Bundesstrasse 269

from Wikipedia, the free encyclopedia
Template: Infobox high-ranking street / Maintenance / DE-B
Bundesstrasse 269 in Germany
Bundesstrasse 269
Basic data
Operator: GermanyGermany Federal Republic of Germany
Overall length: 120 km

State :

Course of the road
Locality towards Lösnich B53
flow Moselle (Lösnicher Bridge)
Locality Losnich
Junction Traben-Trarbach
Template: AB / Maintenance / Empty together with B50 E42
Junction Longkamp
Locality Gonzerath
Locality Morbach B327
Locality at Allenbach B422
Locality Birch field B41
Template: AB / Maintenance / Empty together with B41
Junction (4)  Birch field A62
Junction Gimbweiler
Locality Nohfelden
Bypass Nohfelden bypass
flow Near
Junction Nohfelden
Locality Wolfersweiler
Bypass Wolfersweiler bypass
Locality Hirstein
Locality Pinsweiler
Junction Hofeld-Mauschbach
flow Blew
Junction St. Wendel-Alsfassen
Junction St. Wendel-Winterbach B41
Locality St. Wendel
Locality Winterbach
Locality Alsweiler
Locality Tholey
Locality Sotzweiler
Junction (140)  Tholey A1 E422
Locality Thalexweiler
Locality Aschbach
Locality Lebach B10 B268
Locality Body
Locality Nalbach
flow Prims
Junction (12)  Nalbach / Saarwellingen industrial areasA8
Autobahn beginning replaced by A8 A620
Junction (3)  Saarlouis center A620 E29 B405
Template: AB / Maintenance / Empty together with B405
Locality Picard
Locality Felsberg (Saar) B405
crossing Ittersdorf L 351
EU border crossing Ittersdorf border crossing ( DE - FR )
France Continue on  D 954 (formerly N 54 )
Template: AB / Maintenance / Empty replaced by 269n
Junction Ensdorf / Bous B51
bridge Saar route
flow Saar
Junction (4b)  Ensdorf A620 E29
Junction Lisdorfer Berg industrial park
Junction Altforweiler / Häsfeld industrial area
flow Hell trench
flow Are
crossing Bisten / Langwies / Linslerhof industrial park
bridge under the Völklingen – Thionville railway line
Junction Differten / Überherrn L 168
bridge Saarland circular hiking trail
EU border crossing Überherrn border crossing ( DE - FR )
France Continue on  N 33

The national highway 269 (abbreviation: B 269 ) is a German national road in Rhineland-Palatinate and the Saarland . It leads from Lösnich over the Hunsrück to the French border at Überherrn .

From Lösnich it leads as a feeder to the upgraded route of the B 50 directly east of the Hochmosel bridge and leaves it again at Longkamp . From Birkenfeld to the St. Wendel - Winterbach junction, it runs together with the B 41 . It used to run between Nohfelden and Tholey via Türkismühle , Gonnesweiler , Neunkirchen , Selbach and Theley , today it runs via St. Wendel.

From 1811 to 1824, the section between the border and Saarlouis was part of route impériale 72 "De Metz à Sarrelouis".

Bundesstrasse 269n

Since February 17, 2003, a new section of around 11 km has been built between the A 620 near Saarlouis - Lisdorf and the French border near Überherrn, called the B 269 new , for 78 million euros . This section closes the gap between the French motorway network near Saint-Avold ( A4 ) and the German motorway network near Saarlouis ( A 620 ) and the B 51 near Ensdorf . The last mentioned section used to be called BAB 621 .

In October 2007, a first section of Saarlouis-Lisdorf and the Häsfeld industrial park was opened to traffic. This section of the route is called B 269n and is 3.5 km in length. It cost 14 million euros. On December 11, 2008, the section between connection B 51 and A 620 was also opened to traffic. At the end of 2009, the section from Differter Straße (with a provisional driveway) to the federal border was completed together with the N33 as part of the Creutzwald bypass on the French side.

On August 28, 2012, the last section from Häsfeld to Differter Straße with the connections Linslerhof / Langwies and Überherrn-Mitte was opened to traffic. After the B 269n was cleared, the thorough renovation of the through-traffic of the original B 269, now relieved of traffic, began. In 2013, the Hochwald and Friedrich-August-Strasse in Birkenfeld were also extensively rebuilt. The last section in Alsweiler was renovated from 6 to 24 August 2015 .

Individual evidence

  1. ↑ Major construction site B 269: Problems only wait underground - Nahe newspaper - Rhein newspaper. In: rhein-zeitung.de. August 14, 2013, accessed August 24, 2015 .
  2. ^ Saarländische Wochenblatt publishing company: Road closure B 269 Alsweiler-Tholey - Wochenspiegel. In: wochenspiegelonline.de. August 6, 2015, accessed August 24, 2015 .