The list of wind turbines in Bavaria provides an overview of the installed wind turbines in the state of Bavaria , with a focus on the installed wind farms . Locations with three or more systems are considered wind parks. Systems with a steel lattice tower are marked in italics . Since new wind turbines are constantly being built and dismantled with or without repowering , this list does not claim to be complete; it shows the status from the end of 2019. The database is the interactive map from the Energy Atlas Bavaria.
In 2016, renewable energy sources (sun, wind, hydropower, biogas, biomass) covered around 65 percent of Bavaria's gross electricity needs.
Overview
Surname | Construction year | Total power (MW) |
number | Type (WKA) | place | agriculture circle |
Coordinates | Project planner / operator | Remarks |
---|---|---|---|---|---|---|---|---|---|
Alfeld-Waller wind turbine | 2009 | 2.0 | 1 | Vestas V90-2MW (1 ×) | Catfish | LAU | 49 ° 25 ′ 26 ″ N, 11 ° 29 ′ 21 ″ E | ATM Hartmann, SRE Sachs | |
Allersberg wind turbine | 2002 | 0.6 | 1 | Enercon E-40 / 6.44 (1 ×) | Göggelsbuch | RH | 49 ° 12 ′ 56 "N, 11 ° 12 ′ 14" E | ||
Ammerfeld wind turbine | 2009 | 2.0 | 1 | Enercon E-82 (1 ×) | Ammerfeld | ND | 48 ° 47 ′ 26 "N, 10 ° 59 ′ 4" E | Bavaria wind power | Largest wind power plant in Bavaria when commissioned |
Baisweil wind turbine | 2018 | 3.6 | 1 | Senvion 3.6M140 (1 ×) | Baisweil | OAL | |||
Batzhausen wind turbine | 2001 | 0.6 | 1 | Pfleiderer PWE 650 (1 ×) | Batzhausen | NM | 49 ° 11 '25 "N, 11 ° 37' 46" E | Jura Energy | |
Beratzhausen-Buxlohe wind power plant | 2006 | 0.8 | 1 | Enercon E-48 (1 ×) | Buxlohe | R. | 49 ° 7 ′ 7 "N, 11 ° 49 ′ 47" E | ||
Wind turbine Bieberehren-Klingen | 2006 | 1.5 | 1 | Vestas V82-1.5MW (1 ×) | Sound | WÜ | 49 ° 29 ′ 7 ″ N, 9 ° 59 ′ 7 ″ E | ATM | |
Bohen wind turbine | 2002 | 0.6 | 1 | Enercon E-40 / 6.44 (1 ×) | Boom | MN | 47 ° 53 ′ 3 ″ N, 10 ° 17 ′ 24 ″ E | ||
Braunersreuth wind power plant | 2011 | 0.8 | 1 | Enercon E-53 (1 ×) | Braunersreuth | KU | 50 ° 13 ′ 20 ″ N, 11 ° 32 ′ 20 ″ E | ||
Brno wind power station | 2012 | 0.8 | 1 | Enercon E-53 (1 ×) | Brno | KT | 49 ° 51 '4 "N, 10 ° 21' 49" E | ||
|
|
|
|
|
|
|
|
|
Shutdown in 2014 and subsequent dismantling |
Burgstall wind turbine | 2013 | 2.5 | 1 | Vensys 112 (1 ×) | Burgstall | ON | 49 ° 5 ′ 32 "N, 10 ° 17 ′ 14" E | Citizen wind power Dinkelsbühl | |
Dachau-Etzenhausen wind power plant | 2013 | 2.3 | 1 | Enercon E-82 E2 (1 ×) | Etzenhausen | DAH | 48 ° 16 ′ 42 "N, 11 ° 25 ′ 57" E | ||
Dachau-Pellheim wind power plant | 2016 | 3.0 | 1 | Enercon E-115 (1 ×) | Dachau | DAH | 48 ° 17 ′ 7 "N, 11 ° 25 ′ 9" E | ||
Dentlein-Schwaighausen wind turbine | 2014 | 2.4 | 1 | Nordex N117 / 2400 (1 ×) | Schwaighausen (Dentlein a. F.) | ON | 49 ° 7 ′ 28 "N, 10 ° 24 ′ 33" E | ||
Dezenacker wind turbine | 2002 | 1.3 | 1 | AN Bonus 1300/62 (1 ×) | Dezenacker | ND | 48 ° 40 ′ 1 ″ N, 11 ° 5 ′ 20 ″ E | ||
Duttenbrunn wind turbine | 2009 | 2.0 | 1 | Vestas V90-2MW (1 ×) | Duttenbrunn | MSP | 49 ° 54 ′ 50 "N, 9 ° 42 ′ 27" E | Wotan | |
Ebenried wind turbine | 2014 | 3.05 | 1 | Enercon E-101 (1 ×) | Ebenried | RH | 49 ° 13 ′ 10 "N, 11 ° 15 ′ 45" E | ||
Engetried wind turbine | 2002 | 1.0 | 1 | Enercon E-58 (1 ×) | Engetried | MN | 47 ° 55 '12 "N, 10 ° 22' 26" E | ||
Wind turbine Erdweg | 2019 | 2.4 | 1 | Nordex N117 / 2400 (1 ×) | Erdweg | DAH | 48 ° 18 ′ 16 ″ N, 11 ° 16 ′ 4 ″ E | Wust wind & sun | |
Fernreuth wind turbine | 2001 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Fernreuth | BT | 49 ° 56 ′ 38 "N, 11 ° 20 ′ 17" E | ||
Fröttmaning wind turbine | 1999 | 1.5 | 1 | Enercon E-66 / 15.66 (1 ×) | Munich-Fröttmaning | M. | 48 ° 12 ′ 51 ″ N, 11 ° 37 ′ 49 ″ E | Beermann, Stadtwerke München | built near the Munich-North intersection and the Allianz Arena |
Gangkofen-Spitzgrub wind turbine | 1997 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Spitzgrub | PAN | 48 ° 27 ′ 41 "N, 12 ° 35 ′ 41" E | REG Regenerative Energy Gangkofen | |
Gibbach wind turbine | 2014 | 3.0 | 1 | Vestas V112-3.0MW (1 ×) | Kainricht | AS | 49 ° 33 '36 "N, 11 ° 50' 38" E | Wust, BWE Gibbach | |
Gerolsbach-Weilerau wind turbine | 2015 | 2.35 | 1 | Enercon E-92 (1 ×) | Gerolsbach | PAF | |||
Glött wind turbine | 2007 | 0.8 | 1 | Enercon E-53 (1 ×) | Glött | DLG | 48 ° 29 ′ 42 "N, 10 ° 28 ′ 3" E | Wind power Glött | |
Großhabersdorf-Vincenzbronn wind power plant | 2001 | 0.6 | 1 | DeWind D4 48/600 (1 ×) | Vincenzenbronn | FÜ | 49 ° 25 '23 "N, 10 ° 49' 8" E | ||
Haldenwang wind turbine | 2001 | 1.5 | 1 | Südwind S77 (1 ×) | Haldenwang | OA | 47 ° 48 ′ 6 ″ N, 10 ° 22 ′ 10 ″ E | ||
Harsdorf wind turbine | 1998 | 1.5 | 1 | Enercon E-66 / 15.66 (1 ×) | Altenreuth | KU | 50 ° 1 ′ 16 ″ N, 11 ° 36 ′ 5 ″ E | Beermann | erected at the Bayreuth / Kulmbach motorway triangle |
Haunsfeld wind turbine | 2001 | 1.0 | 1 | AN Bonus 1000/54 (1 ×) | Haunsfeld | EGG | 48 ° 51 '35 "N, 11 ° 2' 25" E | GEFUE | |
Hesselbach wind turbine | 2005 | 1.5 | 1 | Vestas V82-1.5MW (1 ×) | Hesselbach | SW | 50 ° 6 ′ 28 ″ N, 10 ° 18 ′ 12 ″ E | ||
Hinterbreitenthann wind turbine | 2002 | 1.5 | 1 | Südwind S77 (1 ×) | Hinterbreitenthann | ON | 49 ° 13 ′ 10 ″ N, 10 ° 21 ′ 14 ″ E | Wind power Krumbachtal | |
Hitzendorf wind turbine (Pöfersdorf wind turbine) | 2013 | 3.0 | 1 | Enercon E-101 (1 ×) | Heat village | NM | 49 ° 10 ′ 41 ″ N, 11 ° 47 ′ 14 ″ E | east wind | |
Hohenthann wind turbine | 2017 | 2.75 | 1 | GE Wind Energy 2.75-120 (1 ×) | Hohenthann | LA | |||
Jandelsbrunn-Kaltwasser wind turbine | 2009 | 0.2 | 1 | Vestas V25-200kW (1 ×) | Cold water | FRG | 48 ° 45 ′ 25 ″ N, 13 ° 41 ′ 8 ″ E | ||
Jengen-Eurishofen wind turbine | 2002 | 2.0 | 1 | Vestas V80-2MW (1 ×) | Eurishofen | OAL | 47 ° 58 ′ 32 "N, 10 ° 42 ′ 47" E | WindStromSüd GmbH | |
Kallmünz-Dinau wind turbine | 1996 | 0.1 | 1 | Fuhrländer FL 100 (1 ×) | Dinau | R. | 49 ° 9 ′ 24 ″ N, 11 ° 54 ′ 12 ″ E | ||
Kalsing wind turbine | 2002 | 0.75 | 1 | Lagerwey LW 50/750 (1 ×) | Kalsing | CHA | 49 ° 8 ′ 34 "N, 12 ° 33 ′ 10" E | Kalsinger wind energy | Refurbishment after a lightning strike in May 2015 |
Kammerberg wind turbine | 2015 | 3.0 | 1 | Enercon E-115 (1 ×) | Kammerberg | FS | 48 ° 23 ′ 15 ″ N, 11 ° 31 ′ 7 ″ E | Citizen energy Kammerberg | |
Kasberg wind turbine | 2000 | 1.5 | 1 | Enercon E-66 / 15.66 (1 ×) | Kasberg | FO | 49 ° 40 ′ 2 "N, 11 ° 12 ′ 59" E | ||
Kastl wind turbine | 2012 | 3.0 | 1 | Vestas V112-3.0MW (1 ×) | Kastl | AS | 49 ° 23 ′ 46 "N, 11 ° 41 ′ 37" E | Wust, BWE Kastl | |
Kienberg wind turbine | 1993 | 0.08 | 1 | Tacke TW 80 (1 ×) | Kienberg | ND | 48 ° 46 ′ 55 "N, 10 ° 59 ′ 26" E | Kugler | |
Langenwiesen wind turbine | 2014 | 3.05 | 1 | Enercon E-101 (1 ×) | Langenwiesen | PAF | |||
Larrieden wind turbine | 2011 | 2.0 | 1 | Enercon E-82 (1 ×) | Larrieden | ON | 49 ° 8 ′ 1 ″ N, 10 ° 15 ′ 50 ″ E | Citizen wind power Larrieden | erected on the A 7 |
Lauenhain wind turbine | 1997 | 1.5 | 1 | Enercon E-66 / 15.66 (1 ×) | Lauenhain | KC | 50 ° 27 '11 "N, 11 ° 24' 24" E | ||
Legau wind turbine | 2001 | 0.6 | 1 | Enercon E-40 / 6.44 (1 ×) | Legau | MN | 47 ° 51 '12 "N, 10 ° 9' 50" E | ||
Leutershausen-Tiefenthal wind power station | 2001 | 1.3 | 1 | AN Bonus 1300/62 (1 ×) | Tiefenthal | ON | 49 ° 19 ′ 12 ″ N, 10 ° 28 ′ 10 ″ E | ||
Lieritzhofen wind turbine | 2016 | 2.4 | 1 | Nordex N117 / 2400 (1 ×) | Lieritzhofen | LAU | 49 ° 24 ′ 34 "N, 11 ° 30 ′ 24" E | SRE Sachs | |
Losaurach wind turbine | 2006 | 2.0 | 1 | Enercon E-82 (1 ×) | Losaurach | NEA | 49 ° 32 ′ 16 "N, 10 ° 38 ′ 47" E | ||
Lustholz wind turbine | 2016 | 3.0 | 1 | Enercon E-115 (1 ×) | Riedhof | PAF | 48 ° 33 '0 "N, 11 ° 55' 35" E | Public energy Pfaffenhofen | |
Malching wind turbine | 2015 | 3.05 | 1 | Enercon E-101 (1 ×) | Malching | FFB | 48 ° 12 ′ 0 ″ N, 11 ° 11 ′ 7 ″ E | Stadtwerke Fürstenfeldbruck | |
Mammendorf wind turbine | 2014 | 3.05 | 1 | Enercon E-101 (1 ×) | Mammendorf | FFB | 48 ° 11 ′ 26 "N, 11 ° 10 ′ 29" E | Stadtwerke Fürstenfeldbruck | |
Markt Erlbach-Haidt wind power plant | 2005 | 2.0 | 1 | Vestas V90-2MW (1 ×) | Haidt | NEA | 49 ° 30 ′ 52 "N, 10 ° 40 ′ 24" E | Wust, community wind turbine market Erlbach | |
Marktbreit wind turbine | 2008 | 2.05 | 1 | REpower MM92 (1 ×) | Market wide | KT | 49 ° 40 ′ 21 "N, 10 ° 9 ′ 34" E | NATURAL WORKS | |
|
|
|
|
|
|
|
|
|
Self-supply of building yard with solar park, already dismantled |
Mögersbronn wind turbine | 2001 | 0.6 | 1 | Enercon E-40 / 6.44 (1 ×) | Mögersbronn | ON | 49 ° 7 ′ 56 "N, 10 ° 19 ′ 4" E | ||
Moosthann wind turbine | 2014 | 3.0 | 1 | Enercon E-101 (1 ×) | Moosthann | LA | 48 ° 40 ′ 25 "N, 12 ° 15 ′ 25" E | Stadtwerke Vilsbiburg | |
Wind power plant Neunburg vorm Wald | 2015 | 2.4 | 1 | Nordex N117 / 2400 (1 ×) | Neunburg vorm Wald | SAD | 49 ° 18 ′ 43 "N, 12 ° 21 ′ 40" E | Wust, BWE Neunburg vorm Wald, Voltgrün | |
Neuses am Berg wind power plant | 2015 | 3.05 | 1 | Enercon E-101 (1 ×) | Neuses on the mountain | KT | 49 ° 49 '52 "N, 10 ° 9' 44" E | Energy Bals | |
Wind turbine Oberhöhberg | 2001 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Oberhöhberg | WUG | 49 ° 11 ′ 43 "N, 10 ° 47 ′ 45" E | ||
Wind power station Oberostendorf | 2006 | 2.0 | 1 | Vestas V80-2MW (1 ×) | Lengenfeld | OAL | 47 ° 55 ′ 56 "N, 10 ° 46 ′ 28" E | WindStromSüd GmbH | |
Oberspiesheim wind turbine | 2016 | 0.8 | 1 | Enercon E-53 (1 ×) | Oberspiesheim | SW | |||
Oberwaltenkofen wind turbine | 1997 | 0.6 | 1 | Tacke TW 600 (1 ×) | Oberwaltenkofen | LA | 48 ° 36 '29 "N, 12 ° 4' 49" E | ||
Wind power plant Oberweiler | 2012 | 0.8 | 1 | Enercon E-53 (1 ×) | Oberweiler | OAL | |||
Ox thigh wind turbine | 2017 | 2.4 | 1 | Nordex N117 / 2400 (1 ×) | Ox thighs | ERH | |||
Ödwaldhausen wind turbine | 1992 | 0.08 | 1 | Lagerwey LW18 / 80 (1 ×) | Ödwaldhausen | TIR | 49 ° 49 ′ 30 "N, 12 ° 23 ′ 55" E | Desert wind | Two-winged |
Osterkling wind turbine (Hamberg wind turbine) | 2016 | 2.3 | 1 | Enercon E-82 E2 (1 ×) | Bruck-Hamberg | EBE | 48 ° 0 ′ 41 ″ N, 11 ° 57 ′ 8 ″ E | Wind energy Easter blade | |
Paunzhausen-Johanneck wind turbine | 2013 | 2.3 | 1 | Enercon E-82 E2 (1 ×) | Johanneck | FS | 48 ° 28 ′ 33 "N, 11 ° 35 ′ 34" E | erected on the A 9 | |
Peiting wind turbine | 2003 | 0.6 | 1 | DeWind D4 48/600 (1 ×) | Peiting | WM | 47 ° 46 ′ 59 "N, 10 ° 56 ′ 56" E | ||
Pfändhausen wind turbine | 2006 | 2.0 | 1 | Vestas V90-2MW (1 ×) | Pfandhausen | SW | 50 ° 8 ′ 53 "N, 10 ° 12 ′ 55" E | Wotan | |
Plößberg-Schönkirch wind power plant | 1990 | 0.25 | 1 | Micon M530-250 (1 ×) | Schönkirch | TIR | 49 ° 47 ′ 29 "N, 12 ° 17 ′ 56" E | ||
Pondorf wind turbine | 2013 | 2.0 | 1 | Vestas V90-2MW (1 ×) | Pondorf | EGG | 48 ° 56 ′ 25 "N, 11 ° 34 ′ 55" E | Jura Energy, Wind Power Kernl | |
Regensburg-Sallern wind turbine | 1998 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Regensburg-Sallern | R. | 49 ° 3 ′ 25 ″ N, 12 ° 6 ′ 47 ″ E | Wind power | |
Remlingen wind turbine | 2006 | 2.0 | 1 | Vestas V90-2MW (1 ×) | Remlingen | WÜ | 49 ° 48 ′ 11 "N, 9 ° 39 ′ 38" E | Wotan | |
Rennhofen wind turbine | 2003 | 0.6 | 1 | Enercon E-40 / 6.44 (1 ×) | Rennhofen | NEA | 49 ° 33 ′ 1 ″ N, 10 ° 39 ′ 5 ″ E | ||
Riedenburg-Ried wind turbine | 2014 | 3.0 | 1 | Enercon E-101 (1 ×) | reed | KEH | 48 ° 59 ′ 46 "N, 11 ° 44 ′ 34" E | ||
Rühlingstetten wind power plant | 2014 | 3.05 | 1 | Enercon E-101 (1 ×) | Rühlingstetten | ON | 48 ° 59 ′ 27 "N, 10 ° 25 ′ 2" E | Bürgerwind Rühlingstetten | |
Sassendorf wind turbine | 1998 | 1.5 | 1 | Enercon E-66 / 15.66 (1 ×) | Sassendorf | BA | 49 ° 59 ′ 46 "N, 10 ° 55 ′ 52" E | Bürgerwind Sassendorf, Boreas | |
|
|
|
|
|
|
|
|
Dismantling in November 2014 | |
Schnaitenbach-Trichenricht wind turbine | 2013 | 2.5 | 1 | GE Wind Energy 2.5-120 (1 ×) | Trichenricht | AS | 49 ° 29 ′ 45 "N, 12 ° 5 ′ 35" E | GE Wind Energy | Prototype of the GE Wind Energy 2.5-120 |
Wind turbine Schnaitsee-Schabingsföhr | 1998 | 1.0 | 1 | Husum shipyard HSW 1000/57 (1 ×) | Schabingsföhr | TS | |||
Wind turbine Schnaittenbach-Götzendorf | 2013 | 2.4 | 1 | Nordex N117 / 2400 (1 ×) | Götzendorf | AS | 49 ° 29 ′ 32 "N, 12 ° 4 ′ 21" E | Wust, BWE Schnaittenbach, Voltgrün | |
Schnebes wind turbine | 2001 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Nice | KU | 50 ° 14 ′ 7 ″ N, 11 ° 34 ′ 10 ″ E | ||
Schweitenkirchen-Hueb wind turbine | 2002 | 1.8 | 1 | Enercon E-66 / 18.70 (1 ×) | Hueb | PAF | 48 ° 31 '15 "N, 11 ° 35' 42" E | Beermann | |
Schweitenkirchen-Sünzhausen wind turbine | 2002 | 1.8 | 1 | Enercon E-66 / 18.70 (1 ×) | Sünzhausen | PAF | 48 ° 31 '16 "N, 11 ° 39' 47" E | Beermann | |
Seligweiler wind turbine | 2006 | 2.0 | 1 | Gamesa G87-2.0MW (10 ×) | Seligweiler | NU | 48 ° 27 '22 "N, 10 ° 2' 38" E | erected on the A 8 | |
Sellanger wind turbine | 1997 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Sellanger | HO | 50 ° 19 ′ 6 ″ N, 11 ° 47 ′ 9 ″ E | BOREAS | |
|
|
|
|
|
|
|
|
Two-winged, meanwhile dismantled | |
Thalberg wind turbine | 2000 | 0.6 | 1 | Enercon E-40 / 6.44 (1 ×) | Thalberg | PA | 48 ° 39 ′ 25 ″ N, 13 ° 46 ′ 0 ″ E | ||
Theilheim wind turbine | 2000 | 0.75 | 1 | Sea wind 52-750 (1 ×) | Theilheim | WÜ | 49 ° 46 '24 "N, 10 ° 2' 10" E | Volta wind power | |
Thürnhofen wind turbine | 2002 | 0.6 | 1 | Enercon E-40 / 6.44 (1 ×) | Thürnhofen | ON | 49 ° 10 ′ 14 "N, 10 ° 24 ′ 21" E | ||
Traunfeld wind power station | 2001 | 0.6 | 1 | Enercon E-40 / 6.44 (1 ×) | Traunfeld | NM | 49 ° 24 ′ 18 "N, 11 ° 28 ′ 17" E | Jura Energy | |
Wind power plant Urspringen-Süd | 2002 | 0.85 | 1 | Vestas V52-850kW (1 ×) | Urspringen | MSP | |||
Volkenschwand wind turbine | 2000 | 0.6 | 1 | Enercon E-40 / 6.44 (1 ×) | Dietrichsdorf | KEH | 48 ° 36 '54 "N, 11 ° 52' 14" E | Högl wind power | |
Wallmersbach wind turbine | 2002 | 1.5 | 1 | Südwind S77 (1 ×) | Wallmersbach | NEA | 49 ° 30 ′ 44 "N, 10 ° 11 ′ 2" E | VWPA, community wind turbine Wallmersbach | |
Wind turbine nodules | 2001 | 0.6 | 1 | DeWind D4 48/600 (1 ×) | Water balls | BT | 50 ° 5 ′ 4 ″ N, 11 ° 41 ′ 1 ″ E | Dismantling of 2 × DeWind D4 48/600 in February 2015 | |
Weihbüchl wind turbine | 2015 | 3.3 | 1 | Vestas V126-3.3MW (1 ×) | Kumhausen | LA | 48 ° 31 '57 "N, 12 ° 12' 33" E | Stadtwerke Landshut | |
Wind turbine vineyard | 2002 | 0.6 | 1 | Tacke TW 600a (1 ×) | Vineyard | ON | 49 ° 14 '22 "N, 10 ° 20' 57" E | erected on the A 6 | |
Weinried wind turbine | 2000 | 0.6 | 1 | Vestas V44-600kW (1 ×) | Weinried | MN | 48 ° 8 ′ 8 ″ N, 10 ° 17 ′ 6 ″ E | Transmitting systems on the tower of the system | |
Westheim wind turbine | 2002 | 1.8 | 1 | Enercon E-66 / 18.70 (1 ×) | Westheim | KT | 49 ° 44 ′ 54 "N, 10 ° 2 ′ 41" E | erected on the A3 | |
Wildenberg wind turbine | 2016 | 3.3 | 1 | Vestas V126-3.3MW (1 ×) | Wunsiedel | WUN | 50 ° 3 ′ 26 "N, 12 ° 0 ′ 32" E | ZukunftsEnergie Fichtelgebirge / Ostwind | |
Willenhofen wind turbine | 1999 | 0.5 | 1 | Enercon E-40 / 5.40 (1 ×) | Willenhofen | NM | 49 ° 2 ′ 20 "N, 11 ° 43 ′ 26" E | ||
Wittesheim wind turbine | 2002 | 1.8 | 1 | Enercon E-66 / 18.70 (1 ×) | Wittesheim | DON | 49 ° 52 ′ 26 "N, 11 ° 54 ′ 42" E | EW Wittesheim | |
Zeilarn-Haid wind turbine | 2000 | 0.6 | 1 | Enercon E-40 6.44 (1 ×) | Haid | PAN | 48 ° 19 ′ 19 ″ N, 12 ° 51 ′ 35 ″ E | ||
Wind turbines Arnshoechstädt | 2017 | 5.0 | 2 | Vensys 112 (2 ×) | Arnshoechstädt | NEA | |||
Arzberg-Schacht wind turbines | 1999 | 1.2 | 2 | DeWind D4 48/600 (2 ×) | Manhole | WUN | 50 ° 4 ′ 16 ″ N, 12 ° 10 ′ 27 ″ E | ||
Aschbach wind turbines | 2017 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Aschbach | BA | |||
Baar wind turbines | 2017 | 6.0 | 2 | Nordex N117 / 3000 (2 ×) | Baar | AIC | |||
Bernbach wind turbines | 2002 | 3.6 | 2 | Enercon E-66 / 18.70 (2 ×) | Bernbach | OAL | 47 ° 50 ′ 15 "N, 10 ° 42 ′ 2" E | Beermann | |
Bernhardswinden wind turbines | 2014 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Bernhardswinden | ON | 49 ° 15 ′ 14 "N, 10 ° 34 ′ 21" E | Eco energy, BWP Hohenlohe | erected on the A 6 |
Bidingen wind turbines | 2014 | 6.05 | 2 |
Enercon E-101 (1 ×) Enercon E-115 (1 ×) |
Bidingen | OAL | 47 ° 49 ′ 18 "N, 10 ° 44 ′ 51" E | Municipalities of Bidingen and Ingenried | |
Birgland wind turbines | 2014 | 6.0 | 2 | Vestas V112-3.0MW (2 ×) | Birgland | AS | 49 ° 24 ′ 11 "N, 11 ° 34 ′ 45" E | east wind | |
Wind turbines in Bräuersdorf | 2010 | 4.0 | 2 | Enercon E-82 (2 ×) | Bräuersdorf | NEA | 49 ° 31 ′ 31 ″ N, 10 ° 45 ′ 54 ″ E | ||
Wind turbines at Bucher Höhe | 2010 | 4.6 | 2 | Enercon E-70 E4 (2 ×) | book | HAS | 50 ° 2 ′ 50 "N, 10 ° 24 ′ 11" E | Stadtwerke Haßfurt | |
Burgerroth wind turbines | 2003 2011 |
4.0 | 2 |
Vestas V80-2MW (1 ×) Vestas V90-2MW (1 ×) |
Burgerroth | WÜ | 49 ° 31 '46 "N, 10 ° 1' 2" E | IWE | |
Burgsalach wind turbines | 2015 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Burgsalach | WUG | |||
Burk wind turbines | 2016 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Burk | ON | |||
Deindorf wind turbines | 2015 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Deindorf | SAD | 49 ° 34 ′ 3 ″ N, 12 ° 14 ′ 1 ″ E | Voltgrün, REWAG | erected on both sides of the A 6 |
Wind turbines in Denklingen | 2003 2004 |
4.0 | 2 | Vestas V80-2MW (2 ×) | Thinkers | LL | 47 ° 54 ′ 10 "N, 10 ° 49 ′ 31" E | WindStromSüd GmbH | |
Wind turbines Diespeck-Dettendorf | 2009 | 4.0 | 2 | Vestas V90-2MW (2 ×) | Dettendorf | NEA | 49 ° 35 ′ 22 "N, 10 ° 41 ′ 45" E | Wust, BWE Diespeck | |
Wind turbines Dietersdorf | 2017 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Dietersdorf | ERH | |||
Wind turbines Dürrnfarrnbach | 2011 | 4.6 | 2 | Enercon E-82 E2 (2 ×) | Dürrnfarrnbach | FÜ | 49 ° 28 ′ 6 "N, 10 ° 44 ′ 50" E | Wust, WUW wind farm Unterulsenbach-Wilhermsdorf | |
Wind turbines Ebern | 2001 2003 |
3.3 | 2 |
Südwind S77 (1 ×) Enercon E-66 / 18.70 (1 ×) |
Fierst Hemmendorf |
HAS | 50 ° 6 ′ 24 "N, 10 ° 50 ′ 11" E | Bretzenstein wind energy | Rotor blade at Südwind turbine broken off in 2012 |
Edelsfeld wind turbines | 2011 2012 |
4.6 | 2 | Enercon E-82 E2 (2 ×) | Edelsfeld | AS | 49 ° 33 ′ 46 "N, 11 ° 41 ′ 27" E | Ostwind, Wust, BWE Edelsfeld | |
Gangkofen-Dirnaich wind turbines | 1998 | 1.0 | 2 | Enercon E-40 / 5.40 (2 ×) | Dirnaich | PAN | 48 ° 26 ′ 32 "N, 12 ° 29 ′ 24" E | ||
Gössersdorf wind turbines | 2001 2002 |
1.2 | 2 | DeWind D4 48/600 (2 ×) | Goessersdorf | KC | 50 ° 11 ′ 28 "N, 11 ° 25 ′ 12" E | ||
Gutenstetten wind turbines | 2010 | 4.6 | 2 | Enercon E-82 E2 (2 ×) | Gutenstetten | NEA | 49 ° 36 ′ 28 "N, 10 ° 39 ′ 41" E | Wust, BWE Gutenstetten | |
Haimburg wind turbines | 1998 1999 |
1.0 | 2 | Enercon E-40 / 5.40 (2 ×) | Haimburg | NM | 49 ° 21 ′ 7 ″ N, 11 ° 28 ′ 0 ″ E | Jura Energy | |
Helena wind turbines | 2013 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Helena | NM | 49 ° 15 ′ 35 "N, 11 ° 30 ′ 47" E | Maxwind , Jura Energy | |
Wind turbines Hellersbach | 2016 | 6.6 | 2 | Vestas V126-3.3MW (2 ×) | Hellenbach | ON | |||
Herrberchtheim wind turbines | 2013 | 6.1 | 2 | Enercon E-101 (2 ×) | Herrnberchtheim | NEA | 49 ° 35 '53 "N, 10 ° 10' 49" E | juwi , VWPA, Bürgerwindrad Herrnberchtheim | erected on the A 7 |
Wind turbines Hüll | 2016 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Envelope | BT | 49 ° 41 ′ 31 ″ N, 11 ° 26 ′ 20 ″ E | Bürgerwindkraft Betzenstein | |
Wind turbines Köngetried | 2002 | 1.2 | 2 | AN Bonus 600/44 (2 ×) | Köngetried | MN | 47 ° 58 ′ 23 "N, 10 ° 26 ′ 53" E | Honold Windkraft GmbH | |
Wind turbines in Königstein-Kürmreuth | 2014 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Kürmreuth | AS | 49 ° 36 ′ 51 ″ N, 11 ° 40 ′ 29 ″ E | Wust, BWE Königstein, Voltgrün | |
Wind turbines Kugl | 1999 | 1.5 | 2 | Lagerwey LW 50/750 (2 ×) | Ball | DGF | 48 ° 35 ′ 30 "N, 12 ° 42 ′ 15" E | Wind power ball | |
Wind turbines in Kühlenthal-Langenreichen | 2013 | 4.7 | 2 | Nordex N117 / 2400 (1 ×) |
Fertingen Langenreichen |
A. | 48 ° 33 ′ 52 "N, 10 ° 46 ′ 55" E | GP JOULE | |
Lamerdingen wind turbines | 2014 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Lamerdingen | OAL | 48 ° 6 ′ 12 ″ N, 10 ° 45 ′ 4 ″ E | Bürgerwind Lamerdingen | |
Wind turbines Langenaltheim-Nord | 2011 2013 |
5.35 | 2 |
Enercon E-82 E2 (1 ×) Enercon E-101 (1 ×) |
Langenaltheim | WUG | 48 ° 54 '22 "N, 10 ° 55' 48" E | 2001–2005 in the same place 2 × Enron Wind 1.5sl , dismantled again due to planning errors | |
Langenaltheim-Süd wind turbines | 2001 2003 |
1.6 | 2 |
Enercon E-40 / 6.44 (1 ×) Enercon E-58 (1 ×) |
Langenaltheim | WUG | 48 ° 53 ′ 3 "N, 10 ° 56 ′ 53" E | ||
Wind turbines Langenzenn-Kirchfarrnbach | 2016 | 6.6 | 2 | Vestas V126-3.3MW (2 ×) | Kirchfarrnbach | FÜ | |||
Litterzhofen wind turbines | 2001 | 1.2 | 2 | Enercon E-40 / 6.44 (2 ×) | Litterzhofen | EGG | 49 ° 4 ′ 34 "N, 11 ° 23 ′ 40" E | Jura Energy | |
Lützenreuth wind turbines | 2007 | 4.0 | 2 | Enercon E-70 (2 ×) | Lützenreuth | BT | 49 ° 53 ′ 56 "N, 10 ° 8 ′ 58" E | IB Glockner | |
Mähring-Asch wind turbines (Aschberg wind turbines) | 2017 | 4.6 | 2 | Enercon E-82 E2 (2 ×) | Mähring | TIR | |||
Mähring-Laub wind turbines (Wetterberg wind turbines) | 2017 2018 |
6.1 | 2 | Enercon E101 (2 ×) | Mähring | TIR | 49 ° 52 ′ 6 ″ N, 12 ° 26 ′ 18 ″ E | east wind | |
Mainstockheim wind turbines | 2012 | 4.0 | 2 | Vestas V90-2MW (2 ×) | Mainstockheim | KT | 49 ° 46 ′ 55 "N, 10 ° 7 ′ 15" E | Volta wind power | erected on the A3 |
Mallerstetten wind turbines | 2016 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Mallerstetten | NM | |||
Wind turbines market Taschendorf | 2016 | 6.6 | 2 | Vestas V112-3.3MW (2 ×) | Taschendorf market | NEA | |||
Marktschorgast wind turbines | 2003 | 4.0 | 2 | REpower MM82 (2 ×) | Marktschorgast | KU | 50 ° 6 ′ 8 ″ N, 11 ° 40 ′ 31 ″ E | Green Energy, Nevisio | |
Mönchsroth wind turbines | 2016 | 6.9 | 2 | Vestas V112-3.45MW (2 ×) | Mönchsroth | ON | |||
Wind turbines in Neunkirchen | 2013 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Neunkirchen | Mil | 49 ° 41 ′ 58 "N, 9 ° 22 ′ 15" E | Stadtwerke Tübingen , Green City Energy | |
Wind turbines palling | 2005 | 3.0 | 2 | REpower MD77 (2 ×) | Palling | TS | 48 ° 1 ′ 10 "N, 12 ° 37 ′ 50" E | EmZ Bad Endorf community wind farm Palling-Baumham |
|
Pfeffenhausen wind turbines | 2019 | 4.7 | 2 | Enercon E-103 EP2 (2 ×) | Pfeffenhausen | LA | 48 ° 38 ′ 32 "N, 11 ° 59 ′ 18" E | Primus energy | |
Wind turbines Reichholz | 2002 | 1.2 | 2 | Enercon E-40 / 6.44 (2 ×) | Rich wood | OAL | 47 ° 51 ′ 28 "N, 10 ° 26 ′ 24" E | ||
Wind turbines clearing | 2009 | 4.0 | 2 | Vestas V90-2MW (2 ×) | Clearing | MSP | 49 ° 54 ′ 16 "N, 9 ° 38 ′ 19" E | Wotan | |
Schiederhof wind turbines | 2018 | 7.2 | 2 | Vestas V136-3.6MW (2 ×) | Wiesenfelden | SR | 49 ° 1 '49 "N, 12 ° 30' 44" E | east wind | first turbines with a hub height of 149 m and the first wind farm with this type of turbine in Bavaria; Expansion planned |
Wind turbines Schnaitsee-Garting | 1995 | 1.2 | 2 | Tacke TW 600 (2 ×) | Garting | TS | 48 ° 4 ′ 45 "N, 12 ° 21 ′ 44" E | WP Schnaitsee-Garting | |
Schrattenbach wind turbines | 2001 2007 |
3.3 | 2 |
AN Bonus 1300/62 (1 ×) Enercon E-82 (1 ×) |
Schrattenbach | OA | 47 ° 50 ′ 35 "N, 10 ° 19 ′ 17" E | ||
Wind turbines Schraudenbach | 2002 2003 |
2.0 | 2 | Enercon E-58 (2 ×) | Schraudenbach | SW | 49 ° 59 ′ 19 ″ N, 10 ° 0 ′ 14 ″ E | ||
Sindersdorf wind turbines | 2016 | 5.5 | 2 | GE Wind Energy 2.75-120 (2 ×) | Sindersdorf | RH | 49 ° 10 ′ 14 "N, 11 ° 15 ′ 32" E | Green City Energy | erected on the A 9 |
Speicherersdorf-Wirbenz wind turbines | 2001 | 1.5 | 2 | Lagerwey LW 50/750 (2 ×) | Wirbenz | BT | 49 ° 51 ′ 42 "N, 11 ° 50 ′ 4" E | ||
Trunstadt-Lisberg wind turbines | 2017 | 6.1 | 2 | Enercon E-101 (2 ×) |
Trunstadt Lisberg |
BA | |||
Ursensollen wind turbines | 2013 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Ursensollen | AS | 49 ° 24 '50 "N, 11 ° 43' 34" E | Ostwind, Wust, BWE Ursensollen | |
Wind turbines Vasbühl | 2006 | 4.0 | 2 | Vestas V90-2MW (2 ×) | Vasbühl | SW | 50 ° 1 '14 "N, 10 ° 2' 26" E | Wotan | |
Veitsbronn wind turbines | 2016 | 4.8 | 2 | Nordex N117 / 2400 (2 ×) | Reinsdorf | FÜ | 49 ° 29 '26 "N, 10 ° 51' 10" E | VenSol New Energies | |
Waidhaus wind turbines | 2000 | 2.6 | 2 | AN Bonus 1300/62 (2 ×) | Frankenreuth | NEW | 49 ° 39 ′ 3 ″ N, 12 ° 31 ′ 1 ″ E | Denker & Wulf, Theolia | erected directly on the border with the Czech Republic |
Waigolshausen wind turbines | 2013 | 5.0 | 2 | Nordex N100 / 2500 (2 ×) | Waigolshausen | SW | 49 ° 58 ′ 11 "N, 10 ° 8 ′ 28" E | Volta wind power | |
Waizenried wind turbines | 2000 | 1.2 | 2 | Enercon E-40 / 6.44 (2 ×) | Waizenried | OAL | 47 ° 48 ′ 40 "N, 10 ° 23 ′ 33" E | ||
Wind turbines Warmisried | 2003 2009 |
2.05 | 2 |
DeWind D6 62/1250 (1 ×) Enercon E-53 (1 ×) |
Warmisried | MN | 47 ° 56 ′ 44 "N, 10 ° 30 ′ 28" E | Honold Windkraft GmbH | |
Wind turbines Welbhausen | 2007 | 4.0 | 2 | Vestas V90-2MW (2 ×) | Welbhausen | NEA | 49 ° 30 ′ 56 ″ N, 10 ° 12 ′ 7 ″ E | VWPA, community wind turbine Welbhausen / Buchklingen | erected on the A 7 |
Wengen wind turbines | 2006 2007 |
2.5 | 2 | DeWind D6 64/1250 (2 ×) | Wengen | ND | 48 ° 39 ′ 53 "N, 11 ° 2 ′ 20" E | ||
Wind turbines Wettingen | 2017 2018 |
4.8 | 2 | Nordex N117 / 2400 (2 ×) | Wettingen | ON | |||
Wind turbines Wilhelmsdorf-Oberlbach | 2011 | 6.0 | 2 | Vestas V112-3.0MW (2 ×) | Oberlbach | NEA | 49 ° 35 ′ 23 "N, 10 ° 44 ′ 9" E | Wilhelmsdorf community wind turbine | |
Winnberg-Süd wind turbines | 2004 2012 2015 |
6.2 | 2 |
Senvion 3.0M122 (1 ×) Senvion 3.2M114 (1 ×) |
Winnberg | NM | Windpower, Maxwind | Repowering 2015 (1 × Senvion 3.0M122 instead of 1 × Enercon E-58 ) | |
Winnberg-Tauernfeld wind turbines | 2004 2010 2015 |
6.4 | 2 |
REpower 3.4M104 (1 ×) Siemens SWT-3.0-113 (1 ×) |
Winnberg Tauernfeld |
NM | 49 ° 13 ′ 20 ″ N, 11 ° 29 ′ 12 ″ E | Windpower, Maxwind | Repowering 2015 (1 × Siemens SWT-3.0-113 instead of 1 × Enercon E-58 ) |
Adelhofen-Gollachostheim-Pfahlheim-Ost wind farm | 2005 2014 |
11.2 | 5 |
Vestas V90-2MW (2 ×) Nordex N117 / 2400 (3 ×) |
Adelhofen Gollachostheim Pfahlenheim |
NEA | 49 ° 32 '59 "N, 10 ° 9' 22" E | Eco-energy, BWP Adelhofen-Gollachostheim | erected on the A 7 |
Adelshofen-Ohrbach wind farm | 2004 2006 |
4.0 | 3 |
Enercon E-58 (2 ×) Vestas V90-2MW (1 ×) |
Adelshofen Ohrbach |
ON | 49 ° 26 '50 "N, 10 ° 11' 23" E | ||
Altertheim-Helmstadt-Neubrunn wind farm | 2002 2012 2013 2014 2015 2016 |
28.65 | 13 |
Enercon E-40 / 6.44 (2 ×) Enercon E-82 E2 (1 ×) Nordex N117 / 2400 (4 ×) Nordex N100 / 2500 (5 ×) Enercon E-115 (1 ×) |
Altertheim Helmstadt Neubrunn |
WÜ | 49 ° 44 ′ 28 "N, 9 ° 44 ′ 1" E | Green City Energy, Citizen Energy Altertheim; ABO Wind , GDF Suez , WSW ; BadenWind, Energie Bals | |
Aschfeld wind farm | 2006 2009 |
10.0 | 5 | Vestas V90-2MW (5 ×) | Aschfeld | MSP | 49 ° 59 ′ 40 "N, 9 ° 50 ′ 55" E | Wotan | |
Bavarian Odenwald wind farm | 2013 | 12.0 | 5 | Nordex N117 / 2400 (5 ×) |
Heppdiel Windischen beeches |
Mil | 49 ° 39 ′ 51 ″ N, 9 ° 20 ′ 30 ″ E | Green City Energy | |
Berching wind farm | 1998 2001 2012 2013 |
26.9 | 10 |
Enercon E-40 / 5.40 (1 ×) NEG Micon NM60 / 1000 (1 ×) REpower 3.2M114 (7 ×) Vestas V112-3.0MW (1 ×) |
Berching | NM | 49 ° 5 ′ 54 "N, 11 ° 29 ′ 30" E | Windpower, Maxwind , Wust, BWE Ernersdorf-Berching | Repowering 2013 (1 × REpower 3.2M114 instead of 1 × Enercon E-58 ), first repowering project in Bavaria |
Berg-Espich wind farm | 2013 2014 2015 |
26.15 | 11 |
Enercon E-70 E4 (2 ×) Enercon E-82 E2 (4 ×) Nordex N100 / 2500 (4 ×) Enercon E-92 (1 ×) |
Mountain juniper bush |
HO | 50 ° 21 ′ 16 ″ N, 11 ° 46 ′ 25 ″ E | CEE Berg-Espich wind farm, natural power | erected on the A 9 |
Berg-Schnarchenreuth wind farm | 1997 2004 2007 2008 |
7.9 | 6th |
Tacke TW 600 (1 ×) NEG Micon NM82 / 1500 (3 ×) Enercon E-48 (1 ×) Enercon E-82 (1 ×) |
Snoring Reuth | HO | 50 ° 23 ′ 32 "N, 11 ° 46 ′ 33" E | erected on the A 9 | |
Bettenfeld wind farm | 2014 | 12.2 | 4th | Enercon E-101 (4 ×) | Bettenfeld | ON | 49 ° 19 ′ 57 ″ N, 10 ° 8 ′ 4 ″ E | juwi , E-Park I, E-Park II, E-Park III | |
Birkenfels wind farm | 2015 | 10.0 | 4th | Vensys 112 (4 ×) | Birch rock | ON | 49 ° 22 ′ 21 ″ N, 10 ° 32 ′ 37 ″ E | Citizen WP Birkenfels, NorA | |
Bischberg wind farm (incl. Unterried wind farm) | 2011 2012 2014 |
18.3 | 7th |
Vestas V90-2MW (2 ×) Vestas V112-3.0MW (4 ×) Enercon E-82 E2 (1 ×) |
Bischberg Unterried |
NM | 49 ° 22 ′ 38 "N, 11 ° 28 ′ 49" E | SRE Sachs, Maxwind ; Jura Energy, juwi , Windpower, Green City Energy | |
Blue column line wind farm | 2014 | 7.2 | 3 | Nordex N117 / 2400 (3 ×) | Arzberg | WUN | 50 ° 2 ′ 51 ″ N, 12 ° 13 ′ 0 ″ E | east wind | |
Blumenthaler Forst wind farm | 2016 | 14.4 | 6th | Nordex N117 / 2400 (6 ×) |
Sielenbach blades |
AIC | 48 ° 24 '43 "N, 11 ° 7' 46" E | Energy farmers | |
Böhen-Günzegg wind farm | 2002 | 1.8 | 3 | Enercon E-40 / 6.44 (3 ×) | Günzegg | MN | 47 ° 52 ′ 29 "N, 10 ° 21 ′ 11" E | ||
Braunersgrün wind farm | 1999 2001 2012 2014 2016 |
13.15 | 8th |
DeWind D4 48/600 (4 ×) Vestas V112-3.0MW (1 ×) Vensys 112 (2 ×) GE Wind Energy 2.75-120 (1 ×) |
Stemmasgrün Braunersgrün Thiersheim |
WUN | 50 ° 4 ′ 55 "N, 12 ° 4 ′ 59" E | Ostwind, ZukunftsEnergie Fichtelgebirge, Comon Sense Energy |
Repowering 2014 (2 × Vensys 112 instead of 2 × DeWind D4 48/600 ) |
Brenntenberg wind farm | 2011 2012 |
9.15 | 3 | Enercon E-101 (3 ×) | Rechberg | R. | 49 ° 7 ′ 51 ″ N, 11 ° 51 ′ 47 ″ E | East wind, TWS | erected along the A3 |
Brugger Forst wind farm | 2014 | 12.0 | 5 | Nordex N117 / 2400 (5 ×) | Odelzhausen | DAH | 48 ° 20 ′ 12 "N, 11 ° 10 ′ 29" E | Uhl wind power | erected on the A 8 |
Brünnstadt wind farm | 2014 | 9.6 | 3 | REpower 3.2M114 (3 ×) | Brno city | SW | 49 ° 53 ′ 37 "N, 10 ° 17 ′ 45" E | ABO Wind , GGEW | |
Buchau-Körbeldorf wind farm | 2016 2017 |
16.8 | 5 |
Vestas V112-3.3MW (3 ×) Vestas V126-3.45MW (2 ×) |
Buchau Körbeldorf |
BT | 49 ° 47 ′ 1 ″ N, 11 ° 31 ′ 1 ″ E | Ostwind, city of Pegnitz | erected on the A 9 |
Buchbrunn-Mainstockheim wind farm | 2006 2009 |
8.0 | 5 |
Vestas V82-1.5MW (4 ×) Vestas V90-2MW (1 ×) |
Buchbrunn Mainstockheim |
KT | 49 ° 46 ′ 2 "N, 10 ° 6 ′ 43" E | Volta wind power | erected on the A 7 |
Bucheck wind farm | 2015 | 9.6 | 4th | Nordex N117 / 2400 (4 ×) |
Gefrees Zell |
HO BT |
50 ° 5 ′ 29 "N, 11 ° 41 ′ 45" E | Lacuna, Fronteris, Primus Energie | |
Büchenbach wind farm | 2012 2013 |
12.0 | 4th | Vestas V112-3.0MW (4 ×) | Büchenbach | BT | 49 ° 48 ′ 25 "N, 11 ° 30 ′ 12" E | Ostwind, city of Pegnitz | erected on the A 9 |
Buchschwabach wind farm | 2001 2014 |
3.6 | 3 |
Enercon E-40 / 6.44 (2 ×) Nordex N117 / 2400 (1 ×) |
Buchschwabach | FÜ | 49 ° 22 ′ 6 "N, 10 ° 51 ′ 26" E | Green City Energy | |
Creußen-Neuhof wind farm | 2004 2016 |
9.3 | 5 |
NEG Micon NM82 / 1500 (3 ×) Nordex N117 / 2400 (2 ×) |
Neuhof Prebitz |
BT | 49 ° 50 ′ 10 "N, 11 ° 39 ′ 47" E | SoWiTec, FWR energy | |
Creußen-Unterschwarzach wind farm | 2017 | 14.4 | 6th | Nordex N117 / 2400 (6 ×) |
Unterschwarzach Oberschwarzach Frankenberg |
BT | |||
Deining wind farm (including Zieger wind farm and Velburg wind farm) | 2003 2009 2011 2013 2014 2015 |
46.3 | 20th | Pfleiderer PWE 650 (3 ×) Enercon E-82 (1 ×) Enercon E-82 E2 (5 ×) REpower 3.2M114 (5 ×) Senvion 3.0M122 (1 ×) Nordex N117 / 2400 (5 ×) |
Deining Harenzhofen Lengenfeld Mantlach Oberbuchfeld Unterbuchfeld |
NM | 49 ° 13 ′ 23 "N, 11 ° 34 ′ 52" E | Jura Energy, Windpower; Green City Energy, volt green; Ostwind, Energy Alliance Bavaria | |
Denkendorf-Nord wind farm | 2013 2014 |
14.1 | 6th | Enercon E-92 (6 ×) | Dörndorf | EGG | 48 ° 57 ′ 24 "N, 11 ° 28 ′ 48" E | Community wind farm Denkendorf, NeoVis Energie | |
Denkendorf-West wind farm | 2001 2013 |
6.3 | 3 |
Enercon E-66 / 15.66 (1 ×) Nordex N117 / 2400 (2 ×) |
Denkendorf | EGG | 48 ° 55 ′ 39 "N, 11 ° 25 ′ 41" E | Beermann, maxwind | |
Dietenhofen-Neuhof wind farm | 2012 2016 |
15.9 | 5 |
Vestas V112-3.0MW (2 ×) Vestas V126-3.3MW (3 ×) |
Neudorf Neuhof |
TO NEA |
49 ° 25 ′ 28 "N, 10 ° 39 ′ 50" E | juwi , Wust, Bürgerwind Neudorf-Dietenhofen | |
Dinkelsbühl-Wilburgstetten wind farm | 2015 | 13.2 | 4th | Vestas V126-3.3MW (4 ×) |
Sinbronn Wilburgstetten |
ON | 49 ° 2 '39 "N, 10 ° 23' 24" E | ABO Wind , Stadtwerke Stuttgart | |
Dipbach wind farm | 2012 2013 2015 |
19.5 | 9 |
Enercon E-82 (4 ×) Enercon E-82 E2 (5 ×) |
Dipbach | WÜ | 49 ° 53 ′ 56 "N, 10 ° 8 ′ 58" E | Citizen energy Pleichach-Kürnach, GSW, Energie Bals | |
Dürrwangen-Sulzach wind farm | 2012 | 6.9 | 3 | Enercon E-82 E2 (3 ×) | Sulzach | ON | 49 ° 7 ′ 9 ″ N, 10 ° 20 ′ 16 ″ E | juwi , BWE Dürrwangen | |
Eckersdorf wind farm | 2017 | 19.2 | 8th | Nordex N117 / 2400 (8 ×) |
Eckersdorf Lochau |
BT KU |
|||
Elfershausen wind farm | 2020 | 14.4 | 3 | GE Wind Energy 4.8-158 (3 ×) | Elfertshausen | KG | 50 ° 6 ′ 0 ″ N, 9 ° 59 ′ 25 ″ E | Prowind | builds the first GE systems of the "Cypress" series in Germany
on the A 7 |
Ellenfeld wind farm | 1994 2013 |
5.6 | 4th |
Enercon E-40 / 5.40 (2 ×) Enercon E-82 E2 (2 ×) |
Ellenfeld | TIR | 49 ° 50 ′ 29 "N, 12 ° 25 ′ 56" E | Frontier wind | |
Emskirchen-Dürrnbuch wind farm | 2007 2008 |
6.15 | 3 | REpower MM92 (3 ×) | Dürrnbuch | NEA | 49 ° 39 ′ 2 "N, 9 ° 23 ′ 43" E | WSB | |
Englmannsberg wind farm | 2014 | 9.15 | 3 | Enercon E-101 (3 ×) | Englmannsberg | PAF | 48 ° 32 '52 "N, 11 ° 22' 17" E | ||
Enzlarer Berg wind farm | 2015 2016 |
9.4 | 4th | Enercon E-92 (4 ×) |
Enzlar Oberambach |
NEA | 49 ° 41 ′ 4 "N, 10 ° 23 ′ 21" E | Citizens WP Enzlarer Berg | |
Erbendorf-Wildenreuth wind farm | 1994 2003 |
2.63 | 4th |
Tacke TW 80 (1 ×) Frisia F56 / 850 (3 ×) |
Wildenreuth | TIR | 49 ° 48 ′ 39 "N, 12 ° 4 ′ 32" E | wind 7 | |
Erlach wind farm | 2009 2010 2014 |
15.25 | 7th |
Enercon E-82 (5 ×) Enercon E-82 E2 (1 ×) Enercon E-101 (1 ×) |
Erlach | WÜ | 49 ° 43 ′ 3 "N, 10 ° 2 ′ 54" E | Windy , Energie Bals | |
Erlauholz wind farm (Bachern wind farm) | 2015 | 7.2 | 3 | Nordex N117 / 2400 (3 ×) | Bachern | AIC | 48 ° 19 ′ 1 ″ N, 11 ° 1 ′ 40 ″ E | Uhl wind power | |
Ermetzhofen wind farm | 2009 2011 |
6.0 | 3 | Vestas V90-2MW (3 ×) | Ermetzhofen | NEA | 49 ° 29 ′ 39 ″ N, 10 ° 15 ′ 17 ″ E | VWPA, community wind turbine Ermetzhofen / Hardt | |
Fasanerie wind farm (Gattendorf wind farm) | 2010 2012 |
13.0 | 6th |
Enercon E-82 (5 ×) Vestas V112-3.0MW (1 ×) |
Gattendorf Trogenau |
HO | 50 ° 19 '32 "N, 12 ° 1' 51" E | Ostwind, REWAG | erected on the A 93 , Bavaria's first forest wind farm |
Feistelberg wind farm | 2019 | 10.8 | 3 | Nordex N131 / 3600 (3 ×) | Wernberg-Koeblitz | SAD | 49 ° 33 '50 "N, 12 ° 10' 34" E | east wind | |
Forst-Waldsachsen wind farm | 2003 2011 2012 2014 |
23.2 | 11 |
Enercon E-58 (2 ×) Enercon E-70 E4 (1 ×) Enercon E-82 E2 (5 ×) Nordex N100 / 2500 (2 ×) Nordex N117 / 2400 (1 ×) |
Forest of Waldsachsen |
SW | 50 ° 3 ′ 1 ″ N, 10 ° 21 ′ 2 ″ E | juwi , ÜZ Schonungen wind farm, Stadtwerke Schweinfurt, Mainfranken regenerativ, ÜZ Lülsfeld | |
Freudenberg wind farm | 2011 2016 |
8.05 | 3 |
Enercon E-82 E2 (2 ×) Vestas V112-3.45MW (1 ×) |
Joke lesson | AS | 49 ° 29 ′ 32 "N, 12 ° 1 ′ 24" E | Citizen wind Freudenberg, natural electricity, volt green | |
Fuchsstadt wind farm | 2019 2020 |
23.4 | 6th |
Senvion 3.7M144 (3 ×) Nordex N131 / 3900 (2 ×) Nordex N149 / 4500 (1 ×) |
Fuchsstadt Hammelburg |
KG | 50 ° 4 ′ 34 "N, 9 ° 56 ′ 43" E | Green City | |
Gädheim wind farm | 2014 | 7.05 | 3 | Enercon E-92 (3 ×) | Gädheim | SW | 50 ° 1 ′ 58 ″ N, 10 ° 21 ′ 0 ″ E | Energy Bals | |
Gauaschach wind farm | 2011 | 6.0 | 3 | Vestas V100-2MW (3 ×) | Gauaschach | KG | 50 ° 3 ′ 46 ″ N, 9 ° 56 ′ 6 ″ E | Wotan | |
Geroldsgrün-Langenbach wind farm | 2001 2003 |
4.5 | 3 | Südwind S70 (3 ×) | Langenbach | HO | 50 ° 22 ′ 56 "N, 11 ° 35 ′ 13" E | ||
Gerolsbach wind farm | 2015 | 7.2 | 3 | Nordex N117 / 2400 (3 ×) | Gerolsbach | PAF |
48 ° 30 ′ 31 ″ N, 11 ° 19 ′ 23 ″ E 48 ° 29 ′ 18 ″ N, 11 ° 19 ′ 1 ″ E |
Bürgerwind Gerolsbach, Bayernwerk Natur , reencon GmbH | |
Gesater Wald wind farm | 2015 | 12.0 | 5 | Nordex N117 / 2400 (5 ×) |
Watzendorf Suddersdorf |
ON | 49 ° 16 ′ 33 "N, 10 ° 50 ′ 30" E | Uhl wind power | |
Gollhofen-Rodheim wind farm | 2011 | 16.1 | 7th | Enercon E-82 E2 (7 ×) |
Gollhofen Rodheim |
NEA | 49 ° 34 ′ 47 "N, 10 ° 9 ′ 46" E | Eco-energy, community WP Gollhofen-Rodheim | erected on the A 7 |
Großbardorf-Sulzfeld wind farm | 2016 | 13.2 | 4th | Vestas V112-3.3MW (4 ×) |
Großbardorf Sulzfeld |
NES | 50 ° 14 ′ 19 ″ N, 10 ° 22 ′ 18 ″ E | juwi , Wust, BWE Großbardorf-Sulzfeld | |
Großnottersdorf-Waizenhofen wind farm | 2004 2014 2015 |
33.8 | 12 |
Enercon E-70 (2 ×) Vestas V112-3.0MW (7 ×) Nordex N117 / 2400 (1 ×) Senvion 3.2M114 (2 ×) |
Großnottersdorf Waizenhofen |
EI RH |
49 ° 2 ′ 42 "N, 11 ° 14 ′ 12" E | Beermann, Naturstrom, Wust, BWE Thalmässing | |
Guggenberger Höhe wind farm | 2003 2007 2015 |
13.3 | 7th |
Fuhrländer FL MD77 (3 ×) Vestas V90-2MW (2 ×) Nordex N117 / 2400 (2 ×) |
Guggenberg | Mil | 49 ° 39 ′ 2 "N, 9 ° 23 ′ 43" E | Wind energy S & H, Wotan, BayWa re | |
Gunzenhausen-Wassertrüdingen wind farm | 2011 2012 |
18.0 | 9 | Vestas V90-2MW (9 ×) |
Obermögersheim Stetten |
AN WUG |
49 ° 4 ′ 18 "N, 10 ° 40 ′ 50" E | Renerco | |
Hahnenkamm wind farm | 1999 2000 2007 2009 2010 2011 2012 |
19.4 | 12 |
Enercon E-40 / 5.40 (2 ×) Enercon E-66 / 15.66 (2 ×) Enercon E-53 (1 ×) Enercon E-70 (5 ×) Enercon E-70 E4 (2 ×) |
Degersheim | WUG | 49 ° 0 ′ 3 "N, 10 ° 45 ′ 47" E | SMH wind power | |
Haidberg wind farm | 2005 2007 |
7.8 | 4th |
Enercon E-66 / 18.70 (1 ×) Vestas V90-2MW (3 ×) |
Oberkotzau | HO | 50 ° 14 ′ 52 "N, 11 ° 56 ′ 52" E | Global wind power | |
Hain-Ost wind farm | 2016 | 13.75 | 5 | GE Wind Energy 2.75-120 (5 ×) |
Wildenberg grove |
KC | 50 ° 9 ′ 55 "N, 11 ° 19 ′ 54" E | MVV energy | |
Heidelheim wind farm | 2017 | 12.5 | 5 | Vensys 112 (5 ×) | Heidelheim | WUN | 50 ° 8 ′ 55 "N, 12 ° 2 ′ 20" E | Heidelheim, | Instead of wooden hybrid towers, concrete-steel tube construction |
Heßlar wind farm | 2006 | 12.0 | 6th | Vestas V90-2MW (6 ×) | Hesslar | MSP | 49 ° 59 ′ 1 ″ N, 9 ° 51 ′ 30 ″ E | Wotan | |
Himmelreich wind farm | 1998 | 2.2 | 3 |
AN Bonus 600/44 (2 ×) AN Bonus 1000/54 (1 ×) |
Hirschfeld | KC | 50 ° 24 '17 "N, 11 ° 20' 6" E | ||
Hohenzellig wind farm | 2015 | 19.2 | 8th | Nordex N117 / 2400 (8 ×) | Konradsreuth | HO | 50 ° 14 ′ 11 "N, 11 ° 50 ′ 29" E | Lacuna, Fronteris, Primus Energie | |
Wind farm Hoher Weg | 2014 2016 |
7.2 | 3 | Nordex N117 / 2400 (3 ×) |
Ortlesbrunn Altkreisendorf |
AS NEW |
49 ° 44 ′ 1 ″ N, 11 ° 38 ′ 52 ″ E | Green City Energy, Voltgrün, Wust, BWE Hoher Weg | |
Hopferstadt-Bolzhausen wind farm | 2010 2014 |
8.0 | 4th | Vestas V90-2MW (4 ×) |
Bolzhausen Hopferstadt |
WÜ | 49 ° 36 '18 "N, 10 ° 2' 14" E | Volta wind power | |
Hummeltal-Haag-Lindenhardt 1 wind farm (including Mistelbach wind turbines) | 2014 2015 2016 |
36.25 | 12 |
Enercon E-101 (5 ×) Enercon E-115 (5 ×) Vestas V112-3.0MW (2 ×) |
Haag Hummeltal Lindenhardt |
BT | 49 ° 51 ′ 30 "N, 11 ° 31 ′ 44" E | Ostwind, REWAG | built on both sides of the A 9 |
Illschwang wind farm | 2013 | 12.0 | 5 | Nordex N117 / 2400 (5 ×) |
Illschwang Schwenderöd |
AS | 49 ° 25 ′ 22 "N, 11 ° 39 ′ 47" E | Jura Energy | erected on both sides of the A 6 |
Insingen wind farm | 2014 | 12.0 | 5 | Nordex N117 / 2400 (5 ×) | Insingen | ON | 49 ° 18 ′ 10 ″ N, 10 ° 8 ′ 0 ″ E | SATURDAY | |
Kaisten-Eggenhausen wind farm | 2006 2007 |
8.0 | 4th | Vestas V90-2MW (4 ×) |
Eggenhausen Kaisten |
SW | 50 ° 2 ′ 1 ″ N, 10 ° 3 ′ 37 ″ E | Wotan | erected on both sides of the A 7 |
Kallmünz-Beratzhausen wind farm | 2013 2015 |
10.7 | 4th |
Enercon E-82 E2 (2 ×) Enercon E-101 (2 ×) |
Nassenau Oberpfraundorf |
R. | 49 ° 9 '15 "N, 11 ° 51' 59" E | Green Energy 3000 | |
Kasendorf-Weismain wind farm | 2014 | 17.5 | 7th | GE Wind Energy 2.5-120 (7 ×) |
Kasendorf Seubersdorf |
LIF KU |
50 ° 2 ′ 43 "N, 11 ° 17 ′ 46" E | east wind | |
Kaufbeuren wind farm (Friesenried-Salenwang wind farm) | 2008 2014 |
7.4 | 3 |
Enercon E-48 (1 ×) Vestas V126-3.3MW (2 ×) |
Friesenried Salenwang |
OAL | 47 ° 51 '44 "N, 10 ° 31' 24" E | First Vestas V126-3.3MW turbines in Germany | |
Kingholz wind farm | 2016 | 12.0 | 4th | Enercon E-115 (4 ×) | Fuchstal | LL | 47 ° 53 ′ 11 "N, 10 ° 46 ′ 58" E | Bürgerwindkraft Fuchstal | |
Kirchheim wind farm | 2002 2007 |
2.0 | 3 |
Enercon E-40 / 6.44 (2 ×) Enercon E-48 (1 ×) |
Kirchheim | WÜ | 49 ° 40 ′ 15 ″ N, 9 ° 51 ′ 0 ″ E | BadenWind, for-wind | |
Wind farm strength | 2014 | 12.5 | 5 | GE Wind Energy 2.5-120 (5 ×) | Lippertshofen | NM | 49 ° 16 ′ 14 "N, 11 ° 33 ′ 7" E | Jura Energy | |
Kriegswiese wind farm | 2014 2015 |
16.45 | 7th | Enercon E-92 (7 ×) |
Querenbach Schweinsbach |
HO | 50 ° 8 ′ 46 "N, 11 ° 45 ′ 16" E | Primus energy | erected on the A 9 |
Langenberg wind farm | 2001 2005 |
5.3 | 3 |
Südwind S77 (2 ×) Nordex N90 / 2300 (1 ×) |
Kimratshofen | OA | 47 ° 47 ′ 23 "N, 10 ° 8 ′ 9" E | Wind power EW | |
Langenzenn-Laubendorf wind farm | 2014 2015 |
18.0 | 6th | Vestas V112-3.0MW (6 ×) | Foliage village | FÜ | 49 ° 30 ′ 41 ″ N, 10 ° 45 ′ 3 ″ E | Wust, BWE Langenzenn | |
Laubersreuth wind farm | 2010 2011 2014 |
9.8 | 4th |
Fuhrländer FL 2500/100 (3 ×) Enercon E-82 E2 (1 ×) |
Laubersreuth Rabenreuth |
HO | 50 ° 13 ′ 6 ″ N, 11 ° 47 ′ 11 ″ E | Windreich , Stadtwerke Lengerich, Stadtwerke Soest | built on both sides of the A 9 |
Lautertal wind farm | 2002 | 3.0 | 3 | DeWind D6 62/1000 (3 ×) |
Tremersdorf Rottenbach |
CO | 50 ° 21 '53 "N, 10 ° 55' 39" E | NET | |
Leinach-Hettstadt wind farm | 2006 2015 2017 |
13.85 | 6th |
Vestas V90-2MW (3 ×) Nordex N117 / 2400 (2 ×) Enercon E-101 (1 ×) |
Hettstadt Leinach |
WÜ | 49 ° 49 ′ 50 "N, 9 ° 49 ′ 29" E | Wotan | |
Leuzenbronn wind farm | 2001 2002 2014 |
2.8 | 4th |
Enercon E-40 / 6.44 (2 ×) Nordex N50 / 800 (1 ×) Enercon E-53 (1 ×) |
Leuzenbronn | ON | 49 ° 22 ′ 2 ″ N, 10 ° 7 ′ 7 ″ E | ||
Lonnerstadt wind farm | 2015 2017 |
18.6 | 7th |
Nordex N117 / 2400 (5 ×) Vestas V126-3.3MW (2 ×) |
Lonnerstadt Mühlhausen |
ERH | 49 ° 43 ′ 9 "N, 10 ° 44 ′ 56" E | Wust, BWE Lonnerstadt | |
Maierfeld wind farm | 2012 | 9.2 | 4th | Enercon E-82 E2 (4 ×) |
Emsing Erlingshofen |
EGG | 49 ° 0 ′ 14 "N, 11 ° 17 ′ 11" E | Beermann | |
Maßbach wind farm | 2014 | 12.0 | 5 | Nordex N117 / 2400 (5 ×) | Maßbach | KG | 50 ° 10 ′ 41 ″ N, 10 ° 18 ′ 37 ″ E | Green City Energy | |
Mühlhausen wind farm | 2012 | 12.0 | 4th | Vestas V112-3.0MW (4 ×) | Mulhouse | ERH | 49 ° 46 ′ 15 "N, 10 ° 45 ′ 16" E | juwi , Wust, BWE Mühlhausen | |
Münchberg-Gottersdorf wind farm | 2002 2004 |
4.5 | 3 |
Südwind S77 (2 ×) REpower MD77 (1 ×) |
Gottersdorf | HO | 50 ° 12 ′ 23 "N, 11 ° 46 ′ 6" E | Orb | |
Neudorf-Tiefenellern-Poxdorf wind farm | 2007 2011 2014 2016 2017 |
32.7 | 13 |
REpower MD77 (2 ×) Nordex N117 / 2400 (3 ×) Nordex N100 / 2500 (3 ×) Senvion 3.0M122 (5 ×) |
Neudorf Tiefenellern Poxdorf |
BA | 49 ° 56 ′ 0 ″ N, 11 ° 5 ′ 30 ″ E | Naturstrom AG ; Natenco, Citizen WP Litzendorf-Hohenellern | |
Neuenreuth wind farm | 2017 | 13.2 | 4th | Nordex N131 / 3300 (4 ×) |
Neuenreuth Höchstädt |
WUN | 50 ° 5 ′ 18 ″ N, 12 ° 7 ′ 1 ″ E | Future Energy Fichtelgebirge | |
Neustadt ad Aisch-Unterschweinach wind farm | 2005 2011 |
6.3 | 3 |
Enercon E-70 (2 ×) Enercon E-82 E2 (1 ×) |
Unterschweinach | NEA | 49 ° 33 ′ 15 "N, 10 ° 34 ′ 56" E | Beermann | |
Nüdlingen-Münnerstadt wind farm (incl. Langes Schiff wind farm) | 2014 | 17.3 | 7th |
Nordex N117 / 2400 (2 ×) Vensys 112 (5 ×) |
Nüdlingen Münnerstadt |
KG | 50 ° 12 ′ 55 ″ N, 10 ° 9 ′ 2 ″ E | Nüdlinger Energy Cooperative; Long ship Energy, natural power | |
Obbach wind farm | 2015 | 12.5 | 5 | GE Wind Energy 2.5-120 (5 ×) | Obbach | SW | 50 ° 5 ′ 1 ″ N, 10 ° 4 ′ 36 ″ E | ÜZ Lülsfeld | |
Obergünzburg-Günzach wind farm | 2000 2001 |
2.7 | 5 |
Enercon E-40 / 5.40 (3 ×) Enercon E-40 / 6.44 (2 ×) |
Ebersbach Günzach |
OAL | 47 ° 50 ′ 23 "N, 10 ° 27 ′ 59" E | ||
Oberland wind farm | 2011 2012 2017 |
18.4 | 8th |
Enercon E-82 E2 (7 ×) Enercon E-92 (1 ×) |
Helmbrechts Münchberg |
HO | 50 ° 14 ′ 32 "N, 11 ° 46 ′ 51" E | Primus energy | erected along the A 9 , a facility in Oberland I belongs to Daimler AG |
Oberngrub wind farm | 2005 | 7.5 | 5 | Vestas V82-1.5MW (5 ×) |
Oberngrub Tiefenhöchstadt |
BA | 49 ° 51 '21 "N, 11 ° 5' 43" E | SoWiTec | |
Oberreichenbach wind farm | 2014 | 7.5 | 3 | GE Wind Energy 2.5-120 (3 ×) | Oberreichenbach | FÜ | 49 ° 25 ′ 30 "N, 10 ° 46 ′ 17" E | be-wind | |
Oberstreu-Unsleben wind farm | 2017 | 34.0 | 10 | Senvion 3.4M122 (1 ×) |
Head loyal to Unsleben |
NES | |||
Offenhausen wind farm | 2003 2005 2013 2014 2017 |
18.4 | 7th | Pfleiderer PWE 1577 (1 ×) Vestas V82-1.5MW (1 ×) Enercon E-101 (4 ×) Senvion 3.4M114 (1 ×) |
Eismannsberg Dippersricht Oberndorf |
LAU NM |
49 ° 25 ′ 38 "N, 11 ° 26 ′ 41" E | Wust, BWE Offenhausen; Jura Energy | erected on the A 6 |
Ollarzried wind farm | 2006 2007 2011 |
6.9 | 6th |
Enercon E-48 (2 ×) Enercon E-53 (1 ×) Fuhrländer FL MD77 (3 ×) |
Ollarzried | MN | 47 ° 53 ′ 42 "N, 10 ° 22 ′ 11" E | Natenco | |
Pfahlenheim-West wind farm | 2009 2011 2015 |
8.9 | 3 |
Enercon E-82 E2 (1 ×) Vestas V126-3.3MW (2 ×) |
Stake home | NEA | 49 ° 33 '9 "N, 10 ° 6' 48" E | VWPA, community wind turbine Pfahlenheim | |
Pfreimd-Pamsendorf wind farm | 2016 | 12.0 | 5 | Nordex N117 / 2400 (5 ×) | Pamsendorf | SAD | |||
Pilsach wind farm | 2004 2007 2010 2013 2016 |
17.1 | 7th |
Enercon E-70 (1 ×) Enercon E-82 (2 ×) REpower 3.2M114 (3 ×) Vensys 82 (1 ×) |
Pilsach Neumarkt |
NM | 49 ° 18 ′ 2 ″ N, 11 ° 33 ′ 29 ″ E | juwi , wind power | erected on both sides of the A3 |
Pollenfeld wind farm | 2004 2005 2015 |
9.5 | 5 |
Vestas V82-1.5MW (3 ×) GE Wind Energy 2.5-120 (2 ×) |
Pollen field | EGG | 48 ° 57 ′ 42 "N, 11 ° 11 ′ 56" E | Jura Energie, Primus Energie, Bürger-WP Pollenfeld | |
Poppenlauer wind farm | 2015 | 7.2 | 3 | Nordex N117 / 2400 (3 ×) |
Poppenlauer Münnerstadt |
KG | 50 ° 13 '28 "N, 10 ° 12' 30" E | Natural power | erected along the A 71 |
Raitenbucher Forst wind farm | 2017 | 52.8 | 16 | Nordex N131 / 3300 (16 ×) |
Raitenbuch Schernfeld |
EI WUG |
48 ° 58 ′ 51 ″ N, 11 ° 6 ′ 9 ″ E | Ostwind, Stadtwerke Weißenburg | |
Ramsthal wind farm | 2015 | 7.5 | 3 | Vensys 112/2500 (3 ×) |
Ramsthal Bad Kissingen |
KG | 50 ° 8 '23 "N, 10 ° 5' 25" E | Natural power | |
Rannungen wind farm | 2011 | 6.0 | 3 | Vestas V90-2MW (3 ×) |
Rannungen Maßbach |
KG | 50 ° 10 ′ 55 ″ N, 10 ° 12 ′ 29 ″ E | Wotan | erected along the A 71 |
Rapperszell wind farm | 2016 | 8.25 | 3 | GE Wind Energy 2.75-120 (3 ×) | Rapperszell | EGG | |||
Rauhe Fichte wind farm | 2014 | 12.2 | 4th | Enercon E-101 (4 ×) | Feilitzsch | HO | 50 ° 22 ′ 0 ″ N, 11 ° 52 ′ 57 ″ E | Lacuna, Primus Energy | erected on the A 72 |
Remlingen wind farm | 2012 2013 |
14.4 | 6th | Nordex N117 / 2400 (6 ×) | Remlingen | WÜ | 49 ° 49 ′ 52 "N, 9 ° 41 ′ 22" E | ABO Wind, Mainova | |
Repperndorf wind farm | 2005 2009 |
8.0 | 4th |
Enercon E-70 (1 ×) Vestas V90-2MW (3 ×) |
Repperndorf | KT | 49 ° 45 '21 "N, 10 ° 5' 58" E | ABO Wind , ABO Invest | erected on the A 7 |
Retzstadt-Arnstein wind farm | 2014 2015 2017 |
21.6 | 7th |
Vestas V112-3.0MW (5 ×) Vestas V126-3.3MW (2 ×) |
Retzstadt Arnstein |
MSP | 49 ° 55 ′ 35 "N, 9 ° 54 ′ 15" E | juwi , Wust, BürgerEnergie Retzstadt, BWE Retzstadt | |
Retzstadt-Güntersleben wind farm | 2001 2006 2009 2010 |
17.2 | 10 |
DeWind D4 48/600 (2 ×) Vestas V90-2MW (8 ×) |
Retzstadt Güntersleben |
MSP WÜ |
49 ° 53 '30 "N, 9 ° 53' 12" E | MVV Energie, Wotan, be-wind | |
Riedenburg-Otterzhofen wind farm | 1995 1997 2020 |
1.8 | 3 |
Enercon E-40 / 5.40 (2 ×) Enercon E-53 (1 ×) |
Otterzhofen | KEH | 49 ° 0 ′ 3 ″ N, 11 ° 42 ′ 7 ″ E | ||
Riedheim wind farm | 2016 | 8.25 | 3 | GE Wind Energy 2.75-120 (3 ×) | Riedheim | DON | 48 ° 36 ′ 13 ″ N, 10 ° 58 ′ 9 ″ E | VenSol | |
Röslau-Nord wind farm | 2017 | 8.25 | 3 | GE Wind Energy 2.75-120 (3 ×) | Röslau | WUN | 50 ° 6 ′ 14 "N, 11 ° 58 ′ 31" E | ABO Wind , GKU Oberes Ebertal | |
Rottershausen wind farm | 2016 | 9.9 | 3 | Vestas V126-3.3MW (3 ×) | Rottershausen | KG | |||
Sailershäuser Wald wind farm | 2015 | 24.0 | 10 | Nordex N117 / 2400 (10 ×) |
Holzhausen Kleinmünster Sailershausen |
HAS | 50 ° 3 ′ 1 ″ N, 10 ° 21 ′ 2 ″ E | Greenpeace Energy, Stadtwerk Haßfurt, ÜZ | |
Scheppacher Forst wind farm | 2016 | 19.2 | 8th | Nordex N117 / 2400 (8 ×) |
Jettingen-Scheppach Zusmarshausen |
GZ A |
48 ° 24 ′ 41 ″ N, 10 ° 31 ′ 8 ″ E | Vento Ludens | erected along the A 8 |
Schimmendorf-Kirchleus wind farm | 2017 | 16.8 | 7th | Nordex N117 / 2400 (7 ×) |
Schimmendorf Kirchleus |
KU | |||
Schwanfeld-Eßleben wind farm | 2013 2015 2016 |
33.0 | 12 |
Nordex N117 / 2400 (5 ×) Enercon E-115 (7 ×) |
Eßleben Schwanfeld |
SW | 49 ° 56 ′ 1 ″ N, 10 ° 7 ′ 36 ″ E | Stadtwerke Stuttgart , ÜZ Lülsfeld; Energie Bals, WP Werneck-Eßleben | |
Schwebenried-Schraudenbach wind farm | 2009 | 6.0 | 3 | Vestas V90-2MW (3 ×) |
Schwebenried Schraudenbach |
MSP SW |
50 ° 0 ′ 2 "N, 10 ° 1 ′ 51" E | Wotan | |
Selbitz-Schauenstein wind farm | 2014 2015 |
18.6 | 7th |
Enercon E-101 (3 ×) Nordex N117 / 2400 (4 ×) |
Selbitz Schauenstein |
HO | 50 ° 18 ′ 22 "N, 11 ° 42 ′ 58" E | WP Selbitz; N-ERGIE regenerative | |
Seußen wind farm | 2015 | 12.0 | 5 | Nordex N117 / 2400 (5 ×) | Sussen | WUN | 50 ° 2 ′ 40 ″ N, 12 ° 8 ′ 7 ″ E | VentusVentures | |
Stadelhofen wind farm | 2006 | 6.0 | 3 | Vestas V90-2MW (3 ×) | Stadelhofen | MSP | 49 ° 56 ′ 35 "N, 9 ° 42 ′ 32" E | Wotan, B.Ehricke | |
Steinfeld wind farm | 2003 2006 |
6.0 | 3 |
AN Bonus 2000/76 (2 ×) Vestas V90-2MW (1 ×) |
Steinfeld | MSP | 49 ° 56 ′ 22 "N, 9 ° 40 ′ 50" E | Wotan | |
Steinsfeld-Gattenhofen wind farm | 1998 2000 2002 2012 |
4.5 | 5 |
Enercon E-40 / 5.40 (2 ×) Enercon E-40 / 6.44 (2 ×) Enercon E-82 E2 (1 ×) |
Gattenhofen | ON | 49 ° 25 ′ 38 "N, 10 ° 11 ′ 27" E | ||
Sulzthal wind farm | 2020? | 9.0 | 3 | Enercon E-115 (3 ×) | Sulzthal | KG | 50 ° 7 ′ 4 "N, 10 ° 0 ′ 59" E | Enercon | under construction |
Teufelsmühle wind farm | 2016 | 9.15 | 3 | Enercon E-101 (3 ×) | Illkofen | R. | 49 ° 9 ′ 50 "N, 11 ° 47 ′ 56" E | east wind | |
Thalmannsfeld wind farm | 1998 | 2.52 | 4th |
Vestas V44-600kW (2 ×) Vestas V47-660kW (2 ×) |
Thalmannsfeld | WUG | 49 ° 4 ′ 1 ″ N, 11 ° 9 ′ 42 ″ E | ||
Thurnau-Alladorf wind farm | 2015 | 12.0 | 5 | Nordex N117 / 2400 (5 ×) | Alladorf | KU | 49 ° 58 ′ 20 "N, 11 ° 21 ′ 57" E | Raiffeisen Energy | |
Thurnau-Kleetzhöfe wind farm | 2015 2016 |
12.0 | 5 | Nordex N117 / 2400 (5 ×) | Kleetzhöfe | KU |
49 ° 59 ′ 33 "N, 11 ° 23 ′ 16" E |
Raiffeisen Energy | |
Tiefenthal-Gaurettersheim wind farm | 2005 2006 2009 |
10.0 | 6th |
Vestas V82-1.5MW (4 ×) Vestas V90-2MW (2 ×) |
Gaurettersheim Stalldorf Tiefenthal |
WÜ | 49 ° 34 ′ 56 "N, 9 ° 55 ′ 8" E | DEAG | |
Titting wind farm | 2012 2013 2015 2017 |
25.7 | 12 |
Vensys 77 (1 ×) Vensys 112 (2 ×) Nordex N117 / 2400 (8 ×) Senvion 3.2M114 (1 ×) |
Mantlach Stadelhofen |
EGG | 49 ° 1 ′ 47 "N, 11 ° 12 ′ 53" E | SRE Sachs, Naturstrom | |
Töpen-Münchenreuth wind farm | 2001 2002 2012 2013 2015 |
29.9 | 14th |
GE Wind Energy 1.5sl (3 ×) Enercon E-82 E2 (9 ×) Enercon E-92 (2 ×) |
Mödlareuth Munchenreuth |
HO | 50 ° 24 '55 "N, 11 ° 53' 57" E | Megawatt, Lacuna, Primus Energie | 2015 repowering (2 × Enercon E-92 instead of 2 × DeWind D4 48/600 ) |
Trogen wind farm | 2012 2013 2014 |
26.5 | 10 |
Enercon E-82 E2 (5 ×) Enercon E-101 (5 ×) |
Trogen | HO | 50 ° 23 ′ 0 ″ N, 11 ° 58 ′ 23 ″ E | Fronteris, Lacuna, Primus Energie | built at the Hochfranken motorway triangle on both sides of the A 72 |
Uengershausen wind farm | 2010 2011 |
11.0 | 5 |
Vestas V90-2MW (3 ×) Nordex N100 / 2500 (2 ×) |
Uengershausen | WÜ | 49 ° 41 ′ 55 "N, 9 ° 53 ′ 19" E | Theolia, Wotan | |
Uettingen wind farm | 2013 | 7.2 | 3 | Nordex N117 / 2400 (3 ×) | Uettingen | WÜ | 49 ° 48 ′ 36 "N, 9 ° 43 ′ 40" E | ABO Wind, ESWE | |
Originingen-Nord wind farm | 2011 2012 |
6.0 | 3 | Vestas V90-2MW (3 ×) | Urspringen | MSP | |||
Originingen-West wind farm | 2009 | 8.0 | 4th | Vestas V90-2MW (4 ×) | Urspringen | MSP | 49 ° 54 ′ 20 "N, 9 ° 39 ′ 8" E | Wotan, Eurowind, ESTW | |
Vielitz wind farm | 2016 | 9.6 | 4th | Nordex N117 / 2400 (4 ×) | Vielitz | WUN | 50 ° 10 '41 "N, 12 ° 5' 58" E | VOLT GREEN, ESM | |
Vierschau wind farm | 2003 2012 |
24.3 | 12 |
Fuhrländer FL MD77 (3 ×) Enercon E-82 (3 ×) Enercon E-82 E2 (6 ×) |
Four show | HO | 50 ° 17 ′ 56 ″ N, 12 ° 0 ′ 7 ″ E | wp civil engineering | erected on the A 93 |
Waalhaupten wind farm | 2016 2017 |
9.9 | 3 | Vestas V112-3.3MW (3 ×) | Waalhaupten | OAL | 47 ° 58 ′ 5 ″ N, 10 ° 45 ′ 31 ″ E | Wind power south | |
Wadlhauser Gräben wind farm | 2015 | 12.0 | 4th | Enercon E-115 (4 ×) | mountain | STA | 47 ° 59 ′ 5 ″ N, 11 ° 24 ′ 25 ″ E | Citizen Wind Mountain | erected west of the A 95 |
Wallmersbach wind farm | 2014 | 12.0 | 4th | Vestas V112-3.0MW (4 ×) |
Wallmersbach Welbhausen |
NEA | 49 ° 32 ′ 0 ″ N, 10 ° 11 ′ 28 ″ E | juwi , VWPA, community wind turbine Reislein | erected on the A 7 |
Waltersberg wind farm | 2015 | 7.2 | 3 | Nordex N117 / 2400 (3 ×) | Dietenbronn | ON | 49 ° 14 ′ 49 "N, 10 ° 22 ′ 52" E | Uhl wind power | erected on the A 6 |
Wappersdorf wind farm | 2013 | 9.6 | 3 | REpower 3.2M114 (3 ×) | Wappersdorf | AS | 49 ° 21 ′ 5 "N, 11 ° 47 ′ 49" E | Horsch energy | erected on the A 6 |
Wattendorf-Stadelhofen wind farm | 2017 | 28.5 | 11 |
GE Wind Energy 2.5-120 (7 ×) GE Wind Energy 2.75-120 (4 ×) |
Wattendorf Stadelhofen large goat field |
BA LIF |
|||
Weißenburg-Oberhochstatt wind farm (incl. Bergen-Kaltenbuch wind farm and Indernbusch wind farm) | 1997 2001 2002 2004 2012 2014 |
28.7 | 14th |
Tacke TW 1.5s (1 ×) Enercon E-40 / 5.40 (1 ×) Enercon E-40 / 6.44 (1 ×) Enercon E-66 / 18.70 (1 ×) Enercon E-70 (2 ×) Enercon E-82 E2 (2 ×) Nordex N117 / 2400 (4 ×) Enercon E-101 (2 ×) |
Kaltenbuch Indernbuch Oberhochstatt Rohrbach |
WUG | 49 ° 2 ′ 25 ″ N, 11 ° 3 ′ 31 ″ E | Bavaria wind farm; Wust, BWE Kaltenbuch-Bergen | Repowering 2014 (4 × Nordex N117 / 2400 instead of 1 × Tacke TW 600 ) |
Monguelfo wind farm | 2017 | 9.6 | 4th | Nordex N117 / 2400 (4 ×) | Monguelfo | CO | |||
Wildpoldsried wind farm | 2000 2001 2002 2007 2012 2015 |
21.1 | 11 |
Enercon E-58 (2 ×) Südwind S77 (3 ×) Enercon E-82 (2 ×) Enercon E-82 E2 (2 ×) Enercon E-115 (2 ×) |
Kraftisried Wildpoldsried Unterthingau |
OAL OA |
47 ° 46 ′ 46 "N, 10 ° 26 ′ 36" E | Wind power EW | Repowering 2015 (2 × Enercon E-115 instead of 2 × Pfleiderer PWE 1577) |
Wilhermsdorf wind farm | 2009 2011 |
9.2 | 4th | Enercon E-82 E2 (4 ×) |
Wilhermsdorf Langenzenn |
FÜ | 49 ° 27 ′ 55 "N, 10 ° 45 ′ 13" E | Wust, BWE Wilhermsdorf, WUW | |
Windheim wind farm | 2014 2015 |
16.8 | 6th |
Vestas V112-3.0MW (4 ×) Nordex N117 / 2400 (2 ×) |
Windheim | KG | 50 ° 15 '23 "N, 10 ° 7' 47" E | Wotan, natural power | |
Winterschneidbach wind farm | 2017 | 9.9 | 3 | Vestas V112-3.3MW (3 ×) |
Winterschneidbach Zandt |
ON | |||
Wirsberg-Sessenreuth wind farm | 2002 2012 |
6.4 | 3 |
Enercon E-66 / 18.70 (1 ×) Enercon E-82 E2 (2 ×) |
Wirsberg | KU | 50 ° 6 ′ 4 "N, 11 ° 37 ′ 51" E | Beermann energy systems | |
Wolframs-Eschenbach-Lichtenau wind farm | 2003 2018 |
9.0 | 6th |
Enercon E-40 / 6.44 (3 ×) Nordex N117 / 2400 (3 ×) |
Wolframs-Eschenbach Lichtenau |
ON | 49 ° 14 ′ 27 "N, 10 ° 42 ′ 32" E | BadenWind, for-wind | |
Wortelstetten wind farm | 2014 | 7.2 | 3 | Nordex N117 / 2400 (3 ×) | Wortelstetten | DLG | 48 ° 36 '11 "N, 10 ° 44' 51" E | Uhl wind power | |
Würgau wind farm | 2011 2012 |
9.0 | 3 | Vestas V112-3.0MW (3 ×) | Würgau | BA | 49 ° 58 ′ 49 ″ N, 11 ° 7 ′ 14 ″ E | Wotan, ESTW | |
Zedersdorf-Mittelwasungen wind farm | 2016 | 13.75 | 5 | GE Wind Energy 2.75-120 (5 ×) |
Zedersdorf Mittelwasungen |
CO | |||
Zöschingen wind farm | 2013 | 19.2 | 8th | Nordex N117 / 2400 (8 ×) | Zoeschingen | DLG | 48 ° 41 ′ 9 ″ N, 10 ° 17 ′ 9 ″ E | Zöschinger Wind | |
Zweifelsheim-Mausdorf wind farm | 2010 2014 |
8.7 | 4th |
Enercon E-82 (2 ×) Enercon E-92 (2 ×) |
Mausdorf Zweifelsheim |
NEA ERH |
49 ° 32 ′ 50 "N, 10 ° 48 ′ 52" E | Reuthwind |
Individual evidence
- ↑ Maps and data on the energy transition | Energy Atlas Bavaria. Retrieved July 4, 2020 .
- ↑ Share of renewable energies in gross final energy consumption electricity - electricity - BY - data and facts on the development of renewable energies in individual federal states. Retrieved July 4, 2020 .
- ↑ Waller wind turbine. In: SRE Sachs. Accessed October 11, 2015 .
- ↑ Batzhausen wind turbine. In: Jura Energy. Retrieved October 11, 2015 .
- ↑ Wind turbine for Brno. In: inFranken. June 23, 2012, accessed October 11, 2015 .
- ↑ The Sachserhof wind turbine is offline. In: Mainpost. December 16, 2014, accessed October 11, 2015 .
- ↑ Wind turbine on the garbage dump in Munich. In: Beermann Energiesysteme. Retrieved October 11, 2015 .
- ↑ wind turbines. (No longer available online.) In: Stadtwerke München. Archived from the original on July 22, 2015 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Citizens Wind Energy Givingbach. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Harsdorf-Altenreuth wind energy plant. In: Beermann Energiesysteme. Retrieved October 11, 2015 .
- ↑ civil wind project Pöfersdorf. In: East Wind. Retrieved October 11, 2015 .
- ↑ Damage to the wind turbine is removed. In: Mittelbayerische. May 22, 2015, accessed October 11, 2015 .
- ↑ Opponents of the windmill ensure police use. In: Mercury. August 17, 2015, accessed October 11, 2015 .
- ↑ Citizens Wind Energy Kastl. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Lieritzhofen wind energy plant. In: SRE Sachs. Accessed October 11, 2015 .
- ↑ 1. Pfaffenhofen citizens' wind turbine. In: Bürgerenergie Pfaffenhofen. Retrieved February 21, 2016 .
- ↑ Malchinger wind turbine goes online. In: Mercury. October 9, 2015, accessed October 11, 2015 .
- ↑ The wind turbine should be in place in October. In: Süddeutsche Zeitung. March 20, 2014, accessed October 11, 2015 .
- ^ Community wind turbine market Erlbach. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Municipal wind turbine goes online. In: Stadtwerke Vilsbiburg. October 28, 2014, accessed October 11, 2015 .
- ↑ Bürgerwindenergie Neunburg vorm Wald. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ^ Neunburg vorm Wald. Voltgrün, accessed October 11, 2015 .
- ↑ Controversial wind turbine near Neuses is built. In: BR. January 20, 2015, archived from the original on July 4, 2015 ; accessed on October 11, 2015 .
- ↑ Pondorf wind energy plant. In: Jura Energy. Retrieved October 11, 2015 .
- ↑ Citizen wind turbine grows in height. In: schwäbische.de. October 9, 2014, accessed October 11, 2015 .
- ↑ Wind turbines are for the future of energy, but not for eternity. (No longer available online.) November 14, 2014, archived from the original on May 18, 2015 ; accessed on May 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ World premiere in the Upper Palatinate. In: Upper Palatinate Network. September 3, 2013, accessed October 11, 2015 .
- ^ Community wind energy Schnaittenbach. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Schnaittenbach. Voltgrün, accessed October 11, 2015 .
- ↑ Schweitenkirchen-Hueb wind energy plant. In: Beermann Energiesysteme. Retrieved October 11, 2015 .
- ↑ Schweitenkirchen-Sünzhausen wind energy plant. In: Beermann Energiesysteme. Retrieved October 11, 2015 .
- ↑ WEA Theilheim. (No longer available online.) In: Volta Windkraft. Archived from the original on January 6, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Traunfeld wind turbine. In: Jura Energy. Retrieved October 11, 2015 .
- ^ Wallmersbach community wind turbine. In: VWPA. Retrieved October 11, 2015 .
- ↑ Green electricity: Today the construction of the wind farm begins at Wasserknoden. (No longer available online.) In: Radio Mainwelle. November 8, 2001, archived from the original on April 9, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Wind power plant at Weihbüchl. (No longer available online.) In: Stadtwerke Landshut. June 25, 2015, archived from the original on July 4, 2015 ; Retrieved September 5, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Yes to wind power plant at Westheim. In: Mainpost. April 24, 2002, accessed October 11, 2015 .
- ^ Bidingen. In: Beermann Energiesysteme. Retrieved October 11, 2015 .
- ^ Bernhardswinden II. In: Bürgerwindpark Hohenlohe. Retrieved October 11, 2015 .
- ↑ Bernhardswinden community wind farm. In: eco energy. Retrieved October 11, 2015 .
- ↑ Bidingen / Allgäu community complex. In: Beermann Energiesysteme. Retrieved October 11, 2015 .
- ↑ Birgland forest wind farm. In: East Wind. Retrieved August 1, 2020 .
- ↑ Deindorf. (No longer available online.) In: Voltgrün. Archived from the original on January 21, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Bürgerwindenergie Diespeck. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ WUW - wind turbine Unterulsenbach-Wilhermsdorf. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Bürgerwind Edelsfeld. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ^ Citizens wind project Edelsfeld. In: East Wind. Retrieved October 11, 2015 .
- ↑ Bürgerwindenergie Gutenstetten. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Haimburg wind turbine. In: Jura Energy. Retrieved October 11, 2015 .
- ↑ Helena wind farm. In: Jura Energy. Retrieved October 11, 2015 .
- ↑ Helena wind farm. In: maxwind. Retrieved October 11, 2015 .
- ^ Citizens' wind turbine Herrnberchtheim. In: VWPA. Retrieved October 11, 2015 .
- ↑ Betzenstein wind power. Retrieved January 7, 2016 .
- ↑ Citizen wind energy Königstein. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Königstein. Voltgrün, accessed October 11, 2015 .
- ↑ Kühlenthaler wind turbine enters its final phase. (No longer available online.) In: StadtZeitung Augsburg. September 27, 2013, formerly in the original ; accessed on October 11, 2015 . ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.
- ↑ Wind turbine fascinates thousands. In: Augsburger Allgemeine. October 21, 2013, accessed October 11, 2015 .
- ↑ Two wind turbines, larger than Augsburg's hotel tower. In: Augsburger Allgemeine. February 21, 2014, accessed October 11, 2015 .
- ↑ Litterzhofen wind turbine. In: Jura Energy. Retrieved October 11, 2015 .
- ↑ Mainstockheim wind farm. (No longer available online.) In: Volta Windkraft. Archived from the original on January 6, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Sindersdorf wind farm. (No longer available online.) In: Green City Energy. Archived from the original on February 21, 2016 ; accessed on February 21, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Bürgerwindenergie Ursensollen. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Citizen wind project Ursensollen. In: East Wind. Retrieved October 11, 2015 .
- ↑ Now the Vasbühlers are making wind. In: Mainpost. July 14, 2006, accessed October 11, 2015 .
- ↑ VenSol New Energies: Start of construction of the Veitsbronn wind farm. (No longer available online.) Archived from the original on January 7, 2016 ; accessed on January 7, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Waigolshausen wind farm. In: Volta wind power. Retrieved October 11, 2015 .
- ↑ Citizen wind turbine Buchklingen. In: VWPA. Retrieved October 11, 2015 .
- ^ Community wind turbine Welbhausen. In: VWPA. Retrieved October 11, 2015 .
- ↑ Wilhelmsdorf wind power plant. (No longer available online.) In: ESTW Erlanger Stadtwerke. Archived from the original on September 10, 2015 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Construction of the Deining 4 wind power plant in 2015. In: windpower. Retrieved October 11, 2015 .
- ↑ Bürgerwindpark Adelshofen-Gollachostheim. In: eco energy. Retrieved October 11, 2015 .
- ↑ Pfahlenheim community wind turbines. In: VWPA. Retrieved October 11, 2015 .
- ↑ Altertheim wind farm. (No longer available online.) In: Green City Energy. Archived from the original on March 4, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ GDF SUEZ and Wuppertaler Stadtwerke buy a wind farm together. GDF Suez - News, September 7, 2011, accessed October 14, 2012 .
- ↑ Bavarian Odenwald wind farm. (No longer available online.) In: Green City Energy. Formerly in the original ; accessed on October 11, 2015 . ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.
- ↑ Bürgerwindenergie Ernersdorf-Berching. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ^ Repowering of the Oening WEA in 2014. In: windpower. Retrieved October 11, 2015 .
- ↑ Berching-Oening wind farm. In: maxwind. Retrieved October 11, 2015 .
- ↑ Video of the groundbreaking ceremony for the wind farm
- ↑ Bischberg wind farm. In: maxwind. Retrieved October 11, 2015 .
- ↑ Bischberg wind farm. In: SRE Sachs. Accessed October 11, 2015 .
- ↑ Unterried wind farm. (No longer available online.) In: Green City Energy. Formerly in the original ; accessed on October 11, 2015 . ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.
- ^ WP Unterried. In: Jura Energy. Retrieved October 11, 2015 .
- ↑ Construction of the community wind power station Unterried 1 in 2013/2014. In: windpower. Retrieved October 11, 2015 .
- ↑ Blausäulenlinie forest wind farm. In: East Wind. Retrieved October 11, 2015 .
- ↑ In autumn the wind turbines grow taller. In: Augsburger Allgemeine. July 13, 2015, accessed October 11, 2015 .
- ↑ Braunersgrün wind farm. In: East Wind. Retrieved October 11, 2015 .
- ↑ Brenntenberg wind farm. In: East Wind. Retrieved October 11, 2015 .
- ^ Wind project Brenntenberg II. In: Ostwind. Retrieved October 11, 2015 .
- ↑ Odelzhauser wind farm complete. In: Dachauer Rundschau. October 22, 2014, accessed October 11, 2015 .
- ^ Project profile Brünnstadt. (PDF) (No longer available online.) In: ABO Wind. Archived from the original on March 4, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Buchau wind farm is scheduled to run in March. In: nordbayern.de. August 13, 2015, accessed September 17, 2015 .
- ↑ Buchbrunn wind farm. (No longer available online.) In: Volta Windkraft. Archived from the original on January 6, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Mainstockheim wind power plant. (No longer available online.) In: Volta Windkraft. Archived from the original on January 6, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Bucheck wind farm is growing. In: Frankenpost. April 10, 2015, accessed October 11, 2015 .
- ↑ Büchenbach municipal wind farm. In: East Wind. Retrieved October 11, 2015 .
- ↑ Buchschwabach wind energy plant. (No longer available online.) In: Green City Energy. Archived from the original on March 4, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Creußen-Neuhof community wind farm extension. In: FWR energy. Retrieved October 11, 2015 .
- ↑ WP Deining. In: Jura Energy. Retrieved October 11, 2015 .
- ↑ Construction of the Deining wind farm in 2013. In: windpower. Retrieved October 11, 2015 .
- ↑ Construction of the Deining 5 wind turbine in 2015. In: windpower. Retrieved October 11, 2015 .
- ↑ Deining wind farm. In: maxwind. Retrieved October 11, 2015 .
- ↑ Zieger Forest Wind Park. In: East Wind. Retrieved October 11, 2015 .
- ↑ Velburg wind farm. (No longer available online.) In: Green City Energy. Formerly in the original ; accessed on October 11, 2015 . ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.
- ↑ Velburg. (No longer available online.) In: Voltgrün. Archived from the original on January 21, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ^ Community wind farm Denkendorf. (No longer available online.) In: NeoVis Energie. Archived from the original on January 20, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Denkendorf wind energy plant. In: Beermann Energiesysteme. Retrieved October 11, 2015 .
- ↑ Denkendorf wind farm. In: maxwind. Retrieved October 11, 2015 .
- ↑ Bürgerwind Neudorf-Dietenhofen. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Dinkelsbühl-Wilburgstetten wind farm. In: Stadtwerke Stuttgart. Retrieved October 11, 2015 .
- ↑ GSW turn mightily. In: Westdeutsche Allgemeine Zeitung . January 10, 2012, accessed October 14, 2012 .
- ↑ Bürgerwindenergie Dürrwangen. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Ellenfeld wind farm. In: Grenzlandwind. Retrieved October 11, 2015 .
- ↑ Only half finished but already huge. In: Augsburger Allgemeine. June 12, 2015, accessed October 11, 2015 .
- ↑ Citizens' wind turbines in Ermetzhofen. In: VWPA. Retrieved October 11, 2015 .
- ↑ Hardt community wind turbine. In: VWPA. Retrieved October 11, 2015 .
- ↑ Giants generate electricity. In: Frankenpost . April 19, 2011, accessed October 14, 2012 .
- ↑ Fasanerie forest wind farm. In: East Wind. Retrieved October 11, 2015 .
- ↑ Wind farm in Freudenberg. In: Naturstrom. Retrieved October 11, 2015 .
- ↑ Freudenberg. (No longer available online.) In: Voltgrün. Archived from the original on December 22, 2015 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Construction in full load weather. In: Donaukurier. October 1, 2015, accessed October 11, 2015 .
- ^ Community wind farm Gollhofen-Rodheim. In: eco energy. Retrieved October 11, 2015 .
- ^ Bürgerwindenergie Großbardorf-Sulzfeld. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Großnottersdorf community complex. In: Beermann Energiesysteme. Retrieved October 11, 2015 .
- ↑ Citizens' wind energy Thalmässing. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ BayWa re puts the Guggenberg II wind farm into operation. (No longer available online.) In: IWR Pressedienst. May 21, 2015, archived from the original on June 28, 2015 ; accessed on May 21, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ A new wind farm for 30 million euros. In: Nordbayern.de. November 15, 2011, accessed October 14, 2012 .
- ↑ Hain-Ost wind farm: giant components are delivered. inFranken.de, July 12, 2016, accessed on August 14, 2016 .
- ↑ Construction work on the Heidelheim wind farm will continue in 2016. (No longer available online.) TimberTower, July 16, 2015, archived from the original on October 7, 2015 ; accessed on October 6, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Lacuna wind farm Hohenzellig: The first kilowatt hour is fed in! In: Lacuna. June 15, 2015, accessed October 11, 2015 .
- ↑ Citizens Wind Energy Hoher Weg. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ High way. Voltgrün, accessed October 11, 2015 .
- ↑ Bolzhausen wind farm. (No longer available online.) In: Volta Windkraft. Archived from the original on January 6, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Hopferstadt wind farm. (No longer available online.) In: Volta Windkraft. Archived from the original on January 6, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ New wind turbines at Rotmainquelle and Bratwursteiche. April 18, 2015, accessed May 5, 2015 .
- ^ Tannberg-Lindenhardt wind farm I. In: Ostwind. Retrieved October 11, 2015 .
- ↑ New wind turbines at Rotmainquelle and Bratwursteiche. In: nordbayern.de. April 18, 2015, accessed October 11, 2015 .
- ↑ Illschwang wind farm. In: Jura Energy. Retrieved October 11, 2015 .
- ↑ Kallmünz wind farm. (No longer available online.) In: Green Energy 3000. Archived from the original on March 4, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Augsburger Allgemeine: Concrete beer doesn't exactly flow like a stream. November 2, 2015, accessed January 7, 2016 .
- ↑ Windpark Kräft GmbH & Co.KG. In: Jura Energy. Retrieved October 11, 2015 .
- ↑ Langenberg wind power. (No longer available online.) Bürgernetz Allgäu e. V., archived from the original on January 6, 2011 ; Retrieved October 19, 2012 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Bürgerwindenergie Langenzenn. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Community wind energy Lonnerstadt. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Maßbach wind farm. (No longer available online.) In: Green City Energy. Archived from the original on August 29, 2017 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Bürgerwindenergie Mühlhausen. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Three citizens' wind turbines on the way. (No longer available online.) In: inFranken.de of October 23, 2015. Archived from the original on March 26, 2016 ; accessed on March 26, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Weddings are celebrated in Neudorf. September 23, 2014, accessed April 27, 2015 .
- ^ Windpark Neudorf II. In: Naturstrom. Retrieved October 11, 2015 .
- ↑ Neuenreuth wind farm. In: ZukunftsEnergie Fichtelgebirge. Retrieved February 21, 2016 .
- ↑ Citizens' Complex Neustadt ad Aisch. In: Beermann Energiesysteme. Retrieved October 11, 2015 .
- ↑ wind turbine. (No longer available online.) In: Nüdlinger Energie-Genossenschaft. Archived from the original on February 10, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ^ Obbach wind farm: construction diary. In: ÜZ Lülsfeld. Retrieved September 11, 2015 .
- ↑ Franconian showcase project. In: Frankenpost. May 15, 2012, accessed October 14, 2012 .
- ↑ Projects in operation. Retrieved March 2, 2017 .
- ↑ The holistic philosophy: Driven by the wind, from the car to the grid. Retrieved March 2, 2017 .
- ^ WP Eismannsberg. In: Jura Energy. Retrieved October 11, 2015 .
- ^ Community wind energy Offenhausen. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ Construction of the Neumarkt 2 wind energy plant. In: windpower. Retrieved October 11, 2015 .
- ↑ buergerwindpark-pollenfeld.de
- ↑ New wind turbines this year. In: Mainpost. Retrieved April 13, 2015 .
- ↑ A new forest wind farm is growing in the Raitenbuch forest. In: East Wind. Retrieved March 26, 2016 .
- ↑ Whoever digs a pit ... In: Naturstrom Blog. August 14, 2015, accessed October 11, 2015 .
- ↑ Rannungen wind turbine. (No longer available online.) In: ESTW Erlanger Stadtwerke. Archived from the original on September 10, 2015 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Construction progress on the largest wind farm in Bavaria. (No longer available online.) In: Umweltfinanz. Archived from the original on November 3, 2013 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Six wind turbines go online. In: Mainpost. March 19, 2013, accessed October 11, 2015 .
- ↑ Portfolio Bürgerwindaktie ABO Invest. In: ABO Invest AG. Retrieved August 11, 2017 .
- ^ Retzstadt (BWE). Retrieved July 7, 2020 .
- ^ Retzstadt (WE). Retrieved July 7, 2020 .
- ↑ Start of construction of the Riedheim wind farm. (No longer available online.) In: VenSol Neue Energien dated February 4, 2016. Archived from the original on March 26, 2016 ; accessed on March 26, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Reference list ABO Wind. (No longer available online.) Archived from the original on August 11, 2017 ; accessed on August 11, 2017 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ^ Sailershäuser Wald community wind farm. In: Greenpeace Energy. Retrieved October 11, 2015 .
- ↑ Start of construction for eight wind turbines. In: BR. April 8, 2015, archived from the original on March 5, 2016 ; accessed on October 11, 2015 .
- ↑ Schwanfeld wind farm. In: Stadtwerke Stuttgart. Retrieved October 11, 2015 .
- ↑ Our systems at a glance. Retrieved July 5, 2020 .
- ↑ Teufelsmühle wind farm. In: East Wind. Retrieved June 28, 2016 .
- ↑ a b Groundbreaking ceremony: construction work for the Thurnau wind farm begins. In: Radio Plassenburg. April 24, 2015, archived from the original on May 5, 2015 ; Retrieved May 5, 2015 .
- ↑ Titting wind farm. In: SRE Sachs. Accessed October 11, 2015 .
- ↑ Mantlach wind energy plant. In: SRE Sachs. Accessed October 11, 2015 .
- ^ Citizen wind farm Trogen II. (No longer available online.) In: Fronteris. Archived from the original on March 4, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Uettinger wind turbines are ready. In: Mainpost. September 23, 2013, accessed October 11, 2015 .
- ↑ Beginning of the infrastructure measures for the Vielitz wind farm. (No longer available online.) VOLTGRÜN, August 24, 2015, archived from the original on October 7, 2015 ; accessed on October 6, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ "Rendezvous" at a height of 85 meters. In: Frankenpost. August 7, 2007, accessed October 14, 2012 .
- ^ Official Journal of the Ostallgäu District Office. (PDF) Retrieved March 26, 2016 .
- ↑ Groundbreaking for Berger Windpark. In: Münchner Merkur. April 17, 2015, accessed April 17, 2015 .
- ↑ citizens windmill Reislein. In: VWPA. Retrieved October 11, 2015 .
- ↑ Agenda of the city council meeting on Tuesday, October 28, 2014 - 8 p.m. - public meeting. (No longer available online.) In: AL Leutershausen. Archived from the original on March 4, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ The towers are growing. In: Upper Palatinate Media. March 27, 2013, accessed August 1, 2020 .
- ↑ Growth for the Weißenburg-Oberhochstatt wind farm. In: nordbayern.de. August 29, 2014, accessed October 11, 2015 .
- ↑ Bürgerwindenergie Kaltenbuch-Bergen. In: Wust Wind & Sonne. Retrieved October 11, 2015 .
- ↑ wind power. Wildpoldsried community, accessed on October 17, 2012 .
- ↑ Clear the way for two new wind turbines in Wildpoldsried. (No longer available online.) In: Allgäuer Zeitung. August 11, 2011, formerly in the original ; Retrieved October 17, 2012 . ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.
- ↑ In Wildpoldsried the wind turbines turned to dust. In: Bayerischer Rundfunk. June 22, 2015, archived from the original on June 23, 2015 ; Retrieved June 28, 2015 .
- ^ Community wind energy Wilhermsdorf. In: Wust Wind & Sonne. Retrieved July 5, 2020 .
- ↑ The wind farm near Windheim is taking shape. In: TV touring. February 21, 2014, accessed October 11, 2015 .
- ↑ Wirsberg-Sessenreuth public complex. In: Beermann Energiesysteme. Retrieved October 11, 2015 .
- ↑ Wolframs-Eschenbach wind power station. (No longer available online.) In: Energy experience path through the Hesselberg region. Archived from the original on March 4, 2016 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Wind farm: start of construction in Wortelstetten. In: Augsburger Allgemeine. July 5, 2013, accessed October 11, 2015 .
- ↑ Würgau wind power plant. (No longer available online.) In: ESTW Erlanger Stadtwerke. Archived from the original on September 10, 2015 ; accessed on October 11, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Wind farm opened in Zöschingen: 600 citizens are involved. In: Augsburger Allgemeine. May 3, 2015, accessed October 11, 2015 .
- ↑ Mausdorf-Pirkach wind power station. Retrieved July 5, 2020 .
- ↑ Community wind turbine rain tail. In: Reuthwind. Retrieved October 11, 2015 .