Bundesstrasse 454

from Wikipedia, the free encyclopedia
Template: Infobox high-ranking street / Maintenance / DE-B
Bundesstrasse 454 in Germany
Bundesstrasse 454
map
Course of the B 454
Basic data
Operator: GermanyGermany Federal Republic of Germany
Overall length: 64 km

State :

Course of the road
Locality Niederaula B62
Junction (87)  Kirchheim A7
Locality Kirchheim
Locality Heddersdorf
Locality Frielingen
Locality Gersdorf
Locality Electoral houses
Locality Upper auditorium
Locality Asterode
Locality Neukirchen
Locality Rückershausen
Locality Riebelsdorf
crossing Goat grove B254
Locality Schwalmstadt
Junction (18)  Schwalmstadt (from 2020)A49
Locality Wiera
Locality Neustadt (Hesse)
Junction Stadtallendorf -NorthA49
Motorway junction Stadtallendorf main street
Motorway junction Stadtallendorf-Wetzlarer Strasse
Motorway junction Stadtallendorf-Mitte / Waldstrasse
crossing Kirchhain- Langenstein / industrial area
Motorway junction Kirchhain -EastB62

The national highway 454 (abbreviation: B 454 ) is a German national road . It leads from Niederaula (near Bad Hersfeld ) via Schwalmstadt to Kirchhain , where it connects to the B 62 ( A 4 near Olpe - A 5 near Alsfeld).

This federal road serves as a connection between the cities of Bad Hersfeld , Schwalmstadt , Stadtallendorf and Marburg . It was replaced on the Bad Hersfeld- Niederaula and Kirchhain -Marburg sections by the new construction of the B 62 .

Expansion to the motorway feeder

In Stadtallendorf , the B 454 is being upgraded to a feeder road for the planned A 49 . The first construction phase, 1.6 kilometers in length and costing 9.5 million euros, was approved on December 22, 2006. The Waldstraße junction, which had previously been the same as the plan, was rebuilt. The federal road now runs over the junction without any intersections. Forest road as well as the entrances and exits of the federal road meet below in a large roundabout.

Junction B454 / Wetzlarer Straße (2007)

In the second construction phase, the federal road was lowered in the area of ​​the intersection with Wetzlarer Strasse and Lilienthalstrasse. The B454 was moved to a six meter deep trough, the city streets meet above it at a roundabout. The exits / driveways also flow there. The groundbreaking ceremony took place at the beginning of May 2011. The second construction phase was 550 meters long and the construction costs were to be 7.7 million euros. The section was officially opened on August 13, and the cost was around 9 million euros.
The third construction phase includes the intersection with Hauptstrasse and Bahnhofstrasse. Here, too, the B454 is lowered. The start of construction is still open. The length of this construction section is 998 meters, the construction costs are estimated at 16.4 million euros. The expansion will result in total costs of around 33.4 million euros.

See also

Web links

Commons : Bundesstrasse 454  - Collection of pictures, videos and audio files