Pullendorfer Strasse

from Wikipedia, the free encyclopedia
Template: Infobox high-ranking street / maintenance / AT-B
State road B61a in Austria
61aTemplate: Infobox high-ranking street / Maintenance / Generated sign / AT
map
Course of the B 61a
    Under construction   
Basic data
Overall length: 9.88 km
  of which under construction: 1 km

State :

Burgenland

Course of the road
Oberpullendorf district
Junction Oberpullendorf-South S31
Junction London 332
Junction Günser Strasse B50
EU border crossing Austria - Hungary
Hungary Further on M87

The bottle Straße B 61 is a main road in Austria .

history

Pullendorfer Strasse near Oberloisdorf
Pullendorfer Strasse near Rattersdorf

An extension of the Burgenland expressway S 31 from Oberpullendorf-Süd to Günser Straße near Unterpullendorf and subsequently to the Hungarian border near Rattersdorf was originally planned. In November 2010 it became known that this project would not be implemented as an expressway, but as a state road with the financial contribution of the federal government.

The groundbreaking for the new building was on September 22, 2014 at the roundabout (B 50 / end of S 31) between Oberpullendorf and Steinberg-Dörfl . The route runs as Pullendorfer Straße B 61a in ten kilometers initially to Günser Straße B 61 between Mannersdorf and Rattersdorf, as the last kilometer to the Hungarian border could only be planned when the location of the border crossing was determined. The road was opened to traffic on July 17, 2017. The € 37 million route was financed by the federal government, which saves € 40 million by building the two-lane state road instead of a four-lane expressway.

The construction of the B61a from today's roundabout with the B61 near Rattersdorf towards Hungary has been under construction since May 2018, after an application for a strategic environmental assessment (SUP) was submitted at the beginning of 2017. The B61a is to merge with the Hungarian M 87 after the Hungarian border and before Kőszeg . The traffic opening should take place in December 2019. [outdated]

swell

  1. ^ Message from the BMVIT
  2. S31 extension officially opened. burgenland.ORF.at, accessed on July 17, 2017 .
  3. ^ P. 31 Burgenland Schnellstraße / Projects , Federal Ministry for Transport, Innovation and Technology; Retrieved October 20, 2014.
  4. B61a to the Hungarian border: the last kilometer will be implemented
  5. ^ Province of Burgenland, announcement submission of SUP, January 2017