 1995
2012
2015
47.6 16 Senvion 3.2M114 (13 ×)
Enercon E-82 (3 ×)
Wanderup SL 54 ° 40 ′ 30 ″ N, 9 ° 17 ′ 16 ″ E Ing.Henning Holst 2015 repowering (13 × Senvion 3.2M114 for Vestas V47 / 660 KW )
Wangelau wind farm 2014 14.4 6th Nordex N117 / 2400 (6 ×) Wangelau RZ 53 ° 27 '8 "N, 10 ° 33' 30" E WPD, natural wind
Weesby wind farm 1996
1998
2013
12.4 4th Enercon E-101 (2 ×)
Senvion 3.2M114 (2 ×)
Weesby SL 54 ° 51 ′ 15 "N, 9 ° 7 ′ 35" E Medelby community wind farm 2013 repowering (2 × Enercon E-101 and 2 × Senvion 3.2M114 for 4 × Enercon E-40 and 4 × NEG Micon 1500/500 )
Wesselburener Deichhausen wind farm 2014 9.2 4th Enercon E-70 E4 (4 ×) Wesselburener Deichhausen HEI 54 ° 11 '12 "N, 8 ° 56' 14" E 2014 repowering (4 × Enercon E-70 E4 instead of 3 × Enercon E-40 5.40 and 1 × Vestas V44-0.6MW )
Wesselburenerkoog wind farm 2009
2011
2016
25.4 9 Enercon E-70 E4 (9 ×)
Enercon E-92 (2 ×)
Wesselburenerkoog HEI 54 ° 14 ′ 16 "N, 8 ° 53 ′ 28" E
Westerau wind farm 1997 6.3 6th REpower 57/1000 (6 ×) Westerau OD 53 ° 46 ′ 16 ″ N, 10 ° 30 ′ 3 ″ E Thinker & Wulf
Westerbelmhusen wind farm 1994
2013
11.5 5 Enercon E-82 E2 (5 ×) Westerbelmhusen HEI 53 ° 54 ′ 31 "N, 9 ° 4 ′ 34" E Bürgerwind Brunsbüttel Repowering 2013 (5 × Enercon E-82 E2 instead of 1 × AN Bonus 450/37, 1 × GET Danwin 27, 6 × Enercon E-40 / 5.40 and 1 × Vestas V39-500kW )
Wester-Ohrstedt wind farm 2004 6.55 4th REpower MD70 (3 ×)
REpower MM82 (1 ×)
Wester-Ohrstedt NF 54 ° 29 ′ 27 ″ N, 9 ° 10 ′ 13 ″ E e3, wpd
West coast wind farm 1987
1989
1993
1994
1997
2002
2004
2009
2010
51.1 24 Enercon E-58 (2 ×)
Enercon E-66 / 18.70 (2 ×)
Enercon E-70 (18 ×)
REpower MM82 (2 ×)
Kaiser Wilhelm Koog HEI 53 ° 55 ′ 23 "N, 8 ° 57 ′ 0" E West coast wind farm First German wind farm, wind turbine test field, tested wind turbines: MAN Aeroman 30 (20 ×), elektrOmat 25 (5 ×), Enercon E-16 (5 ×), Adler 25 (2 ×), Enercon E-33 (1 ×), HSW 250 T (1 ×), Tacke TW 250 (1 ×), Vestas V27-225 kW (1 ×), Enercon E-40 (1 ×), Vestas V63-1.5MW (1 ×)
Wiemersdorf wind farm 2001
2004
2010
32.8 16 Enercon E-66 / 18.70 (6 ×)
REpower MD77 (3 ×)
Nordex N100 / 2500 (7 ×)
Wiemersdorf SE 53 ° 57 ′ 32 "N, 9 ° 55 ′ 35" E Bürger-WP Wiemersdorf, Geo mbH, Nordex built test site for offshore wind turbines on the A 7
Willenscharen-Brokstedt wind farm 1999
2003
2017
24.75 16 Vestas V66-1.65MW (12 ×)
Vestas V52-850kW (3 ×)
Nordex N117 / 2400 (1 ×)
Willenscharen
Brokstedt
IZ 54 ° 0 ′ 22 "N, 9 ° 50 ′ 13" E Citizens WP Willenscharen-Brokstedt, DGE
Winnert wind farm 2002
2014
2018
16.8 7th REpower 57/1000 (2 ×)
Enercon E-58 (3 ×)
Enercon E-70 E4 (2 ×)
Senvion 3.6M114 (2 ×)
Winnert NF 54 ° 26 '22 "N, 9 ° 11' 11" E Certainly
Wittbek wind farm 2015 19.8 6th Senvion 3.4M104 (2 ×)
Senvion 3.2M114 (2 ×)
Vestas V112-3.3MW (2 ×)
Wittbek NF 54 ° 28 ′ 31 ″ N, 9 ° 10 ′ 17 ″ E GP joules
Wittkiel wind farm 1995 1.8 3 Tacke TW 600 (3 ×) Wittkiel SL 54 ° 40 ′ 7 "N, 9 ° 52 ′ 21" E Schwansener energy systems
Wöhrden wind farm 1998
2008
2009
35.9 35 Enercon E-40 (1 ×)
Vestas V47-0.66MW (25 ×)
Enercon E-48 (1 ×)
Enercon E-70 E4 (7 ×)
Vestas V80 (1 ×)
Woehrden HEI 54 ° 10 ′ 15 ″ N, 9 ° 1 ′ 7 ″ E WKN AG / BGZ
Wöhrden Ost wind farm 2012 30.0 10 Vestas V112-3MW (10 ×) Woehrden HEI 54 ° 9 '17 "N, 9 ° 2' 23" E Dirkshof
Wöhrden West wind farm 1999
2012
14.98 13 Enercon E-40 (1 ×)
Vestas V47-0.66MW (8 ×)
Enercon E-70 E4 (4 ×)
Woehrden HEI 54 ° 9 ′ 27 "N, 8 ° 57 ′ 31" E WKN AG / BGZ 2012 repowering (4 × Enercon E-70 E4 for 3 × Vestas V47-0.66MW and 1 × Enercon E-40 )
Woltersdorf wind farm 2001 7.8 6th AN Bonus 1300/62 (6 ×) Woltersdorf RZ 53 ° 35 ′ 4 "N, 10 ° 38 ′ 32" E e3
Wrohm-Osterrade wind farm 2014 33.0 11 Vestas V112-3.0MW (11 ×) Wrohm
Easter wheel
HEI 54 ° 12 ′ 7 ″ N, 9 ° 24 ′ 7 ″ E Citizens WP Wrohm-Osterrade A wind farm destroyed by fire in 2018
Wulfshagen wind farm 2000
2001
12.5 7th NEG Micon NM72 / 2000 (4 ×)
NEG Micon NM72c / 1500 (3 ×)
Tüttendorf
Felm
RD 54 ° 24 ′ 1 ″ N, 10 ° 1 ′ 28 ″ E Energy source Fire in a plant and reconstruction in 2004
Zarpen wind farm 1992
1996
0.9 3 AN Bonus 150/30 (2 ×)
Vestas V44-600kW (1 ×)
Zarps OD 53 ° 53 ′ 1 ″ N, 10 ° 29 ′ 23 ″ E
Wind test field north 2007
2009
2014
2016
2017
30.45 9 REpower 3.4M104 (2 ×)
REpower MM92 (1 ×)
SkyWind SW 3.4 (1 ×)
Enercon E-126 EP4 (1 ×)
GE 3.2-130 (1 ×)
Siemens SWT-3.6-130 (1 ×)
Nordex N131 / 3600 (1 ×)
Senvion 3.6M140 EBC (1 ×)
South march NF 54 ° 27 ′ 2 ″ N, 9 ° 2 ′ 0 ″ E Wind test field north Test field for innovative wind turbines, currently testing a two- wing SkyWind SW 3.4 wind turbine with a novel tower concept, prototype of Siemens SWT-3.6-130, GE Wind Energy 3.2-130, Nordex N131 / 3600 and Senvion 3.6M140 EBC

Individual evidence

  1. Boyens Newspapers of April 6, 2015: Application for two windmills. (No longer available online.) Archived from the original on September 25, 2015 ; accessed on September 24, 2015 .
  2. ^ Stadtwerke Reinfeld: Wind energy. (No longer available online.) Archived from the original on September 25, 2015 ; accessed on September 24, 2015 .
  3. ^ FH Flensburg: Enercon E30. (No longer available online.) Archived from the original on March 4, 2016 ; accessed on October 11, 2015 .
  4. ^ City of Geesthacht: Pumped storage power plant. (No longer available online.) Archived from the original on September 25, 2015 ; accessed on September 24, 2015 .
  5. ^ Community of Albersdorf: Wind farm - New landmark for Albersdorf. (No longer available online.) Archived from the original on September 28, 2015 ; accessed on September 28, 2015 .
  6. Denker & Wulf dated June 9, 2015: The wind farm is complete - the sixth mill will be connected to the grid these days. (No longer available online.) Archived from the original on September 29, 2015 ; accessed on September 28, 2015 .
  7. a b Eckernförder Zeitung from June 13, 2014: 20 years of wind power from Brodersby. Retrieved October 11, 2015 .
  8. fehmarn24 of January 5, 2007: Largest “repowering wind farm”. Retrieved July 28, 2015 .
  9. Hamburger Abendblatt of October 23, 2010: From crazy idea to solar master. Retrieved July 28, 2015 .
  10. VR Marketplace: Annual Report 2014. Accessed on September 24, 2015 .
  11. ^ RWE Innogy : Grömitz. Retrieved September 24, 2015 .
  12. a b Ventotec: Moorhusen wind farm. (No longer available online.) Archived from the original on September 28, 2015 ; accessed on September 27, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.ventotec.de
  13. Norddeutsche Rundschau from October 30, 2014: Community wind farm in Kohlenbek. Retrieved September 27, 2015 .
  14. GEO mbH: Wind farm with ten times the capacity. Retrieved September 27, 2015 .
  15. ^ RWE Innogy : Lasbek. Retrieved September 24, 2015 .
  16. Windkraft Journal from December 19, 2014: Project developer WKN AG sells Looft II wind energy project. Accessed on September 27, 2015 .
  17. ^ Community of Neuenbrook: Bürgerwindpark Neuenbrook. Retrieved September 24, 2015 .
  18. ^ BWP Obere Arlau GmbH & Co. KG. Retrieved December 16, 2018 .
  19. Kieler Nachrichten, Kiel, Schleswig-Holstein, Germany: New wind farm near Pronstorf - Six giants grow into the sky / News from Segeberg / News - KN - Kieler Nachrichten. In: www.kn-online.de. Retrieved April 14, 2016 .
  20. LLUR Schleswig-Holstein: Official announcement. (PDF) Retrieved September 28, 2015 .
  21. Norddeutsche Rundschau of September 29, 2012: Contract perfect - Oldenborstel gets two wind turbines. Retrieved September 27, 2015 .
  22. ^ RWE Innogy : Riepsdorf. Retrieved September 24, 2015 .
  23. ^ RWE Innogy : Sommerland. Retrieved September 24, 2015 .
  24. Hamburger Abendblatt dated December 23, 1997: Giants in the village. Retrieved September 24, 2015 .
  25. Wiemersdorf wind farm: Tomorrow's wind energy: Tested today in small Wiemersdorf. (PDF) (No longer available online.) Archived from the original on March 3, 2016 ; Retrieved September 25, 2015 .
  26. Energy source : Wulfshagen wind farm. (No longer available online.) Archived from the original on September 29, 2015 ; accessed on September 28, 2015 .
  27. Sven Janssen: Wulfshagen: The wind turbine burned for six hours. (PDF) Retrieved September 28, 2015 .
  28. Husumer Nachrichten of October 16, 2015: Growth in the wind power test field. Retrieved November 15, 2015 .
  29. Renewable energies from October 5, 2016: Wind turbine prototypes are being built at Husum. Retrieved January 11, 2017 .
  30. The new two-winged aircraft makes trade fair visitors curious . In: Renewable Energies. Das Magazin , September 17, 2015. Retrieved April 9, 2016.
  31. 20160323 xl P1030095 wind power plants at Husum.JPG. Wind turbine SW 3.4 from Skywind from Büdelsdorf in the wind test field south of Husum (output: 3.4 megawatts, rotor diameter: 107 meters, hub height: 133.5 meters). commons.wikimedia.org, accessed April 9, 2016 .