The first electrified railway line in Switzerland was the Vevey-Montreux-Chillon Tramway in 1888 . The network of the largest infrastructure operator, the Swiss Federal Railways , has been fully electrified since 2004 ; most of the lines operated by other operators are also electrified.
Unless otherwise stated, the timetable field numbering corresponds to the 2010 timetable period, as it was also used in the Rail Profile Switzerland book (2nd edition) .
Timetable field 100
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Lausanne - Villeneuve | 04/02/1861 | 1891-1900 | 05/14/1924 | OS |
Villeneuve - Bex | 06/10/1857 | 1903-1907 | 05/14/1924 | OS |
Bex - Saint-Maurice | 11/01/1860 | 1906 | 05/14/1924 | OS |
Saint-Maurice - Martigny | 07/14/1859 | 1909-10 | 12/12/1923 | Ll |
Martigny - Riddes | 05/10/1860 | 1914 | 12/12/1923 | Ll |
Riddes - Sion | 05/10/1860 | 1931-1932 | 12/12/1923 | Ll |
Sion - Granges - Lens | 10/15/1868 | 1968-1970 | July 31, 1919 / January 15, 1927 | Ll |
Granges- Lens - Sierre | 10/15/1868 | 1901 | July 31, 1919 / January 15, 1927 | Ll |
Sierre - Salgesch | 06/01/1877 | 1967 | July 31, 1919 / January 15, 1927 | Simplon |
Salgesch - Leuk | 06/01/1877 | - | July 31, 1919 / January 15, 1927 | Simplon |
Leuk - Visp | 07/01/1878 | 1977-1979 | July 31, 1919 / January 15, 1927 | Simplon |
Visp - Brig | 07/01/1878 | 1918 | July 31, 1919 / January 15, 1927 | Simpon |
Brig - Iselle | 06/01/1906 | 1922 | 06/01/1906 / 03/02/1930 | SBB |
Iselle - Preglia | 06/01/1906 | 1922 | 05/15/1930 | FS (Italy) |
Preglia - Domodossola | 06/01/1906 | 1921 | 05/15/1930 | FS (Italy) |
The lines with two electrification dates were first operated with three-phase current 3300 V and 16 2/3 Hz, and on the second date switched to single-phase alternating current 15 kV 16 2/3 Hz.
Timetable field 101
Lausanne-Echallens-Bercher Railway ; 1000 mm, 1500 volts direct current
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Lausanne-Flon – Lausanne-Charderon | May 28, 2000 | - | May 28, 2000 | LIVE |
Lausanne-Charderon-Cheseaux | November 5, 1873 | - | 1.1.1936 | LE |
Cheseaux – Echellens | 2.06.1874 | - | 1.1.1936 | LE |
Echellens – Bercher | 11/24/1898 | - | 1.1.1936 | CV |
Timetable field 102
TL-m1 railway line Lausanne-Flon-Renens TSLO. 1435mm 750V DC
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Lausanne-Flon-Renens | 06/02/1991 | - | 06/02/1991 |
Timetable field 103
TL-m2 railway line Ouchy – Croisettes, reopening as standard-gauge tire metro 750 V direct current. Formerly the Ouchy – Flon cog railway.
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Lausanne – Ouchy – Croisettes | 10/27/2008 | 10/27/2008 | 10/27/2008 |
Timetable field 104
Lausanne-Sébeillon – Lausanne Tridel railway line. Pure goods traffic line, rail connection of the Tridel waste incineration plant. Standard gauge 15 kV 16.7 Hz
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Lausanne-Sébeillon-Lausanne Tridel | 04/16/2007 | - | 04/16/2007 |
Timetable field 111
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Puidoux - Chexbres - Vevey | 05/02/1904 | - | May 16, 1940 | VCh |
The route was leased to SBB .
Timetable field 112
Chemins de fer électriques Veveysans gauge 1000 mm, 750–900 volts direct current.
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Vevey - Chamby | 1.10.1902 | - | 1.10.1902 | CEV |
Saint-Légier - Châtel-Saint-Denis | 2.04.1904 | - | 2.04.1904 | CEV |
- The Blonay – Chamby railway was shut down on May 21, 1966 and is now a museum railway
- The Saint-Légier – Châtel-Saint-Denis railway was closed on May 31, 1969 and dismantled. Replacement by bus line.
- Continuous trains Vevey – Les Pléiades since 1969, see timetable route 115
Timetable field 115
Chemins de fer électriques Veveysans , rack railway system Strub, track width 1000 mm, 800–900 volts direct current
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Blonay - Les Pléiades | July 8th, 1911 | - | 07/07/1911 | BP |
Continuous trains Vevey – Les Pléiades since 1969, see timetable route 112
Timetable field 120
Montreux-Berner-Oberland-Bahn , gauge 1000 mm, 850 volts direct current
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Montreux - Les Avants | 12/17/1901 | 12/17/1901 | MOB | |
Les Avants - Montbovon | 1.10.1903 | 1.10.1903 | MOB | |
Montbovon - Château-d'Oex | 08/19/1904 | 08/19/1904 | MOB | |
Château-d'Oex - Gstaad | December 20, 1904 | December 20, 1904 | MOB | |
Gstaad - Zweisimmen | July 6, 1905 | July 6, 1905 | MOB | |
Zweisimmen - Lenk | June 8, 1912 | June 8, 1912 | MOB |
- Between June 17, 1975 and September 30, 1979, passenger traffic between Zweisimmen and Lenk was suspended.
Timetable field 121
Transports Montreux – Vevey – Riviera until 2001 Montreux – Territet – Glion – Rochers-de-Naye railway, cogwheel railway system Abt, track width 800 mm, 850 volts direct current
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Montreux - Glion | 8.4.1909 | - | 8.4.1909 | MGI |
Glion – Caux | 2.7.1892 | - | 07/22/1938 | GN |
Caux-Naye de Fontaines | 7/28/1892 | - | 07/22/1938 | GN |
Naye Fontaines - Roches-de-Naye | 09/19/1892 | - | 07/22/1938 | GN |
Timetable field 124
Transports Publics du Chablais , Aigle – Sépey – Diablerets until 1999 , track width 1000 mm, 1350 volts direct current
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Aigle - Le Sépey | 12/22/1913 | - | 12/22/1913 | ASD |
Les Planches - Les Diablerets | 07/07/1914 | - | 07/07/1914 | ASD |
Timetable field 125
Transports Publics du Chablais , until 1999 Aigle – Leysin , cog railway system Abt, gauge 1000 mm, 1300 volts direct current (until 1946 650 volts)
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Aigle CFF - Aigle Depot | 5.5.1900 | - | 5.5.1900 | AL |
Aigle Depot - Leysin -Feydey | 11/6/1900 | - | 11/06/1900 | AL |
Leysin-Feydey – Leysin-Grand-Hotel | 9/12/1916 | - | 9/12/1916 | AL |
- Adhesion line between Aigle CFF and Aigle Depot.
Timetable field 126
Transports Publics du Chablais , until 1999 Aigle – Ollon – Monthey – Champéry, mixed Ahädision- / rack-and-pinion railway system Strub, gauge 1000 mm, 850 volts direct current
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Aigle - Monthey -Ville | 2.4.1907 | - | 2.4.1907 | AOMC |
Monthey-Ville - Champéry | 1.2.1908 | - | 2.4.1908 | AOMC |
Monthey-Ville-Monthey CFF | 1.4.1909 | - | 1.04.1909 | AOMC |
- On the branch line Monthey-Ville-Monthey CFF, operations have been closed since July 11, 1976.
Timetable field 127
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 128
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 130
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Saint-Maurice - Collombey | 07/14/1859 | - | May 18, 1946 | Ldl |
Collombey - Le Bouveret | 07/14/1859 | - | 10/01/1954 | Ldl |
Timetable field 132
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 133
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 138
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 139
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 140
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 142
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 143
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 145
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 150
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Gèneve - Versoix canton border | 06/25/1858 | 1868 | 12/22/1925 | GV |
Versoix canton border - Coppet | 06/25/1858 | 1868 | 12/22/1925 | OS |
Coppet - Celigny | 04/14/1858 | 1868 | 12/22/1925 | OS |
Céligny –Céligny canton border | 04/14/1858 | 1868 | 12/22/1925 | GV |
Céligny canton border - Morges | 04/14/1860 | 1868-1872 | 12/22/1925 | OS |
Morges - Renens | 07/01/1855 | 1868 | 12/22/1925 | OS |
Renens - Lausanne | 05/05/1856 | 1872 | 02/01/1925 | OS |
Timetable field 151
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Genève - La Plaine | 03/18/1858 | 1858 | 09/27/1956 | LG |
Electrified with 1500 volts direct current according to the SNCF standard.
Timetable field 152
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
La Plaine - Bellegarde | 03/18/1858 | 1858 | 09/27/1956 | LG |
Belongs to the SNCF, 1500 volts direct current
Timetable field 155
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 156
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Schedule field 200
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Vallorbe - Le Day | 07/01/1870 | 1906 | 06/05/1925 | JE |
Le Day - Daillens | 07/01/1870 | 1905-1908 | 03/01/1925 | JE |
Daillens - Lausanne | See 210 |
Schedule field 201
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Vallorbe - Le Day | 07/01/1870 | 1906 | 06/05/1925 | JE |
Le Day - Le Pont | 10/31/1886 | - | 10/02/1938 | PV |
Le Pont - Le Brassus | 08/21/1899 | - | 10/02/1938 | PBr |
The Le Pont – Le Brassus line has belonged to the Travys since 2001 , but the scheduled passenger traffic is carried out by the SBB along the entire route.
Timetable field 210
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Lausanne - Renens | 05/05/1856 | 1872 | 02/01/1925 | OS |
Renens - Bussigny-près-Lausanne | 07/01/1855 | 1893 | 02/01/1925 | OS |
Bussigny-près-Lausanne - Daillens | 05/07/1855 | 1895-1896 | 02/01/1925 | OS |
Daillens - Ependes | 05/07/1855 | 1919-1921 | 02/01/1925 | OS |
Ependes - Yverdon-les-Bains | 05/07/1855 | 1933 | 02/01/1925 | OS |
Yverdon-les-Bains - Grandson | 11/07/1855 | - | December 23, 1927 | OS |
Grandson - Onnens - Bonvillars | 11/07/1859 | 1958 | December 23, 1927 | OS |
Onnens - Bonvillars - Vaumarcus | 11/07/1859 | - | December 23, 1927 | OS |
Vaumarcus - Gorgier - Saint-Aubin | 11/07/1859 | - | December 23, 1927 | FS |
Gorgier - Saint-Aubin - Auvernier | 11/07/1859 | 1951-1954 | December 23, 1927 | FS |
Auvernier - Neuchâtel | 11/07/1859 | 1898 | December 23, 1927 | FS |
Neuchâtel - Saint-Blaise | 11/07/1859 | 1934 | December 23, 1927 | FS |
Saint-Blaise - La Neuveville | 11/07/1859 | 1914-1917 | December 23, 1927 | FS |
La Neuveville - Ligerz | December 3rd, 1860 | 1957 | December 23, 1927 | OWB |
Ligerz - Twann | December 3rd, 1860 | - | December 23, 1927 | OWB |
Twann - Biel | December 3rd, 1860 | 1969-1975 | December 23, 1927 | OWB |
Timetable field 211
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Schedule field 212
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 220
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Pontarlier - Les Verrières | July 25, 1860 | - | 06/03/1956 | FS |
Les Verrières - Auvernier | July 25, 1860 | - | 11/22/1942 | FS |
Auvernier - Neuchâtel | 11/07/1859 | 1898 | December 23, 1927 | FS |
Timetable field 221
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Schedule field 222
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 223
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Col des Roches - Le Locle | 08/04/1884 | - | 04.10.1931 | JBL |
Le Locle - La Chaux-de-Fonds | 07/02/1857 | - | 04.10.1931 | JI |
La Chaux-de-Fonds - Convers | 11/27/1859 | - | 04.10.1931 | JI |
Convers - Les Hauts-Geneveys | 07/15/1860 | - | 04.10.1931 | JI |
Les Hauts-Geneveys - Neuchâtel | December 01, 1859 | - | 04.10.1931 | JI |
Timetable field 225
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
La Chaux-de-Fonds - Le Creux | 12/17/1888 | - | 07/15/1934 | JBL |
Le Creux - Sonceboz | 04/30/1874 | - | 07/15/1934 | JB |
Sonceboz - Biel | 04/30/1874 | - | 07/15/1934 | JB |
Timetable field 226
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Delémont - Choindez | December 16, 1876 | 1930-1932 | 05/15/1928 | JB |
Choindez - Moutier | December 16, 1876 | - | 05/15/1928 | JB |
Moutier - Court | 05/24/1877 | - | 05/02/1937 | JB |
Court - Tavannes | December 16, 1876 | - | 05/02/1937 | JB |
Tavannes - Sonceboz | 04/30/1874 | - | 05/02/1937 | JB |
Sonceboz - Biel | see 225 |
Timetable field 230
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Biel - Lengnau | see 410 | |||
Lengnau - Moutier | 10/01/1915 | - | 02/15/1928 | BLS |
Moutier - Delémont | see 226 | |||
Delémont - Aesch | 09/25/1875 | - | 11/01/1931 | JB |
Aesch - Basel | 09/25/1875 | 1912-1913 | 11/01/1931 | JB |
The Lengnau – Moutier route is owned by BLS AG , but the entire route is handled by SBB.
Timetable field 236
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 237
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 238
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 240
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Dent - dent border | 09/23/1872 | - | 09.09.1934 | PD |
Delle boundary - Porrentruy | 09/23/1872 | - | 05/15/1933 | PD |
Porrentruy - Glovelier | 03/30/1877 | - | 05/15/1933 | JB |
Glovelier - Delémont | 10/15/1876 | - | 05/15/1933 | JB |
Schedule field 250
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Lausanne - Palézieux | 09/04/1862 | 1902-1905 | 02/19/1926 | LF |
Palézieux - Romont | 09/04/1862 | 1904-1920 | 05/15/1927 | LFB |
Romont - Freiburg | 09/04/1862 | 1949-1955 | 05/15/1927 | LFB |
Freiburg - Balliswil | 09/04/1862 | 1934 | 05/15/1927 | LFB |
Balliswil - Thörishaus | 07/02/1860 | 1929-1934 | 05/15/1927 | LFB |
Thörishaus - Bern | 07/02/1860 | 1914 | 05/15/1927 | SCB |
Timetable field 251
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Lausanne - Palézieux | see 410 | |||
Palézieux - Payerne | 08/25/1876 | - | 07/19/1946 | SO |
Payerne - Murten | 08/25/1876 | - | December 21, 1944 | SO |
Murten - Fräschels | 06/12/1876 | - | December 21, 1944 | SO |
Fräschels - Lyss | 06/12/1876 | - | December 21, 1944 | JB |
Timetable field 252
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Freiburg - Payerne | 08/25/1876 | - | 05/04/1947 | SO |
Payerne - Yverdon-les-Bains | 02/01/1877 | - | 08/01/1945 | SO |
Timetable field 253
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Schedule field 254
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Schedule field 255
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Schedule field 256
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 260/303
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Biel - Busswil near Büren | 06/01/1864 | 1962-1966 | 05/15/1928 | BSb |
Busswil near Büren - Lyss | 06/01/1864 | 1877 | 05/15/1928 | BSb |
Lyss - Münchenbuchsee | 06/01/1864 | - | 05/15/1928 | BSb |
Münchenbuchsee - Zollikofen | 06/01/1864 | 1933 | 05/15/1928 | BSb |
Zollikofen - Bern | see line 450 |
Timetable field 295
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 299
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Schedule field 300
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Schedule field 301
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 302
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 303
S-Bahn Bern S3
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Schedule field 304.1
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Schedule field 304.2
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 305
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 306
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 307
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 308
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
- |
Timetable field 310
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Bern - Wylerfeld | 07/01/1859 | 1859 | 07/07/1919 | SCB |
Wylerfeld - Thun | 07/01/1859 | 1912-1921 | 07/07/1919 | SCB |
Timetable field 410
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Biel - Solothurn | 06/01/1857 | 1920-1938 | December 23, 1927 | SCB |
Solothurn - Olten Hammer | December 04, 1857 | 1950-1956 | December 23, 1927 | SCB |
Olten Hammer – Olten | December 04, 1857 | - | December 23, 1927 | SCB |
Timetable field 414
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Herzogenbuchsee - Solothurn | 06/01/1857 | - | 10/02/1944 | SCB |
Timetable field 415
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Solothurn - Busswil near Büren | December 04, 1876 | - | 10/02/1944 | SCB |
Busswil near Büren - Lyss | see 260 |
Timetable field 450
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Bern - Wylerfeld | 11/15/1858 | 1859 | 11/25/1925 | SCB |
Wylerfeld - Zollikofen | 06/16/1857 | 1864 | 11/25/1925 | SCB |
Zollikofen - Herzogenbuchsee | 06/16/1857 | 1896 | 11/25/1925 | SCB |
Herzogenbuchsee - Aarburg | March 16, 1857 | 1872-1874 | 11/25/1925 | SCB |
Rothrist - Olten | 05/31/1981 | 1981 | 05/31/1981 | SBB |
Aarburg - Olten | 06/09/1856 | 1859 | 02/23/1924 | SCB |
Timetable field 460
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Bern - Gümligen | see 310 | |||
Gümligen - Langnau in the Emmental | 06/01/1864 | - | 08/15/1934 | BSb |
Langnau im Emmental - Lucerne | 08/11/1875 | - | 08/15/1934 | SU |
Timetable field 470
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Lucerne - Alpnachstad | 06/01/1889 | - | 11/18/1941 | JBL |
Alpnachstad - Meiringen | 06/14/1888 | - | 11/18/1941 | Brünig |
Meiringen - Brienz | 06/14/1888 | - | December 24, 1942 | Brünig |
Brienz - Interlaken Ost | 08/23/1916 | - | December 24, 1942 | SBB |
The Brünig route was until 2004 the only narrow gauge track and rack railway SBB Electrification: 15 kV 16 2/3 Hz
Timetable field 475
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Brienz - Brienzer Rothorn | 06/13/1892 | - | - | BRB |
The Brienz-Rothorn Railway was at its opening in 1892 the railway to the highest railway station in Europe. The line was never electrified and still runs with steam locomotives, today with steam locomotives from three generations.
Timetable field 500
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Basel Badischer Bahnhof - Basel SBB | 11/03/1873 | 1962 | 11/01/1956 | St.B |
Basel SBB - Liestal | December 19, 1854 | 1857 | May 18, 1924 | SCB |
Liestal - Sissach | 06/01/1855 | 1857 | May 18, 1924 | SCB |
Sissach - Olten | 01/08/1916 | 1916 | May 18, 1924 | SCB |
Olten - Aarburg | 06/09/1856 | 1859 | 02/23/1924 | SCB |
Aarburg - Emmenbrücke | 06/09/1856 | 1908-1929 | 02/23/1924 | SCB |
Emmenbrücke - Sentimatt | 06/01/1859 | 1939 | 02/23/1924 | SCB |
Sentimatt - Lucerne | 06/01/1859 | 1969 | 02/23/1924 | SCB |
Timetable field 503
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Sissach - Läufelfingen | 05/01/1857 | 1857-1938 | 04.10.1953 | SCB |
Laufelfingen - Olten | 05/01/1858 | 1558-1938 | 04.10.1953 | SCB |
Timetable field 504
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Aarau - Suhr | see 645 | |||
Suhr - Zofingen | 09/06/1877 | - | 07/15/1946 | NB |
Timetable field 600
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Lucerne - Immensee | 06/01/1897 | - | 05/28/1922 | GB |
Immensee - Arth-Goldau | 06/01/1882 | 1904 | 05/28/1922 | GB |
Arth-Goldau - Fountain | 06/01/1882 | 1904 | 05/01/1922 | GB |
Well - Flüelen | 06/01/1882 | 1943-1948 | 05/01/1922 | GB |
Flüelen - Erstfeld | 06/01/1882 | 1896 | 05/01/1922 | GB |
Erstfeld - Göschenen | 06/01/1882 | 1892-1893 | 10/18/1920 | GB |
Göschenen - Airolo | 01/01/1882 | 1883 | 10/18/1920 | GB |
Airolo - Biasca | 06/01/1882 | 1890-1892 | 12/12/1920 | GB |
Biasca - Bellinzona | 06.12.1874 | 1896 | 04/04/1921 | GB |
Bellinzona - Giubiasco | 12/20/1874 | 1883 | 02/06/1922 | GB |
Giubiasco - Rivera - Bironico | 04/10/1882 | 1922-1934 | 02/06/1922 | GB |
Rivera - Bironico - Lugano | 04/10/1882 | 1942-1946 | 02/06/1922 | GB |
Lugano - Melide | 06.12.1874 | 1915 | 02/06/1922 | GB |
Melide - Maroggia - Melano | 06.12.1874 | 1956-1966 | 02/06/1922 | GB |
Maroggia - Melano - Chiasso | 06.12.1874 | 1912-1913 | 02/06/1922 | GB |
The Gotthard tunnel was 16.7 Hz traveled in his first electrical years with 7500 volts.
Timetable field 630
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Bellinzona - Giubiasco | see 600 | |||
Giubiasco - Cadenazzo | 12/20/1874 | 1953 | 05/15/1936 | GB |
Cadenazzo - Locarno | 12/20/1874 | - | 05/15/1936 | GB |
Timetable field 631
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Bellinzona - Cadenazzo | See 600 and 630 | |||
Cadenazzo - Pino | December 04, 1882 | - | 06/11/1960 | GB |
Pino - Luino | December 04, 1882 | - | 06/11/1960 | SFAI |
Timetable field 640
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Aarau - Rupperswil | see 650 | |||
Rupperswil - Lenzburg | 06/23/1874 | 1947 | 05/05/1927 | ASb |
Lenzburg - Wohlen | 06/23/1874 | 1930-1931 | 05/05/1927 | ASb |
Wohlen - Muri | 06/01/1875 | 1966-1981 | 05/05/1927 | ASb |
Muri - Red Cross | 12/01/1881 | 1966-1972 | 05/05/1927 | ASb |
Rotkreuz - Immensee | 06/01/1882 | 1963 | 07/06/1922 | Asb |
Immensee - Arth-Goldau | see 70 |
Timetable field 640 (2)
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Brugg - Othmarsingen - Hendschiken | 06/01/1882 | 1994 | 05/05/1927 | ASb |
This line continues to Wohlen - Muri , see timetable field 640 above.
Timetable field 645
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Aarau - Suhr | 09/06/1877 | - | 07/15/1946 | NB |
Suhr - Lenzburg | 09/06/1877 | - | December 17, 1946 | NB |
Lenzburg - Mellingen | 09/06/1877 | - | December 17, 1946 | NB |
Mellingen - Baden Upper Town | 09/06/1877 | - | December 17, 1946 | NB |
Baden Upper Town - Wettingen | 10/15/1877 | - | December 17, 1946 | NB |
Timetable field 650
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Olten - Aarau | 06/09/1856 | 1872 | 01/21/1925 | SCB |
Aarau - Brugg | 05/15/1858 | 1862 | 01/21/1925 | NOB |
Brugg - Turgi | 09/29/1856 | 1862 | 01/21/1925 | NOB |
Turgi - bathing | 09/29/1856 | 1861 | 01/21/1925 | NOB |
Baden - Zurich | 08/09/1847 | 1861 | 01/21/1925 | SNB |
Timetable field 650 (Heitersberg line)
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Rupperswil - Lenzburg | Line 640 | |||
Lenzburg - Mellingen | Line 645 | |||
Mellingen - Spreitenbach | 06/01/1975 | 1975 | 06/01/1975 | SBB |
Timetable field 651
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Wildegg - Lenzburg | 10/01/1895 | - | May 10, 1910 / October 1, 1930 | STB |
Lenzburg - Beinwil am See | 10/15/1883 | - | May 10, 1910 / October 1, 1930 | STB |
Beinwil am See - Hochdorf | 09/03/1883 | - | 07/11/1910 / 10/01/1930 | STB |
Hochdorf - Emmenbrücke | 09/03/1883 | - | 10/01/1910 / 10/01/1930 | STB |
Emmenbrücke - Lucerne | see 500 |
In the area of the two electrification data, the line was fed with 5500 volts and 25 Hz.
Timetable field 652
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Beinwil am See - Reinach | 01/23/1887 | - | May 10, 1910 / October 1, 1930 | STB |
Reinach - Beromünster | 10/01/1906 | - | May 10, 1910 / October 1, 1930 | STB |
The route was operated like the timetable field 651 with 5500 volts and 25 Hz.
Timetable field 660
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Zurich - Thalwil | 09/20/1875 | 1896-1897 | 03/05/1923 | NOB |
Thalwil - Horgen Oberdorf | 06/01/1897 | 1959-1963 | 03/05/1923 | NOB |
Horgen Oberdorf - Baar | 06/01/1897 | - | 03/05/1923 | NOB |
Baar - train | 06/01/1897 | 1931 | 03/05/1923 | NOB |
Zug - Lucerne | 06/01/1864 | - | 10/09/1922 | ZZL |
Train - Arth-Goldau | 06/01/1897 | - | 06/22/1922 | GB |
Timetable field 700
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Basel SBB - Pratteln | see 500 | |||
Pratteln - Stein-Säckingen | 08/02/1875 | 1895 | October 18, 1926 | Bbb |
Stein-Säckingen - Brugg | 08/02/1875 | 1904-1905 | October 18, 1926 | Bbb |
Brugg - Zurich | see 650 |
Timetable field 701
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Stein-Säckingen - Koblenz | 08/01/1892 | - | 12/12/1944 | Bbb |
Koblenz - Eglisau | 08/01/1876 | - | 07/01/1945 | NOB |
Eglisau - Bülach | 08/01/1876 | 1897 | December 15, 1928 | NOB |
Bülach - Winterthur | 08/01/1876 | - | 07/15/1945 | NOB |
Timetable field 702
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Baden - Turgi | Line 650 | |||
Turgi - Koblenz | 08/18/1859 | - | 10/14/1944 | NOB |
Koblenz - Waldshut | 08/18/1859 | - | - | NOB |
Timetable field 703
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Zurich-Oerlikon - Zurich-Seebach | 06/01/1881 | - | 02/13/1942 | NOB |
Zurich-Seebach - Wettingen | 10/15/1877 | - | 1904–1904 / February 13, 1942 | NB |
Wettingen - Baden | see 650 |
Timetable field 711
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Zurich - Zurich-Altstetten | see 650 | |||
Zurich-Altstetten - train | 06/01/1864 | - | 02/13/1942 | ZZL |
Timetable field 720
Zurich – Thalwil – Zug or Zurich – Thalwil – Ziegelbrücke.
Thalwil – Ziegelbrücke see 900
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Zurich – Zurich Wiedikon | 09/20/1875 | 1.06.1896 | May 5, 1923 | NOB |
Zurich Altstetten – Zurich Wiedikon | 1.06.1897 | 1.3.1927 | 1.3.1927 | NOB |
Zurich Wiedikon – Thalwil | 09/20/1875 | 05/27/1897 | May 5, 1923 | NOB |
Zurich Kollermühle – Thalwil ( Zimmerberg Base Tunnel ) | 06/06/2003 | 06/06/2003 | 06/06/2003 | SBB |
Thalwil – Oberrieden village | 1.06.1897 | 08/01/1962 | May 5, 1923 | NOB |
Oberrieden Dorf – Horgen Oberdorf | 1.06.1897 | 11/23/1959 | May 5, 1923 | NOB |
Horgen Oberdorf-Litti | 1.06.1897 | - | May 5, 1923 | NOB |
Litti-Baar | 1.06.1897 | October 5, 1980 | May 5, 1923 | NOB |
Baar – Zug | 1.06.1897 | 07/22/1931 | May 5, 1923 | NOB |
Zug – Arth-Goldau | 1.06.1897 | - | 06/22/1922 | NOB |
- In Sihlbrugg and in front of Arth-Goldau there is a double track section.
- Only the two tunnels ( Zimmerberg Tunnel and Albis Tunnel ) are single-lane between Zurich and Zug .
Timetable field 730
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Zurich HB - Stadelhofen | 10/01/1894 | - | 05/15/1926 | NOB |
Stadelhofen - Küsnacht | 03/15/1894 | - | 05/15/1926 | NOB |
Küsnacht - Erlenbach | 03/15/1894 | 1968 | 05/15/1926 | NOB |
Erlenbach - Herrliberg - Feldmeilen | 03/15/1894 | 1967 | 05/15/1926 | NOB |
Herrliberg - Feldmeilen - Stäfa | 03/15/1894 | - | 05/15/1926 | NOB |
Stäfa - Uerikon | 03/15/1894 | 1967 | 05/15/1926 | NOB |
Uerikon - Rapperswil | 03/15/1894 | - | 05/15/1926 | NOB |
Timetable field 740
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Zurich - Wallisellen | see 750 | |||
Wallisellen - Uster | 08/01/1856 | 1983-84 | 10/02/1932 | Gtb |
Uster - Wetzikon | 11/09/1857 | (1990) | 10/02/1932 | VSB |
Wetzikon - Rüti | 08/15/1858 | (2006) | 10/02/1932 | VSB |
Rüti - Rapperswil | 02/15/1859 | (1989) | 10/02/1932 | VSB |
Opening dates of the double-lane routes over only one section are given in brackets. There are two lanes in Zurich – Uster, Aathal – Wetzikon, Bubikon-Rüti ZH and Grünstels (service station) –Rapperswil.
Schedule field 741
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Wetzikon - Hinwil | 08/17/1876 | - | 05/07/1944 | EH |
Hinwil - Bauma | 06/01/1901 | - | 10/12/1947 | Uebb |
Schedule field 750
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Zurich HB - Zurich Oerlikon | 06/26/1856 | 1860 | 08/06/1925 | NOB |
Zurich-Oerlikon - Winterthur | 12/27/1855 | 1860-1862 | 08/06/1925 | NOB |
Zurich-Oerlikon - Zurich-Seebach | 06/01/1881 | 1979 | 08/06/1925 | NOB |
Zurich-Seebach - Kloten - Bassersdorf - Effretikon | 10/15/1877 | - | 08/06/1925 | NB |
Zurich-Oerlikon - Airport - Hürlistein ( Bassersdorf ) | 06/01/1980 | 1980 | 06/01/1980 | SBB |
Timetable field 753
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Effretikon - Wetzikon | 08/17/1876 | - | 05/07/1944 | EH |
Timetable field 754
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Winterthur –Winterthur Grüze | 10/14/1855 | 1949 | 05/15/1927 | SGAB |
Grüze - Bauma | 05/04/1875 | - | 07.10.1951 | TTB |
Bauma - forest | 10/15/1876 | - | 07.10.1951 | TTB |
Forest - Rüti | 09/29/1876 | - | 04/30/1944 | WR |
Rüti - Rapperswil | 02/15/1859 | - | 10/02/1932 | VSB |
Since September 29, 1989, the line has been double-lane between the Grünstels service station and Rapperswil.
Timetable field 760
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Zurich - Zurich-Oerlikon | 06/26/1856 | 1860 | 08/06/1925 | NOB |
Zurich-Oerlikon - Bülach | 05/01/1865 | 1975-1985 | December 15, 1928 | BRb |
Bülach - Eglisau | see 761 | |||
Eglisau - Neuhausen am Rheinfall | 06/01/1897 | - | December 15, 1928 | NOB |
Neuhausen am Rheinfall - Schaffhausen | see 762 |
Timetable field 760 (Niederweningen branch)
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Oberglatt - Dielsdorf | 05/01/1865 | - | 05/28/1960 | BRb |
Dielsdorf - Niederweningen | 08/12/1891 | - | 05/28/1960 | NOB |
Timetable field 761
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Winterthur - Bülach | 08/01/1876 | - | 07/15/1945 | NOB |
Bülach - Eglisau | 08/01/1876 | 1897 | December 15, 1928 | NOB |
Eglisau - Koblenz | 08/01/1876 | - | 07/01/1945 | NOB |
Timetable field 762
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Winterthur - Neuhausen am Rheinfall | 04/16/1857 | - | 04/11/1943 | NOB |
Neuhausen am Rheinfall - Schaffhausen | 04/16/1857 | 1931 | December 15, 1928 | NOB |
Timetable field 820
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Schaffhausen - Feuerthalen | 04/02/1895 | - | December 16, 1945 | NOB |
Feuerthalen - Etzwilen | 11/01/1894 | - | December 16, 1945 | NOB |
Etzwilen - Stein am Rhein | 07/17/1875 | - | 07.10.1946 | SNB |
Stein am Rhein - Kreuzlingen | 07/17/1875 | - | 05.10.1946 | SNB |
Kreuzlingen - Constance | 07/17/1875 | - | 05/27/1962 | SNB |
Kreuzlingen harbor - Romanshorn | 07/01/1871 | - | 05/06/1946 | NOB |
Romanshorn - Rorschach | 10/15/1869 | - | 05/15/1928 | NOB |
Timetable field 821
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Winterthur –Oberwinterthur | May 16, 1855 | 1903 | 05/15/1928 | NOB |
Oberwinterthur - Etzwilen | 07/17/1875 | - | 07.10.1946 | SNB |
Etzwilen - Stein am Rhein | 07/17/1875 | - | 07.10.1946 | SNB |
Etzwilen - singing | 07/17/1875 | - | - | SNB |
Passenger traffic on the Etzwilen – Singen line was stopped in 1973.
Timetable field 840
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Winterthur –Oberwinthur | May 16, 1855 | 1903 | 05/15/1928 | NOB |
Oberwinterthur– Romanshorn | May 16, 1855 | 1905-1907 | 05/15/1928 | NOB |
Timetable field 850
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Winterthur - Winterthur Grüze | 10/14/1855 | 1949 | 05/15/1927 | SGAB |
Winterthur Grüze - Räterschen | 10/14/1855 | 1953 | 05/15/1927 | SGAB |
Räterschen - Wil | 10/14/1855 | 1912-1913 | 05/15/1927 | SGAB |
Wil - Flawil | December 25, 1855 | 1927-1931 | 05/15/1927 | SGAB |
Flawil - Gossau | 02/15/1856 | 1929 | 05/15/1927 | SGAB |
Gossau - angles | 02/15/1856 | 1913 | 05/15/1927 | SGAB |
Winkeln - Bruggen | 03/25/1856 | 1926 | 05/15/1927 | SGAB |
Bruggen - St. Gallen | 03/25/1856 | 1912 | 05/15/1927 | SGAB |
Timetable field 852
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
St. Gallen - Gossau | see 850 | |||
Gossau - Bischofszell | 07/05/1876 | - | 03/15/1936 | SG |
Bischofszell - Sulgen | 02/01/1876 | - | 05/15/1936 | SG |
Timetable field 853
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Wil - Wattwil | 06/24/1870 | - | 12/12/1943 | TB |
Wattwil - Ebnat-Kappel | 06/24/1870 | - | 05.10.1931 | TB |
Ebnat-Kappel - Nesslau - New St. Johann | 10/01/1912 | - | 04.10.1931 | BT |
The Wattwil – Ebnat line was leased to the Bodensee-Toggenburg Railway (BT).
Timetable field 870
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Rapperswil - Uznach | 02/15/1859 | - | 05/07/1927 | VSB |
Uznach - Wattwil | 10/01/1910 | - | 05/07/1927 | SBB |
Wattwil - St. Gallen | 10/01/1910 | - | 04.10.1931 | BT |
Romanshorn –SG St. Fiden | 10/01/1910 | - | 01/24/1932 | BT |
Timetable field 880
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
St. Gallen –SG St. Fiden | 25.10.1856 | 1912 | 05/15/1927 | SGAB |
SG St. Fiden - Rorschach | 25.10.1856 | - | 05/15/1927 | SGAB |
Rorschach - Rheineck | 08/25/1857 | 1931 | 05/15/1934 | VSB |
Rheineck - St. Margrethen | 07/01/1858 | 1920 | 05/15/1934 | VSB |
St. Margrethen - Buchs SG | 07/01/1858 | - | 09/21/1934 | VSB |
Buchs SG - Sargans | 07/01/1858 | - | December 15, 1927 | VSB |
Sargans - Chur | see 900 |
Timetable field 900
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Zurich - Thalwil | 09/20/1875 | 1896-1897 | 03/05/1923 | NOB |
Thalwil - Richterswil | 09/20/1875 | 1923-1925 | 06/01/1924 | NOB |
Richterswil - Pfäffikon | 09/20/1875 | 1931 | December 15, 1927 | NOB |
Pfäffikon - Brick Bridge | 09/20/1875 | 1941-1955 | December 15, 1927 | NOB |
Brick Bridge - Weesen | 02/15/1859 | 1969 | December 15, 1927 | VSB |
Weesen - Mühlehorn | 07/01/1859 | 1961-1969 | December 15, 1927 | VSB |
Mühlehorn –Tiefenwinkel | 07/01/1859 | - | December 15, 1927 | VSB |
Tiefenwinkel– Murg | 07/01/1859 | - | December 15, 1927 | VSB |
Murg - Flums | 02/15/1859 | 1969 | December 15, 1927 | VSB |
Flums - Sargans | 02/15/1859 | 1949-1955 | December 15, 1927 | VSB |
Sargans - Bad Ragaz | 07/01/1858 | 1957 | 05/11/1928 | VSB |
Bad Ragaz - Landquart | 07/01/1858 | 1993-1994 | 05/11/1928 | VSB |
Landquart - Chur | 07/01/1858 | 1970-1973 | 05/11/1928 | VSB |
- Zurich - Thalwil , details and Zimmerberg Base Tunnel see 720
Timetable field 901
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Rapperswil - Uznach | 02/15/1859 | - | 05/07/1927 | VSB |
Uznach - brick bridge | 02/15/1859 | - | 05/15/1933 | VSB |
Timetable field 902
route | Company opening | Dual track expansion | Electrification | Route built |
---|---|---|---|---|
Brick Bridge - Näfels - Mollis | 09/20/1875 | - | 05/15/1933 | NOB |
Näfels - Mollis - Glarus | 02/15/1859 | - | 05/15/1933 | VSB |
Glarus - Linthal | 06/01/1879 | - | 03/15/1933 | NOB |
swell
- Peter Willen: Locomotives and railcars of the Swiss railways. Volume 1 SBB. Orell Füssli, 1982
- Hans G. Wägli; Schienennetz Schweiz 3rd revised edition 2010, ISBN 978-3-909111-74-9
- Hans G. Wägli; Rail profile Switzerland 2nd revised edition 2010, (own book, officially part of the Swiss rail network )
See also
- List of schedule fields
- History of the electric drive of rail vehicles in Switzerland
- Chronicle of the electrification of railway lines in Austria