List of stations on the Métro Paris
The list of stations of the Métro Paris is a complete overview of the existing and various closed or under construction stations of the Paris Métro . The Métro, which opened in 1900, is one of the oldest and largest networks in the world. It opens up the 20 arrondissements of Paris as well as various cities and communities in the surrounding departments of the Île-de-France .
The Métro network comprises a total of 303 train stations or 383 individual stops. The different values result from the counting of the transfer points. There are also twelve closed and 48 individual breakpoints that are currently under construction and are to be opened in the coming years.
The stations are distributed over the currently 16 lines of the Métro as follows:
Legend
The following list gives an alphabetical overview of the Métro train stations. In addition, further information on these, references to nearby sights and pictures of the platforms are shown. For a better overview, the individual platform levels are listed separately from one another. The stations are initially sorted in alphabetical order, if they have the same name in chronological order.
- Station : Name of the station
- Line : Metro line that serves the station
- Code : the station's cancellation code ( code d'oblitération ). The first two digits of the usually four-digit code (01 to 31) indicate the sector, the following two (01 to 15) the location of the station within the sector. The stations have a common code regardless of the platform levels. The codes are displayed on the Métro tickets and thus serve as an indication of where they were validated.
- Opening : Opening of the station or the platform level
- Location : location of the platform level (tunnel, viaduct, dam, incision, plan)
- Arrondissement / municipality : Arrondissement or municipality in which the train station is located. The arrondissements are given in abbreviated form using Arabic numbers from 1–20, the names of the surrounding communities are written out.
- : Transfer point to the Réseau express régional (RER)
- : Transfer point to the Transilien
- : Transfer point to the Paris tram
- Notes : further information such as former station names
- Surroundings : Sights or institutions in the vicinity
- Image : Image of the station
Closed underground stations or former preliminary construction work are highlighted in red, underground stations under construction are highlighted in green.
Stations
railway station |
line |
code |
opening |
location |
Arrondissement / municipality |
|
|
|
Remarks | Surroundings | image |
---|---|---|---|---|---|---|---|---|---|---|---|
Abbesses | 31-05 | Oct. 31, 1912 | tunnel | 18th | Change to the Funiculaire de Montmartre | Montmartre , Basilique du Sacré-Cœur , Place du Tertre | |||||
Aéroport d'Orly | 2024 | tunnel | Paray-Vieille-Poste | × | under construction | ||||||
Aimé Césaire | 2021 | tunnel | Aubervilliers | under construction | |||||||
Alésia | 15-05 | Oct. 30, 1909 | tunnel | 14th | Petit-Montrouge | ||||||
Alexandre Dumas | 05-13 | Jan. 31, 1903 | tunnel | 11 , 20 | |||||||
Alma - Marceau | 18-03 | May 27, 1923 | tunnel | 16 | Sidings | Crazy Horse , Palais de Tokyo , Musee du quai Branly | |||||
Anatole France | 29-14 | Sep 24 1937 | tunnel | Levallois-Perret | |||||||
Anvers | 31-04 | Oct 7, 1902 | tunnel | 9 , 18 | Change to the Funiculaire de Montmartre | Montmartre , Basilique du Sacré-Cœur | |||||
Arcueil - Cachan | 2025 | tunnel | Cachan | × | under construction | ||||||
Argentine | 18-11 | Sep 1 1900 | tunnel | 16 , 17 | |||||||
arsenal | Dec 17, 1906 | tunnel | 4th | closed on September 2, 1939 | |||||||
Arts et Métiers | 08-03 | Oct 19, 1904 | tunnel | 3 | Connecting track to line 11; Sidings | Conservatoire national des arts et métiers | |||||
Arts et Métiers | 08-03 | Apr 28, 1935 | tunnel | 3 | Connecting track to line 3 | Conservatoire national des arts et métiers | |||||
Asnières - Gennevilliers - Les Courtilles | 19-04 | Jun 14, 2008 | tunnel |
Asnières-sur-Seine , Gennevilliers |
Line 13 terminus; Sweeping system | ||||||
National Assembly | 10-13 | Nov 5, 1910 | tunnel | 7th | National Assembly | ||||||
Aubervilliers - Pantin - Quatre Chemins | 03-05 | Oct. 4, 1979 | tunnel | Aubervilliers | |||||||
Aulnay | 2025 | tunnel | Aulnay-sous-Bois | under construction | |||||||
Avenue Emile Zola | 17-06 | Jul 13, 1913 | tunnel | 15th | until 1937 operated by line 8 | ||||||
Avron | 05-12 | Apr 2, 1903 | tunnel | 11 , 20 | |||||||
Bagneux - Lucie Aubrac | 2021 | tunnel | Bagneux | × | under construction; Sidings | ||||||
Bagneux - Lucie Aubrac | 2025 | tunnel | Bagneux | × | under construction | ||||||
Balard | 16-09 | Jul 27, 1937 | tunnel | 15th | × | Line 8 terminus; Sidings | Parc André-Citroën | ||||
Barbara | 2021 | tunnel |
Bagneux , Montrouge |
under construction | |||||||
Barbès - Rochechouart | 21-07 | March 26, 1903 | viaduct | 9 , 10 , 18 | |||||||
Barbès - Rochechouart | 21-07 | Apr 21, 1908 | tunnel | 9 , 10 , 18 | |||||||
Basilique de Saint-Denis | 19-15 | Jun 20, 1976 | tunnel | Saint-Denis | × | 1976–1998: Saint-Denis - Basilique | Basilique Saint-Denis | ||||
Bastille | 12-12 | Jul 19, 1900 | incision | 4 , 11 , 12 | Opéra Bastille , Place de la Bastille , July Column , Promenade Plantée | ||||||
Bastille | 12-12 | Dec 17, 1906 | tunnel | 4 , 11 , 12 | Opéra Bastille , Place de la Bastille , July Column , Promenade Plantée | ||||||
Bastille | 12-12 | May 5, 1931 | tunnel | 4 , 11 , 12 | Opéra Bastille , Place de la Bastille , July Column , Promenade Plantée | ||||||
Bel-Air | 13-12 | March 1, 1909 | plan | 12 | closed from September 2, 1939 to January 7, 1963 | ||||||
Belleville | 24-12 | Jan. 31, 1903 | tunnel | 10 , 11 , 19 , 20 | Sidings | ||||||
Belleville | 24-12 | Apr 28, 1935 | tunnel | 10 , 11 , 19 , 20 | |||||||
Berault | 25-10 | March 24, 1934 | tunnel | Saint-Mandé , Vincennes | Institut geographique national | ||||||
Bercy | 13-07 | March 1, 1909 | tunnel | 12 | × | Siding; Connecting track to line 14 | Parc de Bercy , Palais Omnisports de Paris-Bercy | ||||
Bercy | 13-07 | Oct 15, 1998 | tunnel | 12 | × | Connecting track to line 6 | Parc de Bercy , Palais Omnisports de Paris-Bercy | ||||
Bibliothèque François Mitterrand | 15-03 | Oct 15, 1998 | tunnel | 13 | × | Bibliothèque nationale de France , University of Paris VII , Les Frigos | |||||
Billancourt | 28-09 | Feb 3, 1934 | tunnel | Boulogne-Billancourt | |||||||
Bir-Hakeim | 10-04 | Apr 24, 1906 | viaduct | 15th | × | Change from RER to Champ de Mars - Tour Eiffel ; until 1942 operated by line 5 | Eiffel Tower , Champ de Mars | ||||
Blanche | 31-07 | Oct 21, 1902 | tunnel | 9 , 18 | Sidings | Moulin Rouge | |||||
Bobigny - Pablo Picasso | 03-12 | Apr 25, 1985 | tunnel | Bobigny | × | Line 5 terminus; Siding; Connection to Ateliers de Bobigny | |||||
Bobigny - Pantin - Raymond Queneau | 03-11 | Apr 25, 1985 | tunnel | Bobigny , Pantin | |||||||
Boissière | 17-14 | Oct. 2, 1900 | tunnel | 16 | until 1942 operated by line 5 | ||||||
Bolivar | 22-14 | Jul 18, 1911 | tunnel | 19th | |||||||
Bonne Nouvelle | 11-08 | May 5, 1931 | tunnel | 2 , 9 , 10 | Double-decker station with line 9 | CNSAD | |||||
Bonne Nouvelle | 11-08 | Dec 10, 1933 | tunnel | 2 , 9 , 10 | Double-decker station with line 8 | CNSAD | |||||
Botzaris | 23-09 | Jan. 18, 1911 | tunnel | 19th | Parc des Buttes-Chaumont | ||||||
Boulogne - Jean Jaurès | 29-04 | Oct 3, 1980 | tunnel | Boulogne-Billancourt | |||||||
Boulogne - Pont de Saint-Cloud | 29-05 | Oct 2, 1981 | tunnel | Boulogne-Billancourt | End of line 10 | ||||||
Boucicaut | 16-11 | Jul 27, 1937 | tunnel | 15th | |||||||
Bourse | 11-04 | Oct 19, 1904 | tunnel | 2 | Bibliothèque nationale de France , Palais Brongniart , Agence France-Presse | ||||||
Bréguet - Sabin | 12-14 | Dec 31, 1906 | tunnel | 11 | |||||||
Brochant | 30-08 | Jan. 20, 1912 | tunnel | 17th | |||||||
Bry-Villiers-Champigny | 2025 | tunnel | Bry-sur-Marne , Villiers-sur-Marne , Champigny-sur-Marne | × | under construction | ||||||
Buttes Chaumont | 23-13 | Feb 13, 1912 | tunnel | 19th | Parc des Buttes-Chaumont | ||||||
Buzenval | 05-05 | Dec 10, 1933 | tunnel | 20th | |||||||
Cadet | 21-03 | Nov 5, 1910 | tunnel | 9 | |||||||
Cambronne | 02-02 | Apr 24, 1906 | viaduct | 15th | until 1942 operated by line 5 | UNESCO headquarters | |||||
Campo Formio | 14-12 | Jun 2, 1906 | tunnel | 13 | |||||||
Cardinal Lemoine | 12-06 | April 26, 1931 | tunnel | 5 | |||||||
Carrefour Pleyel | 19-13 | Jun 30, 1952 | tunnel | Saint-Denis | Siding; Connection to Ateliers de Pleyel | ||||||
Censier - Daubenton | 12-04 | Feb 15, 1930 | tunnel | 5 | until 1931 served by line 10 | Muséum national d'histoire naturelle , Rue Mouffetard , University of Paris III | |||||
Champ de Mars | Jul 13, 1913 | tunnel | 7th | closed on September 2, 1939; Sidings | Champ de Mars | ||||||
Champigny Center | 2025 | tunnel | Champigny-sur-Marne | under construction | |||||||
Champs-Élysées - Clemenceau | 10-01 | Jul 19, 1900 | tunnel | 8th | Palais de l'Élysée , Théâtre Marigny , Grand Palais , Palais de la découverte | ||||||
Champs-Élysées - Clemenceau | 10-01 | Feb. 18, 1975 | tunnel | 8th | Palais de l'Élysée , Théâtre Marigny , Grand Palais , Palais de la découverte | ||||||
Chardon lagache | 07-11 | Sep 30 1913 | tunnel | 16 | service through line 8 until 1937; Directional platform to Gare d'Austerlitz | ||||||
Charenton - Écoles | 25-13 | Oct 5, 1942 | tunnel | Charenton-le-Pont | Bois de Vincennes | ||||||
Charles de Gaulle - Étoile | 18-12 | Sep 1 1900 | tunnel | 8 , 16 , 17 | × | former connecting track to line 2; Connecting track to line 6 | Arc de Triomphe | ||||
Charles de Gaulle - Étoile | 18-12 | Oct. 2, 1900 | tunnel | 8 , 16 , 17 | × | Line 6 terminus; service through line 5 until 1942; Turning loop; Connecting track to line 1 | Arc de Triomphe | ||||
Charles de Gaulle - Étoile | 18-12 | Dec 13, 1900 | tunnel | 8 , 16 , 17 | × | former connecting track to line 1 | Arc de Triomphe | ||||
Charles Michels | 16-13 | Jul 13, 1913 | tunnel | 15th | until 1937 operated by line 8 | ||||||
Charonne | 24-02 | Dec 10, 1933 | tunnel | 11 | The scene of the attack on February 8, 1962 | ||||||
Château d'Eau | 11-11 | Apr 21, 1908 | tunnel | 10 | |||||||
Château de Vincennes | 25-11 | March 24, 1934 | tunnel | 12 , Vincennes | Line 1 terminus; Connection to Ateliers de Fontenay | Vincennes Castle , Bois de Vincennes | |||||
Château-Landon | 21-11 | Nov 5, 1910 | tunnel | 19th | × | Change to Transilien at Gare de l'Est | |||||
Château Rouge | 21-04 | Apr 21, 1908 | tunnel | 18th | |||||||
Châtelet | 01-08 | Aug 6, 1900 | tunnel | 1 , 4 | × | RER change in Châtelet - Les Halles | |||||
Châtelet | 01-08 | Apr 21, 1908 | tunnel | 1 , 4 | × | RER change in Châtelet - Les Halles | |||||
Châtelet | 01-08 | April 16, 1926 | tunnel | 1 , 4 | × | RER change in Châtelet - Les Halles | |||||
Châtelet | 01-08 | Apr 28, 1935 | tunnel | 1 , 4 | × | Line 11 terminus; Siding; RER change in Châtelet - Les Halles | |||||
Châtelet | 01-08 | Oct 15, 1998 | tunnel | 1 , 4 | × | RER change in Châtelet - Les Halles | |||||
Châtillon - Montrouge | 27-09 | Nov 9, 1976 | tunnel |
Châtillon , Montrouge |
× | Siding; Connection to Ateliers de Châtillon | |||||
Châtillon - Montrouge | 2025 | tunnel |
Châtillon , Montrouge |
× | under construction | ||||||
Chaussée d'Antin - La Fayette | 21-01 | Nov 5, 1910 | tunnel | 9 | Connecting track to line 3 | Galeries Lafayette | |||||
Chaussée d'Antin - La Fayette | 21-01 | Jun 3, 1923 | tunnel | 9 | Galeries Lafayette | ||||||
Chelles | 2028 | tunnel | Chelles | × | × | under construction | |||||
Chemin Vert | 12-13 | May 5, 1931 | tunnel | 3 , 11 | Canal Saint-Martin , Place des Vosges | ||||||
Chevaleret | 09-02 | March 1, 1909 | viaduct | 13 | Hôpital Salpêtrière | ||||||
Chevilly - Trois Communes | 2024 | tunnel | L'Haÿ-les-Roses | under construction | |||||||
Cité | 01-14 | Jan. 9, 1910 | tunnel | 4th | Cathédrale Notre-Dame de Paris , Sainte-Chapelle , Hôtel-Dieu de Paris , Conciergerie | ||||||
Clichy - Montfermeil | 2025 | tunnel | Clichy-sous-Bois , Montfermeil | × | under construction | ||||||
Clichy - Saint-Ouen | 2021 | tunnel | Clichy , Saint-Ouen | × | under construction | ||||||
Cluny - La Sorbonne | 01-05 | Feb 15, 1930 | tunnel | 5 | × | RER change in Saint-Michel - Notre-Dame ; closed from September 2, 1939 to February 17, 1988 |
Latin Quarter , Collège de France , Musée national du Moyen Âge , Sorbonne , St-Séverin de Paris | ||||
Colonel Fabien | 22-15 | Jan. 31, 1903 | tunnel | 10 , 19 | 1903-1945: Combat | ||||||
Commerce | 17-05 | Jul 27, 1937 | tunnel | 15th | staggered side platforms | ||||||
Concorde | 10-02 | Aug 13, 1900 | tunnel | 1 , 8 | Connecting track to line 8 | Place de la Concorde with the Luxor Obelisk , Palais Bourbon , Jardin des Tuileries , Galerie nationale du Jeu de Paume , Musée de l'Orangerie | |||||
Concorde | 10-02 | Nov 5, 1910 | tunnel | 1 , 8 | Place de la Concorde with the Luxor Obelisk , Palais Bourbon , Jardin des Tuileries , Galerie nationale du Jeu de Paume , Musée de l'Orangerie | ||||||
Concorde | 10-02 | March 12, 1914 | tunnel | 1 , 8 | Connecting track to line 1 | Place de la Concorde with the Luxor Obelisk , Palais Bourbon , Jardin des Tuileries , Galerie nationale du Jeu de Paume , Musée de l'Orangerie | |||||
Convention | 16-05 | Nov 5, 1910 | tunnel | 15th | |||||||
Corentin Cariou | 22-04 | Nov 5, 1910 | tunnel | 19th | |||||||
Corentin Celton | 28-02 | March 24, 1934 | tunnel | Issy-les-Moulineaux | |||||||
Corvisart | 14-15 | Apr 24, 1906 | viaduct | 13 | until 1942 operated by line 5 | Butte aux Cailles | |||||
Coteaux Beauclair | 2023 | viaduct | Rosny-sous-Bois , Noisy-le-Sec | under construction | |||||||
Cour Saint-Emilion | 15-01 | Oct 15, 1998 | tunnel | 12 | Parc de Bercy | ||||||
Courcelles | 18-15 | Oct 7, 1902 | tunnel | 8 , 17 | |||||||
Couronnes | 24-13 | Jan. 31, 1903 | tunnel | 11 , 20 | |||||||
Créteil - l'Échat | 25-05 | Sep 24 1973 | incision | Créteil | |||||||
Créteil - l'Échat | 2025 | tunnel | Créteil | under construction | |||||||
Créteil - Préfecture | 25-07 | Sep 9 1974 | plan | Créteil | Line 8 terminus; Sidings | University of Paris XII | |||||
Créteil - Université | 25-06 | Sep 9 1974 | plan | Créteil | University of Paris XII | ||||||
Crimée | 22-06 | Nov 5, 1910 | tunnel | 19th | Canal de l'Ourcq | ||||||
Croix rouge | Dec 10, 1923 | tunnel | 6th | closed on September 2, 1939 | |||||||
Croix de Chavaux | 25-02 | Oct 14, 1937 | tunnel | Montreuil | |||||||
Danube | 23-10 | Jan. 18, 1911 | tunnel | 19th | Directional platform to Louis Blanc | ||||||
Thumbsnil | 13-11 | March 1, 1909 | tunnel | 12 | Connecting track to line 8 | Promenade plantée | |||||
Thumbsnil | 13-11 | May 5, 1931 | tunnel | 12 | Connecting track to line 6 | Promenade plantée | |||||
Denfert-Rochereau | 15-14 | Apr 24, 1906 | tunnel | 14th | × | until 1942 operated by line 5 | catacombs | ||||
Denfert-Rochereau | 15-14 | Oct. 30, 1909 | tunnel | 14th | × | catacombs | |||||
Dugommier | 13-08 | March 1, 1909 | tunnel | 12 | Promenade plantée | ||||||
Dupleix | 17-07 | Apr 24, 1906 | viaduct | 15th | until 1942 operated by line 5 | ||||||
Duroc | 02-07 | Dec 30, 1923 | tunnel | 6 , 7 , 15 | service by line 10 until 1937; Service as line 14 until 1976 | ||||||
Duroc | 02-07 | Jul 29, 1937 | tunnel | 6 , 7 , 15 | |||||||
École Militaire | 10-07 | Jul 13, 1913 | tunnel | 7th | École Militaire , Champ de Mars | ||||||
École vétérinaire de Maisons-Alfort | 25-14 | 19 Sep 1970 | tunnel | Maisons-Alfort | |||||||
Edgar Quinet | 04-06 | Apr 24, 1906 | tunnel | 14th | service through line 5 until 1942; Connecting track to line 4 | Cimetière Montparnasse | |||||
Église d'Auteuil | 07-08 | Sep 30 1913 | tunnel | 16 | service through line 8 until 1937; Directional platform to Boulogne - Pont de Saint-Cloud | Notre-Dame d'Auteuil | |||||
Église de Pantin | 03-10 | Oct 12, 1942 | tunnel | Pantin | Parking facility | Canal de l'Ourcq | |||||
Élysées La Défense | tunnel | Puteaux | former constructed provisions, later La Défense replaced | ||||||||
Esplanade de la Defense | 29-10 | Apr 1, 1992 | tunnel |
Courbevoie , Puteaux |
|||||||
Étienne Marcel | 11-15 | Apr 21, 1908 | tunnel | 1 , 2 | Sidings | ||||||
Europe | 06-12 | Oct 19, 1904 | tunnel | 8th | |||||||
Exelmans | 07-14 | Nov 8, 1922 | tunnel | 16 | Parc des Princes | ||||||
Faidherbe - Chaligny | 12-01 | May 5, 1931 | tunnel | 11 , 12 | |||||||
Falguière | 16-01 | Nov 5, 1910 | tunnel | 15th | |||||||
Félix Faure | 16-12 | Jul 27, 1937 | tunnel | 15th | |||||||
Filles du Calvaire | 08-12 | May 5, 1931 | tunnel | 3 , 11 | Cirque d'hiver | ||||||
Fort d'Aubervilliers | 03-06 | Oct. 4, 1979 | tunnel | Aubervilliers | |||||||
Fort d'Issy - Vanves - Clamart | 2025 | tunnel | Issy-les-Moulineaux , Vanves , Clamart , Malakoff | × | under construction | ||||||
Franklin D. Roosevelt | 18-07 | Jul 19, 1900 | tunnel | 8th | 1900–1942: Marbeuf 1942–1946: Marbeuf - Rond-Point des Champs-Élysées |
Avenue des Champs-Élysées , Petit Palais , Grand Palais | |||||
Franklin D. Roosevelt | 18-07 | May 27, 1923 | tunnel | 8th | 1923–1942: Rond-Point des Champs-Élysées 1942–1946: Marbeuf - Rond-Point des Champs-Élysées |
Avenue des Champs-Élysées , Petit Palais , Grand Palais | |||||
Front Populaire | Dec 18, 2012 | tunnel | Aubervilliers , Saint-Denis | ||||||||
Gabriel Péri | 19-02 | May 3, 1980 | tunnel |
Asnières-sur-Seine , Gennevilliers |
|||||||
Gaîté | 04-04 | Jan. 21, 1937 | tunnel | 14th | Service as line 14 until 1976 | ||||||
Gallieni | 23-05 | Apr 2, 1971 | tunnel | Bagnolet | Line 3 terminus; Sidings | ||||||
Gambetta | 24-10 | Jan 25, 1905 | tunnel | 20th | Line 3bis terminus; Connecting track to line 3; Sidings in the former turning loop | Cimetière Père Lachaise | |||||
Gambetta | 24-10 | March 27, 1971 | tunnel | 20th | Connecting track to line 3bis; Connection to Ateliers de Saint-Fargeau; Siding; After merging with the station in 1969 Martin Nadaud emerged | Cimetière Père Lachaise | |||||
Gare d'Austerlitz | 09-07 | Jun 2, 1906 | viaduct | 5 , 13 | × | The platform runs through the main hall of the Gare d'Austerlitz | Jardin des Plantes , Hôpital Salpêtrière | ||||
Gare d'Austerlitz | 09-07 | Jul 12, 1939 | tunnel | 5 , 13 | × | Line 10 terminus; Sidings | Jardin des Plantes , Hôpital Salpêtrière | ||||
Gare de l'Est | 21-09 | Nov 15, 1907 | tunnel | 10 | × | parallel to the station on line 7; Connecting track to line 7 | |||||
Gare de l'Est | 21-09 | Apr 21, 1908 | tunnel | 10 | × | ||||||
Gare de l'Est | 21-09 | Nov 5, 1910 | tunnel | 10 | × | parallel to the train station on line 5; Connecting track to line 5 | |||||
Gare de Lyon | 09-08 | Jul 19, 1900 | tunnel | 12 | × | × | Connecting track to line 5; 1906 briefly terminus of line 5 | ||||
Gare de Lyon | 09-08 | Oct 15, 1998 | tunnel | 12 | × | × | |||||
Gare du Nord | 21-08 | Apr 21, 1908 | tunnel | 10 | × | × | RER also switched to magenta ; Change line 2 in La Chapelle ; Connecting track to lines 2 and 5 | St-Vincent-de-Paul de Paris | |||
Gare du Nord | 21-08 | Oct 5, 1942 | tunnel | 10 | × | × | RER also switched to magenta ; Change line 2 in La Chapelle ; Connecting track to lines 2 and 4 | St-Vincent-de-Paul de Paris | |||
Gare du Nord USFRT | Nov 15, 1907 | tunnel | 10 | former terminus of line 5; closed on October 5, 1942; today connecting track between lines 4 and 5 | |||||||
Garibaldi | 19-10 | Jun 30, 1952 | tunnel | Saint-Ouen | |||||||
George V | 18-08 | Aug 13, 1900 | tunnel | 8th | |||||||
Glacière | 15-08 | Apr 24, 1906 | viaduct | 13 | until 1942 operated by line 5 | ||||||
Goncourt | 08-05 | Apr 28, 1935 | tunnel | 10 , 11 | |||||||
Grands Boulevards | 11-06 | May 5, 1931 | tunnel | 2 , 9 | Double-decker station with line 9 | Grévin Museum | |||||
Grands Boulevards | 11-06 | Dec 10, 1933 | tunnel | 2 , 9 | Double-decker station with line 8 | Grévin Museum | |||||
Guy Moquet | 30-12 | Feb 26, 1911 | tunnel | 17 , 18 | 1911–1912: Carrefour Marcadet 1912–1946: Marcadet - Balagny |
||||||
Havre - Caumartin | 06-07 | Oct 19, 1904 | tunnel | 9 | × | Change RER in Haussmann - Saint-Lazare and Auber | Boulevard Haussmann with Printemps and Galeries Lafayette | ||||
Havre - Caumartin | 06-07 | Jun 3, 1923 | tunnel | 9 | × | Change RER in Haussmann - Saint-Lazare and Auber | Boulevard Haussmann with Printemps and Galeries Lafayette | ||||
Haxo | tunnel | 19th | Created in 1921 on the Voie de fêtes; never opened, possibly after the merging of lines 3bis and 7bis to line 19 | ||||||||
Hoche | 03-09 | Oct 12, 1942 | tunnel | Pantin | |||||||
Hotel de Ville | 01-15 | Jul 19, 1900 | tunnel | 4th | Hotel de Ville | ||||||
Hotel de Ville | 01-15 | Apr 28, 1935 | tunnel | 4th | Hotel de Ville | ||||||
Iéna | 18-01 | May 27, 1923 | tunnel | 16 | Guimet Museum , Palais de Tokyo | ||||||
Invalides | 10-09 | Jul 13, 1913 | tunnel | 7th | × | Connecting track to line 13; shared platform with line 13 | Hôtel des Invalides | ||||
Invalides | 10-09 | Dec 30, 1923 | tunnel | 7th | × | service by line 10 until 1937; service as line 14 until 1976; Connecting track to line 8; shared platform with line 8 | Hôtel des Invalides | ||||
Issy RER | 2025 | tunnel | Issy-les-Moulineaux | × | under construction | ||||||
Jacques Bonsergent | 08-04 | Dec 17, 1906 | tunnel | 10 | Canal Saint-Martin | ||||||
jasmine | 07-15 | Nov 8, 1922 | tunnel | 16 | |||||||
Jaurès | 22-12 | Feb 23, 1903 | viaduct | 10 , 19 | 1903-1914: Rue d'Allemagne | ||||||
Jaurès | 22-12 | Jan. 18, 1911 | tunnel | 10 , 19 | 1911-1914: Rue d'Allemagne | ||||||
Jaurès | 22-12 | Oct 12, 1942 | tunnel | 10 , 19 | |||||||
Javel - André Citroën | 16-14 | Sep 30 1913 | tunnel | 15th | × | Change to RER in Javel ; until 1937 operated by line 8 | Parc André-Citroën | ||||
Jourdain | 23-14 | Apr 28, 1935 | tunnel | 19 , 20 | |||||||
Jules Joffrin | 20-11 | Oct. 31, 1912 | tunnel | 18th | |||||||
Jussieu | 12-07 | April 26, 1931 | tunnel | 5 | University of Paris IV , Lutetia Arena , Jardin des Plantes , Muséum national d'histoire naturelle , Institut du monde arabe | ||||||
Jussieu | 12-07 | April 26, 1931 | tunnel | 5 | University of Paris IV , Lutetia Arena , Jardin des Plantes , Muséum national d'histoire naturelle , Institut du monde arabe | ||||||
Glue | 18-09 | Oct. 2, 1900 | tunnel | 16 | service through line 5 until 1942; Sidings | ||||||
Kremlin-Bicêtre Hôpital | 2024 | tunnel | Le Kremlin-Bicetre , Gentilly | under construction | |||||||
La Chapelle | 22-09 | Jan. 31, 1903 | viaduct | 10 , 18 | × | × | Change lines 4, 5, RER and Transilien at Gare du Nord | ||||
La Courneuve - May 8, 1945 | 03-07 | May 6, 1987 | tunnel | La Courneuve | × | Line 7 terminus | |||||
La Courneuve - Six Routes | 2024 | tunnel | La Courneuve | × | under construction | ||||||
La Defense | 29-00 | Apr 1, 1992 | tunnel | Puteaux | × | × | × | Line 1 terminus; Sidings | Grande Arche , CNIT , Les Quatre Temps | ||
La Défense - Michelet | tunnel | Puteaux | Later former constructed provisions by Esplanade de la Défense replaced | ||||||||
La Dhuys | 2023 | tunnel | Montreuil , Rosny-sous-Bois | under construction | |||||||
La Fourche | 31-14 | Feb 26, 1911 | tunnel | 17 , 18 | Platforms to Châtillon - Montrouge arranged one above the other | ||||||
La Motte-Picquet - Grenelle | 17-04 | Apr 24, 1906 | viaduct | 15th | until 1942 operated by line 5 | École Militaire | |||||
La Motte-Picquet - Grenelle | 17-04 | Jul 13, 1913 | tunnel | 15th | Double-decker platform and shared platform with line 10 | École Militaire | |||||
La Motte-Picquet - Grenelle | 17-04 | Jul 29, 1937 | tunnel | 15th | Double-decker platform and shared platform with line 8 | École Militaire | |||||
La Muette | 17-11 | Nov 8, 1922 | tunnel | 16 | × | RER change in Boulainvilliers | |||||
La Tour-Maubourg | 10-08 | Jul 13, 1913 | tunnel | 7th | |||||||
Lamarck - Caulaincourt | 20-12 | Oct. 31, 1912 | tunnel | 18th | |||||||
Laumière | 22-13 | Oct 12, 1942 | tunnel | 19th | |||||||
Le Blanc-Mesnil | 2024 | tunnel | Le Blanc-Mesnil | under construction | |||||||
Le Bourget RER | 2024 | tunnel | Le Bourget | × | × | under construction | |||||
Le Kremlin-Bicetre | 26-06 | Dec 10, 1982 | tunnel | Le Kremlin-Bicetre | Bicêtre | ||||||
Le Peletier | 21-02 | Jun 6, 1911 | tunnel | 9 | Sidings | ||||||
Ledru-Rollin | 12-15 | May 5, 1931 | tunnel | 11 , 12 | Promenade plantée | ||||||
Les Agnettes | 19-03 | June 14, 2008 | tunnel |
Asnières-sur-Seine , Gennevilliers |
|||||||
Les Ardoines | 2025 | tunnel | Vitry-sur-Seine | × | under construction | ||||||
Les Gobelins | 14-13 | Feb 15, 1930 | tunnel | 5 , 13 | until 1931 served by line 10 | ||||||
Les Halles | 01-09 | Apr 21, 1908 | tunnel | 1 | × | RER change in Châtelet - Les Halles ; Moved west in 1977 | Forum des Halles | ||||
Les Sablons | 29-08 | Apr 29, 1937 | tunnel | Neuilly-sur-Seine | |||||||
Le Vert de Maisons | 2025 | tunnel | Maisons-Alfort , Alfortville | × | under construction | ||||||
Liberté | 25-12 | Oct 5, 1942 | tunnel | Charenton-le-Pont | |||||||
Liège | 06-13 | Feb 26, 1911 | tunnel | 8 , 9 | offset side platforms; opened in 1911 as Berlin ; closed from August 2, 1914 to December 1, 1914 and from September 2, 1939 to September 16, 1968 |
||||||
Louis Blanc | 22-10 | Nov 23, 1910 | tunnel | 10 | common platform with line 7bis | ||||||
Louis Blanc | 22-10 | Nov 23, 1910 | tunnel | 10 | Line 7bis terminus; common platform with line 7 | ||||||
Louise Michel | 29-13 | Sep 24 1937 | tunnel | Levallois-Perret | |||||||
Lourmel | 16-10 | Jul 27, 1937 | tunnel | 15th | Siding; Connection to Ateliers de Javel | Parc André-Citroën , Cimetière de Vaugirard | |||||
Louvre - Rivoli | 01-12 | Aug 13, 1900 | tunnel | 1 | 1900-1989: Louvre | Pont des Arts , St-Germain-l'Auxerrois | |||||
Mabillon | 02-14 | March 10, 1925 | tunnel | 6th | |||||||
Madeleine | 10-03 | Nov 5, 1910 | tunnel | 8th | La Madeleine , Olympia | ||||||
Madeleine | 10-03 | Jul 13, 1913 | tunnel | 8th | La Madeleine , Olympia | ||||||
Madeleine | 10-03 | Oct 15, 1998 | tunnel | 8th | La Madeleine , Olympia | ||||||
Mairie d'Aubervilliers | 2021 | tunnel | Aubervilliers | under construction; Sidings | |||||||
Mairie d'Issy | 28-03 | March 24, 1934 | tunnel | Issy-les-Moulineaux | Terminus line 12; Sweeping tracks | ||||||
Mairie d'Ivry | 26-05 | May 1, 1946 | tunnel | Ivry-sur-Seine | Line 7 terminus; Sidings | ||||||
Mairie de Clichy | 19-01 | May 3, 1980 | tunnel | Clichy | |||||||
Mairie de Montreuil | 25-03 | Oct 14, 1937 | tunnel | Montreuil | Line 9 terminus; Sidings | ||||||
Mairie de Montrouge | March 23, 2013 | tunnel | Montrouge | Line 4 terminus | |||||||
Mairie de Saint-Ouen | 19-11 | Jun 30, 1952 | tunnel | Saint-Ouen | |||||||
Mairie de Saint-Ouen | 2021 | tunnel | Saint-Ouen | under construction; Sidings | |||||||
Mairie des Lilas | 23-03 | Feb 17, 1937 | tunnel | Les Lilas | Siding; Connection to the Lilas studio | ||||||
Maison Blanche | 14-09 | March 7, 1930 | tunnel | 13 | Separation station of line 7; until 1931 served by line 10 | ||||||
Maison Blanche | 2024 | tunnel | 13 | under construction | |||||||
Maisons-Alfort-Les Juilliottes | 25-04 | Apr 24, 1972 | tunnel | Maisons-Alfort | Sidings | ||||||
Maisons-Alfort - Stade | 25-15 | 19 Sep 1970 | tunnel | Maisons-Alfort | |||||||
Malakoff - Plateau de Vanves | 27-07 | Nov 9, 1976 | tunnel | Malakoff | |||||||
Malakoff - Rue Étienne Dolet | 27-08 | Nov 9, 1976 | dam | Malakoff | |||||||
Malesherbes | 06-01 | May 23, 1910 | tunnel | 17th | University of Paris IV | ||||||
Maraîchers | 05-04 | Dec 10, 1933 | tunnel | 20th | |||||||
Marcadet - Poissonniers | 20-09 | Apr 21, 1908 | tunnel | 18th | |||||||
Marcadet - Poissonniers | 20-09 | 23 Aug 1916 | tunnel | 12 | |||||||
Marcel Sembat | 28-08 | Feb 3, 1934 | tunnel | Boulogne-Billancourt | |||||||
Martin Nadaud | Jan 25, 1905 | tunnel | 20th | closed on August 23, 1969 and merged with Gambetta . The Martin Nadaud station can be seen in the back of the picture. | |||||||
Marx Dormoy | 20-07 | 23 Aug 1916 | tunnel | 18th | |||||||
Maubert - Mutualité | 01-06 | Feb 15, 1930 | tunnel | 5 | Connecting track to lines 4 and 7 | ||||||
Ménilmontant | 24-05 | Jan. 31, 1903 | tunnel | 11 , 20 | |||||||
Michel Bizot | 13-10 | May 5, 1931 | tunnel | 12 | Promenade plantée | ||||||
Michel-Ange - Auteuil | 07-09 | Sep 30 1913 | tunnel | 16 | service through line 8 until 1937; Directional platform to Boulogne - Pont de Saint-Cloud; Connecting track to line 9 | ||||||
Michel-Ange - Auteuil | 07-09 | Nov 8, 1922 | tunnel | 16 | Connecting track to line 10 | ||||||
Michel-Ange-Molitor | 07-10 | Sep 30 1913 | tunnel | 16 | service through line 8 until 1937; Directional platform to Gare d'Austerlitz | ||||||
Michel-Ange-Molitor | 07-10 | Nov 8, 1922 | tunnel | 16 | |||||||
Mirabeau | 07-12 | Sep 30 1913 | tunnel | 16 | service through line 8 until 1937; Directional platform to Gare d'Austerlitz | ||||||
Miromesnil | 18-04 | May 27, 1923 | tunnel | 8th | Palais de l'Élysée , Musée Jacquemart-André | ||||||
Miromesnil | 18-04 | Jun 27, 1973 | tunnel | 8th | Palais de l'Élysée , Musée Jacquemart-André | ||||||
Monceau | 06-02 | Oct 7, 1902 | tunnel | 8 , 17 | Parc Monceau , Musée Cernuschi , Musée Nissim de Camondo | ||||||
Montgallet | 12-03 | May 5, 1931 | tunnel | 12 | Promenade plantée | ||||||
Montparnasse - Bienvenüe | 04-08 | Apr 24, 1906 | tunnel | 6 , 14 , 15 | × | Change to Transilien at Gare Montparnasse ; 1906-1910: Montparnasse ; 1910-1933: Avenue du Maine ; 1933-1942: Bienvenüe ; until 1942 operated by line 5 | Tour Montparnasse , Cimetière Montparnasse , Jardin Atlantique | ||||
Montparnasse - Bienvenüe | 04-08 | Jan. 9, 1910 | tunnel | 6 , 14 , 15 | × | Change to Transilien at Gare Montparnasse ; 1910-1942: Montparnasse ; Connecting track to line 12 | Tour Montparnasse , Cimetière Montparnasse , Jardin Atlantique | ||||
Montparnasse - Bienvenüe | 04-08 | Nov 5, 1910 | tunnel | 6 , 14 , 15 | × | Change to Transilien at Gare Montparnasse ; 1910-1942: Montparnasse ; Connecting track to lines 4 and 13; Sidings | Tour Montparnasse , Cimetière Montparnasse , Jardin Atlantique | ||||
Montparnasse - Bienvenüe | 04-08 | Jan. 21, 1937 | tunnel | 6 , 14 , 15 | × | Change to Transilien at Gare Montparnasse ; 1937–1942: Bienvenüe ; service as line 14 until 1976; Connecting track to line 12 | Tour Montparnasse , Cimetière Montparnasse , Jardin Atlantique | ||||
Montreuil - Hôpital | 2023 | tunnel | Montreuil , Noisy-le-Sec | under construction | |||||||
Mouton Duvernet | 15-04 | Oct. 30, 1909 | tunnel | 14th | |||||||
nation | 05-10 | Jul 19, 1900 | tunnel | 11 , 12 | × | former connecting track to line 2; Connecting track to line 6 | Place de la Nation | ||||
nation | 05-10 | Apr 2, 1903 | tunnel | 11 , 12 | × | Line 2 terminus; Turning loop; Connection to Ateliers de Charonne; former connecting track to line 1; Connecting track to line 9 | Place de la Nation | ||||
nation | 05-10 | March 1, 1909 | tunnel | 11 , 12 | × | Line 6 terminus; Turning loop; Connecting track to line 1 | Place de la Nation | ||||
nation | 05-10 | Dec 10, 1933 | tunnel | 11 , 12 | × | Place de la Nation | |||||
National | 14-11 | March 1, 1909 | viaduct | 13 | |||||||
Noisy - Champs | 2025 | tunnel | Noisy-le-Grand , Champs-sur-Marne | × | under construction | ||||||
Noisy - Champs | 2028 | tunnel | Noisy-le-Grand , Champs-sur-Marne | × | under construction | ||||||
Notre-Dame-de-Lorette | 31-09 | Nov 5, 1910 | tunnel | 9 | Notre-Dame-de-Lorette | ||||||
Notre-Dame-des-Champs | 04-14 | Nov 5, 1910 | tunnel | 6th | |||||||
Oberkampf | 08-10 | Jan 15, 1907 | tunnel | 11 | |||||||
Oberkampf | 08-10 | Dec 10, 1933 | tunnel | 11 | |||||||
Odéon | 01-04 | Jan. 9, 1910 | tunnel | 6th | Connecting track to line 10 | Palais du Luxembourg | |||||
Odéon | 01-04 | Feb. 14, 1926 | tunnel | 6th | Connecting track to line 4 | Palais du Luxembourg | |||||
Olympiades | 15-06 | Jun 26, 2007 | tunnel | 13 | Line 14 terminus | ||||||
Opéra | 06-05 | Oct 19, 1904 | tunnel | 2 , 9 | × | Change to RER in Auber ; Connecting track to line 7 | Opera Garnier | ||||
Opéra | 06-05 | Nov 5, 1910 | tunnel | 2 , 9 | × | Change to RER in Auber | Opera Garnier | ||||
Opéra | 06-05 | Jul 13, 1913 | tunnel | 2 , 9 | × | Change to RER in Auber | Opera Garnier | ||||
Orly Sud | tunnel | Paray-Vieille-Poste | Part of a planned extension of Line 7 to Paris-Orly Airport , will be integrated into Line T7 | ||||||||
Ourcq | 22-02 | March 21, 1947 | tunnel | 19th | Canal de l'Ourcq | ||||||
Palais Royal - Musee du Louvre | 11-02 | Jul 19, 1900 | tunnel | 1 | 1900–1989: Palais Royal | Palais Royal , Louvre | |||||
Palais Royal - Musee du Louvre | 11-02 | Jul 1, 1916 | tunnel | 1 | 1916–1989: Palais Royal | Palais Royal , Louvre | |||||
Parc de Bercy | Oct 1972 | viaduct | 12 | closed in May 1974; Event station | Parc de Bercy | ||||||
Parmentier | 08-11 | Oct 19, 1904 | tunnel | 11 | |||||||
Passy | 17-08 | Nov 6, 1903 | incision | 16 | until 1942 operated by line 5 | Maison de Radio France | |||||
Pasteur | 16-02 | Apr 24, 1906 | tunnel | 15th | until 1942 operated by line 5 | Pasteur Institute | |||||
Pasteur | 16-02 | Nov 5, 1910 | tunnel | 15th | Pasteur Institute | ||||||
Pelleport | 24-09 | Nov. 27, 1921 | tunnel | 20th | |||||||
Père Lachaise | 24-04 | Feb 25, 1903 | tunnel | 11 , 20 | Connecting track to line 3 | Cimetière Père Lachaise | |||||
Père Lachaise | 24-04 | Oct 19, 1904 | tunnel | 11 , 20 | Connecting track to line 2 | Cimetière Père Lachaise | |||||
Pereire | 30-05 | May 23, 1910 | tunnel | 17th | × | Change RER in Pereire - Levallois | |||||
Pernety | 04-02 | Jan. 21, 1937 | tunnel | 14th | Service as line 14 until 1976 | ||||||
Philippe Auguste | 24-07 | Jan. 31, 1903 | tunnel | 11 , 20 | Cimetière Père Lachaise | ||||||
Picpus | 05-09 | March 1, 1909 | tunnel | 12 | Cimetière de Picpus | ||||||
Pierre and Marie Curie | 26-04 | May 1, 1946 | tunnel | Ivry-sur-Seine | |||||||
Pigalle | 31-06 | Oct 7, 1902 | tunnel | 9 , 18 | Connecting track to lines 4 and 5 | Pigalle | |||||
Pigalle | 31-06 | Apr 8, 1911 | tunnel | 9 , 18 | Pigalle | ||||||
Place Carnot | 2023 | tunnel | Romainville | × | under construction | ||||||
Place d'Italie | 14-14 | Apr 24, 1906 | tunnel | 13 | Line 5 terminus; Turning loop; Connecting track to lines 6 and 7; Connection to Ateliers d'Italie | Butte aux Cailles | |||||
Place d'Italie | 14-14 | March 1, 1909 | tunnel | 13 | Connecting track to lines 5 and 7; Connection to Ateliers d'Italie | Butte aux Cailles | |||||
Place d'Italie | 14-14 | Feb 15, 1930 | tunnel | 13 | Turning loop; Connecting track to lines 5 and 6 | Butte aux Cailles | |||||
Place de Clichy | 31-13 | Oct 7, 1902 | tunnel | 8 , 9 , 17 , 18 | Cimetière de Montmartre | ||||||
Place de Clichy | 31-13 | Feb 26, 1911 | tunnel | 8 , 9 , 17 , 18 | Cimetière de Montmartre | ||||||
Place des Fêtes | 23-08 | Jul 18, 1911 | tunnel | 19th | Directional platform to Pré Saint-Gervais and Haxo | Belleville | |||||
Place des Fêtes | 23-08 | Apr 28, 1935 | tunnel | 19th | Belleville | ||||||
Place Monge | 12-05 | Feb 15, 1930 | tunnel | 5 | service through line 10 until 1931; Connecting track to line 10 | Jardin des Plantes , Arena of Lutetia | |||||
Plaisance | 04-03 | Jan. 21, 1937 | tunnel | 14th | Service as line 14 until 1976 | ||||||
Pointe du Lac | PTL | Oct 8, 2011 | plan | Créteil | Connection to Ateliers de Créteil | Stade Dominique-Duvauchelle | |||||
Poissonnière | 21-10 | Nov 5, 1910 | tunnel | 9 , 10 | |||||||
Pont-Cardinet | 2021 | tunnel | 17th | × | under construction | ||||||
Pont de Levallois - Bécon | 29-15 | Sep 24 1937 | tunnel | Levallois-Perret | Line 3 terminus; Sidings | ||||||
Pont de Neuilly | 29-09 | Apr 29, 1937 | tunnel | Neuilly-sur-Seine | |||||||
Pont de Rungis | 2024 | tunnel | Thiais | × | under construction | ||||||
Pont de Sèvres | 28-10 | Feb 3, 1934 | tunnel | Boulogne-Billancourt | Siding; Connection to Ateliers de Boulogne | ||||||
Pont de Sèvres | 2025 | tunnel | Boulogne-Billancourt | under construction | |||||||
Pont Marie | 12-09 | April 16, 1926 | tunnel | 4th | |||||||
Pont Neuf | 01-13 | April 16, 1926 | tunnel | 1 | Sidings | Pont Neuf , Conciergerie | |||||
Porte d'Auteuil | 07-07 | Sep 30 1913 | tunnel | 16 | service through line 8 until 1937; Directional platforms to Boulogne - Pont de Saint-Cloud; Sidings | Parc des Princes , Stade Jean-Bouin , Jardin des Serres d'Auteuil , Hippodrome d'Auteuil , Bois de Boulogne | |||||
Porte d'Italie | 14-03 | March 7, 1930 | tunnel | 13 | × | ||||||
Porte d'Ivry | 26-03 | April 26, 1931 | tunnel | 13 | × | Siding; Connection to Ateliers de Choisy | |||||
Porte d'Orléans | 15-02 | Oct. 30, 1909 | tunnel | 14th | × | Turning loop | |||||
Porte Dauphine | 17-02 | Dec 13, 1900 | tunnel | 16 | Line 2 terminus; Turning loop | ||||||
Porte de Bagnolet | 23-04 | Apr 2, 1971 | tunnel | 20th | × | ||||||
Porte de Champerret | 29-12 | Feb 15, 1911 | tunnel | 17th | Turning loop | ||||||
Porte de Charenton | 13-03 | May 5, 1931 | tunnel | 12 | × | Sidings | |||||
Porte de Choisy | 14-02 | March 7, 1930 | tunnel | 13 | × | until 1931 served by line 10 | |||||
Porte de Clichy | 30-09 | Jan. 20, 1912 | tunnel | 17th | × | × | Turning loop | ||||
Porte de Clichy | 2021 | tunnel | 17th | × | × | under construction | |||||
Porte de Clignancourt | 20-01 | Apr 21, 1908 | tunnel | 18th | Line 4 terminus; Turning loop; Connection to Ateliers de Saint-Ouen | Cimetière parisien de Saint-Ouen , Marché aux puces de Paris | |||||
Porte de la Chapelle | 20-06 | 23 Aug 1916 | tunnel | 18th | × | Terminus line 12; Sidings | |||||
Porte de la Villette | 03-04 | Nov 5, 1910 | tunnel | 19th | × | Turning loop; Connection to Ateliers de la Villette | Cité des sciences et de l'industrie , Parc de la Villette , La Géode | ||||
Porte de Montreuil | 05-03 | Dec 10, 1933 | tunnel | 20th | × | Sidings | |||||
Porte de Pantin | 22-01 | Oct 12, 1942 | tunnel | 19th | × | Parc de la Villette , Cité de la musique , Zénith de Paris , Conservatoire de Paris | |||||
Porte de Saint-Cloud | 07-03 | 29 Sep 1923 | tunnel | 16 | Siding; Connection to Ateliers d'Auteuil | Parc des Princes | |||||
Porte de Saint-Ouen | 30-13 | Feb 26, 1911 | tunnel | 17 , 18 | Sidings | ||||||
Porte de Thiais - Marché International | 2024 | tunnel | Chevilly-Larue | × | under construction | ||||||
Porte de Vanves | 27-02 | Jan. 21, 1937 | tunnel | 14th | × | service as line 14 until 1976; Sidings | |||||
Porte de Versailles | 16-06 | Nov 5, 1910 | tunnel | 15th | × | Moved to the southeast in 1930; Siding; Connection to Ateliers de Vaugirard | |||||
Porte de Vincennes | 05-07 | Jul 19, 1900 | tunnel | 12 , 20 | × | former turning loop; former connecting track to line 2 | |||||
Porte des Lilas | 23-02 | Nov. 27, 1921 | tunnel | 19 , 20 | × | Line 3bis terminus; Turning loop; Connecting track to line 7bis with its own platform system | |||||
Porte des Lilas | 23-02 | Apr 28, 1935 | tunnel | 19 , 20 | × | ||||||
Porte Dorée | 13-01 | May 5, 1931 | tunnel | 12 | × | Bois de Vincennes | |||||
Porte Maillot | 30-01 | Jul 19, 1900 | tunnel | 16 , 17 | × | RER change in Neuilly - Porte Maillot ; Sidings and turning loop | Palais des congrès de Paris | ||||
Porte Molitor | tunnel | 16 | originally intended to connect to Parc des Princes | Parc des Princes | |||||||
Pré Saint-Gervais | 23-11 | Jan. 18, 1911 | tunnel | 19th | × | Line 7bis terminus; Connecting track to line 3bis ( voie navette ) | |||||
Pyramides | 11-03 | Jul 1, 1916 | tunnel | 1 | |||||||
Pyramides | 11-03 | Oct 15, 1998 | tunnel | 1 | |||||||
Pyrenees | 24-14 | Apr 28, 1935 | tunnel | 19 , 20 | Parc de Belleville , Parc des Buttes-Chaumont | ||||||
Quai de la Gare | 09-01 | March 1, 1909 | viaduct | 13 | Palais Omnisports de Paris-Bercy | ||||||
Quai de la Rapée | 09-10 | Jul 13, 1906 | incision | 12 | Connecting track to line 1 | ||||||
Quatre-Septembre | 06-04 | Nov 3, 1904 | tunnel | 2 | Bibliothèque nationale de France | ||||||
Rambuteau | 08-01 | Apr 28, 1935 | tunnel | 3 , 4 | Center Georges Pompidou , Stravinsky Fountain | ||||||
Ranelagh | 17-09 | Nov 8, 1922 | tunnel | 16 | |||||||
Raspail | 15-10 | Apr 24, 1906 | tunnel | 14th | until 1942 operated by line 5 | Cartier Foundation , Cimetière Montparnasse | |||||
Raspail | 15-10 | Oct. 30, 1909 | tunnel | 14th | Cartier Foundation , Cimetière Montparnasse | ||||||
Réaumur - Sébastopol | 11-14 | Oct 19, 1904 | tunnel | 2 , 3 | 1904–1907: Rue Saint-Denis | Musée des arts et métiers | |||||
Réaumur - Sébastopol | 11-14 | Apr 21, 1908 | tunnel | 2 , 3 | Musée des arts et métiers | ||||||
Rennes | 02-11 | Nov 5, 1910 | tunnel | 6th | closed from September 2, 1939 to May 20, 1968 | ||||||
Republique | 08-07 | Oct 19, 1904 | tunnel | 3 , 10 , 11 | Connecting track to line 5 | Place de la République | |||||
Republique | 08-07 | Nov 15, 1907 | tunnel | 3 , 10 , 11 | Connecting track to lines 3 and 8 | Place de la République | |||||
Republique | 08-07 | May 5, 1931 | tunnel | 3 , 10 , 11 | Double-decker station with line 9; Connecting track to lines 5 and 9; Sidings | Place de la République | |||||
Republique | 08-07 | Dec 10, 1933 | tunnel | 3 , 10 , 11 | Double-decker station with line 8; Connecting track to line 8 | Place de la République | |||||
Republique | 08-07 | Apr 28, 1935 | tunnel | 3 , 10 , 11 | Place de la République | ||||||
Reuilly - Diderot | 12-02 | Aug 20, 1900 | tunnel | 12 | |||||||
Reuilly - Diderot | 12-02 | May 5, 1931 | tunnel | 12 | |||||||
Richard-Lenoir | 08-14 | Dec 17, 1906 | tunnel | 11 | |||||||
Richelieu - Drouot | 11-07 | Jun 30, 1928 | tunnel | 2 , 9 | |||||||
Richelieu - Drouot | 11-07 | Jun 30, 1928 | tunnel | 2 , 9 | |||||||
Riquet | 22-08 | Nov 5, 1910 | tunnel | 19th | Canal de l'Ourcq | ||||||
Robespierre | 05-02 | Oct 14, 1937 | tunnel | Montreuil | |||||||
Rome | 31-12 | Nov 6, 1902 | tunnel | 8 , 17 | |||||||
Rosny-Bois-Perrier | 2023 | tunnel | Rosny-sous-Bois | × | under construction | ||||||
Rue de la Pompe | 07-13 | Nov 8, 1922 | tunnel | 16 | |||||||
Rue des Boulets | 05-06 | Dec 10, 1933 | tunnel | 11 | |||||||
Rue du Bac | 02-10 | Nov 5, 1910 | tunnel | 7th | Hotel Matignon , Maison de verre | ||||||
Rue Saint-Maur | 24-06 | Oct 19, 1904 | tunnel | 11 | ESCP Europe | ||||||
Saint-Ambroise | 08-15 | Dec 10, 1933 | tunnel | 11 | |||||||
Saint-Augustin | 06-10 | May 27, 1923 | tunnel | 8th | Change lines 3, 12, 13 and 14 in Saint-Lazare | St-Augustin | |||||
Saint-Denis - Pleyel | 2024 | tunnel | Saint-Denis | × | under construction | Stade de France , Tour Pleyel | |||||
Saint-Denis - Pleyel | 2024 | tunnel | Saint-Denis | × | under construction | ||||||
Saint-Denis - Porte de Paris | 19-14 | May 26, 1976 | tunnel | Saint-Denis | Stade de France | ||||||
Saint-Denis - University | 10-11 | May 25, 1998 | tunnel | Saint-Denis | Line 13 terminus; Sidings | ||||||
Saint-Fargeau | 24-08 | Nov. 27, 1921 | tunnel | 20th | |||||||
Saint-François-Xavier | 02-06 | Dec 30, 1923 | tunnel | 7th | service by line 10 until 1937; Service as line 14 until 1976 | ||||||
Saint-Germain-des-Prés | 02-15 | Jan. 9, 1910 | tunnel | 6th | Sidings | Quartier Saint-Germain-des-Prés , Abbaye Saint-Germain-des-Prés , Café de Flore , Les Deux Magots | |||||
Saint-Georges | 31-10 | Apr 8, 1911 | tunnel | 9 | |||||||
Saint-Jacques | 15-09 | Apr 24, 1906 | incision | 14th | until 1942 operated by line 5 | La Santé | |||||
Saint-Lazare | 06-09 | Oct 19, 1904 | tunnel | 8 , 9 | × | × | RER change in Haussmann - Saint-Lazare ; Change Transilien at Gare Saint-Lazare ; Change to line 9 in Saint-Augustin | ||||
Saint-Lazare | 06-09 | Nov 5, 1910 | tunnel | 8 , 9 | × | × | RER change in Haussmann - Saint-Lazare ; Change Transilien at Gare Saint-Lazare ; Change to line 9 in Saint-Augustin | ||||
Saint-Lazare | 06-09 | Feb 26, 1911 | tunnel | 8 , 9 | × | × | RER change in Haussmann - Saint-Lazare ; Change Transilien at Gare Saint-Lazare ; Change to line 9 in Saint-Augustin | ||||
Saint-Lazare | 06-09 | Dec 16, 2003 | tunnel | 8 , 9 | × | × | Line 14 terminus; RER change in Haussmann - Saint-Lazare ; Change Transilien at Gare Saint-Lazare ; Change to line 9 in Saint-Augustin | ||||
Saint-Mandé | 25-08 | March 24, 1934 | tunnel | Saint-Mandé | Institut geographique national , Bois de Vincennes | ||||||
Saint-Marcel | 09-04 | Jun 2, 1906 | tunnel | 13 | |||||||
Saint Martin | May 5, 1931 | tunnel | 3 , 10 | closed on September 2, 1939; Double-decker station with line 9 | |||||||
Saint Martin | Dec 10, 1933 | tunnel | 3 , 10 | closed on September 2, 1939; Double-decker station with line 8 | |||||||
Saint-Maur - Creteil | 2025 | tunnel | Saint-Maur-des-Fossés | × | under construction | ||||||
Saint-Michel | 01-01 | Sep 9 1910 | tunnel | 5 , 6 | × | RER change in Saint-Michel - Notre-Dame | Latin Quarter , Fontaine Saint-Michel | ||||
Saint-Paul | 12-10 | Aug 6, 1900 | tunnel | 4th | |||||||
Saint-Philippe du Roule | 18-05 | May 27, 1923 | tunnel | 8th | |||||||
Saint-Placide | 04-12 | Jan. 9, 1910 | tunnel | 6th | |||||||
Saint-Sébastien - Froissart | 08-13 | May 5, 1931 | tunnel | 3 , 11 | |||||||
Saint-Sulpice | 02-12 | Jan. 9, 1910 | tunnel | 6th | Saint-Germain-des-Prés , Luxembourg Palace , Saint-Sulpice | ||||||
Ségur | 02-04 | Jul 29, 1937 | tunnel | 7 , 15 | |||||||
Sentier | 11-13 | Nov 20, 1904 | tunnel | 2 | |||||||
Serge Gainsbourg | 2023 | tunnel | Les Lilas | under construction | |||||||
Sevran - Beaudottes | 2025 | tunnel | Sevran | × | under construction | ||||||
Sevran - Livry | 2025 | tunnel | Sevran | × | under construction | ||||||
Sèvres - Babylone | 02-09 | Nov 5, 1910 | tunnel | 6 , 7 | Le Bon Marché | ||||||
Sèvres - Babylone | 02-09 | Dec 30, 1923 | tunnel | 6 , 7 | Le Bon Marché | ||||||
Sèvres - Lecourbe | 02-03 | Apr 24, 1906 | viaduct | 15th | until 1942 operated by line 5 | ||||||
Simplon | 20-10 | May 14, 1908 | tunnel | 18th | |||||||
Solférino | 10-14 | Nov 5, 1910 | tunnel | 7th | Musée d'Orsay | ||||||
Stalingrad | 22-11 | Jan. 31, 1903 | viaduct | 10 , 19 | 1903–1942: Aubervilliers 1942–1946: Aubervilliers - Boulevard de la Villette |
Canal Saint-Martin | |||||
Stalingrad | 22-11 | Nov 5, 1910 | tunnel | 10 , 19 | 1910–1942: Boulevard de la Villette 1942–1946: Aubervilliers - Boulevard de la Villette |
Canal Saint-Martin | |||||
Stalingrad | 22-11 | Oct 12, 1942 | tunnel | 10 , 19 | 1942–1946: Aubervilliers - Boulevard de la Villette | Canal Saint-Martin | |||||
Strasbourg - Saint-Denis | 11-10 | May 5, 1908 | tunnel | 2 , 3 , 10 | Porte Saint-Denis , Porte Saint-Martin | ||||||
Strasbourg - Saint-Denis | 11-10 | May 5, 1931 | tunnel | 2 , 3 , 10 | Double-decker station with line 9 | Porte Saint-Denis , Porte Saint-Martin | |||||
Strasbourg - Saint-Denis | 11-10 | Dec 10, 1933 | tunnel | 2 , 3 , 10 | Double-decker station with line 8 | Porte Saint-Denis , Porte Saint-Martin | |||||
Sully - Morland | 12-08 | Jun 3, 1930 | tunnel | 4th | |||||||
Telegraphe | 23-15 | Apr 28, 1935 | tunnel | 19 , 20 | |||||||
Temple | 08-06 | Oct 19, 1904 | tunnel | 3 | Temple | ||||||
Ternes | 18-14 | Oct 7, 1902 | tunnel | 8 , 17 | Salle Pleyel | ||||||
Tolbiac | 14-10 | March 7, 1930 | tunnel | 13 | until 1931 served by line 10 | ||||||
Trinité - d'Estienne d'Orves | 31-08 | Nov 5, 1910 | tunnel | 9 | Sidings | La Trinité , Théâtre de Paris | |||||
Trocadero | 17-15 | Oct. 2, 1900 | tunnel | 16 | service through line 5 until 1942; Connecting track to line 9 | Palais de Chaillot , Musée de l'Homme , Jardins du Trocadéro , Cimetière de Passy | |||||
Trocadero | 17-15 | Nov 8, 1922 | tunnel | 16 | Connecting track to line 6 | Palais de Chaillot , Musée de l'Homme , Jardins du Trocadéro , Cimetière de Passy | |||||
Tuileries | 11-01 | Jul 19, 1900 | tunnel | 1 | Tuileries Garden , Arc de Triomphe du Carrousel , Place Vendôme | ||||||
Vaneau | 02-08 | Dec 30, 1923 | tunnel | 6 , 7 | |||||||
Varenne | 10-12 | Dec 30, 1923 | tunnel | 7th | service by line 10 until 1937; service as line 14 until 1976; closed from September 2, 1939 to December 24, 1962 |
Hôtel des Invalides , Musée Rodin , Hôtel Matignon | |||||
Vaugirard | 16-04 | Nov 5, 1910 | tunnel | 15th | |||||||
Vavin | 04-07 | Jan. 9, 1910 | tunnel | 6 , 14 | Connecting track to line 6 | ||||||
Victor Hugo | 18-10 | Dec 13, 1900 | tunnel | 16 | Relocated to the east in 1931 | ||||||
Villejuif - Gustave-Roussy Institute | 2024 | tunnel | Villejuif | under construction | |||||||
Villejuif - Gustave-Roussy Institute | 2025 | tunnel | Villejuif | under construction | |||||||
Villejuif - Léo Lagrange | 26-07 | Feb. 28, 1985 | tunnel | Villejuif | |||||||
Villejuif - Louis Aragon | 26-09 | Feb. 28, 1985 | tunnel | Villejuif | × | Line 7 terminus | |||||
Villejuif - Louis Aragon | 2025 | tunnel | Villejuif | × | under construction | ||||||
Villejuif - Paul Vaillant-Couturier | 26-08 | Feb. 28, 1985 | tunnel | Villejuif | |||||||
Villiers | 06-03 | Jan. 26, 1903 | tunnel | 8 , 17 | Musée Cernuschi , Musée Nissim de Camondo | ||||||
Villiers | 06-03 | Oct 19, 1904 | tunnel | 8 , 17 | former turning loop | Musée Cernuschi , Musée Nissim de Camondo | |||||
Vitry Center | 2025 | tunnel | Vitry-sur-Seine | × | under construction | ||||||
Volontaires | 16-03 | Nov 5, 1910 | tunnel | 15th | |||||||
Voltaire | 24-01 | Dec 10, 1933 | tunnel | 11 | |||||||
Wagram | 30-04 | May 23, 1910 | tunnel | 17th |
literature
- Gérard Roland: Stations de métro. D'Abbesses à Wagram . 2003, ISBN 2-86253-307-6 .
See also
Web links
- Track plan of the Paris Métro including former and planned systems ( Memento from February 15, 2010 in the Internet Archive ) (PDF file, 822 kB, French)
- Les codes d'oblitération du métro (French)
Individual evidence
- ↑ Statistics portal Data-Publika Archived copy ( memento of the original from March 13, 2016 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. As of: 2012. Accessed January 22, 2015.