List of wind turbines in Mecklenburg-Western Pomerania
The list of wind turbines in Mecklenburg-Western Pomerania provides an overview of the installed wind turbines in the state of Mecklenburg-Western Pomerania , with a focus on the installed wind parks. Locations with three or more systems are considered wind parks. Systems with a steel lattice tower are marked in italics . Plants that have been dismantled again without repowering at the same location are crossed out . As new wind turbines are constantly being built, this list does not claim to be complete.
The list contains only onshore wind turbines. Systems in offshore wind farms in the German Exclusive Economic Zone off the coast of Mecklenburg-Western Pomerania (e.g. Baltic 1 ) can be found in the list of offshore wind farms .
Overview
Surname | Construction year | Total power (MW) |
number | Type (WKA) | place | agriculture circle |
Coordinates | Project planner / operator | Remarks | |
---|---|---|---|---|---|---|---|---|---|---|
Borg wind turbine | 2007 | 2.0 | 1 | Enercon E-70 (1 ×) | Borg | VR | 54 ° 14 '11 "N, 12 ° 23' 15" E | WIND project | ||
Wind turbines Born a. Darß | 1993 | 0.6 | 2 | North tank NTK 300/31 (2 ×) | Born a. Darß | VR | 54 ° 23 ′ 14 "N, 12 ° 28 ′ 10" E | |||
Breitling wind turbine | 2005 | 2.5 | 1 | Nordex N90 / 2500 (1 ×) | Peez | HRO | 54 ° 9 ′ 25 "N, 12 ° 7 ′ 33" E | WIND project, Nordex | Test system for simulating a location under offshore-like conditions was the first offshore wind turbine in Germany when it was built | |
Wind turbines Bülow | 1995 | 1.0 | 2 | Enercon E-40 / 5.40 (2 ×) | Bülow | LRO | 53 ° 46 ′ 2 "N, 12 ° 5 ′ 35" E | |||
Burow wind turbine | 2000 | 0.6 | 1 | Vestas V44-600kW (1 ×) | World interest | MSE | 53 ° 44 ′ 26 "N, 13 ° 17 ′ 14" E | |||
Dalkendorf wind turbine | 1998 | 0.66 | 1 | Vestas V47-660kW (1 ×) | Dalkendorf | LRO | 53 ° 49 ′ 11 "N, 12 ° 30 ′ 1" E | |||
Dummerstorf wind turbine | 2018 | 7.2 | 2 | Nordex N131 / 3600 (2 ×) | Dummerstorf | LRO | 54 ° 0 ′ 5 ″ N, 12 ° 15 ′ 9 ″ E | WIND project | Prototype of the Nordex N131 with 3.6 MW output | |
Fahrbinde wind turbine | 1997 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Fahrbinde | LUP | 53 ° 26 ′ 28 "N, 11 ° 29 ′ 31" E | Agricultural business | Erected on the A 14 | |
Gagern wind turbine | 1999 | 0.3 | 1 | AN Bonus 300/33 (1 ×) | Gagern | VR | 54 ° 28 ′ 21 ″ N, 13 ° 19 ′ 7 ″ E | |||
Gletzow wind turbine | 1993 | 0.225 | 1 | Vestas V27-225kW (1 ×) | Gletzow | NWM | 53 ° 48 ′ 5 "N, 11 ° 1 ′ 2" E | previously two plants | ||
Götemitz wind turbines | 1994 | 1.0 | 2 | Vestas V39-500kW (2 ×) | Götemitz | VR | 54 ° 20 ′ 17 "N, 13 ° 14 ′ 26" E | WIDEMAG | ||
Groß Lüdershagen wind turbine | 1995 | 0.3 | 1 | North tank NTK 300/31 (1 ×) | Great Lüdershagen | VR | 54 ° 16 ′ 37 "N, 13 ° 4 ′ 29" E | Butcher's Zahlmann | Self-sufficiency of the company | |
Gubkow wind turbines | 2003 | 5.0 | 2 | Nordex N80 / 2500 (2 ×) | Gubkow | LRO | 54 ° 1 ′ 16 ″ N, 12 ° 21 ′ 20 ″ E | WP Gubkow | ||
Wind turbines Hof Tatschow | 2018 | 8.2 | 2 | Siemens Gamesa SWT-DD-142 (2 ×) | Tachev Court | LRO | 53 ° 55 ′ 20 "N, 11 ° 59 ′ 12" E | |||
Wind turbines Kenz | 1994 | 1.0 | 1 | Vestas V39-500kW (2 ×) | Kenz | VR | 54 ° 19 ′ 8 ″ N, 12 ° 44 ′ 9 ″ E | |||
Wind turbines in Klatzow | 1997 2016 |
1.6 | 2 | Enercon E-48 (2 ×) | Klatzow | MSE | 53 ° 43 ′ 7 ″ N, 13 ° 14 ′ 26 ″ E | WIND project | 2016 repowering (2 × Enercon E-53 instead of 2 × Enercon E-40 / 5.40 ) | |
Köchelstorf wind turbine | 2000 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Köchelstorf | NWM | 53 ° 45 ′ 11 ″ N, 11 ° 6 ′ 8 ″ E | |||
Langsdorf wind turbine | 1995 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Langsdorf | VR | 54 ° 4 '8 "N, 12 ° 43' 4" E | Berding concrete | erected on the premises of a concrete processing company, on the A 20 | |
Lischow-Hagebök wind turbine | 2004 | 0.25 | 1 | Nordex N29 / 250 (1 ×) |
Lischow Hagebök |
NWM | 53 ° 58 ′ 9 ″ N, 11 ° 36 ′ 19 ″ E | WIDEMAG | ||
Löwitz wind turbines | 2004 | 3.0 | 2 | Südwind S77 (2 ×) | Loewitz | NWM | 53 ° 47 ′ 8 "N, 11 ° 0 ′ 32" E | WIDEMAG | ||
Malchow wind turbine | 1997 | 0.66 | 1 | Vestas V47-660kW (1 ×) | Malchow | MSE | 53 ° 29 ′ 17 "N, 12 ° 24 ′ 34" E | Malchow municipal utilities | Erected in a commercial area, self-supply of sewage treatment plant | |
Malow wind turbine | 1994 | 0.2 | 1 | Enercon E-30 / 2.30 (1 ×) | Malow | LUP | 53 ° 20 ′ 16 "N, 11 ° 55 ′ 22" E | |||
Mönchhagen wind turbine | 1994 | 0.5 | 1 | Vestas V39-500kW (1 ×) | Mönchhagen | LRO | 54 ° 9 ′ 16 ″ N, 12 ° 13 ′ 9 ″ E | previously two plants, one has now been dismantled | ||
Müssentin wind turbine | 1994 1998 |
0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Must be | VG | 53 ° 54 ′ 29 ″ N, 13 ° 18 ′ 5 ″ E | ContinoWind | previously 2 × Seewind 20/110 | |
Nantrow-Vogelsang wind turbine | 2000 | 0.6 | 2 | North tank NTK-300 (2 ×) |
Nantrow Vogelsang |
NWM | 53 ° 59 ′ 6 "N, 11 ° 37 ′ 33" E | |||
New Nantrow wind turbine | 2000 | 0.3 | 1 | North tank NTK-300 (1 ×) | New Nantrow | NWM | 53 ° 58 ′ 45 "N, 11 ° 38 ′ 40" E | |||
Nienhagen wind turbine | 2014 | 2.4 | 1 | Nordex N117 / 2400 (1 ×) | Nienhagen | HRO | 54 ° 8 ′ 4 "N, 12 ° 10 ′ 27" E | WIND project | Erected on the site of the GVZ Rostock in the immediate vicinity of the Nordex production site , serves as a research facility for testing various components | |
Parchim wind turbine | 2008 | 0.8 | 1 | Enercon E-53 (1 ×) | Parchim | LUP | 53 ° 26 '14 "N, 11 ° 53' 7" E | |||
Radegast wind turbine | 1996 | 0.5 | 1 | North tank NTK 500/37 (1 ×) | Radegast | LRO | 53 ° 57 ′ 17 "N, 11 ° 50 ′ 18" E | |||
Rerik wind turbine | 1995 | 0.25 | 1 | Nordex N29 (1 ×) | Rerik | LRO | 54 ° 7 ′ 1 ″ N, 11 ° 37 ′ 30 ″ E | |||
Retzin wind turbine | 1997 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Retzin | VG | 53 ° 25 ′ 12 "N, 14 ° 15 ′ 16" E | |||
Reutershof wind turbine | 2004 | 1.0 | 1 | Enercon E-58 (1 ×) | Reutershof | MSE | 53 ° 41 ′ 9 ″ N, 12 ° 17 ′ 18 ″ E | |||
Sanitz wind turbines | 1994 2003 |
0.885 | 2 |
Vestas V27-225kW (1 ×) Vestas V47-660kW (1 ×) |
Oberhof | LRO | 54 ° 4 ′ 15 ″ N, 12 ° 24 ′ 2 ″ E | |||
Wind turbines in Schlagsülsdorf | 1996 | 1.0 | 2 | Micon M1500-500 (2 ×) | Schlagsülsdorf | NWM | 53 ° 47 ′ 4 "N, 10 ° 49 ′ 11" E | |||
Schwerin wind power station | 2005 | 0.5 | 1 | Vestas V39-500kW (1 ×) | Schwerin | SN | 53 ° 39 ′ 4 ″ N, 11 ° 24 ′ 5 ″ E | KGW | Test facility of KGW Schweriner Maschinen- und Anlagenbau | |
Segebadenhau wind turbines | 2002 | 1.0 | 2 | Enercon E-40 / 5.40 (2 ×) | Segebadenhau | VR | 54 ° 8 ′ 23 "N, 13 ° 12 ′ 16" E | |||
Wind turbines Selmsdorf | 1995 | 0.54 | 2 | Südwind N 3127 (2 ×) | Selmsdorf | NWM | 53 ° 52 ′ 15 "N, 10 ° 50 ′ 32" E | SS Selmsdorf I – III | previously three systems | |
Starvitz wind turbine | 1995 | 0.3 | 1 | Tacke TW 300 (1 ×) | Starvitz | VR | 54 ° 39 ′ 5 ″ N, 13 ° 17 ′ 5 ″ E | |||
Wind turbine temple | 1994 | 0.1 | 1 | Ventis 20-100 (1 ×) | temple | VR | 54 ° 15 ′ 56 "N, 12 ° 31 ′ 33" E | Two-winged; formerly two plants, both have now been dismantled now only the tower is standing. | ||
Teßmannsdorf wind turbines | 1992 | 0.3 | 1 | North tank NTK 150 XRL (2 ×) | Teßmannsdorf | LRO | 54 ° 3 ′ 8 ″ N, 11 ° 36 ′ 15 ″ E | |||
Thomashof wind turbine | 2002 | 0.3 | 1 | AN Bonus 300/33 (1 ×) | Thomashof | VR | 54 ° 6 ′ 25 ″ N, 12 ° 46 ′ 15 ″ E | |||
Trollenhagen wind turbine | 1997 | 0.5 | 1 | DeWind D4 / 41 (1 ×) | Buchhof | MSE | 53 ° 37 ′ 19 ″ N, 13 ° 17 ′ 33 ″ E | |||
Ventschow wind turbine | 1993 | 0.11 | 1 | Enercon E-40 / 5.40 (1 ×) | Ventschow | NWM | 53 ° 47 ′ 12 "N, 11 ° 34 ′ 22" E | Ventschow concrete plant | erected on the premises of the concrete plant | |
Wind turbines fore leg | 2000 | 1.0 | 2 | Enercon E-40 / 5.40 (2 ×) | Front leg | VG | 53 ° 59 ′ 26 ″ N, 13 ° 8 ′ 13 ″ E | |||
Vossberg wind turbine | 2018 | 3.45 | 1 | Vestas V126-3.45MW (1 ×) | Spantekow | VG | 53 ° 46 ′ 51 ″ N, 13 ° 24 ′ 21 ″ E | Notus energy | ||
Werle wind turbines | 2001 | 1.2 | 2 | Enercon E-40 / 6.44 (2 ×) | Werle | LRO | 53 ° 52 '30 "N, 12 ° 7' 4" E | CW Consult | ||
Wismar wind turbine | 1996 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Wismar | UTI | 53 ° 53 ′ 29 "N, 11 ° 24 ′ 20" E | |||
Wittenburg wind turbine | 2007 | 0.8 | 1 | Enercon E-53 (1 ×) | Wölzow | LUP | 53 ° 29 ′ 24 ″ N, 11 ° 6 ′ 16 ″ E | Erected on the A 24 | ||
Wohlenhagen wind turbine | 1993 | 0.11 | 1 | Sea wind 20/110 (1 ×) | Wohlenhagen | NWM | 53 ° 55 ′ 7 ″ N, 11 ° 14 ′ 29 ″ E | |||
Wolgast wind turbine | 1995 | 0.15 | 1 | AN Bonus 150/30 (1 ×) | Wolgast | VG | 54 ° 3 ′ 17 ″ N, 13 ° 44 ′ 17 ″ E | ZV Wolgast | erected at the sewage treatment plant in Wolgast for self-sufficiency | |
Wustrow wind turbine | 1989 | 0.2 | 1 | Vestas V25-200kW (1 ×) | Wustrow | VR | 54 ° 20 ′ 25 ″ N, 12 ° 23 ′ 1 ″ E | Klaus-Jürgen Beel | In 1988, it was the first wind turbine in the former GDR to be bought in exchange for foreign currency from the timber trade and built in October 1989 | |
Ziesendorf wind turbine | 1996 | 0.225 | 1 | Vestas V29-225kW (1 ×) | Ziesendorf | LRO | 54 ° 0 ′ 7 ″ N, 12 ° 2 ′ 0 ″ E | WIND project | ||
Admannshagen-Bargeshagen wind farm | 1996 1997 2016 2017 |
14.4 | 5 |
Nordex N117 / 2400 (2 ×) Nordex N117 / 3600 (1 ×) Enercon E-115 (2 ×) |
Admannshagen-Bargeshagen | LRO | 54 ° 7 ′ 24 "N, 11 ° 58 ′ 25" E | 2016 Repowering (2 × Nordex N117 / 2400 and 1 × Nordex N117 / 3600 instead of 1 × Nordtank NTK 600/41 , Enercon E-40 / 5.40 , Tacke TW 600 and 2 × Vestas V44-600kW ) Prototype of the Nordex N117 / 3600 |
||
Alt Zachun-Bandenitz wind farm | 2015 2020-2021 |
26.4 | 8th | Vestas V112-3.3MW (8 ×) | Old Zachun | NWM | 53 ° 30 ′ 56 ″ N, 11 ° 19 ′ 13 ″ E | Natural energy | The wind farm was originally supposed to be built in 2015. A construction freeze prevented this for a long time. With the second building application in 2019, the wind farm was approved and is now being built | |
Altefähr wind farm | 1993 1995 |
2.9 | 9 |
North tank NTK 300/31 (8 ×) North tank NTK 500/37 (1 ×) |
Altefähr | VR | 54 ° 20 ′ 24 "N, 13 ° 8 ′ 11" E | WIDEMAG | Repowering planned | |
Altentreptow wind farm | 2003 2004 2005 2009 2011 2013 2014 |
76.65 | 37 |
Vestas V80-2MW (17 ×) Enercon E-70 (2 ×) REpower MD77 (1 ×) Nordex N90 / 2300 (3 ×) Vestas V90-2MW (9 ×) Enercon E-82 E2 (4 ×) Enercon E- 101 (1 ×) |
Altentreptow Loickenzin Barkow |
MSE | 53 ° 41 ′ 31 ″ N, 13 ° 12 ′ 17 ″ E | WEB Windenergie , MBBF, VenSol, Komesker Energie | ||
Amalienhof wind farm | 2002 2009 2010 |
17.2 | 10 |
Enercon E-66 / 18.70 (8 ×) Enercon E-53 (1 ×) Vestas V90-2MW (1 ×) |
Dalkendorf goddess |
LRO | 53 ° 49 ′ 31 ″ N, 12 ° 28 ′ 31 ″ E | Notus energy, WP Amalienhof | ||
Badow-Renzow-Stöllnitz wind farm | 2014 2016 |
32.2 | 14th | Enercon E-82 E2 (14 ×) |
Badow Renzow Stöllnitz |
NWM | 53 ° 37 ′ 28 ″ N, 11 ° 7 ′ 15 ″ E | wpd , WP Badow | ||
Barkow wind farm | 2014 2016 |
49.8 | 16 |
Vestas V112-3.0MW (11 ×) Vestas V112-3.3MW (3 ×) Vestas V126-3.45MW (2 ×) |
Barkow Schlemmin |
LUP | 53 ° 26 ′ 34 "N, 12 ° 10 ′ 18" E | UKA | ||
Bartow wind farm | 2018 | 13.8 | 4th | Vestas V126-3.45MW (4 ×) | Bartow | MSE | 53 ° 49 ′ 46 "N, 13 ° 19 ′ 25" E | erected on the A 20 | ||
Beggerow-Borrentin wind farm | 2012 2013 2014 |
48.22 | 18th |
Enercon E-82 E2 (7 ×) Enercon E-101 (8 ×) Enercon E-92 (2 ×) Vestas V112-3.0 MW (1 ×) |
Beggerow Pentz |
MSE | 53 ° 50 ′ 2 "N, 13 ° 1 ′ 23" E | wpd , natural wind | ||
Behrenshagen wind farm | 2000 | 6.0 | 6th | AN Bonus 1000/54 (6 ×) | Behrenshagen | VR | 54 ° 15 ′ 1 ″ N, 12 ° 31 ′ 5 ″ E | WP Behrenshagen | ||
Bentwisch wind farm | 2000 2002 |
4.5 | 4th |
Nordex N54 (3 ×) Südwind S77 (1 ×) |
Bentwisch | LRO | 54 ° 7 ′ 13 ″ N, 12 ° 14 ′ 1 ″ E | EBETHO | ||
Bentzin wind farm | 1998 | 1.8 | 3 | Vestas V44-600kW (3 ×) | Bentzin | VG | 53 ° 56 ′ 19 ″ N, 13 ° 17 ′ 8 ″ E | ContinoWind | ||
Bergholz-Rossow wind farm | 1999 2009 2011 2013 |
28.4 | 33 | Tacke TW 600a (19 ×) HSW 1000 (5 ×) Enercon E-48 (4 ×) |
Bergholz Rossow |
VG | 53 ° 27 '43 "N, 14 ° 9' 4" E | MBBF, Ventotec, WIDEMAG, WP Rossow |
Repowering 2011 (1 × Enercon E-53 instead of 1 × HSW 1000 ) Dismantling of 3 Tacke TW 600a 2016, 2018, 2019 |
|
Bernitt wind farm | 2014 2015 |
64.05 | 21st | Enercon E-101 (21 ×) |
Bernitt Kurzen Trechow |
LRO | 53 ° 53 '19 "N, 11 ° 55' 23" E | MBBF, Kloss New Energy | ||
Owned wind farm | 2003 2008 |
11.2 | 7th |
REpower MD70 (4 ×) Enercon E-70 (3 ×) |
Ownership | MSE | 53 ° 41 ′ 18 ″ N, 13 ° 27 ′ 13 ″ E | Denker & Wulf, WP owner | ||
Bohlendorf wind farm | 1997 1998 |
4.65 | 3 |
Enercon E-66 / 15.66 (2 ×) Vestas V66-1.65MW (1 ×) |
Black | VR | 54 ° 35 ′ 25 ″ N, 13 ° 17 ′ 6 ″ E | WP Bohlendorf | ||
Boldenshagen wind farm | 1998 | 6.0 | 6th | Nordex N54 (6 ×) | Boldenshagen | LRO | 54 ° 5 ′ 0 ″ N, 11 ° 45 ′ 8 ″ E | eno energy | ||
Börgerende-Rethwisch wind farm | 1994 | 1.35 | 3 | AN Bonus 450/37 (3 ×) | Börgerende-Rethwisch | LRO | 54 ° 8 ′ 34 "N, 11 ° 55 ′ 33" E | WP Börgerende | ||
Brandshagen wind farm | 1997 | 2.0 | 4th | Enercon E-40 / 5.40 (4 ×) | Brandshagen | VR | 54 ° 14 ′ 18 ″ N, 13 ° 9 ′ 5 ″ E | WP Brandshagen | ||
Breesen-Teetzleben wind farm | 2012-2013 2016-2017 |
58.3 | 19th |
Enercon E-101 (8 ×) Vestas V112-3.0MW (8 ×) Vestas V112-3.3MW (3 ×) |
Breesen Groß Teetzleben |
MSE | 53 ° 38 ′ 19 ″ N, 13 ° 10 ′ 19 ″ E | Naturwind, Notus energy, WP Breesen | ||
Broderstorf-Fienstorf wind farm | 2002 2004 2008 2013 |
29.1 | 13 |
Enron Wind 1.5sl (2 ×) GE Wind Energy 1.5sl (3 ×) eno energy 82 (1 ×) Enercon E-101 (4 ×) Vestas V112-3.0 MW (1 ×) eno energy 92 (2 ×) |
Broderstorf Fienstorf |
LRO | 54 ° 6 ′ 7 ″ N, 12 ° 14 ′ 22 ″ E | MBBF, Jade NaturEnergie, eno energy, WP Broderstorf | Prototype of the eno energy 82 | |
Brusow wind farm | 2013–2014 2015 2018 |
11.8 | 3 | eno energy 114 3.5MW (2 ×) eno energy 126 4.8MW (1 ×) |
Brusow | LRO | 54 ° 4 ′ 4 " N , 11 ° 50 ′ 32.8" E | eno energy | Prototypes of the eno energy 114 3.5MW and the eno energy 126 4.8MW | |
Buschmühlen-Rakow wind farm | 2000 2001 2010 2020 |
26.2 | 14th |
Vestas V66-1.65MW (4 ×) Nordex N50 (1 ×) Nordex N62 (3 ×) Nordex N80 / 2500 (2 ×) Fuhrländer FL MD77 (2 ×) Vestas V117-3.45MW (2 ×) |
Bushmills Rakow |
LRO | 54 ° 1 ′ 22 "N, 11 ° 37 ′ 31" E | wpd | ||
Bütow-Zepkow wind farm | 1999 2001 2016 2019 |
52.75 | 43 | DeWind D4 / 48 (32 ×) Enercon E-101 (11 ×) |
Butow Zepkow |
MSE | 53 ° 19 ′ 23 "N, 12 ° 29 ′ 7" E |
Enertrag natural wind |
erected along the A 19 | |
Bützow wind farm | 1995 2003 2014 |
18.1 | 13 |
Enercon E-40 / 5.40 (1 ×) Vestas V52-850kW (2 ×) Vestas V66-1.65MW (4 ×) Enercon E-53 (3 ×) Enercon E-70 (3 ×) |
Long Trechow Parkow |
LRO | 53 ° 52 ′ 20 "N, 11 ° 57 ′ 7" E | win: pro, WP Bützow | Repowering 2014 (2 × Enercon E-70 instead of 2 × Enercon E-40 / 5.40 ) | |
Carinerland Ost wind farm | 1999 2019 |
18.8 | 8th | Enercon E-82 E3 (8 ×) | Krempin | LRO | 54 ° 0 ′ 2 "N, 11 ° 43 ′ 14" E | WIND project | 2019 repowering (8 × Enercon E-82 E2 instead of 8 × AN Bonus 1300/62) | |
Carinerland West wind farm | 1999 2010 2012 2013 2017 2019 |
39.05 | 15th | AN Bonus 1300/62 (4 ×) Nordex S82 / 1500 (1 ×) Nordex N100 / 2500 (2 ×) Enercon E-70 E4 (2 ×) Enercon E-126 7.5MW (1 ×) eno energy 114/3500 ( 1 ×) Enercon E-82 E2 (2 ×) Enercon E-92 (1 ×) Nordex N133 / 4800 (1 ×) |
Panzow Ravensberg Neubukow |
LRO | 54 ° 0 ′ 11 ″ N, 11 ° 41 ′ 7 ″ E | WIND project | Prototypes of the Nordex N100 / 2500 and Nordex N133 / 4800 , a Nordex N100 / 2500 bears the club emblem of FC Hansa Rostock on the gondola | |
Cramonshagen wind farm | 1998 2003 |
5.4 | 8th | WindWorld W4200 (6 ×) NEG Micon NM52 / 900 (2 ×) |
Nienmark | NWM | 53 ° 41 ′ 16 "N, 11 ° 18 ′ 14" E | MDP Group, wind7 | ||
Dalwitz wind farm | 2013 2014 |
27.45 | 9 | Enercon E-101 (9 ×) | Dalwitz | LRO | 53 ° 55 ′ 5 ″ N, 12 ° 32 ′ 25 ″ E | wpd | ||
Dargelin wind farm | 1995 | 1.5 | 3 | Vestas V39-500kW (3 ×) | Dargelin | VG | 54 ° 0 ′ 15 "N, 13 ° 20 ′ 29" E | |||
Dargelütz wind farm | 2006 2011 |
35.8 | 17th |
Enercon E-70 (11 ×) Enercon E-70 E4 (6 ×) |
Dargelütz | LUP | 53 ° 29 ′ 25 ″ N, 11 ° 50 ′ 24 ″ E | Natural wind, wpd | ||
Demmin wind farm | 1997 | 2.4 | 4th | AN Bonus 600/44 (4 ×) | Demmin | MSE | 53 ° 54 '22 "N, 13 ° 5' 23" E | |||
Dersekow wind farm | 1998 2001 2009 2016 |
27.82 | 15th |
Enercon E-40 / 5.40 (1 ×) Vestas V47-660kW (2 ×) Vestas V90-2MW (10 ×) Vestas V112-3.0MW (2 ×) |
Dersekov | VG | 54 ° 3 ′ 7 ″ N, 13 ° 15 ′ 18 ″ E | WP Dersekow | erected on both sides of the A 20 | |
Diedrichshagen wind farm | 1993 2001 |
1.9 | 6th |
Vestas V27-225kW (4 ×) Enercon E-40 / 5.40 (2 ×) |
Diedrichshagen | HRO | 54 ° 10 ′ 7 ″ N, 12 ° 1 ′ 1 ″ E | West wind | ||
Dölitz wind farm | 1995 | 3.6 | 6th | Vestas V44-600kW (6 ×) | Dolitz | LRO | 53 ° 56 ′ 15 "N, 12 ° 40 ′ 25" E | Müritz WKA | ||
Eixen wind farm | 2006 2013 |
24.9 | 12 | Enercon E-70 (12 ×) | Eixen | VR | 54 ° 9 ′ 33 "N, 12 ° 40 ′ 29" E | MVC wind farm | ||
Elmenhorst wind farm | 1998 | 2.25 | 5 | AN Bonus 450/37 (5 ×) | Elmenhorst | LRO | 54 ° 9 ′ 35 ″ N, 11 ° 59 ′ 17 ″ E | |||
Fahrwalde wind farm | 2012 2014 2017 |
31.3 | 12 |
Enercon E-82 E2 (11 ×) Enercon E-101 (2 ×) |
Fahrwalde | VG | 53 ° 25 ′ 18 ″ N, 14 ° 3 ′ 7 ″ E | Thüga renewable energies, wpd , WP Fahrenwalde infra | ||
Friedland I wind farm | 1998 2002 2009 2011 2012 2013 |
25.8 | 13 |
Enercon E-66 / 18.70 (4 ×) Enercon E-82 (5 ×) Enercon E-70 (2 ×) Enercon E-82 E2 (2 ×) |
Friedland | MSE | 53 ° 38 ′ 29 "N, 13 ° 34 ′ 6" E | Alme Windkraft, Enertrag | Repowering 2009 and 2013 (1 × Enercon E-82 and 3 × Enercon E-82 E2 instead of 4 × Nordex N54 ) | |
Friedland II wind farm | 2002 | 9.0 | 6th | GE Wind Energy 1.5s (6 ×) | Friedland | MSE | 53 ° 38 ′ 35 "N, 13 ° 32 ′ 13" E | Energiekontor | ||
Friedland III wind farm | 1999 2004 2009 2012 |
24.1 | 15th |
Nordex N60 (7 ×) GE Wind Energy 1.5s (2 ×) Enercon E-82 (6 ×) |
Friedland | MSE | 53 ° 41 ′ 3 ″ N, 13 ° 31 ′ 13 ″ E | MBBF, Jade Group | ||
Gadebusch wind farm | 2004 | 5.25 | 5 | REpower 1000/57 (5 ×) | Gadebusch | NWM | 53 ° 42 ′ 17 ″ N, 11 ° 9 ′ 1 ″ E | wind7 | ||
Gischow wind farm | 2000 2009 2011 |
11.1 | 9 |
Enercon E-40 / 5.40 (5 ×) Enercon E-70 (4 ×) |
Gischow | LUP | 53 ° 26 ′ 20 "N, 11 ° 59 ′ 32" E | WP Gischow / Lutheran | ||
Glasewitz wind farm | 2014 | 27.4 | 9 |
Enercon E-101 (8 ×) Nordex N117 / 3000 (1 ×) |
Glasewitz | LRO | 53 ° 49 ′ 29 "N, 12 ° 15 ′ 23" E | Notus energy, Saxovent | erected on the A 19 , prototype of the Nordex N117 / 3000 | |
Görmin wind farm | 1995 1999 2003 2006 2011 |
20.97 | 14th |
Vestas V47-660kW (7 ×) Vestas V80-2MW (4 ×) Vestas V90-2MW (1 ×) Enercon E-101 (1 ×) Vestas V112-3.3MW (1 ×) |
Göslow Trissow Böken |
VG | 53 ° 59 ′ 20 ″ N, 13 ° 18 ′ 10 ″ E | ContinoWind, WEB Windenergie , WIDEMAG, Görminer Windpark | erected on the A 20 , repowering 2011 (1 × Enercon E-101 instead of 3 × Vestas V39-500kW ), prototype of the Enercon E-101 | |
Grebbin wind farm | 1998 2008 2014 |
28.7 | 13 |
Enercon E-82 (4 ×) Enercon E-82 E2 (9 ×) |
Grebbin | LUP | 53 ° 30 ′ 2 "N, 11 ° 51 ′ 6" E | RWE Innogy , wpd , Grebbiner Wind | 2014 repowering (9 × Enercon E-82 E2 instead of 3 × Enercon E-40 5.40 ) | |
Gremersdorf-Rekentin wind farm | 2002 2003 2004 2013 2014 2015 2016 |
43.4 | 23 |
GE Wind Energy 1.5sl (11 ×) Enercon E-66 / 20.70 (5 ×) Enercon E-70 E4 (3 ×) Enercon E-82 E2 (2 ×) Enercon E-92 (1 ×) Enercon E-101 ( 1 ×) |
Gremersdorf Pöglitz Rekentin |
VR | 54 ° 7 '4 "N, 12 ° 51' 5" E | MBBF, Jade Group, KNE wind farm | ||
Gressow wind farm | 1995 | 1.8 | 3 | Micon M1800-600 (3 ×) | Gressow | NWM | 53 ° 51 ′ 34 "N, 11 ° 20 ′ 34" E | |||
Grimmen-Grellenberg wind farm | 1998 2009 2013 2016 |
24.1 | 14th | AN Bonus 1300/62 (6 ×) Enercon E-82 (5 ×) Vestas V90-2MW (1 ×) Enercon E-82 E2 (1 ×) Senvion MM100 (1 ×) |
Jessin Grellenberg |
VR | 54 ° 5 ′ 30 "N, 12 ° 59 ′ 35" E | wpd , WIDEMAG, WP Grimmen | erected on the A 20 | |
Groß Bisdorf wind farm | 2012 2016 2019 |
34.5 | 11 |
Vestas V112-3.0MW (7 ×) Vestas V112-3.3MW (2 ×) Vestas V112-3.3MW (2 ×) |
Gross Bisdorf | VG | 54 ° 3 ′ 17 ″ N, 13 ° 13 ′ 20 ″ E | Renewable energies Groß Bisdorf, InvestInvent | Erected on the A 20 | |
Groß Luckow-Blumenhagen wind farm | 2001 2009 |
18.65 | 11 | AN Bonus 1300/62 (7 ×) Fuhrländer FL 2500 (3 ×) REpower MM82 (1 ×) |
Groß Luckow Blumenhagen |
VG | 53 ° 31 ′ 14 "N, 13 ° 50 ′ 30" E | WP Groß Luckow, MBBF | erected on both sides of the A 20 | |
Groß Niendorf wind farm | 2000 2014 |
16.3 | 14th |
Enercon E-40 / 5.40 (8 ×) eno energy 82 (6 ×) |
Gross Niendorf | LUP | 53 ° 35 ′ 20 "N, 11 ° 52 ′ 7" E | eno energy, Stadtwerke Sigmaringen | ||
Groß Pravtshagen wind farm | 2000 | 4.2 | 7th | NEG Micon NM48 / 600 (7 ×) | Great Pravtshagen | NWM | 53 ° 49 ′ 29 ″ N, 11 ° 14 ′ 30 ″ E | WP Groß Pravtshagen | Erected on the A 20 | |
Groß Trebbow wind farm | 2011 | 6.15 | 3 | eno energy 82 (3 ×) | Great Trebbow | NWM | 53 ° 42 ′ 11 "N, 11 ° 20 ′ 23" E | Plan 8, TOBI energy | ||
Harmshagen wind farm | 2000 2013 |
9.2 | 4th | Enercon E-70 E4 (4 ×) | Harmshagen | NWM | 53 ° 47 ′ 29 ″ N, 11 ° 16 ′ 22 ″ E | Landwind, Jan Luttuschka | Repowering 2013 (previously 4 × Enercon E-40 / 5.40 ) | |
Helmshagen-Hinrichshagen wind farm | 2000 2001 2015 |
11.28 | 10 |
Vestas V47-660kW (8 ×) Vestas V112-3.0MW (2 ×) |
Helmshagen Hinrichshagen |
VG | 54 ° 3 '22 "N, 13 ° 21' 14" E | Wallenborn Project, WP Helmshagen, BMB Windkraft | Repowering 2015 (2 × Vestas V112-3.0MW instead of 7 × Vestas V47-660kW ) | |
Wind farm Helpt | 1996 | 3.0 | 5 | Tacke TW 600 (5 ×) | Pasenow | MSE | 53 ° 29 ′ 34 "N, 13 ° 34 ′ 7" E | WP Woldegk | ||
Hohen Luckow wind farm |
2012 2013 2015 2016 |
72.4 | 22nd |
Nordex N117 / 2400 (1 ×) REpower 3.4M104 (14 ×) Senvion 3.2M114 (7 ×) |
Hohen Luckow | LRO | 53 ° 59 ′ 6 ″ N, 11 ° 56 ′ 22 ″ E | Denker & Wulf, Gut Hohen Luckow | erects the first Nordex N117 / 2400 customer system on both sides of the A 20 | |
Hohen Pritz wind farm | 2001 | 21.0 | 14th | Südwind S77 (14 ×) | Hohen Pritz | LUP | 53 ° 37 ′ 8 "N, 11 ° 54 ′ 8" E | Dirkshof | ||
Hohen Schwarfs wind farm | 1999 2002 |
9.0 | 5 |
Enercon E-66 / 15.66 (2 ×) Vestas V80-2MW (3 ×) |
High Schwarfs | LRO | 54 ° 1 ′ 33 ″ N, 12 ° 11 ′ 19 ″ E | Nordum Academy | Erected at the Rostock motorway junction | |
Hoort wind farm | 2018 2019-2020 |
57.6 | 16 | Nordex N117 / 3600 (16 ×) | Hoort | LUP | 53 ° 27 ′ 28 "N, 11 ° 20 ′ 28" E | LOSCON GmbH, mea energy agency | erected on both sides of the A 24 | |
Hornstorf-Kalsow wind farm | 2001 2006 2007 2010 |
26.1 | 17th |
Nordex N62 / 1300 (9 ×) REpower MD77 (2 ×) Südwind S77 (3 ×) Enercon E-82 E2 (3 ×) |
Hornstorf Kalsow |
NWM | 53 ° 55 '17 "N, 11 ° 33' 28" E | AREF, DIF WP Kalsow, Kloss New Energy, seebaWIND | ||
Iven wind farm | 2001 2007 2008 2011 |
35.55 | 14th |
Nordex N90 / 2500 (2 ×) Nordex N100 / 2500 (1 ×) Vestas V90-2MW (5 ×) Vestas V90-3MW (5 ×) Enercon E-101 (1 ×) |
Iven | VG | 53 ° 47 ′ 33 "N, 13 ° 24 ′ 19" E | Ventotec, wpd , WP Iven |
Repowering 2007 and 2008 (2 × Nordex N90 / 2500 , 1 × Nordex N90 / 2500 , 5 × Vestas V90-2MW and 5 × Vestas V90-3MW instead of 18 × Nordwind NW 44-750) Prototype of the Nordex N100 / 2500 in pre-series production |
|
Jatzke wind farm | 2003 | 10.5 | 7th | REpower MD70 (7 ×) | Jatzke | MSE | 53 ° 36 ′ 30 ″ N, 13 ° 32 ′ 20 ″ E | WP Jatzke | ||
Juergenshagen wind farm | 2002 | 6.4 | 8th | AN Bonus 1300/62 (6 ×) AN Bonus 2000/76 (2 ×) |
Satow | LRO | 53 ° 58 ′ 1 ″ N, 11 ° 53 ′ 33 ″ E | wpd | erected on both sides of the A 20 | |
Kalkhorst wind farm | 1999-2000 2004 |
14.4 | 5 |
Enercon E-40 5.40 (2 ×) Südwind S77 (3 ×) |
Kalkhorst | NWM | 53 ° 56 ′ 31 ″ N, 11 ° 1 ′ 13 ″ E | WPD, WIDEMAG, wind project | ||
Kambs-Hof Tatschow wind farm | 2000 2015 |
36.0 | 16 |
Enercon E-40 / 5.40 (2 ×) Nordex N100 / 2500 (14 ×) |
Kambs Hof Tachev |
LRO | 53 ° 54 ′ 12 ″ N, 12 ° 2 ′ 12 ″ E | Denker & Wulf, Kloss New Energy | ||
Kandelin-Poggendorf wind farm | 2017 | 21.0 | 7th | Enercon E-115 (7 ×) |
Kandelin Poggendorf |
VR | 54 ° 2 ′ 59 "N, 13 ° 8 ′ 31" E | |||
Kankel wind farm | 2013 2014 |
8.05 | 3 | Wind to Energy W2E-120 / 3fc (2 ×) Wind to Energy W2E-100 / 2.0 (1 ×) |
Kankel | LRO | 53 ° 57 ′ 28 "N, 12 ° 13 ′ 17" E | Kloss New Energy, wp ingenieurbau, W2E WP Kankel | Wind test field for testing the prototypes of the manufacturer Wind to Energy (subsequent company of Fuhrländer , on whose technology the systems are based) | |
Karlsburg wind farm | 1996 2001 2003 |
25.5 | 19th |
Nordtank NTK 500/37 (3 ×) REpower MD70 (6 ×) REpower MD77 (10 ×) |
Karlsburg Lühmannsdorf |
VG | 53 ° 59 ′ 19 ″ N, 13 ° 36 ′ 35 ″ E | WIND project, Renertec | ||
Kassow-Oettelin wind farm | 2014 | 22.5 | 9 | Nordex N100 / 2500 (9 ×) |
Kassow Oettelin |
LRO | 53 ° 51 ′ 31 ″ N, 12 ° 5 ′ 10 ″ E | Yield | ||
Kavelstorf wind farm | 2001 2005 |
10.2 | 8th |
Nordex N54 (2 ×) Nordex N60 (4 ×) REpower MD77 (2 ×) |
Kavelstorf dam |
LRO | 54 ° 1 ′ 4 "N, 12 ° 10 ′ 20" E | DK WP Kavelstorf, Northland Power | Erected on the A 20 | |
Kirch Mulsow wind farm | 2010 2018 |
18.95 | 6th | eno energy 82 (1 ×) eno energy 92 (1 ×) Enercon E-126 EP3 (1 ×) Enercon E-141 EP4 (1 ×) eno energy 126 (2 ×) |
Kirch Mulsow | LRO | 53 ° 58 ′ 20 "N, 11 ° 41 ′ 29" E | eno energy | Prototype of the eno energy 92 and prototype of the Enercon E-126 EP3 | |
Kladrum wind farm | 1998 1999 2001 2006 2011–2012 2014 2016 |
91.95 | 58 | Tacke TW 600 (18 ×) Vestas V66-1.65MW (5 ×) Enron Wind 1.5s (2 ×) Enercon E-70 E4 (28 ×) Vestas V72-1.5MW (1 ×) eno energy 82 (1 ×) eno energy 92 (3 ×) |
Kladrum Zölkow Frauenmark Kossebade |
LUP | 53 ° 32 ′ 22 "N, 11 ° 48 ′ 20" E | Germania Windpark, Ventotec, Naturwind, Thüga ee , wpd , BayWa re, eno energy | ||
Bad Kleinen wind farm | 2004 | 11.5 | 5 | Nordex N90 / 2300 (5 ×) | Lots | NWM | 53 ° 47 ′ 25 ″ N, 11 ° 26 ′ 31 ″ E | e.dis | ||
Klein Bünzow wind farm | 1998 2004 2008 2009 |
32.3 | 17th |
Enercon E-66 / 15.66 (7 ×) Enercon E-66 / 20.70 (1 ×) Vestas V80-2MW (2 ×) Enercon E-70 (6 ×) Vestas V90-2MW (1 ×) |
Klein Bünzow | VG | 53 ° 54 ′ 33 "N, 13 ° 38 ′ 20" E | WPB WP Klein Bünzow | ||
Klein Toitin wind farm | 1996 | 2.4 | 4th | Tacke TW 600 (4 ×) | Little Toitin | VG | 53 ° 54'15 "N, 13 ° 22'7" E | WP Klein Toitin | ||
Klein Welzin wind farm | 1997 | 3.0 | 5 | Vestas V44-600kW (5 ×) | Klein Welzin | NWM | 53 ° 38 ′ 6 ″ N, 11 ° 13 ′ 4 ″ E | EBV WP Klein Welzin, Calliston | ||
Kletzin wind farm | 1998 2014 |
17.4 | 9 |
Vestas V44-600kW (4 ×) Vestas V112-3.0MW (5 ×) |
Kletzin | MSE | 53 ° 54 ′ 29 ″ N, 13 ° 9 ′ 1 ″ E | Repowering 2014 (5 × Vestas V112-3.0MW instead of 11 × Vestas V44-600kW ) | ||
Wind farm Kloster Wulfshagen | 2005 2009 |
20.6 | 10 | Enercon E-70 (10 ×) | Wulfshagen Monastery | VR | 54 ° 10 ′ 19 ″ N, 12 ° 27 ′ 22 ″ E | WIND project | ||
Kluis-Silenz wind farm | 1999 | 6.0 | 10 | AN Bonus 600/44 (10 ×) |
Kluis Silence |
VR | 54 ° 28 ′ 24 ″ N, 13 ° 18 ′ 6 ″ E | WP Kluis-Silenz | ||
Krackow wind farm | 1999 2002 |
2.5 | 5 | Enercon E-40 / 5.40 (5 ×) | Battinsthal | VG | 53 ° 19 ′ 17 ″ N, 14 ° 15 ′ 30 ″ E | IFE Eriksen | ||
Krackow-Glasow wind farm | 2013 2015 |
48.0 | 16 | Amperax A3000 (1 ×) Vestas V112-3.0MW (15 ×) |
Krackow Glazov |
VG | 53 ° 21 ′ 49 "N, 14 ° 11 ′ 23" E | WPD | ||
Kramerhof wind farm | 1995 | 1.5 | 3 | Enercon E-40 / 5.40 (3 ×) | Kramerhof | VR | 54 ° 21 ′ 7 ″ N, 13 ° 2 ′ 13 ″ E | WP Kramerhof | ||
Kröpelin wind farm | 2001 2009 |
8.4 | 9 |
Nordex N54 (6 ×) Enercon E-48 (3 ×) |
Boldenshagen | LRO | 54 ° 4 ′ 11 "N, 11 ° 46 ′ 4" E | DK WP Kröpelin, plan 8 | ||
Kublank-Groß Miltzow wind farm | 2012 2013 2014 2015 2016 |
53.65 | 18th |
Enercon E-82 E2 (15 ×) Enercon E-101 (3 ×) |
Kublank Golm |
MSE | 53 ° 33 ′ 5 ″ N, 13 ° 32 ′ 25 ″ E | wpd , natural wind | erected on both sides of the A 20 | |
Kuhlrade wind farm | 1994 2001 2003 2007 2017 |
27.625 | 15th |
Vestas V27-225kW (1 ×) Micon M1800-600 (1 ×) Vestas V80-2MW (10 ×) NEG Micon 64/1500 (1 ×) Enercon E-70 (1 ×) Vestas V117-3.3MW (1 ×) |
Kuhlrade Bookhorst Freudenberg |
VR | 54 ° 12 ′ 30 "N, 12 ° 29 ′ 23" E | Notus energy, WIND-projekt, ATM Hartmann, eno energy, MDP & Wiemken | Previously two Vestas V27-225kW turbines , one has now been dismantled | |
Kuhs-Sarmstorf wind farm | 1998 2004 2013 2014 |
27.55 | 14th | Tacke TW 600 (5 ×) Vestas V90-2MW (3 ×) Enercon E-101 (5 ×) Vestas V112-3.3MW (1 ×) |
Kuh Sarmstorf Siemitz |
LRO | 53 ° 52 ′ 2 "N, 12 ° 12 ′ 21" E | MBBF, WEB Windenergie , wpd | ||
Küstrow wind farm | 1993 1995 |
2.25 | 5 | AN Bonus 450/37 (5 ×) | Küstrow | VR | 54 ° 21 ′ 12 "N, 12 ° 45 ′ 32" E | Wind power Nisdorf | Formerly 1 × Nordtank NTK 300/31 , 4 × Micon M530-250 , 1 × Micon M750-400 and 4 × Enercon-33 , these systems were all dismantled in 2015 | |
Levenhagen wind farm | 2000 2001 |
2.82 | 5 |
Enercon E-40 / 5.40 (3 ×) Vestas V47-660kW (2 ×) |
Boltenhagen | VG | 54 ° 4 ′ 31 ″ N, 13 ° 18 ′ 2 ″ E | |||
Lübesse-Sülte-Uelitz wind farm | 1999 2005 2020 |
38.3 | 21st |
South wind S70 (2 ×) South wind S77 (13 ×) Nordex N90 / 2300 (4 ×) Nordex N131 / 3300 (2 ×) |
Sülte Lübesse Uelitz |
LUP | 53 ° 29 ′ 29 ″ N, 11 ° 26 ′ 14 ″ E | Energiequelle , EFI Wind, WP Lübesse-Uelitz, Naturwind | Dismantling of the 8 Enercon E-40 / 5.40 2015 | |
Lübow wind farm | 1996 | 2.0 | 4th | Enercon E-40 / 5.40 (4 ×) | Wietow | NWM | 53 ° 50 ′ 23 "N, 11 ° 31 ′ 26" E | Rübsamen Wind Energy, URS WP Lübow | ||
Lüssow wind farm | 1995 | 4.5 | 9 | Enercon E-40 / 5.40 (9 ×) | Lüssow | VR | 54 ° 17 ′ 11 ″ N, 13 ° 1 ′ 6 ″ E | WP Lüssow | ||
Lutheran wind farm | 2001 2002 2017 |
6.45 | 6th |
Enercon E-40 / 6.44 (5 ×) Vestas V126-3.45MW (1 ×) |
Lutheran | LUP | 53 ° 28 ′ 0 ″ N, 11 ° 59 ′ 25 ″ E | WP Gischow / Lutheran | 2017 repowering (1 × Vestas V126-3.45MW instead of 2 × NEG Micon NM52 / 900 ) | |
Mannhagen wind farm | 2001 2003 2013 2015 |
23.3 | 11 |
Vestas V80-2MW (2 ×) Vestas V90-2MW (8 ×) Vestas V112-3.3MW (1 ×) |
Mannhagen | VR | 54 ° 11 ′ 14 "N, 13 ° 10 ′ 0" E | WP Mannhagen, WP Miltzow | erected on both sides of the B 96 , repowering in 2013 and 2015 (6 × Vestas V90-2MW and 3 × Vestas V112-3.3MW instead of 7 × Vestas V80-2MW ) | |
Medow wind farm | 2006 | 12.0 | 6th | Vestas V90-2MW (6 ×) | Medow | VG | 53 ° 49 ′ 34 "N, 13 ° 32 ′ 31" E | WP Medow | ||
Milow wind farm | 2019 | 33.3 | 9 | eno energy 114/3500 (3 ×) eno energy 126/4000 (3 ×) Vestas V126-3.6MW (3 ×) |
Milow Steesow |
LUP | 53 ° 10 ′ 28 ″ N, 11 ° 33 ′ 5 ″ E | WP Medow | ||
Mistorf-Groß Schwiesow wind farm | 2001 2003 2004 2014 2016 |
40.25 | 18th | AN Bonus 2000/76 (11 ×) Enercon E-66 / 18.70 (1 ×) Enercon E-70 (2 ×) Enercon E-82 E2 (3 ×) Enercon E-101 (1 ×) Nordex N100 / 2500 (1 ×) |
Mistorf Groß Schwiesow |
LRO |
53 ° 51 ′ 32 ″ N, 12 ° 7 ′ 2 ″ E 53 ° 51 ′ 13 ″ N, 12 ° 5 ′ 10 ″ E |
wpd | Venue since 2015 of the rock festival "Rock am Wind" | |
Moltenow wind farm | 1995 | 2.0 | 4th | Vestas V39-500kW (4 ×) | Moltenow | LRO | 53 ° 53 ′ 33 "N, 11 ° 50 ′ 3" E | MBBF | ||
Müggenburg-Panschow wind farm | 2001 2009 2010 2011 2012 |
42.3 | 25th |
NEG Micon NM64c / 1500 (16 ×) Vestas V90-2MW (8 ×) Enercon E-70 (1 ×) |
Müggenburg Panschow Stretense |
VG | 53 ° 47 ′ 0 ″ N, 13 ° 37 ′ 16 ″ E | e3, WP Müggenburg / Panschow | ||
Nadrensee wind farm | 2005 2006 2015 |
32.3 | 16 |
Vestas V90-2MW (13 ×) Enercon E-82 (2 ×) Enercon E-82 (1 ×) |
Nadrensee | VG | 53 ° 19 ′ 19 ″ N, 14 ° 22 ′ 20 ″ E | Enertrag , Troiwerth WP Nadrensee | erected on the A 11 | |
Neetzow-Liepen wind farm | 2013 2014 |
42.7 | 14th | Enercon E-101 (14 ×) | Neetzow-Liepen | VG | 53 ° 52 ′ 26 ″ N, 13 ° 26 ′ 7 ″ E | Wallenborn project, Neetzow-Liepen planning company | ||
Neu Guthendorf wind farm | 2001 | 12.0 | 6th | Vestas V80-2MW (6 ×) | New Guthendorf | VR | 54 ° 9 ′ 28 "N, 12 ° 30 ′ 28" E | WIND project, WP Neu Guthendorf | ||
Neu Kosenow wind farm | 2011–2012 2013 |
60.0 | 30th | Vestas V90-2MW (30 ×) |
New Kosenow Ducherow |
VG | 53 ° 46 ′ 28 "N, 13 ° 45 ′ 23" E | Saxovent, Notus energy | ||
Nielitz wind farm | 2006 | 10.0 | 5 | Vestas V90-2MW (5 ×) | Nielitz | VG | 54 ° 1 ′ 22 ″ N, 13 ° 6 ′ 1 ″ E | MBBF | ||
Parchim-Ost wind farm | 2014 2015 2016 |
78.6 | 25th |
Vestas V112-3.0MW (13 ×) Vestas V112-3.3MW (10 ×) Vestas V126-3.3MW (2 ×) |
Parchim | LUP |
53 ° 26 '7 "N, 11 ° 53' 35" E 53 ° 25 '4 "N, 11 ° 53' 18" E |
UKA North | Two spatially separated parking areas | |
Passow wind farm | 2002 2006 |
6.0 | 4th |
NEG Micon NM64 / 1500 (2 ×) Fuhrländer FL MD77 (2 ×) |
Passow | NWM | 53 ° 42 ′ 29 ″ N, 11 ° 9 ′ 12 ″ E | plan-8, WP Passow | ||
Petersdorf wind farm | 2006 2007 2009 |
14.0 | 7th |
Vestas V90-2MW (4 ×) Enercon E-82 (3 ×) |
Petersdorf | MSE | 53 ° 28 ′ 23 "N, 13 ° 32 ′ 13" E | MBBF, Notus energy, Saxovent | ||
Plauerhagen wind farm | 1995 2000 2010 2016 |
58.4 | 20th |
eno energy 82 (8 ×) eno energy 114 (12 ×) |
Plauerhagen | LUP | 53 ° 30 ′ 0 ″ N, 12 ° 13 ′ 31 ″ E | MVV Energie , DEW21 | Earlier 3 × North wind NW 40 and 4x North Wind NW44 are (already reduced) by 2x eno 126 during the repowering be replaced | |
Poppendorf wind farm | 2006 2007 |
11.8 | 4th |
Siemens SWT-2.3-82 (2 ×) Siemens SWT-3.6-107 (2 ×) |
Poppendorf | LRO | 54 ° 7 ′ 33 ″ N, 12 ° 19 ′ 3 ″ E | E.ON Climate & Renewables | erected on the site of the Yara fertilizer plant in Poppendorf | |
Postlow wind farm | 1999 2002 2003 |
11.6 | 7th |
Enron Wind 1.5s (4 ×) Enercon E-66 / 18.70 (1 ×) Nordex N90 / 2300 (1 ×) GE Wind Energy 1.5sl (1 ×) |
Postlow | VG | 53 ° 50 '13 "N, 13 ° 33' 34" E | Yield | ||
Questin wind farm | 2010 2012 2014 |
9.1 | 4th | Kenersys K82 (1 ×) Kenersys K100 (1 ×) Kenersys K110 (1 ×) Kenersys K120 (1 ×) |
Questin | NWM | 53 ° 49 ′ 32 "N, 11 ° 8 ′ 17" E | Kenersys | Wind test field for testing the prototypes from the manufacturer Kenersys | |
Quitzerow wind farm | 2006 | 6.0 | 3 | Vestas V90-2MW (3 ×) | Quitzerow | MSE | 53 ° 54 ′ 20 "N, 13 ° 7 ′ 26" E | Calliston, Quitzerow community wind farm | ||
Radegast wind farm | 2003 2006 |
8.3 | 5 |
GE Wind Energy 1.5sl (4 ×) Enercon E-70 (1 ×) |
Radegast | LRO | 53 ° 57 '13 "N, 11 ° 51' 35" E | MBBF | erected on the A 20 | |
Rakow wind farm | 2000 2012 |
31.0 | 29 | DeWind D4 / 48 (21 ×) Enercon E-82 E2 (8 ×) |
Rakov | VR | 54 ° 3 '34 "N, 13 ° 3' 24" E | Plambeck New Energies | ||
Ramitzow wind farm | 1996 | 1.5 | 3 | Enercon E-40 / 5.40 (3 ×) | Ramitzow | VG | 53 ° 54 '26 "N, 13 ° 39' 23" E | |||
Reez wind farm | 1996 | 1.5 | 3 | Enercon E-40 / 5.40 (3 ×) | Reez | LRO | 53 ° 59 ′ 33 "N, 12 ° 10 ′ 14" E | WP Reez | ||
Richtenberg wind farm | 2000 | 1.5 | 3 | Enercon E-40 / 5.40 (3 ×) | Richtenberg | VR | 54 ° 12 ′ 21 ″ N, 12 ° 52 ′ 25 ″ E | |||
Rollwitz wind farm | 1999 2010 2012 |
19.9 | 10 |
Nordex N60 / 1300 (10 ×) Enercon E-82 E2 (3 ×) |
Schmarsow | VG | 53 ° 27 ′ 5 ″ N, 13 ° 57 ′ 17 ″ E | MBBF, WPD | erected on the A 20 | |
Rukieten wind farm | 2003 2013 |
28.45 | 11 |
Enercon E-58 (1 ×) Enercon E-101 (10 ×) |
Rukieten | LRO | 53 ° 54 ′ 2 ″ N, 12 ° 8 ′ 7 ″ E | wpd , EBETHO | ||
Rüting wind farm | 2003 2012 |
7.85 | 5 |
Vestas V52-850kW (2 ×) eno energy 82 (3 ×) |
Rüting | NWM | 53 ° 47 ′ 26 "N, 11 ° 14 ′ 13" E | GL Industrial Services, Plan 8 | ||
Samtens wind farm | 1999 | 2.4 | 4th | AN Bonus 600/44 (4 ×) | Frankenthal | VR | 54 ° 20 ′ 9 ″ N, 13 ° 17 ′ 3 ″ E | |||
Sarow wind farm | 2012 2014 |
24.0 | 12 | Gamesa G90 (12 ×) | Ganschendorf | MSE | 53 ° 49 ′ 9 ″ N, 13 ° 6 ′ 31 ″ E | KGAL | ||
Satow wind farm | 1995 2013 |
6.4 | 5 |
Enercon E-40 / 5.40 (2 ×) Enercon E-53 (1 ×) Enercon E-70 (2 ×) |
Satow | LRO | 53 ° 58 ′ 7 "N, 11 ° 52 ′ 33" E | Energy 21 | ||
Schmedshagen wind farm | 1994 1995 |
1.7 | 3 |
Vestas V39-500kW (1 ×) Vestas V44-600kW (2 ×) |
Schmedshagen | VR | 54 ° 21 ′ 11 ″ N, 13 ° 0 ′ 8 ″ E | |||
Schönberg wind farm | 1998 1999 2004 2010–2016 2019 |
30.3 | 15th |
Vestas V44-600kW (1 ×) NEG Micon NM60 / 1000 (2 ×) Vestas V80-2MW (1 ×) Enercon E-82 E2 (3 ×) Enercon E-92 (8 ×) |
Schoenberg Sabow |
NWM | 53 ° 50 ′ 18 "N, 10 ° 57 ′ 28" E | Calliston, WKN WP Schönberg, BayWa | 2019 repowering (8 × Enercon E-92 instead of 7 × Vestas V44-600kW ) | |
Blackbe wind farm | 1992 | 1.12 | 4th | Enercon E-32 (4 ×) | Black | VR | 54 ° 39 ′ 28 "N, 13 ° 20 ′ 7" E | Wittower wind farm | previously a total of 7 Enercon-32 plants , now 3 plants have been dismantled | |
Selmsdorf-Sülsdorf wind farm | 2007 2013 |
29.9 | 13 |
Enercon E-70 (8 ×) Enercon E-82 E2 (5 ×) |
Selmsdorf Sülsdorf |
NWM | 53 ° 52 ′ 20 "N, 10 ° 53 ′ 17" E | BayWa re, KKB, AREF WP Selmsdorf-Sülsdorf | ||
Semlow wind farm | 2000 2001 |
4.3 | 3 |
Enercon E-40 / 5.40 (2 ×) AN Bonus 1300/62 (1 ×) |
Semlow | VR | 54 ° 10 ′ 7 ″ N, 12 ° 39 ′ 35 ″ E | MBBF | ||
Siedenbrünzow wind farm | 1998 2002 |
16.8 | 10 |
Enercon E-66 / 15.66 (9 ×) Enercon E-66 / 18.70 (1 ×) |
Kletzin | MSE | 53 ° 54 ′ 11 "N, 13 ° 8 ′ 33" E | Siedenbrünzower wind power | ||
Siggelkow-Redlin wind farm | 2017 2020 |
37.7 | 13 |
Enercon E-101 (10 ×) Vestas V136-3.6MW (2 ×) |
Redlin | LUP | 53 ° 20 '26 "N, 12 ° 1' 12" E | Natural wind | ||
Stäbelow wind farm | 2013 2014 2019 |
18.0 | 7th | eno energy 92-2.2MW (5 ×) eno energy 126-3.5MW (2 ×) |
Stäbelow Hastorf |
LRO | 54 ° 3 ′ 4 ″ N, 12 ° 0 ′ 11 ″ E } | eno energy | ||
Stavenhagen wind farm | 1996 2001 |
10.2 | 11 | Tacke TW 600 (7 ×) Enron Wind 1.5s (4 ×) |
Basepohl | MSE | 53 ° 43 ′ 1 ″ N, 12 ° 54 ′ 9 ″ E | MBBF | ||
Stofferstorf wind farm | 2002 2009 2011 2012 2013 2014 2015 |
33.9 | 18th |
Enercon E-66 / 18.70 (8 ×) Enercon E-70 (1 ×) Vensys 70 (1 ×) Vensys 77 (3 ×) Enercon E-70 E4 (5 ×) |
Stofferstorf Barnekow |
NWM | 53 ° 52 ′ 33 "N, 11 ° 22 ′ 10" E | |||
Stuthof wind farm | 1995 | 2.5 | 5 | Enercon E-40 / 5.40 (5 ×) | Stuthof | HRO | 54 ° 9 ′ 34 "N, 12 ° 9 ′ 15" E | WP Stuthof | ||
Suckow wind farm | 2012-2013 | 32.5 | 13 | Nordex N100 / 2500 (13 ×) | Suckow | LUP | 53 ° 19 ′ 29 ″ N, 11 ° 59 ′ 16 ″ E | SüdWestStrom, heliotec | ||
Tribsees wind farm | 2001 2015 2017 |
30.9 | 9 |
Enercon E-101 (6 ×) Enercon E-126 EP4 (3 ×) |
Tribsees | VR | 54 ° 4 ′ 20 "N, 12 ° 46 ′ 28" E | SGW Sindram, Wallenborn, CIwind, WP Tribsees | Repowering 2015 (previously 10 × Vestas V47-660kW ) | |
Trinwillershagen wind farm | 2003 2016 |
32.6 | 20th |
GE Wind Energy 1.5sl (17 ×) Enercon E-82 E2 (1 ×) Nordex N117 / 2400 (2 ×) |
Wiepkenhagen Langenhanshagen |
VR | 54 ° 16 ′ 14 "N, 12 ° 37 ′ 32" E | WP Trinwillershagen | ||
Upahl wind farm | 1993 2001 2010 2013 |
6.1 | 3 |
REpower MD70 (1 ×) Enercon E-82 E2 (2 ×) |
Upahl | NWM | 53 ° 49 ′ 23 "N, 11 ° 12 ′ 4" E | WP Groß Pravtshagen | erected on the A 20 , repowering 2013 (1 × Enercon E-82 E2 instead of 1 × Micon M1500-500) | |
Vietlipp wind farm | 2014 | 6.9 | 3 | Enercon E-82 E2 (3 ×) | Vietlipp | VR | 54 ° 4 ′ 21 ″ N, 13 ° 2 ′ 32 ″ E | Trebelwind | ||
Völschow wind farm | 1998 1999 2008 2013 2014 2015 |
57.15 | 21st |
Vestas V90-2MW (7 ×) Vestas V112-3.0MW (6 ×) Vestas V112-3.3MW (3 ×) Enercon E-101 (5 ×) |
Völschow | VG | 53 ° 53 ′ 15 ″ N, 13 ° 20 ′ 8 ″ E | MBBF, GGEW , WP Völschow | built on both sides of the A 20 , repowering in 2014 (4 × Vestas V90-2MW and 1 × Vestas V112-3.0MW instead of 6 × Nordex N43 and 1 × Nordex N50 ) and 2017 (3 × Vestas V112-3.3MW instead of 4 × Nordex N54 ) | |
Vorbein wind farm | 1999 2013 |
6.62 | 8th |
Vestas V47-660kW (7 ×) Vestas V90-2MW (1 ×) |
Front leg | VG | 54 ° 0 ′ 22 ″ N, 13 ° 7 ′ 24 ″ E | WPV WP front leg | ||
Wendisch Baggendorf wind farm | 1998 2006 |
12.7 | 7th |
Vestas V44-0.6MW (2 ×) Nordex N90 / 2300 (5 ×) |
Leyerhof | VR | 54 ° 5 ′ 20 "N, 12 ° 58 ′ 19" E | Ventisolar | ||
RH 2 project Werder / Kessin / Altentreptow | 2001 2003 2004 2010 2011 2012 2013 2014 2015 2016 |
204.25 | 57 |
Vestas V80-2MW (13 ×) Enercon E-53 (1 ×) Enercon E-82 E2 (17 ×) Enercon E-126 (14 ×) Enercon E-92 (7 ×) Enercon E-101 (4 ×) Vestas V112-3.3MW (1 ×) |
Kessin Grapzow Altentreptow Grischow Werder |
MSE | 53 ° 42 ′ 34 "N, 13 ° 19 ′ 14" E | wpd , Zopf, WIND project, Komesker Energie | built demonstration and test facility on both sides of the A 20 to test a hybrid power plant with integrated hydrogen storage , repowering 2014 (4 × Enercon E-92 instead of 3 × Enercon E-40 / 6.44 ) |
|
Werder-Ruthen wind farm | 1998 2000 2001 2002 2003 |
39.5 | 52 |
Enercon E-40 / 5.40 (13 ×) Tacke TW 600a (7 ×) NEG Micon NM52 / 900 (32 ×) |
Werder Ruthen |
LUP | 53 ° 29 ′ 19 ″ N, 12 ° 0 ′ 20 ″ E | UKA | ||
Wilmshagen wind farm | 2001 2004 2008 2013 2017 |
31.1 | 13 |
Vestas V80-2MW (6 ×) GE Wind Energy 1.5s (1 ×) Vestas V90-2MW (1 ×) Vestas V112-3.0MW (3 ×) Vestas V112-3.3MW (2 ×) |
Mannhagen | VR | 54 ° 9 ′ 35 "N, 13 ° 11 ′ 18" E | MBBF | Repowering 2013 (3 × Vestas V90-2MW instead of 1 × Vestas V80-2MW ) and 2017 (2 × Vestas V112-3.3MW instead of 2 × Vestas V80-2MW ) | |
Wittenhagen wind farm | 2018 | 16.0 | 5 | Siemens SWT-3.2-113 (5 ×) | Wittenhagen | VR | 54 ° 9 ′ 9 ″ N, 13 ° 2 ′ 16 ″ E | WIND project | ||
Wolgast wind farm | 1997 | 10.5 | 19th |
Enercon E-40 / 5.40 (18 ×) Enercon E-66 / 15.66 (1 ×) |
Wolgast | VG | 54 ° 4 ′ 1 ″ N, 13 ° 44 ′ 23 ″ E | Pommer & Schwarz, EBV WP Wolgast | ||
Wusterhusen-Brünzow wind farm | 1994 2001 |
31.5 | 25th |
Nordtank NTK 500/37 (3 ×) NEG Micon NM48 / 750 (4 ×) NEG Micon NM64c / 1500 (18 ×) |
Wusterhusen Gustebin Brünzow |
VG | 54 ° 6 ′ 7 ″ N, 13 ° 36 ′ 23 ″ E | SH WP Wusterhusen, WP Brünzow | ||
Züsedom wind farm | 2007 2012 |
22.4 | 10 |
Enercon E-70 (2 ×) Enercon E-82 E2 (8 ×) |
Züsedom | VG | 53 ° 26 '5 "N, 14 ° 2' 3" E | wpd , WP Züsedom |
Individual evidence
- ↑ Nordex SE dated February 2, 2006: First offshore turbine erected in Germany. Retrieved June 28, 2015 .
- ↑ Nordkurier of December 24, 1998: The wind turbine does not turn over Amalienhof until January '99. Retrieved December 16, 2015 .
- ^ Stadtwerke Malchow ( Memento from April 26, 2015 in the Internet Archive )
- ↑ Schweriner Volkszeitung from January 4, 2011: Wind turbine heats up Ventschow's emotions. Retrieved December 27, 2015 .
- ↑ a b wind farms | Notus energy. Retrieved November 23, 2018 .
- ↑ Schweriner People's Newspaper of September 12, 2014: The Wind Power Pioneers. Retrieved June 28, 2015 .
- ↑ MBBF: Altentreptow. Retrieved December 7, 2015 .
- ↑ Gadebusch-Rehnaer Zeitung of May 18, 2015: Krembz remains close to the wind. Retrieved December 27, 2015 .
- ↑ UKA: Barkow wind energy park officially opened. Retrieved December 6, 2015 .
- ↑ Natural wind : Beggerow-Borrentin wind farm. Retrieved December 7, 2015 .
- ↑ MBBF: Bergholz. Retrieved December 23, 2015 .
- ↑ Ventotec: Bergholz wind farm. (No longer available online.) Archived from the original on December 23, 2015 ; accessed on December 23, 2015 .
- ↑ Bützower Zeitung of July 31, 2014: New wind farm at Bernitt is growing. Retrieved December 14, 2015 .
- ↑ Natural wind : Breesen wind farm. Retrieved December 7, 2015 .
- ↑ MBBF: Broderstorf. Retrieved December 14, 2015 .
- ↑ MBBF: Broderstorf II. Accessed December 14, 2015 .
- ↑ MBBF: Broderstorf III. Retrieved December 14, 2015 .
- ↑ Ostsee-Zeitung of November 21, 2013: Brusow: Start of construction for the “whisper wheels”. (No longer available online.) Archived from the original on December 22, 2015 ; accessed on December 14, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ win: pro energy group: Bützow wind farm. Retrieved December 14, 2015 .
- ↑ FC Hansa Rostock from April 27, 2010: WIND project with the highest Hansa landmark in the world. Retrieved December 14, 2015 .
- ↑ Natural wind : Daegelütz wind farm. Retrieved December 6, 2015 .
- ↑ Thüga renewable energies: The facts about the Fahrenwalde wind farm. (No longer available online.) Archived from the original on December 23, 2015 ; accessed on December 23, 2015 .
- ↑ MBBF: Friedland III. Retrieved December 7, 2015 .
- ^ Jade Group: Friedland III wind farm. Retrieved December 7, 2015 .
- ↑ Notus dated October 19, 2014: Nordex prototype for Glasewitz completed. Retrieved July 7, 2015 .
- ^ RWE Innogy: Grebbin. Retrieved December 6, 2015 .
- ↑ MBBF: Gremersdorf. Retrieved December 22, 2015 .
- ↑ Archived copy ( Memento from March 4, 2016 in the Internet Archive )
- ↑ IWR of June 26, 2014: eno energy delivers ten wind turbines to Mecklenburg. Retrieved July 1, 2015 .
- ↑ Harmshagen wind farm is online! ( Memento from March 7, 2016 in the Internet Archive )
- ↑ Construction and operation of 6 wind turbines in the Helmshagen / Hinrichshagen wind farm ( Memento from March 4, 2016 in the Internet Archive )
- ↑ CleanThinking: Nordex is installing the first Nordex N117 in Hohen Luckow. Retrieved December 14, 2015 .
- ^ Gut Hohen Luckow: wind farm. (No longer available online.) Archived from the original on January 6, 2016 ; accessed on December 14, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Dirkshof renewable energies: Hohen Pritz wind farm. Retrieved December 6, 2015 .
- ↑ NORDUM Academy: Hohen Schwarfs wind farm. Retrieved December 16, 2015 .
- ↑ Ventotec: WP Iven. (No longer available online.) Archived from the original on December 23, 2015 ; accessed on December 23, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Denker & Wulf AG of May 27, 2015: Construction of the concrete towers in the WP Kambs. (No longer available online.) Archived from the original on December 22, 2015 ; accessed on December 14, 2015 .
- ^ Renertec: Wind farm Karlsburg-Lühmannsdorf Mecklenburg-Western Pomerania. Retrieved December 2, 2015 .
- ↑ Bützower Zeitung from September 19, 2014: Oettelin wind farm is now up and running. Retrieved December 14, 2015 .
- ↑ Sun, wind & heat: eno energy erects the eno 92-2.2 prototype in Kirch Mulsow Rostock. Retrieved December 14, 2015 .
- ↑ Ventotec: WP Kladrum. (No longer available online.) Archived from the original on December 20, 2015 ; Retrieved December 6, 2015 .
- ↑ Natural wind : Kladrum wind farm. Retrieved December 6, 2015 .
- ↑ Natural wind : Kublank-Groß Miltzow wind farm. Retrieved December 7, 2015 .
- ↑ MBBF: cow . Retrieved December 14, 2015 .
- ↑ MBBF: Kuhs II. Accessed December 14, 2015 .
- ↑ [1]
- ↑ Source of energy: Sülte. (No longer available online.) Archived from the original on December 20, 2015 ; Retrieved December 6, 2015 .
- ↑ Archived copy ( Memento from December 27, 2015 in the Internet Archive )
- ↑ Archived copy ( Memento from March 5, 2016 in the Internet Archive )
- ↑ MBBF: Moltenow (Klein Sien). Retrieved December 16, 2015 .
- ^ Enertrag: Nadrensee wind field. Retrieved December 23, 2015 .
- ↑ Archived copy ( Memento from March 4, 2016 in the Internet Archive )
- ↑ Notus: Commissioning of 14 wind turbines in the Neu Kosenow wind farm. Retrieved December 23, 2015 .
- ↑ MBBF: Nielitz. Retrieved December 23, 2015 .
- ↑ Parchimer Zeitung of March 17, 2015: Parchim-Ost wind farm is to grow. Retrieved December 6, 2015 .
- ↑ MBBF: Petersdorf. Retrieved December 7, 2015 .
- ↑ Windkraft-Journal from September 17, 2015: With the new wind farm DEW21 cracks the 100 MW mark in terms of wind generation. Retrieved December 6, 2015 .
- ↑ Simone Herbst: Even more electricity: Facelift in the Plauerhagen wind farm | svz.de . In: svz . ( svz.de [accessed on May 18, 2018]).
- ↑ Enertrag: Postlow wind farm. Retrieved December 23, 2015 .
- ↑ MBBF: Radegast. Retrieved December 14, 2015 .
- ↑ MBBF: Rollwitz. Retrieved December 23, 2015 .
- ↑ [2]
- ↑
- ↑ IWR of March 21, 2014: Baywa re sells wind farm to Swiss utility. Retrieved December 27, 2015 .
- ↑ MBBF: Semlow. Retrieved December 22, 2015 .
- ↑ DGAP media meeting on November 25, 2013: eno energy is building wind farms in Mecklenburg-Western Pomerania and Saxony-Anhalt. Retrieved December 14, 2015 .
- ↑ MBBF: Stavenhagen. Retrieved December 7, 2015 .
- ↑ SüdWestStrom implements onshore project in Mecklenburg-Western Pomerania. (No longer available online.) Südwestdeutsche Stromhandels GmbH, archived from the original on December 20, 2015 ; Retrieved December 6, 2015 .
- ↑ Archived copy ( Memento from March 4, 2016 in the Internet Archive )
- ↑ Archived copy ( Memento from March 4, 2016 in the Internet Archive )
- ↑ MBBF: Völschow wind farm put into operation. Retrieved December 23, 2015 .
- ↑ [3]
- ↑ MBBF: Wilmshagen. Retrieved December 22, 2015 .