The first electrified railway line in Switzerland was the Vevey-Montreux-Chillon Tramway in 1888 . The network of the largest infrastructure operator, the Swiss Federal Railways , has been fully electrified since 2004 ; most of the lines operated by other operators are also electrified.
Unless otherwise stated, the timetable field numbering corresponds to the 2010 timetable period, as it was also used in the Rail Profile Switzerland book (2nd edition) .
Important information is missing from this article or section. Help Wikipedia by
researching and
pasting it .
Timetable field 100
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Lausanne - Villeneuve
|
04/02/1861 |
1891-1900 |
05/14/1924 |
OS
|
|
Villeneuve - Bex
|
06/10/1857 |
1903-1907 |
05/14/1924 |
OS
|
|
Bex - Saint-Maurice
|
11/01/1860 |
1906 |
05/14/1924 |
OS
|
|
Saint-Maurice - Martigny
|
07/14/1859 |
1909-10 |
12/12/1923 |
Ll
|
|
Martigny - Riddes
|
05/10/1860 |
1914 |
12/12/1923 |
Ll
|
|
Riddes - Sion
|
05/10/1860 |
1931-1932 |
12/12/1923 |
Ll
|
|
Sion - Granges - Lens
|
10/15/1868 |
1968-1970 |
July 31, 1919 / January 15, 1927 |
Ll
|
| Granges- Lens - Sierre
|
10/15/1868 |
1901 |
July 31, 1919 / January 15, 1927 |
Ll
|
|
Sierre - Salgesch
|
06/01/1877 |
1967 |
July 31, 1919 / January 15, 1927 |
Simplon
|
|
Salgesch - Leuk
|
06/01/1877 |
- |
July 31, 1919 / January 15, 1927 |
Simplon
|
|
Leuk - Visp
|
07/01/1878 |
1977-1979 |
July 31, 1919 / January 15, 1927 |
Simplon
|
|
Visp - Brig
|
07/01/1878 |
1918 |
July 31, 1919 / January 15, 1927 |
Simpon
|
|
Brig - Iselle
|
06/01/1906 |
1922 |
06/01/1906 / 03/02/1930 |
SBB
|
|
Iselle - Preglia
|
06/01/1906 |
1922 |
05/15/1930 |
FS (Italy)
|
|
Preglia - Domodossola
|
06/01/1906 |
1921 |
05/15/1930 |
FS (Italy)
|
The lines with two electrification dates were first operated with three-phase current 3300 V and 16 2/3 Hz, and on the second date switched to single-phase alternating current 15 kV 16 2/3 Hz.
Timetable field 101
Lausanne-Echallens-Bercher Railway ; 1000 mm, 1500 volts direct current
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| Lausanne-Flon – Lausanne-Charderon |
May 28, 2000 |
- |
May 28, 2000 |
LIVE
|
| Lausanne-Charderon-Cheseaux |
November 5, 1873 |
- |
1.1.1936 |
LE
|
| Cheseaux – Echellens |
2.06.1874 |
- |
1.1.1936 |
LE
|
| Echellens – Bercher |
11/24/1898 |
- |
1.1.1936 |
CV
|
Timetable field 102
TL-m1 railway line Lausanne-Flon-Renens TSLO. 1435mm 750V DC
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| Lausanne-Flon-Renens |
06/02/1991 |
- |
06/02/1991 |
|
Timetable field 103
TL-m2 railway line Ouchy – Croisettes, reopening as standard-gauge tire metro 750 V direct current. Formerly the Ouchy – Flon cog railway.
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| Lausanne – Ouchy – Croisettes |
10/27/2008 |
10/27/2008 |
10/27/2008 |
|
Timetable field 104
Lausanne-Sébeillon – Lausanne Tridel railway line. Pure goods traffic line, rail connection of the Tridel waste incineration plant. Standard gauge 15 kV 16.7 Hz
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| Lausanne-Sébeillon-Lausanne Tridel |
04/16/2007 |
- |
04/16/2007 |
|
Timetable field 111
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Puidoux - Chexbres - Vevey
|
05/02/1904 |
- |
May 16, 1940 |
VCh
|
The route was leased to SBB .
Timetable field 112
Chemins de fer électriques Veveysans gauge 1000 mm, 750–900 volts direct current.
- The Blonay – Chamby railway was shut down on May 21, 1966 and is now a museum railway
- The Saint-Légier – Châtel-Saint-Denis railway was closed on May 31, 1969 and dismantled. Replacement by bus line.
- Continuous trains Vevey – Les Pléiades since 1969, see timetable route 115
Timetable field 115
Chemins de fer électriques Veveysans , rack railway system Strub, track width 1000 mm, 800–900 volts direct current
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Blonay - Les Pléiades
|
July 8th, 1911 |
- |
07/07/1911 |
BP
|
Continuous trains Vevey – Les Pléiades since 1969, see timetable route 112
Timetable field 120
Montreux-Berner-Oberland-Bahn , gauge 1000 mm, 850 volts direct current
- Between June 17, 1975 and September 30, 1979, passenger traffic between Zweisimmen and Lenk was suspended.
Timetable field 121
Transports Montreux – Vevey – Riviera until 2001 Montreux – Territet – Glion – Rochers-de-Naye railway, cogwheel railway system Abt, track width 800 mm, 850 volts direct current
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Montreux - Glion
|
8.4.1909 |
- |
8.4.1909 |
MGI
|
| Glion – Caux |
2.7.1892 |
- |
07/22/1938 |
GN
|
| Caux-Naye de Fontaines |
7/28/1892 |
- |
07/22/1938 |
GN
|
| Naye Fontaines - Roches-de-Naye
|
09/19/1892 |
- |
07/22/1938 |
GN
|
Timetable field 124
Transports Publics du Chablais , Aigle – Sépey – Diablerets until 1999 , track width 1000 mm, 1350 volts direct current
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Aigle - Le Sépey
|
12/22/1913 |
- |
12/22/1913 |
ASD
|
| Les Planches - Les Diablerets
|
07/07/1914 |
- |
07/07/1914 |
ASD
|
Timetable field 125
Transports Publics du Chablais , until 1999 Aigle – Leysin , cog railway system Abt, gauge 1000 mm, 1300 volts direct current (until 1946 650 volts)
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Aigle CFF - Aigle Depot |
5.5.1900 |
- |
5.5.1900 |
AL
|
| Aigle Depot - Leysin -Feydey |
11/6/1900 |
- |
11/06/1900 |
AL
|
| Leysin-Feydey – Leysin-Grand-Hotel |
9/12/1916 |
- |
9/12/1916 |
AL
|
- Adhesion line between Aigle CFF and Aigle Depot.
Timetable field 126
Transports Publics du Chablais , until 1999 Aigle – Ollon – Monthey – Champéry, mixed Ahädision- / rack-and-pinion railway system Strub, gauge 1000 mm, 850 volts direct current
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Aigle - Monthey -Ville |
2.4.1907 |
- |
2.4.1907 |
AOMC
|
| Monthey-Ville - Champéry
|
1.2.1908 |
- |
2.4.1908 |
AOMC
|
| Monthey-Ville-Monthey CFF |
1.4.1909 |
- |
1.04.1909 |
AOMC
|
- On the branch line Monthey-Ville-Monthey CFF, operations have been closed since July 11, 1976.
Timetable field 127
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 128
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 130
Timetable field 132
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 133
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 138
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 139
Gornergratbahn
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 140
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 142
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 143
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 145
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 150
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Gèneve - Versoix canton border |
06/25/1858 |
1868 |
12/22/1925 |
GV
|
|
Versoix canton border - Coppet
|
06/25/1858 |
1868 |
12/22/1925 |
OS
|
|
Coppet - Celigny
|
04/14/1858 |
1868 |
12/22/1925 |
OS
|
|
Céligny –Céligny canton border |
04/14/1858 |
1868 |
12/22/1925 |
GV
|
|
Céligny canton border - Morges
|
04/14/1860 |
1868-1872 |
12/22/1925 |
OS
|
|
Morges - Renens
|
07/01/1855 |
1868 |
12/22/1925 |
OS
|
|
Renens - Lausanne
|
05/05/1856 |
1872 |
02/01/1925 |
OS
|
Timetable field 151
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Genève - La Plaine
|
03/18/1858 |
1858 |
09/27/1956 |
LG
|
Electrified with 1500 volts direct current according to the SNCF standard.
Timetable field 152
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
La Plaine - Bellegarde
|
03/18/1858 |
1858 |
09/27/1956 |
LG
|
Belongs to the SNCF, 1500 volts direct current
Timetable field 155
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 156
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Schedule field 200
Schedule field 201
The Le Pont – Le Brassus line has belonged to the Travys since 2001 , but the scheduled passenger traffic is carried out by the SBB along the entire route.
Timetable field 210
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Lausanne - Renens
|
05/05/1856 |
1872 |
02/01/1925 |
OS
|
|
Renens - Bussigny-près-Lausanne
|
07/01/1855 |
1893 |
02/01/1925 |
OS
|
|
Bussigny-près-Lausanne - Daillens
|
05/07/1855 |
1895-1896 |
02/01/1925 |
OS
|
|
Daillens - Ependes
|
05/07/1855 |
1919-1921 |
02/01/1925 |
OS
|
|
Ependes - Yverdon-les-Bains
|
05/07/1855 |
1933 |
02/01/1925 |
OS
|
|
Yverdon-les-Bains - Grandson
|
11/07/1855 |
- |
December 23, 1927 |
OS
|
|
Grandson - Onnens - Bonvillars
|
11/07/1859 |
1958 |
December 23, 1927 |
OS
|
|
Onnens - Bonvillars - Vaumarcus
|
11/07/1859 |
- |
December 23, 1927 |
OS
|
|
Vaumarcus - Gorgier - Saint-Aubin
|
11/07/1859 |
- |
December 23, 1927 |
FS
|
|
Gorgier - Saint-Aubin - Auvernier
|
11/07/1859 |
1951-1954 |
December 23, 1927 |
FS
|
|
Auvernier - Neuchâtel
|
11/07/1859 |
1898 |
December 23, 1927 |
FS
|
|
Neuchâtel - Saint-Blaise
|
11/07/1859 |
1934 |
December 23, 1927 |
FS
|
|
Saint-Blaise - La Neuveville
|
11/07/1859 |
1914-1917 |
December 23, 1927 |
FS
|
|
La Neuveville - Ligerz
|
December 3rd, 1860 |
1957 |
December 23, 1927 |
OWB
|
|
Ligerz - Twann
|
December 3rd, 1860 |
- |
December 23, 1927 |
OWB
|
|
Twann - Biel
|
December 3rd, 1860 |
1969-1975 |
December 23, 1927 |
OWB
|
Timetable field 211
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Schedule field 212
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 220
Timetable field 221
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Schedule field 222
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 223
Timetable field 225
Timetable field 226
Timetable field 230
The Lengnau – Moutier route is owned by BLS AG , but the entire route is handled by SBB.
Timetable field 236
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 237
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 238
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 240
Schedule field 250
Timetable field 251
Timetable field 252
Timetable field 253
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Schedule field 254
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Schedule field 255
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Schedule field 256
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 260/303
Timetable field 295
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 299
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Schedule field 300
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Schedule field 301
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 302
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 303
S-Bahn Bern S3
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Schedule field 304.1
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Schedule field 304.2
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 305
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 306
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 307
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 308
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| - |
|
|
|
|
Timetable field 310
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Bern - Wylerfeld
|
07/01/1859 |
1859 |
07/07/1919 |
SCB
|
|
Wylerfeld - Thun
|
07/01/1859 |
1912-1921 |
07/07/1919 |
SCB
|
Timetable field 410
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Biel - Solothurn
|
06/01/1857 |
1920-1938 |
December 23, 1927 |
SCB
|
|
Solothurn - Olten Hammer |
December 04, 1857 |
1950-1956 |
December 23, 1927 |
SCB
|
|
Olten Hammer – Olten |
December 04, 1857 |
- |
December 23, 1927 |
SCB
|
Timetable field 414
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Herzogenbuchsee - Solothurn
|
06/01/1857 |
- |
10/02/1944 |
SCB
|
Timetable field 415
Timetable field 450
Timetable field 460
Timetable field 470
The Brünig route was until 2004 the only narrow gauge track and rack railway SBB Electrification: 15 kV 16 2/3 Hz
Timetable field 475
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Brienz - Brienzer Rothorn
|
06/13/1892 |
- |
- |
BRB
|
The Brienz-Rothorn Railway was at its opening in 1892 the railway to the highest railway station in Europe. The line was never electrified and still runs with steam locomotives, today with steam locomotives from three generations.
Timetable field 500
Timetable field 503
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Sissach - Läufelfingen
|
05/01/1857 |
1857-1938 |
04.10.1953 |
SCB
|
|
Laufelfingen - Olten
|
05/01/1858 |
1558-1938 |
04.10.1953 |
SCB
|
Timetable field 504
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Aarau - Suhr
|
see 645
|
|
Suhr - Zofingen
|
09/06/1877 |
- |
07/15/1946 |
NB
|
Timetable field 600
The Gotthard tunnel was 16.7 Hz traveled in his first electrical years with 7500 volts.
Timetable field 630
Timetable field 631
Timetable field 640
Timetable field 640 (2)
This line continues to Wohlen - Muri , see timetable field 640 above.
Timetable field 645
Timetable field 650
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Olten - Aarau
|
06/09/1856 |
1872 |
01/21/1925 |
SCB
|
|
Aarau - Brugg
|
05/15/1858 |
1862 |
01/21/1925 |
NOB
|
|
Brugg - Turgi
|
09/29/1856 |
1862 |
01/21/1925 |
NOB
|
|
Turgi - bathing
|
09/29/1856 |
1861 |
01/21/1925 |
NOB
|
|
Baden - Zurich
|
08/09/1847 |
1861 |
01/21/1925 |
SNB
|
Timetable field 650 (Heitersberg line)
Timetable field 651
In the area of the two electrification data, the line was fed with 5500 volts and 25 Hz.
Timetable field 652
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Beinwil am See - Reinach
|
01/23/1887 |
- |
May 10, 1910 / October 1, 1930 |
STB
|
|
Reinach - Beromünster
|
10/01/1906 |
- |
May 10, 1910 / October 1, 1930 |
STB
|
The route was operated like the timetable field 651 with 5500 volts and 25 Hz.
Timetable field 660
Timetable field 700
Timetable field 701
Timetable field 702
Timetable field 703
Timetable field 711
Timetable field 720
Zurich – Thalwil – Zug or Zurich – Thalwil – Ziegelbrücke.
Thalwil – Ziegelbrücke see 900
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
| Zurich – Zurich Wiedikon |
09/20/1875 |
1.06.1896 |
May 5, 1923 |
NOB
|
| Zurich Altstetten – Zurich Wiedikon |
1.06.1897 |
1.3.1927 |
1.3.1927 |
NOB
|
| Zurich Wiedikon – Thalwil |
09/20/1875 |
05/27/1897 |
May 5, 1923 |
NOB
|
| Zurich Kollermühle – Thalwil ( Zimmerberg Base Tunnel ) |
06/06/2003 |
06/06/2003 |
06/06/2003 |
SBB
|
| Thalwil – Oberrieden village |
1.06.1897 |
08/01/1962 |
May 5, 1923 |
NOB
|
| Oberrieden Dorf – Horgen Oberdorf |
1.06.1897 |
11/23/1959 |
May 5, 1923 |
NOB
|
| Horgen Oberdorf-Litti |
1.06.1897 |
- |
May 5, 1923 |
NOB
|
| Litti-Baar |
1.06.1897 |
October 5, 1980 |
May 5, 1923 |
NOB
|
| Baar – Zug |
1.06.1897 |
07/22/1931 |
May 5, 1923 |
NOB
|
| Zug – Arth-Goldau |
1.06.1897 |
- |
06/22/1922 |
NOB
|
- In Sihlbrugg and in front of Arth-Goldau there is a double track section.
- Only the two tunnels ( Zimmerberg Tunnel and Albis Tunnel ) are single-lane between Zurich and Zug .
Timetable field 730
Timetable field 740
Opening dates of the double-lane routes over only one section are given in brackets. There are two lanes in Zurich – Uster, Aathal – Wetzikon, Bubikon-Rüti ZH and Grünstels (service station) –Rapperswil.
Schedule field 741
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Wetzikon - Hinwil
|
08/17/1876 |
- |
05/07/1944 |
EH
|
|
Hinwil - Bauma
|
06/01/1901 |
- |
10/12/1947 |
Uebb
|
Schedule field 750
Timetable field 753
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Effretikon - Wetzikon
|
08/17/1876 |
- |
05/07/1944 |
EH
|
Timetable field 754
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Winterthur –Winterthur Grüze |
10/14/1855 |
1949 |
05/15/1927 |
SGAB
|
| Grüze - Bauma
|
05/04/1875 |
- |
07.10.1951 |
TTB
|
|
Bauma - forest
|
10/15/1876 |
- |
07.10.1951 |
TTB
|
|
Forest - Rüti
|
09/29/1876 |
- |
04/30/1944 |
WR
|
|
Rüti - Rapperswil
|
02/15/1859 |
- |
10/02/1932 |
VSB
|
Since September 29, 1989, the line has been double-lane between the Grünstels service station and Rapperswil.
Timetable field 760
Timetable field 760 (Niederweningen branch)
Timetable field 761
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Winterthur - Bülach
|
08/01/1876 |
- |
07/15/1945 |
NOB
|
|
Bülach - Eglisau
|
08/01/1876 |
1897 |
December 15, 1928 |
NOB
|
|
Eglisau - Koblenz
|
08/01/1876 |
- |
07/01/1945 |
NOB
|
Timetable field 762
Timetable field 820
Timetable field 821
Passenger traffic on the Etzwilen – Singen line was stopped in 1973.
Timetable field 840
| route |
Company opening |
Dual track expansion |
Electrification |
Route built
|
|
Winterthur –Oberwinthur |
May 16, 1855 |
1903 |
05/15/1928 |
NOB
|
| Oberwinterthur– Romanshorn
|
May 16, 1855 |
1905-1907 |
05/15/1928 |
NOB
|
Timetable field 850
Timetable field 852
Timetable field 853
The Wattwil – Ebnat line was leased to the Bodensee-Toggenburg Railway (BT).
Timetable field 870
Timetable field 880
Timetable field 900
Timetable field 901
Timetable field 902
swell
- Peter Willen: Locomotives and railcars of the Swiss railways. Volume 1 SBB. Orell Füssli, 1982
- Hans G. Wägli; Schienennetz Schweiz 3rd revised edition 2010, ISBN 978-3-909111-74-9
- Hans G. Wägli; Rail profile Switzerland 2nd revised edition 2010, (own book, officially part of the Swiss rail network )
See also
Web links